The file's text, extracted by GovTribe without its formatting.
Cover Sheet
| Naval Enterprise Network Program |
| UNITED STATES NAVY |
| Solicitation: N00039-18-R-0005 |
| Attachment J-14, Network Infrastructure Services Rate Card |
| Version: Final Rev 1 |
| Date: 30 November 2018 |
| Program Executive Office Enterprise Information Systems |
| Program Manager, Naval Enterprise Networks |
| 1325 10th Street, SE, Suite 301 |
| Washington, DC 20374 |
Instructions
| ISP-OSP |
| For each line item please provide the following: |
| Column D: Price per single unit or per foot where applicable |
| Hardware is not to be included in these prices |
| Facilities |
| For each line item please provide the following: |
| Column D: Price per single unit |
| Column E: Price per unit for 2 - 6 units |
| Column F: Price per unit for 7 or more units |
| Hardware is not to be included in these prices |
| HW Installation |
| ** INSTALLATION INCLUDES Design, Configuration, Pre-Implementation and Implementation |
| For each line item please provide the following: |
| Column C: Price per single unit |
| Hardware is not to be included in these prices |
| HW Full Uninstall |
| ** UNINSTALLATION INCLUDES Design, Configuration, Pre-Implementation and Implementation |
| For each line item please provide the per unit price |
| Hardware is not to be included in these prices |
| 4 Alternative Uninstall tabs: Relocate within Zone/Immediate Move to New Zone/Delayed Move to New Zone/Uninstall and Replace |
| ** UNINSTALLATION/INSTALLATION INCLUDE Design, Configuration, Pre-Implementation and Implementation |
| Reinstallation must reflect overlap between installation and uninstallation effort |
| For each line item please provide the per unit price |
| Hardware is not to be included in these prices |
| HW Installation tab is not used for reinstallation in these scenarios |
ISP-OSP
Task Summary Task Description Per Unit Price
| NOTE: Materials are not included in the tasks below. Test results are to be delivered to the claimant prior to invoice. | |
| ISP COPPER INSTALLATION AND REPAIR ISP COPPER INSTALLATION AND REPAIR | INSIDE PLANT (ISP) Tasks (Copper, Plenum only) - ISP Drop\Port Installation and Repair. CAT 5e to be installed when terminated on an existing CAT 5e patch panel. Cat 6 required for all new installation requiring a new patch panel. Cat 6a is not to be installed. | |
| 24 Port Patch Panel- Copper CAT 5e | Install CAT 5e Patch Panel- 24 port |
| (Note: cost for termination of new cable drops is covered in appicable CLINs) | $ - 0 | | |
| | 48 Port Patch Panel- Copper CAT 5e | Install CAT 5e Patch Panel- 48 port |
| (Note: cost for termination of new cable drops is covered in appicable CLINs) | $ - 0 | | |
| | 24 Port Patch Panel- Copper CAT 6 | Install CAT 6 Patch Panel- 24 port |
| (Note: cost for termination of new cable drops is covered in appicable CLINs) | $ - 0 | | |
| | 48 Port Patch Panel- Copper CAT 6 | Install CAT 6 Patch Panel- 48 port |
| (Note: cost for termination of new cable drops is covered in appicable CLINs) | $ - 0 | | |
| | 24 Port Patch Panel- Copper CAT 5e w/ 1U Wire Manager | Install CAT 5e Patch Panel- 24 port and 1U Wiremanager |
| (Note: cost for termination of new cable drops is covered in appicable CLINs) | $ - 0 | | |
| | 48 Port Patch Panel- Copper CAT 5e w/ 2U Wire Manager | Install CAT 5e Patch Panel- 48 port and 2U Wire Manager |
| (Note: cost for termination of new cable drops is covered in appicable CLINs) | $ - 0 | | |
| | 24 Port Patch Panel- Copper CAT 6 w/ 1U Wire Manager | Install CAT 6 Patch Panel- 24 port and 1U Wire Manager |
| (Note: cost for termination of new cable drops is covered in appicable CLINs) | $ - 0 | | |
| | 48 Port Patch Panel- Copper CAT 6 w/ 2U Wire Manager | Install CAT 6 Patch Panel- 48 port and 2U Wire manager |
| (Note: cost for termination of new cable drops is covered in appicable CLINs) | $ - 0 | | | |
| | 1U Wire Manager | Install a 1U Wire Manager | $ - 0 |
| | 2U Wire Manager | Install a 2U Wire Manager | $ - 0 |
| ISP FIBER INSTALLATION AND REPAIR | INSIDE PLANT (ISP) Tasks (Fiber) - ISP Drop\Port Installation and Repair | | |
| | 24 Port Patch Panel- Fiber | Install single or multi-mode fiber Patch Panel & supporting bulkheads - Fully loaded 24 port w/ LC, SC or ST couplings as specified | |
| (Note: termination of new cable drops is covered in applicable CLINs) | $ - 0 | | |
| | 48 Port Patch Panel- Fiber | Install single or multi-mode fiber Patch Panel & supporting bulkheads - Fully loaded 48 port w/ LC, SC or ST couplings as specified |
| (Note: termination of new cable drops is covered in applicable CLINs) | $ - 0 | | | |
| | Fiber Bulkhead | Install a fiber bulkhead LC, SC or ST as specified into an existing fiber panel | $ - 0 |
| ISP FIBER TIE INSTALLS | INSIDE PLANT (ISP) Tasks Fiber Tie Installs: Price per foot of ISP fiber tie (single or multi-mode, Plenum only) in a building to furnish and install intra-building cable from the building entrance point to the telecommunications closet or closet-to-closet. | | |
Note: termination, testing and certification of new cables should be covered in other fixed price items. (See applicable section above)
| | Fiber ISP Tie Cable Install - 6 Strands - per foot | 6 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber ISP Tie Cable Install - 12 Strands - per foot | 12 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber ISP Tie Cable Install - 24 Strands - per foot | 24 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber ISP Tie Cable Install - 36 Strands - per foot | 36 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber ISP Tie Cable Install - 48 Strands - per foot | 48 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber ISP Tie Cable Install - 60 Strands - per foot | 60 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber ISP Tie Cable Install - 72 Strands - per foot | 72 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber ISP Tie Cable Install - 144 Strands - per foot | 144 strands : CMP/Plenum (per foot) | $ - 0 |
| | ISP Tie Setup Charge | Setup charge to prep for installation of Fiber ISP Ties | |
| (Pricing is on a Per Instance Basis) | $ - 0 | | | |
| | Plenum Innerduct - per foot | Install Plenum Innerduct (per foot) | $ - 0 |
| OSP FIBER INSTALLS OSP FIBER INSTALLS | Outside Plant Tasks (OSP) | | |
| | OSP Setup Charge | Setup charge to prep for installation of Fiber OSP | |
| (Pricing is on a Per Instance Basis) | $ - 0 | | | |
| | OUTSIDE PLANT (OSP) Tasks Fiber Installs: Price per FOOT for OSP fiber run (single only) to furnish, install OSP fiber cable within EXISTING conduit. | | |
NOTE: Per NAVFAC requirements, tracer wire/detectable warning tape must be placed in with conduit if it is not present when installing new fiber.
NOTE: If Splicing, Conduit installation, Maxcell, Direct Burying of Conduit\Cable, simple trenching or trenching thru major obstacles is needed, the applicable Tasks in this section would be selected in addition to the Strand selection.
NOTE: Termination, testing and certification of new cables should be covered in other fixed price items. (See applicable section above)
| | Fiber OSP Tie Cable Install - 6 Strands - per foot | 6 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber OSP Tie Cable Install - 12 Strands - per foot | 12 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber OSP Tie Cable Install - 24 Strands - per foot | 24 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber OSP Tie Cable Install - 36 Strands - per foot | 36 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber OSP Tie Cable Install - 48 Strands - per foot | 48 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber OSP Tie Cable Install - 60 Strands - per foot | 60 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber OSP Tie Cable Install - 72 Strands - per foot | 72 strands : CMP/Plenum (per foot) | $ - 0 |
| | Fiber OSP Tie Cable Install - 144 Strands - per foot | 144 strands : CMP/Plenum (per foot) | $ - 0 |
| | Onner conduit - 3 cell sock - per foot | Inner conduit (install at least a 3 cell sock) (this Task modifies the above Tasks to include inner conduit) | $ - 0 |
| | Rodding and Roping - per foot | Rodding and Roping | $ - 0 |
| | OSP Conduit Install - per foot | Install OSP Conduit - per foot (this Task modifies the above Tasks to include conduit installation of two new 4" PVC conduits with pull rope and mandrell, tracer wire/detectable warning tape) | $ - 0 |
| | OSP Rated Innerduct - per foot | Install OSP Rated Innerduct (this Task modifies the above Tasks to include OSP Rated Innerduct) | $ - 0 |
| | OSP Direct Bury - per foot | Perform Direct Bury of OSP cable | |
| (This task modifies the above OSP cable tasks to include directly bury rated cable and additional labor for situations that do not require OSP conduit/trenching) | $ - 0 | | | |
| | Tracer Wire/detectable warning tape - per foot | Install a Tracer Wire/detectable warning tape for new installs or when a Tracer Wire/detectable warning tape does not exist | $ - 0 |
| SERVER FARM ISP TASKS | INSIDE PLANT (ISP) Tasks - Server Farm | | |
| | Server Farm 24 Port Patch Panel - Copper Plenum, Cat 6 | Install patch panel - 24 port Cat6 | |
| (Note: cost for termination of new cable drops is covered in appicable CLINs) | $ - 0 | | |
| | Server Farm 48 Port Patch Panel - Copper Cat 6 | Install patch panel - 48 port Cat6 |
| (Note: cost for termination of new cable drops is covered in appicable CLINs) | $ - 0 | | | |
| | Server Farm Horizontal Cable Manager 1U | Install Horizontal Cable Manager | $ - 0 |
| | Server Farm Horizontal Cable Manager 2U Dual-Sided | Install Dual-sided horizontal cable manager | $ - 0 |
| | Server Farm Horizontal Cable Manager 2U Single-Sided | Install Single-sided horizontal cable manager | $ - 0 |
| | Server Farm 48 Port Patch Panel - Fiber | Install fiber Patch Panel - 48 port w/ SC or ST connectors as specified | |
| (Note: termination of new cable drops is covered in applicable CLINs) | $ - 0 | | |
| | Server Farm 72 Port Patch Panel - Fiber | Install fiber Patch Panel - 72 port w/ SC or ST connectors as specified |
| (Note: termination of new cable drops is covered in applicable CLINs) | $ - 0 | | |
| | Server Farm 1U Patch Panel - Fiber | Install fiber Patch Panel |
| (Note: Termination of new cable drops is covered in other fixed price items.) | $ - 0 | | |
| | Server Farm LC-12 Connector Modules for 1U patch panel - Fiber | Install fiber connector module |
| (Note: termination of new cable drops is covered in applicable CLINs) | $ - 0 | | |
| | Server Farm LC-24 Connector Modules for 1U patch panel - Fiber | Install fiber connector module |
| (Note: termination of new cable drops is covered in applicable CLINs) | $ - 0 | | | |
| | Server Farm Raised Floor Cable Tray - per foot | Install raised floor cable tray in Server Farm. (per foot) | $ - 0 |
| | Server Farm Overhead Cable Tray - per foot | Install overhead cable tray in Server Farm. (per foot) | $ - 0 |
Facilities Task Summary Task Description Pricing per Unit
| NOTE: Materials are not included in the tasks below. | |
| CABINET AND RACK INSTALLATIONS | Cabinet Installation | Price |
per Unit 1 each Price per Unit 2-6 Price per Unit 7+ MDF/IDF Full Size Cabinet Installation, (2 circuits Not to Exceed 60 feet power, 60 feet ground) - Requires delivery Cabinet bolt/electrical, Full size cabinet (2 people) (Includes IDF Design/As Build, Cabinet pickup and delivery- Local Site, Grounding, TGB, Up to 2 UPS (1-6KVA rating), 2” EMT stovepipes)
| Price reflects up to a 2-Circuit Install | $ - 0 | $ - 0 | $ - 0 |
| | MDF/IDF Full Size Cabinet Installation, (2 circuits Not to Exceed 60 feet power, 60 feet ground) - Previously delivered | Cabinet bolt/electrical, Full size cabinet (2 people) |
(Includes IDF Design/As Build, Grounding, TGB, Up to 2 UPS (1-6KVA rating), 2” EMT stovepipes)
| Price reflects up to a 2-Circuit Install | $ - 0 | $ - 0 | $ - 0 |
| | MDF/IDF Wall Mount Cabinet/Half Height Floor Mount, (1 circuit- Not to Exceed 60 feet power, 60 feet ground) - Requires delivery | Cabinet bolt/electrical, Wall Mount/Half Height (2 people) |
(Includes IDF Design/As Build, Cabinet pickup and delivery- Local Site, Grounding, TGB, Installation of Fire Rated Backboard, 1KVA UPS, 2” EMT stovepipes)
| Price reflects up to a 1-Circuit Install | $ - 0 | $ - 0 | $ - 0 |
| | MDF/IDF Wall Mount Cabinet/Half Height Floor Mount, (1 circuit- Not to Exceed 60 feet power, 60 feet ground) - Previously delivered | Cabinet bolt/electrical, Wall Mount/Half Height (2 people) |
(Includes IDF Design/As Build, Grounding, TGB, Installation of Fire Rated Backboard, 1KVA UPS, 2” EMT stovepipes)
| Price reflects up to a 1-Circuit Install | $ - 0 | $ - 0 | $ - 0 |
| | PoP MDF w/ (2) Two Full height cabinets, (Two -Cabinets), (Two - 2 circuits Not to Exceed 60 feet power, 60 feet ground) - Requires delivery | Cabinet bolt/electrical, Two Full size cabinets (2 people) |
(Includes PoP Design/As Build, 2-Cabinet pickup and delivery- Local Site, 2- Grounding, 1- TGB, Up to 4 UPS's (1-6 KVA rating), up to 4 external Batts, 2- 4” EMT stovepipes)
| Price reflects up to a 2-Circuit Install for each Cabinet | $ - 0 | $ - 0 | $ - 0 |
| | PoP MDF w/ (2) Two Full height cabinets, (Two -Cabinets), (Two - 2 circuits Not to Exceed 60 feet power, 60 feet ground) - Previously delivered | Cabinet bolt/electrical, Two Full size cabinets (2 people) |
(Includes PoP Design/As Build, 2- Grounding, 1- TGB, Up to 4 UPS's (1-6 KVA rating), up to 4 external Batts, 2- 4” EMT stovepipes)
| Price reflects up to a 2-Circuit Install for each Cabinet | $ - 0 | $ - 0 | $ - 0 |
| | PoP MDF w/ (3) Three Full height cabinets, (Three -Cabinets), (Two - 2 circuits Not to Exceed 60 feet power, 60 feet ground) - Requires delivery | Cabinet bolt/electrical, Three Full size cabinets (2 people) |
(Includes PoP Design/As Build, 3-Cabinet pickup and delivery- Local Site, 3- Grounding, 1- TGB, Up to 4 UPS's (1-6 KVA rating), up to 4 external Batts, 2- 4” EMT stovepipes)
| Price reflects up to a 2-Circuit Install for two Cabinets | $ - 0 | $ - 0 | $ - 0 |
| | PoP MDF w/ (3) Three Full height cabinets, (Three -Cabinets), (Two - 2 circuits Not to Exceed 60 feet power, 60 feet ground) - Previously delivered | Cabinet bolt/electrical, Three Full size cabinets (2 people) |
(Includes PoP Design/As Build, 3- Grounding, 1- TGB, Up to 4 UPS's (1-6 KVA rating), up to 4 external Batts, 2- 4” EMT stovepipes)
| Price reflects up to a 2-Circuit Install for two Cabinets | $ - 0 | $ - 0 | $ - 0 |
| | MDF/IDF 19"X7' 2-Post Rack Installation, (2 circuits Not to Exceed 60 feet power, 60 feet ground) | 2-Post Rack bolt/electrical (2 people) |
(Includes providing a 19"X7' 2-Post Rack, IDF Design/As Build, Grounding, TGB, Up to 2 UPS's (1-3 KVA rating), Up to 2 external Batts)
| Price reflects up to a 2-Circuit Install | $ - 0 | $ - 0 | $ - 0 |
| | MDF/IDF 19"X7' 2-Post Rack Installation, (1 circuit- Not to Exceed 60 feet power, 60 feet ground) | 2-Post Rack bolt/electrical (2 people) |
(Includes providing a 19"X7' 2-Post Rack, IDF Design/As Build, Grounding, TGB, 1 UPS (1-2 KVA rating)
| Price reflects up to a 1-Circuit Install | $ - 0 | $ - 0 | $ - 0 | | | |
| | MDF/IDF Ladder Rack Installation - per foot | Install overhead ladder rack in MDF/IDF. (per foot) | $ - 0 | $ - 0 | $ - 0 |
| NON STANDARD WORK NON STANDARD WORK NON STANDARD WORK | Non Standard Work | | Price | | |
per Unit 1 each Price per Unit 2-6 Price per Unit 7+
| | Cabinet and Power Installation (2 Circuits- Up to 60 Lin. Ft) | ¾ inch EMT conduit, 4-#12 THHN in conjunction with Cabinet Installation only. Price reflects up to a 2-Circuit, grounding, and stove pipe IDF Installation | | | |
| (UPS install not included) | $ - 0 | $ - 0 | $ - 0 | | | |
| | Cabinet and Power Installation Wall Mount/Half Height (1 Circuit- Up to 60 Lin. Ft) | ¾ inch EMT conduit, 3-#12 THHN in conjunction with Cabinet Installation only. Price reflects up to a 1-Circuit, grounding, and stove pipe IDF Installation | | | |
| (UPS install not included) | $ - 0 | $ - 0 | $ - 0 | | | |
| | Power Installation to Existing Cabinet (2 Circuit- Up to 60 Lin. Ft) | ¾ inch EMT conduit, 4-#12 THHN to an Existing Cabinet only. Price reflects up to a 2-Circuit IDF Installation. | | | |
| (Cabinet Mounting, UPS's, Grounding, TGB, and Stove Pipe not included). | $ - 0 | $ - 0 | $ - 0 | | | |
| | Power Installation to Existing Cabinet (1 Circuit- Up to 60 Lin. Ft) | ¾ inch EMT conduit, 3-#12 THHN to an Existing Cabinet only. Price reflects up to a 1-Circuit IDF Installation. | | | |
| (Cabinet Mounting, UPS's, Grounding, TGB, and Stove Pipe not included). | $ - 0 | $ - 0 | $ - 0 | | | |
| | Power Installation (1 or 2 Circuit- If Lin. Ft. > 60 ft.) | ¾ inch EMT conduit, 3 or 4-#12 THHN in conjunction with Cabinet Installation only; per Lin. Ft. Price reflects per foot (Grounding not included) | $ - 0 | $ - 0 | $ - 0 |
| | Power Installation (1 or 2 Circuit- If Lin. Ft. > 60 ft.) Grounding Installation (If Lin. Ft. > 60) | ¾ inch EMT conduit, 4-#12 THHN in conjunction with Cabinet Installation only; per Lin. Ft. Price reflects per foot (includes grounding) | $ - 0 | $ - 0 | $ - 0 |
| | Cabinet Uninstall (excludes moving of network equipment) | Includes cabinet uninstall and removal of electrical outlet from the cabinet. Does not include Cabinet Removal (transport from current location to local NMCI warehouse or another location at current site) | $ - 0 | $ - 0 | $ - 0 |
| | Cabinet Removal (per cabinet) | Includes removing of cabinet from current location to local NMCI warehouse or another location at current site | $ - 0 | $ - 0 | $ - 0 |
| | Electrical Sub Panel Install | Install an electrical sub-panel. Electrical panel shall include conduit and wire from the main panel to the new sub-panel location, new electrical panel and electrical breakers. Includes electrical installation. | $ - 0 | $ - 0 | $ - 0 |
| | UPS Installation- 1KVA (no circuit or receptacle included) | Includes pick up from local warehouse and installation/removal of a 1KVA UPS. | $ - 0 | $ - 0 | $ - 0 |
| | UPS Installation- Quantity of 1 UPS/Battery Combo (no circuit or receptacles included) | Includes pick up from local warehouse and installation/removal of 1 (one) UPS (2-6KVA rating) and 1 external battery | $ - 0 | $ - 0 | $ - 0 |
| | UPS Uninstallation- 1KVA (no circuit or receptacle included) | Includes uninstall/removal and delivery to local warehouse of 1KVA UPS | $ - 0 | $ - 0 | $ - 0 |
| | UPS Uninstallation- Quantity of 1 UPS/Battery Combo (no circuit or receptacles included) | Includes uninstall/removal and delivery to local warehouse of 1 (one) UPS (2-6KVA rating) and 1 external battery | $ - 0 | $ - 0 | $ - 0 |
| | UPS internal or external battery replacement | Includes pick up, removal and replacement of internal or external battery, and battery disposal. | $ - 0 | $ - 0 | $ - 0 |
| | Cabinet Pickup and delivery- Local Site | Cabinet Pick up from Warehouse for installation at a local Site | $ - 0 | $ - 0 | $ - 0 |
| | Cabinet Pickup and delivery- Non Local Site | Cabinet Pick up from Warehouse for installation at a Non local Site Includes up to two hours of travel from the warehouse | $ - 0 | $ - 0 | $ - 0 |
| | Installation of Fire Rated Backboard (4'X4') | Mount Fire Rated Backboard (4'X4') **Paint & Plywood are fire rated** | $ - 0 | $ - 0 | $ - 0 |
| SERVER FARM TASKS | Server Farm Tasks | | Price | | |
per Unit 1 each Price per Unit 2-6 Price per Unit 7+
| Server Farm Standard Rack Bracing Installation | Install standard bracing to subfloor. Provide and install rack coupling. | $ - 0 | $ - 0 | $ - 0 |
| Server Farm Seismic Rack Bracing Installation | Install seismic bracing to subfloor. Provide and install rack coupling. | $ - 0 | $ - 0 | $ - 0 |
| Server Farm Raised Floor Tile Cut | Make 5 inch diameter cut in raised floor. Install closing plastic grommet. | $ - 0 | $ - 0 | $ - 0 |
| Server Farm Rack PDU Installation | Install (1) Rack PDU. Connect to receptacle and attach to rack. | $ - 0 | $ - 0 | $ - 0 |
HW Installation
| ** INSTALLATION INCLUDES Design, Configuration, Pre-Implementation and Implementation |
| Device/Purpose | Installation ** |
Price Per Unit
| Switches and Routers, Standalone and Stacked | Stacked Switches | |
| 1U Stack Master, up to 2 SFPs | $ - 0 |
| 1U Stack Member, installed with initial stack | $ - 0 |
| 1U Stack Member, installed to expand stack | $ - 0 |
| Modular Chassis Switches | |
| Large Chassis Modular Switch or Router, 2 uplinks | $ - 0 |
| Large Chassis Blade or Module, installed with initial chassis | $ - 0 |
| Large Chassis Blade or Module, installed after initial chassis | $ - 0 |
| Medium Chassis Modular Switch or Router, 2 uplinks | $ - 0 |
| Medium Chassis Blade or Module, installed with initial chassis install | $ - 0 |
| Medium Chassis Blade or Module, installed after initial chassis install | $ - 0 |
| Small Chassis Router, 2 uplinks | $ - 0 |
| Small Chassis Router Module, installed with initial chassis install | $ - 0 |
| Small Chassis Router Module, installed after initial chassis install | $ - 0 |
| Standalone Switches | |
| 1U standalone switch up to 2 SPFs | $ - 0 |
| Transceivers | Any Transciever, SFP, GBIC added to any device | $ - 0 |
| Routers and other Active Gear | Router, Small Platform | $ - 0 |
| Router, Medium Platform | $ - 0 |
| Router, Large Platform | $ - 0 |
| Router Modules, installed with router initially | $ - 0 |
| Router Modules, installed after router install | $ - 0 |
| Redundant Power Supply | $ - 0 |
| Firewall or VPN, Small Platform | $ - 0 |
| Firewall or VPN, Medium Platform | $ - 0 |
| Firewall or VPN, Module, installed with Firewall or VPN | $ - 0 |
| Firewall or VPN, Module, installed after Firewall or VPN | $ - 0 |
| Firewall or VPN, Power Supply, installed after Firewall or VPN | $ - 0 |
| WANX, Small Platform | $ - 0 |
| WANX, Medium Platform | $ - 0 |
| WANX, Large Platform | $ - 0 |
| WANX Module, installed during WANX installation | $ - 0 |
| WANX Module, installed after initial installation | $ - 0 |
| Media Conversion | All Media Converters | $ - 0 |
HW Full Uninstall
| Full Device Uninstall | Network device will be uninstalled, packed, and returned to the warehouse. Device removed from design. Configuration Archived. Upstream devices modified to reflect removal of devices. Completed during one maintenance window. |
| Description | Uninstallation |
Price Per Unit
| Switches and Routers, Standalone and Stacked | Stacked Switches | |
| 1U Stack Master, up to 2 SFPs | $ - 0 |
| 1U Stack Member, installed with initial stack | $ - 0 |
| 1U Stack Member, installed to expand stack | $ - 0 |
| Modular Chassis Switches | |
| Large Chassis Modular Switch or Router, 2 uplinks | $ - 0 |
| Large Chassis Blade or Module, installed with initial chassis | $ - 0 |
| Large Chassis Blade or Module, installed after initial chassis | $ - 0 |
| Medium Chassis Modular Switch or Router, 2 uplinks | $ - 0 |
| Medium Chassis Blade or Module, installed with initial chassis install | $ - 0 |
| Medium Chassis Blade or Module, installed after initial chassis install | $ - 0 |
| Small Chassis Router, 2 uplinks | $ - 0 |
| Small Chassis Router Module, installed with initial chassis install | $ - 0 |
| Small Chassis Router Module, installed after initial chassis install | $ - 0 |
| Standalone Switches | |
| 1U standalone switch up to 2 SPFs | $ - 0 |
| Transceivers | Any Transciever, SFP, GBIC added to any device | $ - 0 |
| Routers and other Active Gear | Router, Small Platform | $ - 0 |
| Router, Medium Platform | $ - 0 |
| Router, Large Platform | $ - 0 |
| Router Modules, installed with router initially | $ - 0 |
| Router Modules, installed after router install | $ - 0 |
| Redundant Power Supply | $ - 0 |
| Firewall or VPN, Small Platform | $ - 0 |
| Firewall or VPN, Medium Platform | $ - 0 |
| Firewall or VPN, Module, installed with Firewall or VPN | $ - 0 |
| Firewall or VPN, Module, installed after Firewall or VPN | $ - 0 |
| Firewall or VPN, Power Supply, installed after Firewall or VPN | $ - 0 |
| WANX, Small Platform | $ - 0 |
| WANX, Medium Platform | $ - 0 |
| WANX, Large Platform | $ - 0 |
| WANX Module, installed during WANX installation | $ - 0 |
| WANX Module, installed after initial installation | $ - 0 |
| Media Conversion | All Media Converters | $ - 0 |
| Additional Configuration Tasks for SIPR Uninstalls | |
| SIPR CONFIGURATION (per device) | 0 |
Relocate within Zone
| Uninstall/Reinstall Within a Distribution Zone | Network device will be uninstalled and reinstalled in a new location at the same PSI, and supported by the same distribution point (MDF). This is an immediate move and reinstall; the network device must be removed and reinstalled within the same maintenance window. |
| Description | | Relocation |
Price Per Unit
| Switches and Routers, Standalone and Stacked | Stacked Switches | |
| 1U Stack Master, up to 2 SFPs | $ - 0 |
| 1U Stack Member, installed with initial stack | $ - 0 |
| 1U Stack Member, installed to expand stack | $ - 0 |
| Modular Chassis Switches | |
| Large Chassis Modular Switch or Router, 2 uplinks | $ - 0 |
| Large Chassis Blade or Module, installed with initial chassis | $ - 0 |
| Large Chassis Blade or Module, installed after initial chassis | $ - 0 |
| Medium Chassis Modular Switch or Router, 2 uplinks | $ - 0 |
| Medium Chassis Blade or Module, installed with initial chassis install | $ - 0 |
| Medium Chassis Blade or Module, installed after initial chassis install | $ - 0 |
| Small Chassis Router, 2 uplinks | $ - 0 |
| Small Chassis Router Module, installed with initial chassis install | $ - 0 |
| Small Chassis Router Module, installed after initial chassis install | $ - 0 |
| Standalone Switches | |
| 1U standalone switch up to 2 SPFs | $ - 0 |
| Transceivers | Any Transciever, SFP, GBIC added to any device | $ - 0 |
| Routers and other Active Gear | Router, Small Platform | $ - 0 |
| Router, Medium Platform | $ - 0 |
| Router, Large Platform | $ - 0 |
| Router Modules, installed with router initially | $ - 0 |
| Router Modules, installed after router install | $ - 0 |
| Redundant Power Supply | $ - 0 |
| Firewall or VPN, Small Platform | $ - 0 |
| Firewall or VPN, Medium Platform | $ - 0 |
| Firewall or VPN, Module, installed with Firewall or VPN | $ - 0 |
| Firewall or VPN, Module, installed after Firewall or VPN | $ - 0 |
| Firewall or VPN, Power Supply, installed after Firewall or VPN | $ - 0 |
| WANX, Small Platform | $ - 0 |
| WANX, Medium Platform | $ - 0 |
| WANX, Large Platform | $ - 0 |
| WANX Module, installed during WANX installation | $ - 0 |
| WANX Module, installed after initial installation | $ - 0 |
| Media Conversion | All Media Converters | $ - 0 |
| Additional Configuration Tasks for SIPR Uninstalls | |
| SIPR CONFIGURATION (per device) | $ - 0 |
Immediate Move to New Zone
| Out of Distribution Zone or Temporary Relocation, Immediate Move | Network device will be uninstalled and reinstalled to a new location at the same PSI, and supported by a new distribution point (MDF). This is an immediate move and reinstall; the network device must be removed and reinstalled within the same maintenance window. |
| Description | Immediate Move |
Price Per Unit
| Switches and Routers, Standalone and Stacked | Stacked Switches | |
| 1U Stack Master, up to 2 SFPs | $ - 0 |
| 1U Stack Member, installed with initial stack | $ - 0 |
| 1U Stack Member, installed to expand stack | $ - 0 |
| Modular Chassis Switches | |
| Large Chassis Modular Switch or Router, 2 uplinks | $ - 0 |
| Large Chassis Blade or Module, installed with initial chassis | $ - 0 |
| Large Chassis Blade or Module, installed after initial chassis | $ - 0 |
| Medium Chassis Modular Switch or Router, 2 uplinks | $ - 0 |
| Medium Chassis Blade or Module, installed with initial chassis install | $ - 0 |
| Medium Chassis Blade or Module, installed after initial chassis install | $ - 0 |
| Small Chassis Router, 2 uplinks | $ - 0 |
| Small Chassis Router Module, installed with initial chassis install | $ - 0 |
| Small Chassis Router Module, installed after initial chassis install | $ - 0 |
| Standalone Switches | |
| 1U standalone switch up to 2 SPFs | $ - 0 |
| Transceivers | Any Transciever, SFP, GBIC added to any device | $ - 0 |
| Routers and other Active Gear | Router, Small Platform | $ - 0 |
| Router, Medium Platform | $ - 0 |
| Router, Large Platform | $ - 0 |
| Router Modules, installed with router initially | $ - 0 |
| Router Modules, installed after router install | $ - 0 |
| Redundant Power Supply | $ - 0 |
| Firewall or VPN, Small Platform | $ - 0 |
| Firewall or VPN, Medium Platform | $ - 0 |
| Firewall or VPN, Module, installed with Firewall or VPN | $ - 0 |
| Firewall or VPN, Module, installed after Firewall or VPN | $ - 0 |
| Firewall or VPN, Power Supply, installed after Firewall or VPN | $ - 0 |
| WANX, Small Platform | $ - 0 |
| WANX, Medium Platform | $ - 0 |
| WANX, Large Platform | $ - 0 |
| WANX Module, installed during WANX installation | $ - 0 |
| WANX Module, installed after initial installation | $ - 0 |
| Media Conversion | All Media Converters | $ - 0 |
| Additional Configuration Tasks for SIPR Uninstalls | |
| SIPR CONFIGURATION (per device) | $ - 0 |
Delayed Move to New Zone
| Out of Distribution Zone or Temporary Relocation, Delayed Move | Network device will be uninstalled and reinstalled to a new location at the same PSI, and supported by a new distribution point (MDF). This is an immediate move and reinstall; once removed, the network device will be reinstalled during a future maintenance window, no later than the expiration of the configuration bundle. |
| Description | Delayed Move |
Price Per Unit
| Switches and Routers, Standalone and Stacked | Stacked Switches | |
| 1U Stack Master, up to 2 SFPs | $ - 0 |
| 1U Stack Member, installed with initial stack | $ - 0 |
| 1U Stack Member, installed to expand stack | $ - 0 |
| Modular Chassis Switches | |
| Large Chassis Modular Switch or Router, 2 uplinks | $ - 0 |
| Large Chassis Blade or Module, installed with initial chassis | $ - 0 |
| Large Chassis Blade or Module, installed after initial chassis | $ - 0 |
| Medium Chassis Modular Switch or Router, 2 uplinks | $ - 0 |
| Medium Chassis Blade or Module, installed with initial chassis install | $ - 0 |
| Medium Chassis Blade or Module, installed after initial chassis install | $ - 0 |
| Small Chassis Router, 2 uplinks | $ - 0 |
| Small Chassis Router Module, installed with initial chassis install | $ - 0 |
| Small Chassis Router Module, installed after initial chassis install | $ - 0 |
| Standalone Switches | |
| 1U standalone switch up to 2 SPFs | $ - 0 |
| Transceivers | Any Transciever, SFP, GBIC added to any device | $ - 0 |
| Routers and other Active Gear | Router, Small Platform | $ - 0 |
| Router, Medium Platform | $ - 0 |
| Router, Large Platform | $ - 0 |
| Router Modules, installed with router initially | $ - 0 |
| Router Modules, installed after router install | $ - 0 |
| Redundant Power Supply | $ - 0 |
| Firewall or VPN, Small Platform | $ - 0 |
| Firewall or VPN, Medium Platform | $ - 0 |
| Firewall or VPN, Module, installed with Firewall or VPN | $ - 0 |
| Firewall or VPN, Module, installed after Firewall or VPN | $ - 0 |
| Firewall or VPN, Power Supply, installed after Firewall or VPN | $ - 0 |
| WANX, Small Platform | $ - 0 |
| WANX, Medium Platform | $ - 0 |
| WANX, Large Platform | $ - 0 |
| WANX Module, installed during WANX installation | $ - 0 |
| WANX Module, installed after initial installation | $ - 0 |
| Media Conversion | All Media Converters | $ - 0 |
| Additional Configuration Tasks for SIPR Uninstalls | |
| SIPR CONFIGURATION (per device) | $ - 0 |
Uninstall and Replace
| Uninstall and Replace | Network device will be uninstalled, packed, returned to the warehouse and replaced with a different device. Upgrades to devices planned for refresh or upgrade but refreshed/upgraded outside of a refresh/upgrade project are subject to uninstall labor. |
| Description | Uninstall and replace |
Price Per Unit
| Switches and Routers, Standalone and Stacked | Stacked Switches | |
| 1U Stack Master, up to 2 SFPs | $ - 0 |
| 1U Stack Member, installed with initial stack | $ - 0 |
| 1U Stack Member, installed to expand stack | $ - 0 |
| Modular Chassis Switches | |
| Large Chassis Modular Switch or Router, 2 uplinks | $ - 0 |
| Large Chassis Blade or Module, installed with initial chassis | $ - 0 |
| Large Chassis Blade or Module, installed after initial chassis | $ - 0 |
| Medium Chassis Modular Switch or Router, 2 uplinks | $ - 0 |
| Medium Chassis Blade or Module, installed with initial chassis install | $ - 0 |
| Medium Chassis Blade or Module, installed after initial chassis install | $ - 0 |
| Small Chassis Router, 2 uplinks | $ - 0 |
| Small Chassis Router Module, installed with initial chassis install | $ - 0 |
| Small Chassis Router Module, installed after initial chassis install | $ - 0 |
| Standalone Switches | |
| 1U standalone switch up to 2 SPFs | $ - 0 |
| Transceivers | Any Transciever, SFP, GBIC added to any device | $ - 0 |
| Routers and other Active Gear | Router, Small Platform | $ - 0 |
| Router, Medium Platform | $ - 0 |
| Router, Large Platform | $ - 0 |
| Router Modules, installed with router initially | $ - 0 |
| Router Modules, installed after router install | $ - 0 |
| Redundant Power Supply | $ - 0 |
| Firewall or VPN, Small Platform | $ - 0 |
| Firewall or VPN, Medium Platform | $ - 0 |
| Firewall or VPN, Module, installed with Firewall or VPN | $ - 0 |
| Firewall or VPN, Module, installed after Firewall or VPN | $ - 0 |
| Firewall or VPN, Power Supply, installed after Firewall or VPN | $ - 0 |
| WANX, Small Platform | $ - 0 |
| WANX, Medium Platform | $ - 0 |
| WANX, Large Platform | $ - 0 |
| WANX Module, installed during WANX installation | $ - 0 |
| WANX Module, installed after initial installation | $ - 0 |
| Media Conversion | All Media Converters | $ - 0 |
| Additional Configuration Tasks for SIPR Uninstalls | |
| SIPR CONFIGURATION (per device) | $ - 0 |
image1.png