About this file
This document contains questions and answers from potential vendors regarding solicitation N00024-23-R-4107 for carrier maintenance and repair efforts in San Diego, California. The solicitation seeks maintenance, repair and modernization services for Nimitz- and Ford-class aircraft carriers homeported in and visiting the San Diego area, including emergent work, continuous maintenance availabilities, pre-refueling complex overhauls, and Chief of Naval Operations scheduled availabilities. The questions and answers clarify details of the required work scope and schedules, provide additional guidance on proposal formatting and pricing, and resolve discrepancies in attachments. Services will support availabilities for USS Theodore Roosevelt, USS Carl Vinson, USS John C. Stennis, USS Abraham Lincoln, USS Ronald Reagan, and other carriers through fiscal year 2028. The Naval Sea Systems Command is the contracting agency.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00024-23-R-4107 : SAN DIEGO PRIVATE SECTOR MAINTENANCE
BIDDERS QUESTIONS & GOVERNMENT ANSWERS
Question
Number:
Question
Source: (RFP, Attachment #, etc.)
Page
Number and
Paragraph
Header from
Source:
Question: Response:
10 Attachment L-3 and J-5 CVN
Schedule
L-3 Labor Hour Phasing
Tab
Attach L-3 Labor Hour Phasing does not align with Attach J-5 CVN Avail Schedule. Should the offeror ignore the schedule in pricing? If so, how is J-5 to be used and evaluated in other areas of the proposal?
Please see Amendment 0002. Attachment L-3 and Attachment J-5 are now aligned. See Figure 1 chart at the end of Q&As of the availabilities that should be covered in this
SD PSM effort. The J-5 acts as a baseline in order for the vendors to form a cost proposal to be evaluated upon.
11 Attachment L-3 L-3 ODC Tab and Labor
Tabs
L-3 ODC tab has rows in each CLIN for 7 years of Travel and
Materials. Since this aligns to neither the 5 Contract Years nor the 6 Fiscal Years found elsewhere in L-3, it is unclear which way the government wants pricing for ODCs. Does the government want the ODCs to align to Contract or Fiscal Year?
Please see Amendment 0002, L-3 updated to reference 5 years.
12 Attachment L-3 L-3 Labor
Hour Phasing
Tab
In L-3 Labor Hour Phasing the labeling in Cells B18 does not match L18 and B25 does not match L25. Should these be
Planning and Execution for CIA or DPIA?
Please see Amendment 0002, L-3 changed to CIA.
13 RFP Page 171 of paragraph (b)
Page 163 of 187 Para 3.5.5 defines a Major Subcontractor as, "a subcontractor that will accomplish 10% or more of the dollar value of the work required by the solicitation or are awarded a subcontract which equals or exceeds $55 million". Page 171 of
187 Para (b) describes a Major Subcontractor as those with Cost type subcontracts greater than $2M and 10% of the contract value. Please explain.
Past performance “major subcontractor” page 163 definition is specific to Vol. III past performance section only. Page
171 definition is correct for purposes of L-3/cost realism analysis for Vol. IV only.
14 Attachments L-3 and J-6
Labor tabs fee rows and
ODC Tab
Note 2
L-3 identifies 10% fee for prime labor and 1% fee for subcontract labor. The fee structure in the cost proposal format
L-3 does not align with Attachment J-6 or Section L subcontractor cost data and instructions for proposing fee. Please explain.
Please see Amendment 0002, L-3 updated to reference 5% vice 10%.
15 RFP and Exhibit-
A CDRLs
Section B and 4 of 187;
CDRL
Blocks 17 and 18
RFP Section B Page 2 of 187 reflects CLIN 0004 as NSP. RFP
Section B Page 4 of 187 reflects CLIN 0004 as Not Separately
Priced. Section L seems to require all exhibits to be completed.
Are offerors expected to provide the price group and estimated total price for each CDRL (Block 17 and 18) in the proposal submittal?
No. CDRLs do not have to be priced in the IDIQ unless specifically requested in the DO.
16 RFP Page 165 of
187, Section
3.5.6 Para
A.7
Section L 3.5.6 Para A(7) States, "The proposed estimate shall consider that Puget Sound Naval Shipyard (PSNS) will furnish general services in support of the ship while it is at PSNS." Is this an error?
Please see Amendment 0002. Reference removed.
Question
Number:
Question
Source: (RFP, Attachment #, etc.)
Page
Number and
Paragraph
Header from
17 SOW Page 10 of
187, Para B-
231-H002
WORKSITE
TRAVEL
COSTS
(OCT 2018)
Question: Understanding that the GOVERNMENT requires all work to be performed at the GOVERNMENT Facility, North
Island Naval Base, San Diego, CA, please provide a detailed list of GOVERNMENT provided facilities at the GOVERNMENT worksite; such as parking spaces available for bidder personnel, office spaces available for bidder personnel, available lay-down space available for bidder required equipment/materials, lunch/break facilities available for bidder personnel, GOVERNMENT provided warehousing space available for bidder personnel, and all other GOVERNMENT provided facilities in support of bidder contract execution. Please provide a GOVERNMENT Response soonest to facilitate required bidder bid and proposal preparation efforts.
No change to RFP.
The Government normally provides:
- office spaces at Bldg. 626,
- Additional desk locations to support CNO Execution are available at the contractor trailer located on the Maintenance
Pier (Juliet). Fiber connections would need to be made, -available lay-down space available for contractor required equipment/materials, -lunch/break facilities available for contractor personnel
(current trailers have limited kitchenette facilities), -limited parking for PSM senior folk, not all personnel working on the contract. Most Maintenance Support Reps
(MSRs) bus people in to start the day and pick them up after
Not provided:
-Warehouse space
-NMCI connection (no NMCI jacks)
-There is no public wifi connection available -Network/IT capability/fiber optic connections is funded by contractor
Question
Number:
Question
Source: (RFP, Attachment #, etc.)
Page
Number and
Paragraph
Header from
*Execution planning period is seventeen months prior to the scheduled CNO PIAs.
**Execution planning period is six months prior to the scheduled CNO CIAs.
Dates subject to change and are contingent upon updates to the CNO CVN Availability Schedule (dtd.
07/16/2022)
Availability
USS THEODORE ROOSEVELT (CVN 71) PIA*
USS CARL VINSON (CVN 70) PIA*
USS THEODORE ROOSEVELT (CVN 71) PIA*
USS JOHN C. STENNIS (CVN 74) PIA*
USS CARL VINSON (CVN 70) CIA**
USS ABRAHAM LINCOLN (CVN 72) CIA**
USS THEODORE ROOSEVELT (CVN 71) CIA**
USS JOHN C. STENNIS (CVN 74) CIA**
USS RONALD REAGAN (CVN 76) CIA**
USS CARL VINSON (CVN 70) CIA**
File details come from the government source that posted it. Updated .