N00024-21-R-2253 Amend 0008 050721.pdf
PDF 181 KB Posted
- Solicitation number
- N0002421R2253
About this file
This document is an amendment to a solicitation for the design and construction of up to eight Yard Repair, Berthing and Messing (YRBM) barges.
The Naval Sea Systems Command is seeking proposals to award an initial craft with options for seven additional barges. The scope includes detail design and construction services. This is a 100% total small business set-aside conducted pursuant to FAR 19.5. The amendment provides responses to bidder questions, revising requirements for door types, air handlers, and fire suppression system materials. It also updates attachments including the requirements matrix and data requirements list. The receipt of proposals date is unchanged. Interested parties should direct any further inquiries to the point of contact specified in the amendment.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002420NR53156
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Revised Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002421R2253
X 9B. DATED (SEE ITEM 11)
26-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-May-2021
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2020
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002421R2253
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SECTION A - SOLICITATION/CONTRACT FORM
REVISED SUMMARY OF CHANGES
The purpose of this amendment to solicitation N00024-21-R-2253 is to:
a) Respond to questions submitted by potential Offerors; and
b) Revise Section J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS.
1. The following questions were submitted by potential Offerors. The Government’s response follows each question. Questions and Answers 079 through 084 are provided in this Amendment 0008.
Question 079: Can the Government clarify when Contractor uploads their proposal to DoD Safe File is the preference to have Volume I submitted as one document with all factors included in one file or would the Government prefer Volume I to be submitted with separate files for each factor such as Volume 1: Factor 1 is one file, Volume 1: Factor 2 is one file, etc?
Answer 079: The Government does not have a preference.
Question 080: Specification Section 624a states; "Watertight doors are to be provided with means of indicating locally and remotely on the quarterdeck whether they are open or closed. Single joiner doors shall be provided for all spaces except that double doors shall be provided for (e) Entrance into craft from the Alternative Gangway on the Main deck. The doors shall be a minimum of 72 inches wide. " Will the Government allow an alternative 72" watertight sliding door on the main deck for the alternative gangway and main gangway at quarterdeck?
Answer 080: No, the two sets of 72” wide double doors, one leading to the Main Entrance Gangway and the other to the Alternative Entrance Gangway, shall not be watertight sliding doors. It should be noted that very few areas require use of watertight vice weathertight doors. Watertight integrity shall be defined per ABS MOU 3-3-2/5.3:
All internal and external openings whose lower edges are below the levels to which watertight integrity is to be ensured, as shown by the diagrams submitted in accordance with 3-1-2/1, are to be fitted with appliances to ensure watertight integrity.
J-1 is updated to clarify door requirements.
Question 081: Specification Section 512a states "Redundant air handler units shall be provided for each berthing deck." Would the Government consider any adjustments or clarifications to this requirement since, as written, it will result in a fairly complex system?
Answer 081: Yes. J-1 will be updated to remove the requirement for redundant air handler units for each berthing deck.
Question 082: Section L.2(b) mentions foldouts but also appears to limit page size to 8-1/2" x 11". Can Offerors use 11" x 17" pages in appendices documents for drawings, IMS, etc?
Answer 082: Per Section L.2(b)(3) all offeror proposals will be submitted electronically via DOD SAFE. However, use of an 11" x 17" page setup in electronic submittal is permitted for any portion of the Offeror's proposal that is not included in the page count.
Question 083: Specification Section 555b Watermist Firefighting System Watermist system specifications call requires 70/30 CuNi tubing. The maximum pressure 70/30 CuNi tubing is rated is 250psig@250degrees.
Additionally, per NFPA 750 water lines are required to be stainless steel (piping or tubing) to interconnect the nozzle network of each hazard with the Water Mist/Fog system. The normal system operating pressure of a Water
Mist System is 1050psi. Will the Government accept other than 70/30- CuNi tubing to meet the 1050 standard watermist system psi?
Answer 083: No. The watermist piping shall be 70/30 CuNi per the PSPEC. NFPA 750 allows for copper and copper alloy piping. Pipe/Tube Standards can be found in table 6.3.3.1 of NFPA 750. The watermist system piping shall be an appropriate diameter and schedule to support design pressures and flow. For reference from NFPA 750:
Table 6.3.3.1 Pipe or Tube Standards Materials and Dimensions and Standard Titles Copper Tube (Drawn, Seamless) -Standard Specification for Solder Metal [95-5 (Tin-Antimony-Grade 95TA)] - ASTM B32 -Standard Specification for Seamless Copper Tube* - ASTM B75/B75M -Standard Specification for Seamless Copper Water Tube* - ASTM B88 -Standard Specification for General Requirements for Wrought Seamless Copper and Copper-Alloy Tube - ASTM B251 -Standard Specification for Liquid and Paste Fluxes for Soldering Applications of Copper and Copper-Alloy Tube -
ASTM B813
-Specification for Filler Metals for Brazing and Braze Welding (Classification BCuP-3 or BCuP-4) - AWS A5.8M/A5.8
Question 084: In response to the answer provided to Bidder's Question 076 in Amendment 0007. The updated flowrates and pressures required at the nozzle seem excessive. Section 5-2-2 of the ABS Rules for Mobile Offshore Units requires 50 psi at each hydrant (1.1.4) and a minimum of 110 gpm of flow supplied to the whole firemain (1.1.5) which would result in approximately 55 gpm of flow at each hydrant, assuming two are operating. The ABS required operating conditions would result in approximately 45psi and 55gpm of flow from each nozzle which is less than the 70psi and 90gpm minimum requirement given in the amendment. Designing a fire system to support such high flow rates and pressures will increase the weight and cost of the firemain as larger piping will be required to keep flow velocities below the prescribed limits. Additionally, the higher pressures and flowrates will make it more difficult for operators to control the fire hose. Can the Navy please advise why such high pressures and flowrates are required for this barge, or if those quantities can be reduced?
Answer 084: The pressure and flow rates indicated in the BQ 067 response are the conditions required to support the ratings of the Navy standard nozzles that are indicated is Section 555a. These requirements exist to ensure future berthing barges are designed in a manner to support commonality of fire nozzles found on other Naval vessels.
Pressure and flow requirements indicated will not be reduced. Note, other new construction berthing barges use 2.5" 90/10 CuNi headers for firemain to meet a very similar requirement.
2. As a result of the above, SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS, is hereby deleted in its entirety and revised to read as follows:
“ATTACHMENT TITLE
Attachment J-1 YRBM Requirements Matrix Rev. - dated 03 MAY 21 Attachment J-2 YRBM Data Requirements List dated 21 APR 21 Attachment J-3 Commercial Warranty Terms (To be provided by Offeror, will become a part of the contract) dated XX XXX XX Attachment J-4 Item Unique Identification dated 02 MAR 21 Attachment J-5 Identification of Non-Commercial Data (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-6 Identification of Commercial Data (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-7 Integrated Digital Environment Site Access and Public Key Infrastructure/Information
Assurance Awareness Attributes dated 02 MAR 21 Attachment J-8 Standard Form 24 (Rev 8/2016) - Bid Bond (To be provided by Offeror; will become a part of the contract) dated XX XXX XX Attachment J-9 Standard Form 25 (Rev 8/2016) Performance Bond (To be provided by Offeror; will become a part of the contract) dated XX XXX XX
Attachment J-10 Standard Form 25A (Rev 8/2016) Payment Bond (To be provided by Offeror; will become a part of the contract) dated XX XXX XX
ADDENDUMS TITLE
ADDENDUM L-1 Bidder’s Questions Submittal Form ADDENDUM L-2 YRBM Requirements Matrix Response – UPD Amend 0008 ADDENDUM L-3 Commercial Warranty Terms (To become Attachment J-3 at award) ADDENDUM L-4 Identification of Non-Commercial Data (To become J-5 at award) ADDENDUM L-5 Identification of Commercial Data (To become J-6 at award) ADDENDUM L-6 Proposed Delivery Schedule Form ADDENDUM L-7 Past Performance Reference Form ADDENDUM L-8 Pricing Summary ADDENDUM L-9 Certification Regarding Responsibility Matters ADDENDUM L-10 Standard Form 24 (Rev 8/2016) - Bid Bond (To become J-8 at award) ADDENDUM L-11 Standard Form 25 (Rev 8/2016) – Performance Bond (To become J-9 at award) ADDENDUM L-12 Standard Form 25A (Rev 8/2016) – Payment Bond (To become J-10 at award)”
3. Receipt of Proposals is not extended as a result of this amendment.
4. Except as provided herein, all other terms and conditions of solicitation N00024-21-R-2253 remain unchanged.