This is an amendment to a solicitation for the design and construction of Yard Repair, Berthing and Messing (YRBM) barges for the Naval Sea Systems Command on behalf of the Support Ships, Boats, and Craft Program Office. The amendment provides responses to questions from potential offerors, revises the requirements matrix, and adjusts pricing terms. Up to eight YRBM barges will be acquired, with one to be awarded initially and options for seven more. The solicitation is set aside entirely for small businesses. Offerors must submit proposals by the previously established due date. Pricing must be fixed with no economic adjustments allowed due to market fluctuations. The amendment clarifies stability requirements and equipment specifications.

View the file

Other files

File Type Posted
NIST SP 800-171 Reminder 070721.pdf PDF
L-2 YRBM_Requirements Matrix 02Jun21.xlsx XLSX spreadsheet
J-1 YRBM_Requirements Matrix 02Jun21.xlsx XLSX spreadsheet
N00024-21-R-2253 conformed thru Amend 0011 051721.pdf PDF
J-1 YRBM_Requirements Matrix 17May21.xlsx XLSX spreadsheet
N00024-21-R-2253 Amend 0011 051721.pdf PDF
L-2 YRBM_Requirements Matrix 17May21.xlsx XLSX spreadsheet
L-8 Pricing Summary 17May21.xlsx XLSX spreadsheet
J-2 YRBM Data Requirements List dated 17May21.pdf PDF
N00024-21-R-2253 P00010 051221.pdf PDF
L-8 Pricing Summary 11May21.xlsx XLSX spreadsheet
N00024-21-R-2253 P00009 051121.pdf PDF
N00024-21-R-2253 Amend 0008 050721.pdf PDF
J-1 YRBM_Requirements Matrix 03May21.xlsx XLSX spreadsheet
L-2 YRBM_Requirements Matrix 03May21.xlsx XLSX spreadsheet
N00024-21-R-2253 Amend 0007 042821.pdf PDF
J-1 YRBM_Requirements Matrix 26Apr21.xlsx XLSX spreadsheet
L-2 YRBM_Requirements Matrix 26Apr21.xlsx XLSX spreadsheet
L-2 YRBM_Requirements Matrix 21Apr21.xlsx XLSX spreadsheet
J-1 YRBM_Requirements Matrix 21Apr21.xlsx XLSX spreadsheet
N00024-21-R-2252 Amend 0006 042321.pdf PDF
J-2 YRBM Data Requirements List dated 21Apr21.pdf PDF
N00024-21-R-2253 Amend 0005 041921.pdf PDF
NAVSEAINST 5510.2D and NAVSEA M-5510.2 .pdf PDF
N00024-21-R-2253 Amend 0004 041521.pdf PDF
L-2 YRBM_Requirements Matrix 12Apr21.xlsx XLSX spreadsheet
NAVSEAINST 05510-02D Security Program.pdf PDF
J-1 YRBM_Requirements Matrix 12Apr21.xlsx XLSX spreadsheet
J-2 YRBM Data Requirements List dated 12Apr21.docx DOCX document
N00024-21-R-2253 Amend 0003 041221.pdf PDF
J-1 YRBM_Requirements Matrix 06Apr21.xlsx XLSX spreadsheet
L-2 YRBM_Requirements Matrix 06Apr21.xlsx XLSX spreadsheet
N00024-21-R-2253 Amendment 0002 040821.pdf PDF
J-1 YRBM_Requirements Matrix 31Mar21.xlsx XLSX spreadsheet
NAVSEAINST 9096.6B_Weight and KG Margin Policy.pdf PDF
N00024-21-R-2253 Amend 0001 040121.pdf PDF
L-2 YRBM_Requirements Matrix 31Mar21.xlsx XLSX spreadsheet
L-6 Proposed Delivery Schedule Form Rev A.xls XLS spreadsheet
L-8 Pricing Summary.xlsx XLSX spreadsheet
J-7 YRBM IDE.pdf PDF
L-12 SF25A Payment Bond.pdf PDF
L-1 Bidders Questions Submittal Form.xls XLS spreadsheet
L-7 Past Performance Form.doc DOC document
J-2 YRBM Data Requirements List dated 24Mar21.pdf PDF
L-11 SF25 Performance Bond.pdf PDF
L-2 YRBM_Requirements Matrix Response.xlsx XLSX spreadsheet
L-4 ID of Non Commercial Data.doc DOC document
N00024-21-R-2253 032621.pdf PDF
J-4 Item Unique Identification.pdf PDF
L-10 SF24 Bid Bond.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002420NR53156

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Revised Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Jun-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002421R2253

X 9B. DATED (SEE ITEM 11)

26-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Jun-2021

CODE

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2020

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002421R2253

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

REVISED SUMMARY OF CHANGES

The purpose of this amendment to solicitation N00024-21-R-2253 is to:

a) Respond to questions submitted by potential Offerors; and

b) Revise Section J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS.

1. The following questions were submitted by potential Offerors. The Government’s response follows each question. A correction to previously answered BQ 045 is provided. Questions and Answers 088 through 095 are provided in this Amendment 0012.

Question 045: Attachment J-1 Section 070b states “American Bureau of Shipping (ABS) shall class the YRBM craft as A1 Accommodation Barge, Harbor Service.” Further, the ABS Accommodation Barge Guide references ABS Mobile Offshore Unit (MOU) Rules for stability criteria. In the ABS MOU Rules 3-3-2/1.3.1, wind speeds of 70 kn & 100 kn are identified for unrestricted/offshore service and 50 kn minimum for restricted service.

Since YRBM will be classed for Harbor Service, annotated in ABS Accommodation rules as “Limited or Restricted Service”, is it required that the craft meet unrestricted offshore stability criteria, or is Restricted Service with a 50 knot wind heeling moment acceptable?”

Answer 045 CORRECTION: After investigation, the Navy has determined that restricted Harbor Service will be used for intact stability, not unrestricted. The correct wind speed is 50 knots.

Question 088: Solicitation section L.8.1.1. (b)(1)(2) states "Offerors shall provide technical specifications of the proposed craft to demonstrate the ability to meet the requirements of this RFP, including special/unique features, place of manufacture, administrative procedures for performance, etc." Is the Navy requiring a draft technical specification be submitted with the proposal?

Answer 088: No, the Navy does not require a draft technical specification be submitted with the proposal. The Offeror shall fill-in the columns labeled "APPROACH TO SATISFYING REQUIREMENT AND EQUIPMENT TO BE INSTALLED" found in the "Requirements" and "Appendix A" tab of the J-1 Requirements Matrix and provide with the technical proposal as Addendum L-2.

Question 089: Will the Navy add appropriate language to the solicitation implementing an Economic Price Adjustment clause tied to an appropriate index (i.e. Steel Vessel Index) in accordance with an appropriate FAR clause to mitigate some of the risks to the Contractors and eliminate the need to price this risk into the initial bid offering?

Answer 089: Due to the manner in which funds are appropriated for the YRBM, the Navy must have fixed pricing on the YRBM contract. An Offeror should consider market fluctuations when pricing material.

Question 090: The Navy stated they would not consider economic price adjustments on steel and copper.

However, the Offeror wanted to ask again if the Navy would consider an economic price adjustment on this contract? There are some CLIN's that are extremely concerning for small business to quote FFP. If not an EPA Clause, does the Navy have another solution to propose to Industry on how to mitigate costs that are outside of Contractor control? For instance, one towing Contractor has concerns there are fees in the canal and costs to get vessels through canal which are difficult to quote on a daily basis let alone years out. Will the Navy allow the Contractor to pass actual costs for reimbursement after award?

Answer 090: The Navy is unable to offer flexibly priced CLINS.

Question 091: The first Design Review (DR) and Logistics Guidance Conference (LGC) occur 2 months after award. Can they be held at the same time or do they need to be separate meetings?

Answer 091: Yes, the first DR and LGC may be held in the same meeting/event.

Question 092: Contract Clause C-211-H019 COMMONALITY AND STANDARDIZATION requires the Contractor to develop and implement a Commonality and Standardization plan with equipment/components currently installed in US Navy Ships. It instructs Contractors to utilize both Industry Common Parts and Government Virtual Shelf to implement these selections. Although the information on how to gain access to Virtual Shelf is listed, a bidders question was asked per Amendment 0006, Question 042 requesting access and the Navy said they will not sponsor access at the proposal level.

Can the Navy please advise or provide direction to Industry on how we are to ensure the equipment selections made at proposal level are implemented and priced in accordance with the NAVSEA Enterprise Commonality Virtual Shelf if the Offeror does not have access to the Virtual Shelf? Also, can the Navy advise how the lack of access to Virtual Shelf, if reflected in the equipment selections, will be evaluated against another Contractor who might already have access since this poses an unfair advantage to Industry for Contractors currently with access to this repository?

Answer 092: The Navy has provided Attachment J-1 including Attachment J-1, Appendix A, which includes the Manufacturer and Model Numbers of items of particular interest to the Navy for maintaining consistency with equipment/components currently installed on US Navy ships and craft. As stated in Section M of the RFP, Total Ownership Cost will be evaluated based upon compatibility of components with commercially available components and/or components found on other Navy or Government in-service craft. Since the Navy has already provided the list of items of particular interest in Attachment J-1 including Attachment J-1, Appendix A, access to the NAVSEA Enterprise Commonality Virtual Shelf is not required and will not provide Offerors with any advantage over selecting components based upon review of the Attachment J-1 including Attachment J-1 Appendix A.

Question 093: YRBM Specification Section 631b, Surface Preparation, states "All shop primers/preconstruction primers shall be removed for potable water tanks, freshwater drain collecting tanks, non-skid applications, and single coat applications." Will the Navy consider a compatible pre-construction primer under single-coat paint?

Answer 093: During this phase of the procurement, the Navy is not able to provide approval to retain a compatible pre-construction primer under single-coat paint (e.g. Sherwin Williams Fast Clad ER Epoxy). The Navy may revisit this request after contract award using the Request for Variance (RFV) process.

Question 094: The October 13th 2020 industry day presentation, slide 12, stated Mandatory Craft Capabilities:

“Withstands hurricane-force winds in excess of 36 m/s (70 knots) with a concurrent 1.0 m/s (2.0 knots) current.” The response to BQ 045 stated “The YRBM shall meet unrestricted offshore stability criteria in accordance with ABS requirements.”

Unrestricted offshore stability criteria in accordance with ABS MOU Rules requires demonstrating wind speeds of both 70 knots and 100 knots. The intent of the two separate speeds within the ABS MOU Rules reflects the drilling crafts ability to ballast down or lower vessel legs, within 3 hours, when conditions worsen from 70 knots to 100 knots.

Considering above, please confirm the desired wind speed for YRBM intact stability.

Answer 094: After investigation, the Navy has determined that restricted Harbor service will be used for intact stability, not unrestricted. The correct wind speed is 50 knots. Please disregard previous answer to BQ 045 and see corrected response above.

Question 095: Specification Section 672d, Storerooms, states: “Clean Linen Stowage/Issue Room. A Clean Linen Stowage/Issue Room, 5 m2 (54 ft2) minimum, shall be on each level that there are berthing spaces.

Access to the linen room shall be from the laundry with a passing window to a passageway for daily issuance of clean linen to the duty crew. Shelving for stowage of complete linen sets (2 sheets, 1 pillow case, 1 towel per berth) equivalent to 2-1/2 times the duty crew shall be installed.”.

The requirement as stated appears to require the laundry space on the deck level of the duty crew. Is this intent of the requirement for placement of the laundry space on the duty crew berthing deck or to provide a minimum Clean Linen Stowage locker on each berthing deck?

Answer 095: There shall be one clean linen stowage/issue room located adjacent to the bulk laundry room.

Linen lockers on each berthing deck will not be required. The relevant sections in J-1 are updated to reflect this change.

2. As a result of the above, SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS, is hereby deleted in its entirety and revised to read as follows:

“ATTACHMENT TITLE

Attachment J-1 YRBM Requirements Matrix Rev. - dated 02 JUN 21 Attachment J-2 YRBM Data Requirements List dated 17 APR 21 Attachment J-3 Commercial Warranty Terms (To be provided by Offeror, will become a part of the contract) dated XX XXX XX Attachment J-4 Item Unique Identification dated 02 MAR 21 Attachment J-5 Identification of Non-Commercial Data (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-6 Identification of Commercial Data (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-7 Integrated Digital Environment Site Access and Public Key Infrastructure/Information

Assurance Awareness Attributes dated 02 MAR 21 Attachment J-8 Standard Form 24 (Rev 8/2016) - Bid Bond (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-9 Standard Form 25 (Rev 8/2016) Performance Bond (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-10 Standard Form 25A (Rev 8/2016) Payment Bond (To be provided by Offeror; will become a part of the contract) dated XX XXX XX

ADDENDUMS TITLE

ADDENDUM L-1 Bidder’s Questions Submittal Form ADDENDUM L-2 YRBM Requirements Matrix Response – UPD Amend 0012 ADDENDUM L-3 Commercial Warranty Terms (To become Attachment J-3 at award) ADDENDUM L-4 Identification of Non-Commercial Data (To become J-5 at award) ADDENDUM L-5 Identification of Commercial Data (To become J-6 at award) ADDENDUM L-6 Proposed Delivery Schedule Form ADDENDUM L-7 Past Performance Reference Form ADDENDUM L-8 Pricing Summary – UPD Amend 0011 ADDENDUM L-9 Certification Regarding Responsibility Matters ADDENDUM L-10 Standard Form 24 (Rev 8/2016) - Bid Bond (To become J-8 at award) ADDENDUM L-11 Standard Form 25 (Rev 8/2016) – Performance Bond (To become J-9 at award) ADDENDUM L-12 Standard Form 25A (Rev 8/2016) – Payment Bond (To become J-10 at award)”

3. Receipt of Proposals is not extended as a result of this amendment.

4. Except as provided herein, all other terms and conditions of solicitation N00024-21-R-2253 remain unchanged.