This is a solicitation for the USS Lake Erie (CG 70) FY21 Selected Restricted Availability (SRA). The Naval Sea Systems Command is seeking a contractor to perform maintenance, modernization, and repair services. The availability includes a combination of work packages and is expected to require extensive facilities and resources capable of coordinating multiple areas of ship maintenance and repair. The work is to be performed at the contractor's facility on the West Coast of the United States. The solicitation is issued through beta.SAM.gov and interested parties must register in the System for Award Management to participate. The Government anticipates making a single award by August 2020 for work starting in November 2020.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.
SHIP: USS LAKE ERIE (CG 70)
TPPC-CG70-SWRMC21-CN01
ERRATA NUMBER:
SPECIFICATION NUMBER:
THE FOLLOWING ITEMS ARE REPLACED:
516-11-002
331-11-001
437-21-001
438-90-002
153-11-001
DATED: 5/12/2020 3:03:30PMPage 1 of 1
SHIP: USS LAKE ERIE (CG 70) ITEM NO: 153-11-001 (E5)
COAR: 16 PCN: ES01-NNGD
ES01-NNFA
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 Apr 2019 PLANNER: See Attachment A
SSP: TPPC-CG70-SWRMC21-CN01 1 of 3 ITEM NO: 153-11-001
ERRATA NO. 5
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: 02 Level Deckhouse Structural Repair; accomplish
1.2 Location of Work:
1.2.1 Fan Room (02-234-2-Q)
1.2.1.1 27 Inches Above Deck on Port Deckhouse Side, 74 Inches Aft of Frame 234
1.2.2 Weather Deck 02 Level, Frames 290-352, Starboard
1.2.2.1 One Foot to 19 Feet 7 Inches Forward of Frame 346, 3
Feet 9 Inches Outboard House Side of Starboard Bulkhead
1.3 Identification:
1.3.1 Quantity (One LF), Horizontal Tee Stiffener, 4 Inch X 2.0 # T, Aluminum Alloy, H111 5456 QQ-A-200/7, Identification Number 4 on Sheet 4C of 2.2
1.3.2 Quantity (72 SF), Deck Plating, .250 Inch, Aluminum Alloy, 5456 H116 ASTM B209, Identification Number 19 on Sheet 3B of 2.3
2. REFERENCES:
2.1 Standard Items, (FY20)
2.2 153-6011883 Rev K, Strl Assy 418 02 Lvl to 03 Lvl Fr 222-262
2.3 152-6011953 Rev V, Structural Assy 411 01 to 02 Lvl Fr 290-352
2.4 DM 10-623 Rev B, Quality Assurance Requirements For Welding 5XXX Series Aluminum Structures For CG-47 Class
3. REQUIREMENTS:
3.1 Accomplish the following repairs at each location listed in 1.2, using 2.2 and 2.3 for guidance.
3.1.1 Remove existing and install new horizontal tee stiffener identified in 1.3.1 and located in 1.2.1, using 2.2 for guidance.
3.1.1.1 Chip and grind each surface flush in way of each repair.
3.1.1.2 Template exact size, configuration, and location from each existing shipboard condition.
3.1.1.3 Material must conform to material requirements of 2.2.
3.1.2 Remove existing, and install new aluminum deck plating listed in 1.3.2 and located in 1.2.2.
3.1.2.1 Chip and grind each surface flush in way of each repair.
3.1.2.2 Template exact size, configuration, and location from each existing shipboard condition.
SSP: TPPC-CG70-SWRMC21-CN01 2 of 3 ITEM NO: 153-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.1.2.3 Material must conform to material requirements of 2.3.
3.1.3 Accomplish up to 144 square inches of base metal repairs based on the nondestructive testing report submitted in 3.2.1 and when directed by the SUPERVISOR.
3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column C, Lines One through 7 in accordance with 2.4.
3.2.1 Accomplish nondestructive testing in accordance with Lines 9 and 10.
3.3 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each insert installed in 3.2.1.2. Allowable leakage: None.
(E5)
3.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 45, Columns A, B, and E, for application of nonskid and paint, on deck plating replaced in 3.1.2.3.
(E5)
3.4.1 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 39, Column E for surfaces not receiving nonskid.
3.5 Accomplish the requirements of 009-11 of 2.1 for new and disturbed insulation.
3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SSP: TPPC-CG70-SWRMC21-CN01 3 of 3 ITEM NO: 153-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Attachment A
Planners
SOLTERO, JUAN
BETHON, KIMBERLY
COLE, RANDOLPH
HODGES, CHAD
JENSEN, JOHN
MALONE, LISA
NICHOLS, GARY
NUNEZ, ALEXANDER
RIVERA, DAVID
TAYLOR, NEIL
SHIP: USS LAKE ERIE (CG 70) ITEM NO: 331-11-001 (E5)
COAR: 16 PCN: EA01-8000
EA01-7998
EA01-7999
CMP: NONE
PLANNER: RIVERA, DAVID
COLE, RANDOLPH
SSP: TPPC-CG70-SWRMC21-CN01 1 of 2 ITEM NO: 331-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Chiller & Freezer Trough Heater Strips; replace
1.2 Location of Work:
1.2.1 Chiller Storeroom No. One (2-237-2-A)
1.2.2 Chiller Storeroom No. 2 (2-244-2-A)
1.2.3 Freeze Storeroom (2-252-2-A)
1.3 Identification:
1.3.1 Quantity (1200 LF), Cable, Self-Regulating Heating, 2800 Series, P/N 2508-11500, FN 69 of 2.3
(E5)
2. REFERENCES:
2.1 Standard Items
2.2 516-5921261 Rev L, Refrigeration Piping Cooling Coils and Drip Pans
- Details
2.3 331-5920746 Rev V, Lighting Sys Wrg Dk Plan 1st Platf Fr 220-300
3. REQUIREMENTS:
3.1 Remove existing, procure and install new heating cable identified in
1.3 for the locations listed in 1.2 using 2.2 and 2.3 for guidance.
3.1.1 Template exact size, configuration, and location from existing shipboard conditions.
(V)(G) "OPERATIONAL TEST"
3.2 Accomplish operational testing of the equipment installed in 3.1 to ensure equipment functions to designed sequence of operation, in accordance with ship's operating procedures.
3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None.
4.2 CFR: E-NASS-0296 applies
4.3 CFR: E-NASS-0386 applies
4.4 CFR: E: NASS-0448 applies
5. GOVERNMENT FURNISHED MATERIAL (GFM):
SSP: TPPC-CG70-SWRMC21-CN01 2 of 2 ITEM NO: 331-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LAKE ERIE (CG 70) ITEM NO: 437-21-001 (E5)
COAR: 16 PCN: EB14-2195
EB14-2194
EB14-2198
EM04-3051
CSWT FILE NO: 437-004 (CG 47) CMP: NONE
REVISED: 11 Oct 2018 PLANNER: BYRUM, JEREMY
COLE, RANDOLPH
MALONE, LISA
SSP: TPPC-CG70-SWRMC21-CN01 1 of 4 ITEM NO: 437-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Fuel Oil Storage Tank Level Indicator (TLI) System; repair
1.2 Location of Work:
1.2.1 Fuel Oil Tank (6-58-1-F)
1.2.2 Boatswain Storeroom (4-78-1-A)
1.2.3 Fuel Oil Tank (6-94-1-F)
1.2.4 MK 41 Vertical Launching System Magazine Number One (3-94-0-M)
1.2.5 Fuel Oil Tank (6-174-2-F)
1.2.6 Engine Room Number One (5-174-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), Tank Level Indicating (TLI) System for Fuel Oil Storage Tank (6-58-1-F), Circuit Number C-5TK2-1
1.3.1.1 Quantity (One EA), TLI Transmitter, Liquid Quantity, Gems Designation Number XM-55050-81-U-43-2000-L-38-1000-I-L-30, NSN 6680-01-281-3352, Identifying Number P78 of Sheet 4, Section 4-A of 2.5, Manufacturer Gems Danaher, Gems Sensor Division, Plainville, CT, Located in 1.2.1
1.3.1.2 Quantity (One EA), TLI Junction Box Assembly, One Probe, Gems Part Number 36565, NSN 5940-01-425-1596, Identifying Number J1 of Sheet 4, Section 4-A of 2.5, Located in 1.2.2
1.3.2 Quantity (One EA), TLI System for Fuel Oil Storage Tank (6-94- 1-F), Circuit Number C-5TK2-7
1.3.2.1 Quantity (One EA), TLI Transmitter, Liquid Quantity, Gems Designation Number XM-55050-75-U-36-1000-L-39-0510-I-L-50, NSN 6680-01-323-8730, Identifying Number P102 of Sheet 4, Section 7-A of 2.5, Manufacturer Gems Danaher, Gems Sensor Division, Plainville, CT, Located in 1.2.3
1.3.2.2 Quantity (One EA), TLI Transmitter, Liquid Quantity, Gems Designation Number XM-55050-118-1000-I-L-30, NSN 6680-01- 266-6889, Identifying Number P14 of Sheet 4, Section 7-A of 2.5, Manufacturer Gems Danaher, Gems Sensor Division, Plainville, CT, Located in 1.2.3
1.3.2.3 Quantity (One EA), TLI Junction Box Assembly, 2 Probe, Gems Part Number 36552, NSN 5940-01-425-1598, Identifying Number J2 of Sheet 4, Section 7-A of 2.5, Located in 1.2.4
SSP: TPPC-CG70-SWRMC21-CN01 2 of 4 ITEM NO: 437-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1.3.3 Quantity (One EA), TLI System for Fuel Oil Storage Tank (6- 174-2-F), Circuit Number C-5TK2-4
1.3.3.1 Quantity (One EA), TLI Transmitter, Liquid Quantity, Gems Designation Number XM-55050-39-1500-I-L-50, NSN 6680-01-262- 4045, Identifying Number P81 of Sheet 8, Section 7-B of 2.5, Manufacturer Gems Danaher, Gems Sensor Division, Plainville, CT, Located in 1.2.5
1.3.3.2 Quantity (One EA), TLI Transmitter, Liquid Quantity, Gems Designation Number XM-55050-30-1500-I-L-30, NSN, 6680-01- 256-8467, Identifying Number P40 of Sheet 8, Section 7-B of 2.5, Manufacturer Gems Danaher, Gems Sensor Division, Plainville, CT, Located in 1.2.5
1.3.3.3 Quantity (One EA), TLI Transmitter, Liquid Quantity, Gems Designation Number XM-55050-28-0510-I-L-30, NSN 6680-01-266- 6899, Identifying Number P100 of Sheet 8, Section 7-B of 2.5, Manufacturer Gems Danaher, Gems Sensor Division, Plainville, CT, Located in 1.2.5
1.3.3.4 Quantity (One EA), TLI Junction Box Assembly, 3 Probe, Gems Part Number 36553, NSN 5975-01-211-8720, Identifying Number J3 of Sheet 8, Section 7-B of 2.5, Located in 1.2.6
2. REFERENCES:
2.1 Standard Items, (FY21)
2.2 S9261-AQ-MMA-010, Change C, Fuel Control System for CG47 through
CG73
2.3 0965-LP-109-1010 Rev 4, Tank Level Indicating (TLI) System, Type No.
36000
2.4 SN572-AH-MMA-010, Change C, Tank Level Indicators
2.5 541-6013570 Rev H, Tank Level Indicating System
2.6 MIL-STD-2003A, Electric Plant Installation Standard Methods for Surface Ships and Submarines
2.7 MIL-STD-1310H, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility, Electromagnetic Pulse (EMP) Mitigation, and Safety
2.8 43721-4-701 Rev B, Gem Tank Level Indicator Functional Test
2.9 605-2540769 Rev D, Label Plate Standards
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-90 of 2.1 for the services of a qualified technical representative to provide oversight assistance of maintenance support and technical documentation, special tools, equipment, and production support for the equipment listed in 1.3.
3.2 Remove existing and install new the equipment listed in 1.3, located in 1.2 and provided in 5.1, using the technical representative provided in 3.1 and 2.2 through 2.5 for guidance.
SSP: TPPC-CG70-SWRMC21-CN01 3 of 4 ITEM NO: 437-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.2.1 Ensure each electrical installation is in accordance with 2.6.
3.2.2 Bond and ground equipment in accordance with 2.7.
3.3 Accomplish the requirements of 009-25 of 2.1 for a completion air test of each tank located in 1.2. Test pressure must be 2 PSIG. Maintain test pressure for 15 minutes for temperature stabilization prior to start of test. Hold test pressure for 10 minutes. Allowable drop in pressure:
None.
3.4 Accomplish the requirements of 009-13 of 2.1 for each receiver meter, each remote meter, and each edge view meter associated with each TLI receiver for each tank listed in 1.2 using the technical representative provided in 3.1 and 2.2 through 2.5 for guidance.
(Q)(G) "ALIGN AND CALIBRATE"
3.5 Align and calibrate each new TLI transmitter installed in 3.2 in accordance with Chapters 6-6 through 6-8 of 2.3, using the technical representative provided in 3.1, 2.2 and 2.4 and 2.5 for guidance.
3.5.1 Accomplish dry tank calibration in accordance with Chapter 6-7 through Chapter 6-8 of 2.2.
(E5)
3.5.2 Accomplish DELETEDliquid in tank calibration in accordance with Chapter 6-8 of 2.2.
(E5)
(Q)(G) "OPERATIONAL TEST"
3.6 Accomplish an operational test of each new TLI transmitter aligned and calibrated in 3.4 in accordance with 2.8 and using the technical representative provided in 3.1 for guidance. Allowable defects: None.
3.7 Install each new label plate in accordance with 2.9, using 2.4 and
2.5 for guidance.
3.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
4. NOTES:
4.1 If NSI 009-90 is invoked in the work specification, the OEM may witness/conduct the (G) checkpoints as authorized by the SUPERVISOR.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 1 EA
TLI Transmitter, Liquid Quantity P78 2.5
6680-01- 281-3352 3.2
2. 1 EA
TLI Transmitter, Liquid Quantity P102 2.5
6680-01- 323-8730 3.2
3. 1 EA
TLI Transmitter, Liquid Quantity P14 2.5
6680-01- 266-6889 3.2
4. 1 EA TLI Transmitter, P81 2.5 6680-01- 3.2
SSP: TPPC-CG70-SWRMC21-CN01 4 of 4 ITEM NO: 437-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Liquid Quantity 262-4045
5. 1 EA
TLI Transmitter, Liquid Quantity P40 2.5
6680-01- 256-8467 3.2
6. 1 EA
TLI Transmitter, Liquid Quantity P100 2.5
6680-01- 266-6899 3.2
7. 1 EA
TLI Junction Box Assembly J1 2.5
5940-01- 425-1596 3.2
8. 1 EA
TLI Junction Box Assembly J2 2.5
5940-01- 425-1598 3.2
9. 1 EA
TLI Junction Box Assembly J3 2.5
5975-01- 211-8720 3.2
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LAKE ERIE (CG 70) ITEM NO: 438-90-002 (E5)
COAR: 30 PCN: PE20-L022
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 Apr 2019 PLANNER: MALONE, LISA
CHUA, PATRICK
COLE, RANDOLPH
WENCESLAO, JAY
SSP: TPPC-CG70-SWRMC21-CN01 1 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: ShipAlt CG47-73856K, Integrated Ship Control; accomplish
(OPTION ITEM)
(E4)
1.2 Location of Work:
1.2.1 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable.
1.4 Security Classification of Equipment, Components, Spaces and Documents: The Equipment, Space or Document is classified and subject to the applicable provisions of the National Industrial Security Program Operating Manual, DOD 5220.22M (0584-LP-179-6400).
1.4.1 Spaces:
1.4.1.1 Pilot House (05-149-0-C) (CONFIDENTIAL)
1.4.1.2 Aegis Radar Room No. One (04-140-1-C) (CONFIDENTIAL)
1.4.1.3 MK-99 Transmitter Room (03-162-2-C) (CONFIDENTIAL)
1.4.1.4 Combat System Maintenance Control Repair 8 and Technical Library (1-159-0-C) (CONFIDENTIAL)
1.4.1.5 Combat System Maintenance Control Repair 8 and Technical Library (1-159-0-C) (CONFIDENTIAL)
1.4.1.6 Radio Central (02-220-0-C) (SECRET)
1.4.1.7 Combat Information Center (02-138-0-C) (CONFIDENTIAL)
1.4.1.8 Computer Central (01-138-0-C) (CONFIDENTIAL)
1.4.1.9 AEGIS Radar Room No. 3 (01-220-0-C) (CONFIDENTIAL)
1.4.1.10 Sonar Room No. One (2-28-0-Q) (CONFIDENTIAL)
1.4.1.11 IC & Gyro Room No. One & Load Center (2-127-0-C)
(CONFIDENTIAL)
1.4.1.12 Central Control Station (2-272-0-C) (CONFIDENTIAL)
1.4.1.13 IC & Gyro Room No. 2 (3-382-0-C) (CONFIDENTIAL)
2. REFERENCES:
2.1 Standard Items, (FY21)
2.2 DM 10-623 Rev B, SERMC, Quality Assurance Requirements for Welding of 5XXX Series Aluminum Structural for CG-47 Class
2.3 S9CG0-BP-SRM-010/CG47 CL , Superstructure Cracking Repair
SSP: TPPC-CG70-SWRMC21-CN01 2 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2.4 185-8530347 Rev A, ShipAlt CG47-73856K ISC Upgrade Foundation Ripout
2.5 185-8530348 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 1 Foundations
2.6 185-8530349 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 2 (01 Lvl & Abv) Foundations
2.7 185-8530350 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 2 (IB to Mn Dk) Foundations
2.8 185-8530351 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 3 Foundations
2.9 185-8530352 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 4 Foundations
2.10 185-8530353 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 5 Foundations
2.11 621-8530373 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Joiner Bhd
2.12 622-8530374 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to False Decks
2.13 622-8530375 Rev A, ShipAlt CG47-73856K ISC Upgrade Misc Grating & Handrail Mod
2.14 624-8530376 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Joiner Doors
2.15 512-8530369 Rev A, ShipAlt CG47-73856K ISC-Upgrade Mod to HVAC Sys
2.16 640-8530379 Rev A, ShipAlt CG47-73856K ISC-Upgrade Mod to Furniture
2.17 671-8530380 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Stowages
2.18 558-8530370 Rev A, ShipAlt CG47-73856K ISC Upgrade Misc Piping System Mod Fr 260-Fwd
2.19 558-8530371 Rev A, ShipAlt CG47-73856K ISC Upgrade Misc Piping System Mod Fr 260 Aft
2.20 101-8530345 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Compt & Access
2.21 401-8530357 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 1 Mod to Arr
2.22 401-8530358 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 2 Mod to Arr
2.23 401-8530359 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 3 Mod to Arr
2.24 401-8530360 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 4 Mod to Arr
2.25 401-8530361 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 5 Mod to Arr
2.26 631-8530377 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Paint
SSP: TPPC-CG70-SWRMC21-CN01 3 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Schedule
2.27 634-8530378 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Deck Covering
2.28 602-8530372 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Label Plates
2.29 304-8799287, CG47 Class Integrated Design Drawing for CG70 Cable Routing
2.30 304-8799290, CG47 Class Integrated Drawing Design for CG70 Cable Way Mod
2.31 4720-CG71-FY21 Rev 8, Ship Alteration Material Summary (4720/3) (E5)
2.32 00IDDCG70P162, RLAR 00IDDCG70P162 (E3)
2.33 73856CG70P161, RLAR 73856CG70P161 (E3)
2.34 REV16, 4720-CG70-SRA21-A09-ISSUE-SUPPL--REV16 (E3)
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-09 of 2.1 for Welding 5XXX Series Aluminum Structures for CG-47 Class in accordance with 2.2 and 2.3.
3.1.1 Each weld to each deck and each longitudinal bulkhead that are associated with a Structural Ship Alteration are critical welds, regardless if the Alteration is in a critical region and regardless of where welding occurs.
3.1.2 Accomplish the requirements of 2.32, 2.33, and 2.34 in their entirety.
(E3)
3.2 Accomplish the requirements of 2.4 through 2.20 and 2.26 through
2.28 and applicable portions of 2.29 through 2.30 including all general, local, special, test and rip-out notes, using 2.21 through 2.25 for guidance and material listed in 5.3. (See Note 4.1)
3.2.1 Work is to be completed in accordance with the schedule in Attachment A.
3.2.2 Cut and fit all raw material provided as GFM in 5.3 to the appropriate size for install.
3.2.3 Accomplish the requirements of 009-65 of 2.1.
3.2.4 Chip and grind each surface flush and smooth in way of each removal and repair.
3.2.5 Vee out and weld 10 linear feet of linear indications, based on liquid penetrant inspection of base metal conducted in 3.2 and as directed by the SUPERVISOR.
3.2.6 Accomplish 10 square feet of aluminum base metal repairs, based on liquid penetrant inspection of base metal conducted in 3.2 and as directed by the SUPERVISOR.
3.2.6.1 Each base metal repair weld area shall not exceed 2
SSP: TPPC-CG70-SWRMC21-CN01 4 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
inches in diameter.
3.2.6.2 Each surface shall be ground to sound metal prior to
clad welding.
3.2.6.3 Fill local pits and grooves with weld material prior to application of principal build up layers.
3.2.6.4 Surfaces of completed base metal repair welds shall be ground smooth with plate surface.
3.2.6.5 Submit one legible copy, in hard copy or approved
transferrable media, of a bi-weekly report listing amount of welding conducted in 3.2.5 and 3.2.6 to the SUPERVISOR. Total cost greater or less than the specified requirements will be subject to an equitable adjustment.
3.2.7 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A, B, and C, Lines One through 7.
3.2.7.1 Accomplish nondestructive testing in accordance with
Lines 9, 10 and 11.
(V)(G) "STRAIN FREE"
3.2.8 Align the piping to each joint and fitting. Piping must be supported independently and must not impose a strain.
3.2.9 Accomplish the requirements of 009-12 of 2.1, including Table One, Columns A and B, Lines One through 10.
3.2.10 Accomplish the requirements of 009-25 of 2.1 for an air hose test of new and disturbed watertight boundary bulkhead/deck welds, and cable penetrations. Allowable leakage: None
(V)(G) "VENTILATION TEST"
3.2.11 Accomplish testing and balancing of HVAC system with the requirements of Test Note T-1 and T-2 of 2.15. Allowable leakage at new and disturbed joints: none
3.2.12 Isolate each component subject to damage and clean the new and modified fresh water, chilled water, oily waste, and JP-5 piping system to a cleanliness level that results in the internal surfaces being visually free of grease, oil, flux, scale, dirt, loose particles, and other contamination foreign to the base metal. Tap water residues on metals and light superficial rust on carbon steel surfaces, caused by a short time exposure to the atmosphere, are permitted. Light dust on cleaned surfaces is not objectionable, provided that the quantity and size of the particle does not adversely affect system operation.
3.2.13 Isolate each component subject to damage and clean the new and modified firemain, seawater, weather deck drain, and condensate drain piping system to a cleanliness level that results in the internal system surfaces being cleaned free of contamination and remaining residue on the surface does not interfere with the
SSP: TPPC-CG70-SWRMC21-CN01 5 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
operation of or damage system components.
3.2.14 Accomplish the requirements of 009-71 of 2.1 for new and disturbed piping as follows:
3.2.14.1 Accomplish a hydrostatic test for new and disturbed JP- 5 piping in accordance with Test Note T-2 on sheet 7 of 2.19.
Allowable leakage: None.
3.2.14.2 Accomplish a static test on new and disturbed weather deck drain piping in accordance with Test Note T-2 on sheet 6 of
2.19. Allowable leakage: None.
3.2.14.3 Accomplish a static test on new and disturbed chilled water piping in accordance with Test Note T-3 on sheet 10 of
2.19. Allowable leakage: None.
3.2.14.4 Accomplish a static test on new and disturbed
condensate drain piping in accordance with Test Note T-2 on sheet 13 of 2.19. Allowable leakage: None.
(V)(G) "OPERATIONAL TEST"
3.2.15 Accomplish an operational test on new and disturbed firemain, seawater, oily waste, JP-5, chilled water, condensate drain, wash water and fresh water piping in accordance with Test Note T-M080G of
2.18 and Test Notes T-2 on sheets 5, 7, 10, 11, 12 and 15 of 2.19.
Allowable leakage: None
3.2.16 Accomplish the requirements of 009-87 of 2.1.
3.2.17 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 6, Columns A, B, D and E for preservation of steel surfaces in accordance with 2.26.
3.2.18 Accomplish the requirements of 009-26 of 2.1, including Attachments B and C, in accordance with 2.27.
3.2.18.1 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 28, Columns A and B, for Aluminum Decks.
3.2.18.2 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 6, Columns A and B, for Steel Decks.
3.2.19 Accomplish the requirements of 009-11 of 2.1 for new or disturbed lagging and insulation.
3.2.19.1 Accomplish the requirements of 009-12 of 2.1 for each new fastener (stud) to support insulation and lagging.
3.2.19.2 Accomplish the requirements of 009-32 of 2.1 for each surface to be insulated with the exception of non-ferrous and corrosion resistant steel (CRES) piping, plating, and vent ducting.
3.2.19.3 Accomplish the requirements of 009-32 of 2.1 for new insulation, lagging, and reusable covers to match each surrounding area.
SSP: TPPC-CG70-SWRMC21-CN01 6 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.3 Accomplish the requirements of 2.28 for label plates.
3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
4. NOTES:
4.1 AIT is doing all of the electrical, fiber, and equipment mounting.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 1 KT
Kit fo ShipAlt 73856K 2.31 3.2
SSP: TPPC-CG70-SWRMC21-CN01 7 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
ATTACHMENT A 438-90-002
USS Lake Erie (CG 70) 73856K EQUIPMENT & CABLE INSTALL SCHEDULE AND TEST
REQUIREMENT DATES: Rev:
Equipment A+Date
Date to turnover for connection by
AIT or Completion/Testin g Date
Comments Compartment Bulls Eye
ISC Turnover 1 A+110 10-Mar-21
Lighting Distribution Sys Mod Complete to support energizing power to all equipment for A+110.
A+110 10-Mar-21 SHIP WIDE SHIP
WIDE
Network Switch 1 A+110 10-Mar-21 Sonar 2-28-0-Q
Network Switch 2 A+110 10-Mar-21 CSMC 1-159-0-Q
Network Switch 3 A+110 10-Mar-21 CCS 2-272-0-C
Network Switch 4 A+110 10-Mar-21 AFT IC 3-382-0-C
All FICB's A+110 10-Mar-21 SHIP WIDE SHIP
WIDE
UPS 1 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
FAN RM 03-138-2-
Q
UPS 2 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
FAN RM 03-188-0-
Q
UPS 3 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
PLT STAGE 2-58-0-Q
UPS 4 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
MER 1 5-174-0-E
UPS 5 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
ECSE 3-245-2-Q
UPS 6 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
MER 2 5-300-0-E
SSP: TPPC-CG70-SWRMC21-CN01 8 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
UPS 7 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
NIXIE 2-506-1-Q
CPU RACK #2 A+110 10-Mar-21 CCS 2-272-0-C
SOSU-11 A+110 10-Mar-21 CCS 2-272-0-C
SOSU-9 A+110 10-Mar-21 CCS 2-272-0-C
SOSU-13 A+110 10-Mar-21 CCS 2-272-0-C
DAU-17A A+110 10-Mar-21 CCS 2-272-0-C
DAU-17B A+110 10-Mar-21 CCS 2-272-0-C
CPU RACK #1 A+110 10-Mar-21 CCS 2-272-0-C
ICAS EQUIPMENT RACK A+110 10-Mar-21 CCS 2-272-0-C
SOSU-10 A+110 10-Mar-21 CCS 2-272-0-C
SOSU-12 A+110 10-Mar-21 CCS 2-272-0-C
PROPULSION BACKUP
LAN SWITCH ENCL IN
CCS
A+110 10-Mar-21 CCS 2-272-0-C
RELAY ENCL NO. 2 A+110 10-Mar-21 AUX 2 5-260-0-E
RSOS-8 A+110 10-Mar-21 AUX 2 5-260-0-E
ISC Turnover 2 A+118 18-Mar-21
Lighting Distribution Sys Mod Complete to support energizing power to all equipment for A+118.
A+118 18-Mar-21 SHIP WIDE SHIP
WIDE
Macinery Control Connection Boxes, Connections/Modification s Complete to Support all
Equipment in
A+118 18-Mar-21 SHIP WIDE SHIP
WIDE
Damage Control Connection Boxes, Connections/Modification s Complete to Support all
Equipment in
A+118 18-Mar-21 SHIP WIDE SHIP
WIDE
Misc IC System Mod Dwg A+118 18-Mar-21
Complete and tested before Earliest Event, Undocking or
MST/PCD
(Date)
SHIP WIDE SHIP
WIDE
SSP: TPPC-CG70-SWRMC21-CN01 9 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
PROPULSION BACKUP
LAN SWITCH ENCL IN
MER 1
A+118 18-Mar-21 MER 1 5-174-0-E
RSOS-7 A+118 18-Mar-21 CSMC 1-159-0-Q
RSOS-1 A+118 18-Mar-21 REPAIR 2 1-94-2-Q
DAU-10 A+118 18-Mar-21 MER 1 5-174-0-E
DAU-8A A+118 18-Mar-21 MER 1 5-174-0-E
RSOS-3 A+118 18-Mar-21 MER 1 5-174-0-E
RSOS-4 A+118 18-Mar-21 MER 1 5-174-0-E
DAU-11 A+118 18-Mar-21 MER 1 5-174-0-E
DAU-8B A+118 18-Mar-21 MER 1 5-174-0-E
RSOS-2 A+118 18-Mar-21 MER 1 5-174-0-E
DAU-12B A+118 18-Mar-21 AUX 1 5-220-0-E
DAU-18A A+118 18-Mar-21 MER 1 5-174-0-E
RSOS-5 A+118 18-Mar-21 REPAIR 5 1-226-2-Q
RSOS-6 A+118 18-Mar-21 AUX 1 5-220-0-E
RELAY ENCLOSURE
NO4/ DSLC A+118 18-Mar-21 MER 1 5-174-0-E
ISC Turnover 3 A+125 25-Mar-21
Lighting Distribution Sys Mod Complete to support energizing power to all equipment A+77.
A+125 25-Mar-21 SHIP WIDE SHIP
WIDE
Macinery Control Connection Boxes, Connections/Modification s Complete to Support all
Equipment in
A+125 25-Mar-21 SHIP WIDE SHIP
WIDE
Damage Control Connection Boxes, Connections/Modification s Complete to Support all
Equipment in
A+125 25-Mar-21 SHIP WIDE SHIP
WIDE
RSOS-9 A+125 25-Mar-21 HELO HNGR 02-292-0- Q
DAU-19B A+125 25-Mar-21 MER 2 5-300-0-E
RELAY ENCLOSURE NO
1 A+125 25-Mar-21 ECSE 1 3-245-2-Q
DAU-12A A+125 25-Mar-21 ECSE 1 3-245-2-Q
SSP: TPPC-CG70-SWRMC21-CN01 10 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
DAU-19A A+125 25-Mar-21 MER 2 5-300-0-E
DAU-26B A+125 25-Mar-21 JP-5 PMP
RM 3-398-0-E
DAU-18B A+125 25-Mar-21 MER 2 5-300-0-E
DAU-20 A+125 25-Mar-21 MER 2 5-300-0-E
RSOS-10 A+125 25-Mar-21 MER 2 5-300-0-E
RSOS-14 A+125 25-Mar-21 MER 2 5-300-0-E
RELAY ENCLOSURE NO
3 A+125 25-Mar-21 JP-5 PMP
RM 3-398-0-E
RELAY ENCLOSURE NO
5/ DSLC A+125 25-Mar-21 MER 2 5-300-0-E
RELAY ENCLOSURE NO
6/ DSLC A+125 25-Mar-21 ECSE 2 2-439-2-Q
PROPULSION BACKUP
LAN SWITCH ENCL IN
MER 2
A+125 25-Mar-21 MER 2 5-300-0-E
DAU-27 A+125 25-Mar-21 ECSE 2 2-439-2-Q
RSOS-12 A+125 25-Mar-21 REPAIR 3 2-446-2-Q
RSOS-13 A+125 25-Mar-21 3 SWBD 2-464-3-Q
RSOS-15 A+125 25-Mar-21 MER 2 5-300-0-E
DAU-26A A+125 25-Mar-21 SD STRM 3-382-1-A
RSOS-11 A+125 25-Mar-21 JP-5 PMP
RM 3-398-0-E
DAU-21 A+125 25-Mar-21 MER 2 5-300-0-E
ISC Turnover 4 A+139 08-Apr-21 Lighting Distribution Sys Mod Complete to support energizing power to all equipment for A+139.
A+139 08-Apr-21 SHIP WIDE SHIP
WIDE
Macinery Control Connection Boxes, Connections/Modification s Complete to Support all
Equipment in
A+139 08-Apr-21 SHIP WIDE SHIP
WIDE
Damage Control Connection Boxes, Connections/Modification s Complete to Support all
Equipment in
A+139 08-Apr-21 SHIP WIDE SHIP
SSP: TPPC-CG70-SWRMC21-CN01 11 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
FLUX-GATE A+139 08-Apr-21 PLT HS 05-149-0- C
SCS-2 CPU A+139 08-Apr-21 C CNTRL 03-138-0- C
LOCAL SCS-2 KVM
AMPL A+139 08-Apr-21 C CNTRL 03-138-0-
C
NAV - 4 CPU A+139 08-Apr-21 C CNTRL 03-138-0- C
LOCAL NAV-4 KVM
AMPL A+139 08-Apr-21 C CNTRL 03-138-0-
C
NAV - 3 CPU A+139 08-Apr-21 C CNTRL 03-138-0- C
LOCAL NAV-3 KVM
AMPL A+139 08-Apr-21 C CNTRL 03-138-0-
C
NAV 2 DISPLAY A+139 08-Apr-21 CIC 02-138-0- C
CONN RACK A+139 08-Apr-21 CIC 02-138-0- C
DAU-4 A+139 08-Apr-21 C CNTRL 03-138-2- Q
IBS RADAR INTERFACE
RACK A+139 08-Apr-21 XMTR RM 03-162-2-
C
PC RACK I (NAV 1& 5)
IBS BACKUP LAN ) A+139 08-Apr-21 RADAR RM
04-140-1- C
LAN SWITCH
ENCLOSURE A+139 08-Apr-21 CIC 02-138-0-
C
MCS HMI CPU RACK A+139 08-Apr-21 RADAR RM
04-140-1- C
REMOTE SCS-2 KVM
AMPL(VMS) A+139 08-Apr-21 CO 04-140-2-
L
NAV - 4 DISPLAY A+139 08-Apr-21 CO 04-140-2- L
REMOTE NAV-4 KVM
AMPL(VMS) A+139 08-Apr-21 CO 04-140-2-
L
REMOTE NAV-4 KVM
AMPL(HMI) A+139 08-Apr-21 CO 04-140-2-
L
NAV - 3 DISPLAY A+139 08-Apr-21 CHRT RM 04-164-1- C
REMOTE NAV-3 KVM
AMPL A+139 08-Apr-21 CHRT RM 04-164-1-
C
NAV - 1 DISPLAY A+139 08-Apr-21 PLT HS 05-149-0- C
REMOTE NAV-1 KVM
AMPL A+139 08-Apr-21 PLT HS 05-149-0-
C
HELM A+139 08-Apr-21 PLT HS 05-149-0- C
SCS - 2 DISPLAY A+139 08-Apr-21 PLT HS 05-149-0-
SSP: TPPC-CG70-SWRMC21-CN01 12 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
C
REMOTE SCS-2 KVM
AMPL A+139 08-Apr-21 PLT HS 05-149-0-
C
NAV 2 ENCLOSURE A+139 08-Apr-21 CIC 02-138-0- C
NAV - 5 DISPLAY A+139 08-Apr-21 CIC 02-138-0- C
DAU-3 A+139 08-Apr-21 FAN RM 03-188-0- Q
CONN DISPLAY A+139 08-Apr-21 PLT HS 05-149-0- C
REMOTE CONN KVM
AMPL A+139 08-Apr-21 PLT HS 05-149-0-
C
LEE HELM A+139 08-Apr-21 PLT HS 05-149-0- C
CL BWDU (MON + CPU
OH) A+139 08-Apr-21 PLT HS 05-149-0-
C Port BWDU A+139 08-Apr-21 WD 05 WD 05
Stbd BWDU A+139 08-Apr-21 WD 05 WD 05
EOOW DESK A+139 08-Apr-21 CCS 2-272-0-C
Hydra Equipment A+145 14-Apr-21
Hydra install complete and ready to test by
Date.
Testing complete by
MST/PCD
SHIP WIDE SHIP
SHIP: USS LAKE ERIE (CG 70) ITEM NO: 516-11-002 (E5)
COAR: 16 PCN: EA01-8004
CSWT FILE NO: 516-006 (CG 47) CMP: NONE
REVISED: 14 Sep 2019 PLANNER: FEUZ, SEAN
COLE, RANDOLPH
HERNANDEZ, GENARO
LOPEZ, CHRISTOPHER
SSP: TPPC-CG70-SWRMC21-CN01 1 of 3 ITEM NO: 516-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Evaporator Pressure Regulator (EPR) Valve; replace
1.2 Location of Work:
1.2.1 Provisions Handling Room (2-232-0-Q)
1.3 Identification:
1.3.1 Quantity (2 EA), Valve, Regulating, Mfr: Parker Hannifin, A8A- 7/8 by 7/8,Part Number:101711, NSN: 3b 4820-01-111-8371, APL:
882103022, RSS 60 and RSS 61 of 2.4
2. REFERENCES:
2.1 Standard Items, (FY21)
2.2 S9086-RW-STM-010/CH-516 Rev 5, Refrigeration Systems
2.3 S9516-AH-MMA-010 Rev 6, Ship's Stores Refrigeration Plant, 1.1 Tons Capacity
2.4 519-6013489 Rev E, Refrigeration System Arrangement 1st Platf FR 220-260
2.5 516-6014009 Rev C, Refrigeration System Piping Diagram
2.6 MIL-STD-777 Rev F, Change 2, Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships
2.7 605-2540769 Rev D, Label Plate Standards
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-86 of 2.1, Pump down, remove, clean and store the refrigerant from the equipment listed in 1.3 and located in 1.2, using 2.2 and 2.3 as guidance.
(E5)
3.1.1 Retain Refrigerant for reuse.
3.1.2 Stencil each container legibly using one inch high character with the word "Clean R-134".
Report: Required Report (AC) -
AVAILABILITY
COMPLETION + 4
days
3.1.2.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the cleaning requirements of 3.1 and amount of refrigerant removed to the
SUPERVISOR.
SSP: TPPC-CG70-SWRMC21-CN01 2 of 3 ITEM NO: 516-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.2 Remove existing and install new each EPR valve listed in 1.3 and located in 1.2.1, using 2.2 through 2.6 for guidance.
3.3 Chip and grind each surface flush in way of each repair.
3.4 Accomplish the requirements of 009-12 of 2.1, including Table One, Column B, Lines One through 10.
3.4.1 Accomplish the requirements of 009-71 of 2.1 for the new and disturbed piping system.
3.4.1.1 Ensure hydrostatic test pressure is 250 PSIG, using dry nitrogen in accordance with 2.5.
(V) "STRAIN FREE"
3.5 Align the piping to each new valve. Piping must be supported independently and must not impose a strain.
3.6 Evacuate and dehydrate new and disturbed refrigeration equipment and associated piping using section 6-8 of 2.3 for guidance.
3.6.1 Charge system using refrigerant recovered in 3.1.1.
(V)(G) "LEAK TEST"
3.7 Accomplish refrigerant leak-testing procedure in accordance with section 6.6 of 2.3. Allowable leakage: None
(V)(G) "OPERATIONAL TEST"
3.8 Accomplish an operational test of the equipment listed in 1.3 at system operating temperature and pressure. Allowable leakage at disturbed joints: None.
3.8.1 Cycle each valve from full shut to full open 4 times.
Allowable sticking or binding: None.
3.8.2 Adjust new ERP valves in accordance with paragraph 516-
8.7.5.9.1 of 2.2.
3.9 Install each new label plate in accordance with 2.7, using 2.5 for guidance.
3.10 Accomplish the requirements of 009-32 of 2.1, for new and disturbed surface.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
5.2 PUSH MATERIAL:
SSP: TPPC-CG70-SWRMC21-CN01 3 of 3 ITEM NO: 516-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. None.
File details come from the government source that posted it. Updated .