SD PSM QA Round 5.pdf

PDF 181 KB Posted

Attached to
San Diego Carriers CVN IDIQ Maintenance/Repair
Solicitation number
N00024-23-R-4107
Issued by

About this file

This document contains questions and answers related to a solicitation for carrier maintenance and repair services in San Diego, California. The Naval Sea Systems Command is seeking proposals to perform maintenance, repair, and modernization efforts for CVN 68 and CVN 78 Class Aircraft Carriers homeported in and visiting the San Diego area. Services will include emergent work, continuous maintenance availabilities, pre-refueling complex overhaul availabilities, and Chief of Naval Operations scheduled availabilities. Bidders had submitted questions which are answered here to clarify requirements around page limits for resumes and the applicability of certain FAR clauses. No changes were made to the solicitation in response to the questions.

View the file

Other files

File Type Posted
N00024-23-R-4107 Amendment 00005 conformed with redlines.pdf PDF
N00024-23-R-4107 Amendment 00005.pdf PDF
SD PSM QA Round 4.pdf PDF
SPS Amendment 0004.pdf PDF
N00024-23-R-4107_Amendment 0004_Conformed with Redlines.docx.pdf PDF
SD PSM QA Round 3.docx.pdf PDF
SPS Amendment 0003.pdf PDF
L-3_Cost Proposal Format SD PSM_12.16.22.xlsx XLSX spreadsheet
L-2_RIS_Past Performance Questionnaire (PPQ) SD PSM_12.16.22.docx DOCX document
N00024-23-R-4107_Amendment 0003_Conformed with Redlines.pdf PDF
SD PSM QA Round 2.pdf PDF
L-3_Cost Proposal Format SD PSM_12.12.22.xlsx XLSX spreadsheet
SPS Amendment 0002.pdf PDF
N00024-23-R-4107_Amendment 0002_Conformed with redlines.pdf PDF
L-3_Cost Proposal Format SD PSM_12.2.22.xlsx XLSX spreadsheet
SPS Amendment 0001.pdf PDF
L-2_RIS_Past Performance Questionnaire (PPQ) SD PSM_12.2.22.docx DOCX document
N00024-23-R-4107_Amendment 0001_Conformed with redlines.pdf PDF
SD PSM QA.pdf PDF
J-2_DD 254 N00024-22-R-4107_SIGNED.pdf PDF
J-7_Continuous Maintenance Planning 897-11-001-002 FY-22 06.16.21.pdf PDF
L-1_Bidders Question Submittal Form_ SD PSM.xlsx XLSX spreadsheet
CUI_J-1 Notional Work Package PIA_ 8.11.22.pdf PDF
Exhibit A - Contract Data Requirements List(s) CDRLs DD Form 1423 10.25.22.pdf PDF
L-2_RIS_Past Performance Questionnaire (PPQ) SD PSM.docx DOCX document
CUI_J-5 CVN Availability Schedule 2022-07-16.pdf PDF
N00024-23-R-4107_SD PSM RFP_11.23.22.pdf PDF
L-3_Cost Proposal Format SD PSM_10.24.22.xlsx XLSX spreadsheet
DD-2345_Template.pdf PDF
J-6_Determination of AF and SBSIF_ 11.1.22.pdf PDF
CUI_J-3_Integrated Logistic Support Contract Specification _9.27.22.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-23-R-4107 : SAN DIEGO PRIVATE SECTOR MAINTENANCE

BIDDERS QUESTIONS & GOVERNMENT ANSWERS

Question

Number:

Question

Source: (RFP, Attachment #, etc.)

Page

Number and

Paragraph

Header from

Source:

Question: Response:

34 RFP Page

157/186, Section

3.5.1

The Government's answer to bidder question 30 stops short of indicating if additional resumes beyond the two requested PM resumes would count toward the page total, (even if those additional resumes are 3 pages or less). Please clarify.

In Amendment 0004, on page 157 of 186 of the conformed w/ redlines, or page 14 of 31 of the

Amendment 0004, the Government highlighted with the exception. Resumes are not part of the 125 page count. The additional pages beyond the 3 pages for PM are counted against the 125 page count, for example, you have 4 pages for PM Mr.

XXX, the single 1 xtra page adds to the 125 page count. You may submit other resumes but the

Government is mainly interested in the PM/PM equivalent. No change to RFP.

35 RFP Page 109 of 187, Section I

Does the Government agree that the Contracts for

Materials, Supplies, Articles and Equipment

Exceeding $15,000 Act a/k/a Walsh Healey Public

Contracts Act (PCA) applies to the work to be performed under this RFP and consequently, FAR

52.222-55 should be removed from Section I of the

RFP because that FAR clause applies only in solicitations and contracts that include the clause at

52.222-6 Construction Wage Rate Requirements, or

52.222-41 Service Contract Labor Standards and those two FAR clauses are not in the RFP?

Removed. See Amendment 0005.