SMIT Attch L-1 USMC Cost Summary Format.xlsx

XLSX spreadsheet 477 KB Posted

Attached to
NGEN-R Service Management, Integration and Transport (SMIT)
Solicitation number
N00039-18-R-0005
Issued by

About this file

This document provides details for a federal contract solicitation for service management, integration and transport services. The Space and Naval Warfare Systems Command intends to release a Request for Proposal on or around July 31, 2018 for the acquisition of these services in support of the Department of the Navy as part of the Next Generation Enterprise Network Recompete requirement. Responses will be due on or around October 1, 2018. The services are divided into four work segments: operating model, service operations, service integration, and transport and productivity. The contract will be a single award indefinite delivery/indefinite quantity contract with both fixed price and cost reimbursement contract line items. The period of performance consists of a five year base period and three one-year option periods.

View the file

Other files

File Type Posted
N00039-18-R-0005-0009 SMIT RFP Amendment 01172019.docx DOCX document
N00039-18-R-0005 SMIT RFP Conformed 0009.docx DOCX document
SMIT Attch L-3 Cost Price Evaluation Template Rev5 01172019.xlsx XLSX spreadsheet
SMIT Attch L-3 Cost Price Evaluation Template Rev4 01112019.xlsx XLSX spreadsheet
N00039-18-R-0005 SMIT RFP Conformed 0008.docx DOCX document
N00039-18-R-0005-0008 SMIT RFP Amendment 01112019.docx DOCX document
N00039-18-R-0005-0007 SMIT RFP Amendment 01102019.docx DOCX document
N00039-18-R-0005 SMIT RFP Conformed 0007.docx DOCX document
SMIT Attch L-3 Cost Price Evaluation Template Rev3 01012019.xlsx XLSX spreadsheet
SMIT Attch J-7 Service Level Requirements (SLR) Matrix_Final Rev2.xlsx XLSX spreadsheet
SMIT RFP Questions and Answers Set 4 12212018.pdf PDF
SMIT RFP Questions and Answers Set 5 01092019.pdf PDF
SMIT_RFP_Amd_01-06_Package.zip ZIP file
Final_SMIT_RFP_Package_10182018.zip ZIP file
SMIT_RFP_Questions_Set1-3.zip ZIP file
N00039-18-R-0005-0005 SMIT RFP Amendment 12172018.docx DOCX document
SMIT Attch J-1 PWS v1.0_Final Rev1.docx DOCX document
A002 SMIT CDRL_ONE-Net Transition Plan Rev 1.docx DOCX document
SMIT Attch L-4 ONE-Net Estimated Transition Support Services Manning Rev1.xlsx XLSX spreadsheet
SMIT Attch L-3 Cost Price Evaluation Template Rev1 12112018.xlsx XLSX spreadsheet
SMIT Attch J-29 NGEN Master Tools Library_Final Rev1.xlsx XLSX spreadsheet
SMIT Attch J-27 Cost and Software Data Rep. (CSDR) Plan_Final Rev1.xlsx XLSX spreadsheet
A001 SMIT CDRL_NMCI Transition Plan_Rev1.docx DOCX document
SMIT Attch J-24 USMC Operations Support Services_Final_Rev2.xlsx XLSX spreadsheet
SMIT Attch J-13 Labor Rate Card Material Discounts Final Rev2.xlsx XLSX spreadsheet
N00039-18-R-0005-0004 SMIT RFP Amendment 12112018.docx DOCX document
N00039-18-R-0005-0003 SMIT RFP Amendment 12032018.docx DOCX document
SMIT Attch J-11 Wage Determination_Final_Rev1.xlsx XLSX spreadsheet
SMIT Attch J-5 Navy Government Furnished Property (GFP)_Final Rev1.xlsx XLSX spreadsheet
SMIT Attch J-13 Labor Rate Card Material Discounts Final Rev1.xlsx XLSX spreadsheet
SMIT RFP Questions and Answers Set 3 12032018.pdf PDF
SMIT Attch J-21 SMIT Navy Data Attributes_Final Rev1.xlsx XLSX spreadsheet
SMIT Attch J-17 Travel Rate Card_Final Rev 1.xlsm XLSM spreadsheet
SMIT Attch J-7 Service Level Requirements (SLR) Matrix_Final Rev1.xlsx XLSX spreadsheet
SMIT Attch J-24 USMC Operations Support Services_Final_Rev1.xlsx XLSX spreadsheet
SMIT Attch L-1 USMC Cost Summary Format Rev1.xlsx XLSX spreadsheet
SMIT Attch J-19 Transport Service Details Supplement_Final Rev1.docx DOCX document
N00039-18-R-0005-0002 SMIT RFP Amendment 11302018.docx DOCX document
SMIT Attch J-14 Network Infrastructure Services Rate Card_Final Rev1.xlsx XLSX spreadsheet
SMIT RFP Questions and Answers Set 2 11292018.pdf PDF
SMIT RFP Questions and Answers Set 1 11172018.pdf PDF
NGEN-R_CommentResolutionMatrix_Industry.xlsx XLSX spreadsheet
N00039-18-R-0005-0001 SMIT RFP Amendment 10262018.docx DOCX document
SMIT Attch J-3 SMIT Award Fee Plan_Final.docx DOCX document
SMIT Attch J-19 Transport Service Details Supplement_Final.docx DOCX document
SMIT_USMC_CDRL_B001_THRU_B040.docx DOCX document
SMIT Attch J-14 Network Infrastructure Services Rate Card_Final.xlsx XLSX spreadsheet
SMIT Attch J-30 Identification and Assertion of URD_As-Proposed.docx DOCX document
SMIT USN CDRL's A001-A074.zip ZIP file
SMIT Attch J-13 Labor Rate Card Material Discounts Final.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

Solicitation: N00039-18-R-0005
ATTACHMENT L-1
USMC Cost Summary Format

Offeror Name:

DCAA Point of Contact:

DATE: 18 October 2018
Program Executive Office Enterprise Information Systems
Program Manager, Naval Enterprise Networks
1325 10th Street, SE, Suite 301
Washington, DC 20374

Instructions

#Category / Worksheet NameDescription / Instruction
1GeneralPlease fill out the cells that are highlighted in "blue". This should auto-populate "Prime Offeror Name" & "DCAA Point of Contact" for the remaining tabs.
2GeneralEnsure all worksheets, from input data such as Rate & Hours, are fully traceable, calculations are linked, and any added tabs are described appropriately to ensure the government can effectively and efficiently assess Completeness
3GeneralEnsure Labor Category, Clearance, Hours, and supporting data are consistent with CLIN structure and Attachment 24 USMC Operation Support Services, and can thus be traceable.
4GeneralOfferors shall note that there are separate tabs for each USMC Region that shall be completed
6Regional TabsHours; Offeror's shall in input hours from Attachment J-24 USMC Operation Support Services.
7Region TabsOffeors shall input, at minimum, the following Cost Elements:

- Prime Labor Categories: Location, Clearance, Hours, Rate and Annual Amount

- Prime Contractor Indirect Labor Costs (Overhead, Fringe, G&A, etc.)

- Subcontractor Labor Cost: Location, Clearance, Hours, Rate and Annual Amount

- Prime Contractor Pass Through (not including fee)

- Fixed Fees for Prime-to-Prime, Prime-to-Sub, and Total Fee

- Total Labor Cost Plus Fixed Fee (CPFF)

- Other Direct Costs 8 Regional Tabs Offerors shall input total CPFF for each Region in Section B and Attachment L-3.

Please fill out the cells that are highlighted in "blue". This should auto-populate "Prime Offeror Name" & "DCAA Point of Contact" for the remaining tabs.

MCSC

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AA
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

MCCOG

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AB
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceAlt. CertHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

HQMC

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AC
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

MARFOREUR

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AD
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

MFCC

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AE
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceAlt. Cert.HoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

NCR

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AF
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

EAST

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AG
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

ALBANY-NCWF

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AH
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

MIDPAC

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AK
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

WEST

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AJ
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

WESTPAC

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AL
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

MARFORRES

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AM
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

ESD

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AN
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

MCCOG-SUP

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AP
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceAlt. Cert.HoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

HQMC-P&R-SUP

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AQ
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

NCR-SUP

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AR
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

EAST-II MEF-SUP

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AS
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

EAST-NCWF-SUP

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AT
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8
Cost ElementsLocationClearanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Labor Category 1
Labor Category 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all SLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Escalation AnalysisPercent
Escalation from Base Year 1 to Base Year 2
Escalation from Base Year 2 to Base Year 3
Escalation from Base Year 3 to Base Year 4
Escalation from Base Year 4 to Base Year 5
Escalation from Base Year 5 to Option Year 6
Escalation from Option Year 6 to Option Year 7
Escalation from Option Year 7 to Option Year 8

ALBANY-NCWF-SUP

SOLICITATION NO.N00039-18-R-0005
CLIN:X004AU
Prime Offeror Name:
DCAA Point of Contact Information:
Subcontractor Name (if applicable):
Sub-Contract Type (e.g., FFP, T&M, etc.)
Total for All YearsBase Year 1Base Year 2Base Year 3Base Year 4Base Year 5Option Year 1Option Year 2Option Year 3Option 52.217-8

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .