N00024-21-R-2253 Amendment 0002 040821.pdf

PDF 180 KB Posted

Attached to
Yard Repair Berthing and Messing Barge (YRBM) Solicitation
Solicitation number
N0002421R2253
Issued by

About this file

This document is an amendment to a solicitation for the design and construction of Yard Repair, Berthing and Messing (YRBM) barges. The Naval Sea Systems Command is seeking proposals for the detail design and construction of up to eight YRBM barges to provide berthing and messing facilities for repair ship crews. One craft will initially be awarded with options for seven additional craft. This procurement is set aside for total small businesses. Proposals are due by the date specified in the original solicitation. The amendment provides responses to bidder questions, revises data submission requirements, and clarifies proposal formatting instructions.

View the file

Other files

File Type Posted
NIST SP 800-171 Reminder 070721.pdf PDF
N00024-21-R-2253 Amend 0012 060421.pdf PDF
L-2 YRBM_Requirements Matrix 02Jun21.xlsx XLSX spreadsheet
J-1 YRBM_Requirements Matrix 02Jun21.xlsx XLSX spreadsheet
N00024-21-R-2253 conformed thru Amend 0011 051721.pdf PDF
J-1 YRBM_Requirements Matrix 17May21.xlsx XLSX spreadsheet
N00024-21-R-2253 Amend 0011 051721.pdf PDF
L-2 YRBM_Requirements Matrix 17May21.xlsx XLSX spreadsheet
L-8 Pricing Summary 17May21.xlsx XLSX spreadsheet
J-2 YRBM Data Requirements List dated 17May21.pdf PDF
N00024-21-R-2253 P00010 051221.pdf PDF
L-8 Pricing Summary 11May21.xlsx XLSX spreadsheet
N00024-21-R-2253 P00009 051121.pdf PDF
N00024-21-R-2253 Amend 0008 050721.pdf PDF
J-1 YRBM_Requirements Matrix 03May21.xlsx XLSX spreadsheet
L-2 YRBM_Requirements Matrix 03May21.xlsx XLSX spreadsheet
N00024-21-R-2253 Amend 0007 042821.pdf PDF
J-1 YRBM_Requirements Matrix 26Apr21.xlsx XLSX spreadsheet
L-2 YRBM_Requirements Matrix 26Apr21.xlsx XLSX spreadsheet
L-2 YRBM_Requirements Matrix 21Apr21.xlsx XLSX spreadsheet
J-1 YRBM_Requirements Matrix 21Apr21.xlsx XLSX spreadsheet
N00024-21-R-2252 Amend 0006 042321.pdf PDF
J-2 YRBM Data Requirements List dated 21Apr21.pdf PDF
N00024-21-R-2253 Amend 0005 041921.pdf PDF
NAVSEAINST 5510.2D and NAVSEA M-5510.2 .pdf PDF
N00024-21-R-2253 Amend 0004 041521.pdf PDF
L-2 YRBM_Requirements Matrix 12Apr21.xlsx XLSX spreadsheet
NAVSEAINST 05510-02D Security Program.pdf PDF
J-1 YRBM_Requirements Matrix 12Apr21.xlsx XLSX spreadsheet
J-2 YRBM Data Requirements List dated 12Apr21.docx DOCX document
N00024-21-R-2253 Amend 0003 041221.pdf PDF
J-1 YRBM_Requirements Matrix 06Apr21.xlsx XLSX spreadsheet
L-2 YRBM_Requirements Matrix 06Apr21.xlsx XLSX spreadsheet
J-1 YRBM_Requirements Matrix 31Mar21.xlsx XLSX spreadsheet
NAVSEAINST 9096.6B_Weight and KG Margin Policy.pdf PDF
N00024-21-R-2253 Amend 0001 040121.pdf PDF
L-2 YRBM_Requirements Matrix 31Mar21.xlsx XLSX spreadsheet
L-6 Proposed Delivery Schedule Form Rev A.xls XLS spreadsheet
L-8 Pricing Summary.xlsx XLSX spreadsheet
J-7 YRBM IDE.pdf PDF
L-12 SF25A Payment Bond.pdf PDF
L-1 Bidders Questions Submittal Form.xls XLS spreadsheet
L-7 Past Performance Form.doc DOC document
J-2 YRBM Data Requirements List dated 24Mar21.pdf PDF
L-11 SF25 Performance Bond.pdf PDF
L-2 YRBM_Requirements Matrix Response.xlsx XLSX spreadsheet
L-4 ID of Non Commercial Data.doc DOC document
N00024-21-R-2253 032621.pdf PDF
J-4 Item Unique Identification.pdf PDF
L-10 SF24 Bid Bond.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002420NR53156

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Revised Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002421R2253

X 9B. DATED (SEE ITEM 11)

26-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Apr-2021

CODE

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2020

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002421R2253

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

REVISED SUMMARY OF CHANGES

The purpose of this amendment to solicitation N00024-21-R-2253 is to:

a) Respond to questions submitted by potential Offerors;

b) Revise Section J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS;

c) Revise Section L – INSTRUCTIONS TO OFFERORS.

1. The following questions were submitted by potential Offerors. The Government’s response follows each question. Questions and Answers 008 through 013 are provided in this Amendment 0002.

Question 008: Can the Government provide to Offerors the following reference documents: COMSCINST 9330.6 - Accommodations Standards for Military Sealift Command Ships, and T9070-AB-PRO-010 - NAVSEA Design Practices and Criteria Manual for General Arrangement Design?

Answer 008: No, COMSCINST 9330.6 and T9070-AB-PRO-010 are sub tier reference documents that do not pertain to YRBM.

Question 009: Page 133 of the RFP states “Drawings shall be submitted in an AutoCAD 2012™ compatible format and PDF unless otherwise specified” and in Attachment J-2 on page i, it states that “Drawings shall be submitted in an AutoCAD 2013™compatible format and PDF format.” Which AutoCAD compatible format should be used, 2012 or 2013?

Answer 009: AutoCAD 2013 compatible format is correct. Section L.2(b)(4) of the RFP is updated accordingly.

Question 010: Item 401a for the LAN Equipment Room states that “The LAN Equipment Room shall be provided with a minimum area of 24.2 m2 (260 ft2) of usable space within the total LAN Equipment Room’s total area.

Usable space is defined by unobstructed floor space as well as a minimum height of 203.2 cm (80 inches) from the walking surface to any obstructions overhead. The LAN Equipment Room shall have a minimum length of 4 m (13 ft.) and a minimum width of 6 m (20 ft.).” Does the space require a minimum length of 4 m (13 ft.) and a minimum width of 6 m (20 ft.) if the minimum area of usable space is met? The width of the deck house with an adequate passageway width makes this challenging to meet.

Answer 010: No. The LAN Equipment Room does not require a minimum length and width if the area requirement and usable space requirements are met. The J-1 YRBM Requirements Matrix is updated to remove "The LAN Equipment Room shall have a minimum length of 4 m (13 ft.) and a minimum width of 6 m (20 ft.)".

Question 011: The ABS Accommodation Barge notation Section 3 3.3/3.3.1 Structural Fire Protection requires the deckhouse to be subdivided into two main vertical zones for deckhouses exceeding 40 m, although the vertical zone can be extended to a maximum of 48 m. If the deckhouse is between 40 and 48 m, will the Navy ask ABS to waive this requirement and allow a single vertical zone?

Answer 011: No. The Navy will not pursue a waiver for the ABS requirement listed. All ABS structural fire protection requirements shall be met.

Question 012: P 135, Per L.8.1.1., the Technical Proposal (Volume I) shall be organized in the following format, with attachments, if any, incorporated in the relevant sections:

(a) Cover Letter, Title Page, Table of Contents

(b) Factor 1.0 Technical Merit of Design

(c) Factor 2.0 Facility and Management Feasibility

(d) Factor 3.0 Past Performance

Can the government please clarify whether it prefers for the proposal to include addendums, calculations, drawings, and estimates in an appendix at the end of each Factor or an appendix at the end of Volume I since they are not included in the page count?

Answer 012: The Government prefers that all items excluded from the Volume I page count be added as appendices at the end of Volume 1.

Question 013: P 138, Per L.8.1.1. (c) Factor 2: Facility and Management Feasibility:

(3) Key Personnel: Offerors shall:

a) Provide resumes for no more than five (5) total key personnel (one in each category either Offeror or proposed major subcontractors) who will be dedicated to the YRBM Program in each program management, engineering, quality assurance, production, and tests and trials that demonstrate sufficient experience and knowledge necessary to support the successful accomplishment of the requirements of the solicitation. Can the government please confirm that resumes are excluded from the proposal page count, as done in most NAVSEA RFPs?

Answer 013: Yes, resumes are excluded from the proposal page count. Section L.8.1 of the RFP is updated accordingly.

2. As a result of the above, SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS, is hereby deleted in its entirety and revised to read as follows:

“Attachment J-1 YRBM Requirements Matrix Rev. - dated 06 APR 21 Attachment J-2 YRBM Data Requirements List dated 24 MAR 21 Attachment J-3 Commercial Warranty Terms (To be provided by Offeror, will become a part of the contract) dated XX XXX XX Attachment J-4 Item Unique Identification dated 02 MAR 21 Attachment J-5 Identification of Non-Commercial Data (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-6 Identification of Commercial Data (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-7 Integrated Digital Environment Site Access and Public Key Infrastructure/Information

Assurance Awareness Attributes dated 02 MAR 21 Attachment J-8 Standard Form 24 (Rev 8/2016) - Bid Bond (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-9 Standard Form 25 (Rev 8/2016) Performance Bond (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-10 Standard Form 25A (Rev 8/2016) Payment Bond (To be provided by Offeror; will become a part of the contract) dated XX XXX XX

ADDENDUMS TITLE

ADDENDUM L-1 Bidder’s Questions Submittal Form ADDENDUM L-2 YRBM Requirements Matrix Response – UPD Amend 0002 ADDENDUM L-3 Commercial Warranty Terms (To become Attachment J-3 at award) ADDENDUM L-4 Identification of Non-Commercial Data (To become J-5 at award) ADDENDUM L-5 Identification of Commercial Data (To become J-6 at award) ADDENDUM L-6 Proposed Delivery Schedule Form ADDENDUM L-7 Past Performance Reference Form ADDENDUM L-8 Pricing Summary ADDENDUM L-9 Certification Regarding Responsibility Matters ADDENDUM L-10 Standard Form 24 (Rev 8/2016) - Bid Bond (To become J-8 at award) ADDENDUM L-11 Standard Form 25 (Rev 8/2016) – Performance Bond (To become J-9 at award) ADDENDUM L-12 Standard Form 25A (Rev 8/2016) – Payment Bond (To become J-10 at award) ”

3. As a result of the above, SECTION L - INSTRUCTIONS TO OFFERORS is hereby revised as follows:

a. SECTION L.2., PROPOSAL SUBMISSIONS, Section L.2(b)(4) is hereby modified as follows:

Delete: AutoCAD 2012™ Add: AutoCAD 2013™

b. SECTION L.8., SPECIFIC INSTRUCTIONS, L.8.1 is hereby deleted in its entirety and replaced with the following:

“The page count for the Technical Proposal (Volume I) is limited to a maximum of one hundred fifty (150) pages, exclusive of title pages and tables of contents, tabbed index divider pages, drawings, calculations, Integrated Master Schedule (IMS), YRBM Requirements Matrix (Addendum L-2), Commercial Warranty Terms (Addendum L-3), assertions of Technical Data Rights (Addendum L-4 and L-5), Key Personnel Resumes, the Proposed Delivery Schedule Form (Addendum L-6), and past performance questionnaires (Addendum L-7), will be excluded from the page count. Alternative Specifications are exempt from the overall page count, but shall not exceed twenty (20) pages in total. Offerors are cautioned that if an offer is not in compliance with the page limitations, the extra pages will be removed and not evaluated.”

c. Deleted duplicate clause 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION

(JAN 2017).

4. Receipt of Proposals is not extended as a result of this amendment.

5. Except as provided herein, all other terms and conditions of solicitation N00024-21-R-2253 remain unchanged.

File details come from the government source that posted it. Updated .