N00024-21-R-2253 Amend 0001 040121.pdf

PDF 208 KB Posted

Attached to
Yard Repair Berthing and Messing Barge (YRBM) Solicitation
Solicitation number
N0002421R2253
Issued by

About this file

This document is an amendment to a solicitation for the design and construction of Yard Repair, Berthing and Messing (YRBM) barges. The Naval Sea Systems Command is seeking up to eight YRBM barges through this total small business set-aside opportunity, with one craft to be awarded initially and options for seven additional craft. Questions submitted by potential offerors are answered, including clarifying that specifications like deck space requirements and stairway angles must be met but providing some flexibility. The list of attachments is updated and offerors are advised that page limits for technical proposals remain at 150 pages with some exclusions.

View the file

Other files

File Type Posted
NIST SP 800-171 Reminder 070721.pdf PDF
N00024-21-R-2253 Amend 0012 060421.pdf PDF
L-2 YRBM_Requirements Matrix 02Jun21.xlsx XLSX spreadsheet
J-1 YRBM_Requirements Matrix 02Jun21.xlsx XLSX spreadsheet
N00024-21-R-2253 conformed thru Amend 0011 051721.pdf PDF
J-1 YRBM_Requirements Matrix 17May21.xlsx XLSX spreadsheet
N00024-21-R-2253 Amend 0011 051721.pdf PDF
L-2 YRBM_Requirements Matrix 17May21.xlsx XLSX spreadsheet
L-8 Pricing Summary 17May21.xlsx XLSX spreadsheet
J-2 YRBM Data Requirements List dated 17May21.pdf PDF
N00024-21-R-2253 P00010 051221.pdf PDF
L-8 Pricing Summary 11May21.xlsx XLSX spreadsheet
N00024-21-R-2253 P00009 051121.pdf PDF
N00024-21-R-2253 Amend 0008 050721.pdf PDF
J-1 YRBM_Requirements Matrix 03May21.xlsx XLSX spreadsheet
L-2 YRBM_Requirements Matrix 03May21.xlsx XLSX spreadsheet
N00024-21-R-2253 Amend 0007 042821.pdf PDF
J-1 YRBM_Requirements Matrix 26Apr21.xlsx XLSX spreadsheet
L-2 YRBM_Requirements Matrix 26Apr21.xlsx XLSX spreadsheet
L-2 YRBM_Requirements Matrix 21Apr21.xlsx XLSX spreadsheet
J-1 YRBM_Requirements Matrix 21Apr21.xlsx XLSX spreadsheet
N00024-21-R-2252 Amend 0006 042321.pdf PDF
J-2 YRBM Data Requirements List dated 21Apr21.pdf PDF
N00024-21-R-2253 Amend 0005 041921.pdf PDF
NAVSEAINST 5510.2D and NAVSEA M-5510.2 .pdf PDF
N00024-21-R-2253 Amend 0004 041521.pdf PDF
L-2 YRBM_Requirements Matrix 12Apr21.xlsx XLSX spreadsheet
NAVSEAINST 05510-02D Security Program.pdf PDF
J-1 YRBM_Requirements Matrix 12Apr21.xlsx XLSX spreadsheet
J-2 YRBM Data Requirements List dated 12Apr21.docx DOCX document
N00024-21-R-2253 Amend 0003 041221.pdf PDF
J-1 YRBM_Requirements Matrix 06Apr21.xlsx XLSX spreadsheet
L-2 YRBM_Requirements Matrix 06Apr21.xlsx XLSX spreadsheet
N00024-21-R-2253 Amendment 0002 040821.pdf PDF
J-1 YRBM_Requirements Matrix 31Mar21.xlsx XLSX spreadsheet
NAVSEAINST 9096.6B_Weight and KG Margin Policy.pdf PDF
L-2 YRBM_Requirements Matrix 31Mar21.xlsx XLSX spreadsheet
L-6 Proposed Delivery Schedule Form Rev A.xls XLS spreadsheet
L-8 Pricing Summary.xlsx XLSX spreadsheet
J-7 YRBM IDE.pdf PDF
L-12 SF25A Payment Bond.pdf PDF
L-1 Bidders Questions Submittal Form.xls XLS spreadsheet
L-7 Past Performance Form.doc DOC document
J-2 YRBM Data Requirements List dated 24Mar21.pdf PDF
L-11 SF25 Performance Bond.pdf PDF
L-2 YRBM_Requirements Matrix Response.xlsx XLSX spreadsheet
L-4 ID of Non Commercial Data.doc DOC document
N00024-21-R-2253 032621.pdf PDF
J-4 Item Unique Identification.pdf PDF
L-10 SF24 Bid Bond.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002420NR53156

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Revised Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002421R2253

X 9B. DATED (SEE ITEM 11)

26-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Apr-2021

CODE

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2020

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002421R2253

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

REVISED SUMMARY OF CHANGES

The purpose of this amendment to solicitation N00024-21-R-2253 is to:

a) Respond to questions submitted by potential Offerors;

b) Revise Section J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS;

c) Revise Section L – INSTRUCTIONS TO OFFERORS.

1. The following questions were submitted by potential Offerors. The Government’s response follows each question. Questions and Answers 001 through 007 are provided in this Amendment 0001.

Question 001: Will the US Navy allow an alternate rub rail system instead of split pipe fendering as specified in 100a?

Answer 001: No. The Government will not accept an alternate rub rail system.

Question 002: In section 071 it says there shall be a minimum of 3’ of deck space outboard of the deck house on the main deck. Are the bitts allowed to be in this 3’ of deck space? Or must there be 3’ inboard of the bitts before the deck house?

Answer 002: Yes. The bitts are allowed to be in the 3 feet of deck space. However, Per PSPEC section 071 "Equipment located in the deck space shall not be a hazard to the free movement of personnel or craft equipment during operations or maintenance activities." No. There does not need to be 3' between the bitts and the deck house.

Question 003: Will the US Navy accept an Impressed Current hull protection system in lieu of sacrificial anodes?

Answer 003: No. The Government will not accept an Impressed Current hull protection system in lieu of sacrificial anodes.

Question 004: Are the area requirements (I.e. medical storeroom 4.5 m^2) for compartments gross areas or net areas? For example, the space within the laid out bulkheads or do they need to account for joiner work too?

Answer 004: The area requirements for compartments are Net Area. The actual occupied area that is accessible to the operator. In most cases this will be the space within the non-structural joiner work. In cases where non-structural joiner work is not required, it would be the occupied area between the laid out bulkheads.

Question 005: Have all the associated J Attachments been posted to beta.sam.gov?

Answer 005: Yes. All J-Attachments have been posted to beta.sam.gov. There are a number of Addendums that become J-Attachments at award. These Addendum's are annotated with a note in Section J of the RFP. Addendum L-10 Special License was removed and mistakenly referenced in L.8.1. and Section L.8.1.1.(b)(3). Section L is updated accordingly.

Question 006: Section 622d specifies a maximum stairway angle of 38 degrees, with a clear tread width of 4'-0" (min) or 54" (preferred). Our design is based on a 10'0" spacing between decks. For a transverse stairway amidships, -- The 38 degree angle yields a stairway close to 12'-0" long.

-- Deckhouse side structure & joiner work would require 1'-3" min.

-- Landing outboard would require 4'-0" min.

-- Landing inboard would require 4'-0" min.

-- Passageway structure & joiner work would require 6" min.

These values add up to 21'-9" min, which is close to the maximum possible deckhouse breadth, without even making any allowances for a centerline passageway. In short, a transverse stairway cannot be fitted amidship without resorting to a turn-around half-height landing.

So, is the 38 degree requirement negotiable? Will a design with steeper stairs be rejected out of hand?

Answer 006: No. J-1 requirements are not negotiable, however J-1 is revised to specify a stairway angle of 38 degrees is preferred and 45 degrees is the maximum allowed. J-1 and ASTM F1166 allow the stair orientation to be fore and aft or athwart ship. In addition, intermediate landings are allowed. A design with steeper stairs will not constitute a rejection of the contractors bid, but may negatively impact the bidders rating for the technical factor.

Question 007: Can the Government provide to Offerors the document NAVSEAINST 9096.6, referenced in Section 079 Stability for Service Life Allowances (SLA) for weight and stability?

Answer 007: Yes, NAVSEAINST 9096.6B is provided with this solicitation amendment.

2. As a result of the above, SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS, is hereby deleted in its entirety and revised to read as follows:

“Attachment J-1 YRBM Requirements Matrix Rev. - dated 31 MAR 21 Attachment J-2 YRBM Data Requirements List dated 24 MAR 21 Attachment J-3 Commercial Warranty Terms (To be provided by Offeror, will become a part of the contract) dated XX XXX XX Attachment J-4 Item Unique Identification dated 02 MAR 21 Attachment J-5 Identification of Non-Commercial Data (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-6 Identification of Commercial Data (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-7 Integrated Digital Environment Site Access and Public Key Infrastructure/Information

Assurance Awareness Attributes dated 02 MAR 21 Attachment J-8 Standard Form 24 (Rev 8/2016) - Bid Bond (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-9 Standard Form 25 (Rev 8/2016) Performance Bond (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-10 Standard Form 25A (Rev 8/2016) Payment Bond (To be provided by Offeror; will become a part of the contract) dated XX XXX XX

ADDENDUM L-1 Bidder’s Questions Submittal Form ADDENDUM L-2 YRBM Requirements Matrix Response – UPD Amend 0001 ADDENDUM L-3 Commercial Warranty Terms (To become Attachment J-3 at award) ADDENDUM L-4 Identification of Non-Commercial Data (To become J-5 at award) ADDENDUM L-5 Identification of Commercial Data (To become J-6 at award) ADDENDUM L-6 Proposed Delivery Schedule Form ADDENDUM L-7 Past Performance Reference Form ADDENDUM L-8 Pricing Summary ADDENDUM L-9 Certification Regarding Responsibility Matters ADDENDUM L-10 Standard Form 24 (Rev 8/2016) - Bid Bond (To become J-8 at award) ADDENDUM L-11 Standard Form 25 (Rev 8/2016) – Performance Bond (To become J-9 at award) ADDENDUM L-12 Standard Form 25A (Rev 8/2016) – Payment Bond (To become J-10 at award)”

3. As a result of the above, SECTION L - INSTRUCTIONS TO OFFERORS is hereby revised as follows:

a. SECTION L.8., SPECIFIC INSTRUCTIONS, paragraph L.8.1 is hereby deleted in its entirety and replaced with the following:

“The page count for the Technical Proposal (Volume I) is limited to a maximum of one hundred fifty (150) pages, exclusive of title pages and tables of contents, tabbed index divider pages, drawings, calculations, Integrated Master Schedule (IMS), YRBM Requirements Matrix (Addendum L-2), Commercial Warranty Terms (Addendum L-3), assertions of Technical Data Rights (Addendum L-4 and L-5), the Proposed Delivery Schedule Form (Addendum L-6), and past performance questionnaires (Addendum L-7), will be excluded from the page count. Alternative Specifications are exempt from the overall page count, but shall not exceed twenty (20) pages in total. Offerors are cautioned that if an offer is not in compliance with the page limitations, the extra pages will be removed and not evaluated.”

b. SECTION L.8., SPECIFIC INSTRUCTIONS, paragraph L.8.1.1.(b)(3) is hereby deleted in its entirety and replaced with the following:

“Technical Data Rights: Offeror shall provide the following to support Government evaluation of the Offeror’s ability to provide the minimum desired level of Technical Data Rights as specified in SOW paragraph C-3.085b:

a) For all non-commercial technical data and computer software to be delivered under the contract, the Offeror shall complete and submit Addendum L-4 (fill in “None” if it is not applicable).

b) For all commercial technical data and computer software to be delivered under the contract, the Offeror shall complete and submit Addendum L-5 (fill in “None” if it is not applicable).

The Technical Data Rights assertions of the successful Offeror shall be binding in the resulting contract as Attachments J-6 and J-7. If any Commercial Technical Data will be offered with less than Government Purpose Rights (GPR), a table in the format of Addendum L-4 (for Non Commercial Technical Data) shall be provided with an added column indicating if GPR will be offered under CLIN 3006 for the declared commercial technical data. In addition to Addendum L-4, the contractor must show evidence of access and rights or license to the design.

It is the Government’s desire that all technical data (TD) and computer software (CS)/computer software documentation (CSD) be delivered with a minimum of GPR (as defined in DFARS 252.227-7013).

If the Offeror proposes to deliver commercial TD/CS/CSD, it is the Government’s desire to obtain GPR to the commercial TD/CS/CSD.”

4. Receipt of Proposals is not extended as a result of this amendment.

5. Except as provided herein, all other terms and conditions of solicitation N00024-21-R-2253 remain unchanged.

File details come from the government source that posted it. Updated .