Cover Page
| Solicitation: N00039-18-R-0005 |
| ATTACHMENT L-1 |
| USMC Cost Summary Format |
Offeror Name:
DCAA Point of Contact:
| Version: Final Rev 1 |
| DATE: 30 November 2018 |
| Program Executive Office Enterprise Information Systems |
| Program Manager, Naval Enterprise Networks |
| 1325 10th Street, SE, Suite 301 |
| Washington, DC 20374 |
Instructions
| # | Category / Worksheet Name | Description / Instruction |
| 1 | General | Please fill out the cells that are highlighted in "blue". This should auto-populate "Prime Offeror Name" & "DCAA Point of Contact" for the remaining tabs. |
| 2 | General | Ensure all worksheets, from input data such as Rate & Hours, are fully traceable, calculations are linked, and any added tabs are described appropriately to ensure the government can effectively and efficiently assess Completeness |
| 3 | General | Ensure Labor Category, Clearance, Hours, and supporting data are consistent with CLIN structure and Attachment 24 USMC Operation Support Services, and can thus be traceable. |
| 4 | General | Offerors shall note that there are separate tabs for each USMC Region that shall be completed |
| 6 | Regional Tabs | Hours; Offeror's shall in input hours from Attachment J-24 USMC Operation Support Services. |
| 7 | Region Tabs | Offeors shall input, at minimum, the following Cost Elements: |
- Prime Labor Categories: Location, Clearance, Hours, Rate and Annual Amount
- Prime Contractor Indirect Labor Costs (Overhead, Fringe, G&A, etc.)
- Subcontractor Labor Cost: Location, Clearance, Hours, Rate and Annual Amount
- Prime Contractor Pass Through (not including fee)
- Fixed Fees for Prime-to-Prime, Prime-to-Sub, and Total Fee
- Total Labor Cost Plus Fixed Fee (CPFF)
- Other Direct Costs 8 Regional Tabs Offerors shall input total CPFF for each Region in Section B and Attachment L-3.
Please fill out the cells that are highlighted in "blue". This should auto-populate "Prime Offeror Name" & "DCAA Point of Contact" for the remaining tabs.
MCSC
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AA |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
MCCOG
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AB |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Alt. Cert | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
HQMC
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AC |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
MARFOREUR
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AD |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
MFCC
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AE |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Alt. Cert. | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
NCR
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AF |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
EAST
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AG |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
WEST
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AJ |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
MIDPAC
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AK |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
WESTPAC
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AL |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
MARFORRES
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AM |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
ESD
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AN |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
MCCOG-SUP
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AP |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Alt. Cert. | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
HQMC-P&R-SUP
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AQ |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
NCR-SUP
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AR |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
EAST-II MEF-SUP
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AS |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
EAST-NCWF-SUP
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AT |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
Reserved
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | Reserved |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |
| Cost Elements | Location | Clearance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Category 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Etc. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime Contractor Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Indirect Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Direct and Indirect Labor cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COM | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total Prime Contractor Labor Cost | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all SLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | | |
| Pass Through Amount (not including fee) | | |
| Prime Contractor Fee for Subcontractor Labor | | |
| Total Pass Through Amount (including fee) | | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | | |
| Fixed Fee for Labor Performed by Prime Contractor | | ERROR:#DIV/0! |
| Escalation Analysis | Percent |
| Escalation from Base Year 1 to Base Year 2 | |
| Escalation from Base Year 2 to Base Year 3 | |
| Escalation from Base Year 3 to Base Year 4 | |
| Escalation from Base Year 4 to Base Year 5 | |
| Escalation from Base Year 5 to Option Year 6 | |
| Escalation from Option Year 6 to Option Year 7 | |
| Escalation from Option Year 7 to Option Year 8 | |
WEST-3rd MAW-SUP
| SOLICITATION NO. | N00039-18-R-0005 |
| CLIN: | X004AV |
| Prime Offeror Name: |
| DCAA Point of Contact Information: |
| Subcontractor Name (if applicable): |
| Sub-Contract Type (e.g., FFP, T&M, etc.) |
| | | Total for All Years | | Base Year 1 | | | Base Year 2 | | | Base Year 3 | | | Base Year 4 | | | Base Year 5 | | | Option Year 1 | | | Option Year 2 | | | Option Year 3 | | | Option 52.217-8 | | |