Bidder Question Nos. 47 - 71.pdf

PDF 101 KB Posted

Attached to
Amendment 0009 USS LAKE ERIE (CG-70) FY21 Selected Restricted Availability (SRA)
Solicitation number
N00024-20-R-4401
Issued by

About this file

This document contains a solicitation and related questions and answers for the USS Lake Erie (CG-70) FY21 Selected Restricted Availability. The solicitation seeks proposals for the execution of maintenance, modernization, and repair efforts for the USS Lake Erie, requiring facilities capable of coordinating multiple areas of ship maintenance and repair. Interested parties must register in the System for Award Management and monitor the beta.SAM.gov site for solicitation release and amendments. Proposals are due in August 2020 and the availability start date is anticipated to be November 2020. The place of performance is a contractor facility on the West Coast of the United States. The solicitation includes specifications, work plans and drawings, milestones, and a pricing workbook, and is a full and open competition not set aside for small businesses. The document also contains 71 questions and answers related to clarifying details of the specification package.

View the file

Other files

File Type Posted
N0002420R4401_A0009_CONFORMED.pdf PDF
N0002420R4401_A0009.pdf PDF
N0002420R4401_A0008_CONFORMED.pdf PDF
N0002420R4401_A0008.pdf PDF
Bidder Question Nos. 81 - 101.pdf PDF
N0002420R4401_A0007_CONFORMED.pdf PDF
N0002420R4401_A0007.pdf PDF
N0002420R4401_A0006.pdf PDF
Bidder Question Nos. 72 - 80.pdf PDF
N0002420R4401_A0006_CONFORMED.pdf PDF
TPPC-CG70-SWRMC21-CN01 - ERRATA 5 Rev 1.pdf PDF
N0002420R4401_A0005.pdf PDF
N0002420R4401_A0005_CONFORMED.pdf PDF
TPPC-CG70-SWRMC21-CN01 - ERRATA 4 rev 1.pdf PDF
N0002420R4401_A0004_CONFORMED.pdf PDF
Bidder Question Nos. 39 - 46.pdf PDF
N0002420R4401_A0004.pdf PDF
Bidder Questions Nos. 31 - 38.pdf PDF
N0002420R4401_A0003.pdf PDF
Bidders Questions Nos. 18 - 30.xlsx XLSX spreadsheet
Bidders Questions Nos. 18-30.pdf PDF
N0002420R4401_A0002_Conformed.pdf PDF
Bidders Questions Nos. 18 - 30.pdf PDF
N0002420R4401_A0002.pdf PDF
N0002420R4401_A0001.docx DOCX document
Bidder Questions Nos. 1-17.xlsx XLSX spreadsheet
N0002420R4401_A0001 Conformed.docx DOCX document
Attachment J-8 GFM LIST CG70_FY21_SRA.xlsx XLSX spreadsheet
Attachment S-3 PPI Form CG70_FY21_SRA.docx DOCX document
Attachment S-5 Eligibility Criteria Data Sheet CG70_FY21_SRA.docx DOCX document
Attachment S-7 Proposal Assessment 21_SRA_CG_70.xlsx XLSX spreadsheet
Attachment J-5 QASP CG70_FY21_SRA.pdf PDF
CDRLs.zip ZIP file
Attachment J-7 Schedule Model Review CG70_FY21_SRA.pdf PDF
N00024-20-R-4401.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: N00024‐20‐R‐4401 USS LAKE ERIE (CG 70) SRA NAVSEA POC: Dan Magrino, daniel.magrino@navy.mil, (202) 781‐3544

Jackie Black, jacqueline.black@navy.mil, (202) 781‐1088

Master # Question Area

Para # Date Received Contractor Question Government Response

47 RFP, Sect. C 5.4 8‐Apr‐20

RFP N00024‐20‐R‐4401, Section C ‐ Descriptions and Specifications, SCOPE OF WORK, 5.4 states, “PAINT ABATEMENT: Abatement work will be conducted in accordance with NSI 009‐32. Paint abatement will be included as part of offerors proposed pricing and is not subject to additional growth.” Contractor’s Question: (A) Since the ship was last painted in a US Shipyard, has there been any paint applied outside of the United States? (B) If so, verify that all paint applied outside of the United States met NAVSEA Standard Item FY21, 009‐32, table 1 thru 8 requirements?

Contractors must comply with the requirements of NAVSEA Standard Item 009‐32, which states the following: "Consider marine coatings, decking systems, and abrasive blasting media to contain heavy metals (e.g., beryllium, cadmium, chromium, or lead), hexavalent chromium, crystalline silica and/or other toxic or hazardous substances." The Government does not have confirmation regarding whether paint was applied to the USS LAKE ERIE outside of the United States. Price accordingly.

J‐1, WI No. 331‐

11‐001 3.1 14‐Apr‐20

Work Item 331‐11‐001, Chiller & Freezer Trough Heater Strips; Replace. Paragraph 3.1 states, “Remove existing, procure and install new heating cable identified in 1.3 for the locations listed in 1.2 using 2.2 and 2.3 for guidance”. Contract notes paragraph 3.1 advises to procure a heating cable identified in para 1.3.1 as P/N 2508‐11500 2800 series. This P/N is incorrect and not recognized by vendors… see attached data sheet from the manufacturer with the industry recognized P/N nomenclature. Please provide a correct P/N for this cable. Contractor’s Question: Can the Customer provide the correct part number using industry recognized P/N nomenclature and will an Errata revising the Specification?

No errata will be provided. The part number in 1.3.1 is available to industry.

J‐1, WI No. 167‐

90‐001 2.2 14‐Apr‐20

Work item:167‐90‐001 Reference 2.2 is a ShipAlt replacing 17 doors. One door per RLAR has been Deleted that leaves 16 doors to be replaced. The 4720 list of Kitted material is only showing 15 Doors.

Reference 2.2 DWG 167‐8799530 is showing item 301 to be 4 doors and one was Deleted so that leaves 3 doors 4720 is only showing 2 doors per this item. Will another door be added to 4720 or will KTR need to procure one additional door?

RLAR 83308CG70P167 provided via Errata 3 addresses this concern.

Doors for WI 167‐90‐001 are GFM, the contractor is not required to procure an additional door.

J‐1, WI No. 634‐

11‐001 3.1 14‐Apr‐20

Work Item 634‐11‐001, Galley Annex Deck Covering; install Paragraph 3.1 states, “Accomplish the requirements of 009‐26 of 2.1, including Attachment A, for removal of each existing deck covering system down to base substrate and installation of new waterproof membrane and high durability deck paint conforming to MIL‐PRF‐32584 for each area identified in 1.3 and located in 1.2, using 2.2 for guidance”. Contractor notes NSI 009‐26, paragraph 3.9.3.2 States “The use of a waterproof membrane is not required in areas where MIL‐PRF‐32584, Types I, II or III products are used”. Contractor’s Question: Is it the Customers intension to install both waterproof membrane and high durability deck paint and if not will an Errata be issued revising this specification?

Yes, the intent is to install both waterproof membrane and high durablity deck paint where determined required by the

SUPERVISOR.

J‐1, WI No. 582‐

11‐001 3.4.2 15‐Apr‐20

Work Item: 582‐11‐001 Paragraph 3.4.2, calls out to accomplish a shop test of the equipment overhauled (Capstan). According to the OEM, the Capstan would need to be attached to the Wildcat in order to test and most of the Capstan overhaul would be accomplished on board the ship. The specification does not call to remove equipment, just to accomplish overhaul and para 3.6 requires operational testing. Please delete “shop test” requirement.

Contractor shall accomplish the requirements of 3.4.2 in accordance with Chapter 13 Unit Shop test of 2.4.

J‐1, WI No. 150‐

11‐007 3.3 15‐Apr‐20

Work Item 150‐11‐007: Paragraph 3.1 Remove the grout and deck covering and clean the deck drain area around the deck drain located in 1.2 to accomplish final NDT requirements for aluminum plate weld joint J1 (UT) and deck drain to aluminum weld joint J‐3 (PT), using 2.2 through 2.5 for guidance. Paragraph 3.3 states; "Accomplish the requirements of 009‐26 of 2.1, including Attachment A for installation of each new ceramic tile deck covering system." Contractor’s Question: Is the intension for paragraph

3.3 for the ktr to remove and replace the entire deck located in para 1.2 or just repair the ceramic tile around the deck drain being repaired in 3.1? Please review & advise.

The intent of paragraph 3.3 is to repair the cermaic tile removed around the deck drains following accomplishment of NDT requirements.

J‐1, WI No. 168‐

12‐001 3.3.2 15‐Apr‐20

Work Item: 168‐12‐001 Paragraph 3.3.2 should spell out the requirements for Electrostatic Powdercoating conforming to MIL‐PRF‐24712 vs. Fluidized Bed Method, the same as the requirements in paragraph 3.3. Question (A): Will an Errata be issued to spell out Electrostatic Powdercoating, the same as the requirement in para 3.3 to make it consistent? Paragraph

3.4.1 tasks contractor to “Install each part retained in 3.1.2.2”. There is no such paragraph. Maybe should be 3.1.1.2. Question (B): Will and Errata be issued to make corrections to paragraph 3.4.1?

(A) Paragraph 3.3 states the requirements for Electrostatic Powercoating. 3.3.2 is a subparagraph to 3.3. Not necessary to re‐ state the requirement in a subparagraph.

(B) Typo in 3.4.1. Corrected 3.1.2.2 to 3.1.1.2. Errata No. 4 provides clarification.

J‐1, WI No. 526‐

80‐001 3.1 15‐Apr‐20

WI 526‐80‐001 CG47 Class AER 68141D, Overboard Discharge Modification; accomplish. References 2.2 through 2.4, directs the KTR to install scupper eyebrows below each overboard discharge port. KTR notes, the references provide do not provide enough detail to determine all interferences for the 131 overboard discharge ports. For estimating purposes, all interferences will be determined at time of layout and will be subject to an equitable adjustment.

The contractor is required to bid accurately. The Government has extended the ship check deadline to May 13, 2020, so that the contractor can ship check to determine interferences and estiamte accordingly. If there is a discrpancy between the work specificstion and what is required during execution, addressed through traditional growth process.

J‐1, WI No. 456‐

90‐001 3.2 15‐Apr‐20

WI 456‐90‐001, ShipAlt CG47‐92873K, RME Deactivated/Remove CG Spy Dehydrator, accomplish (OPTION ITEM). Paragraph, 3.2 states, “Accomplish the requirements of

2.2 through 2.4”. Contractor notes that upon review of references 2.2 through 2.4 that there is no material stated to be provided as GFM. Paragraph 3.2.1 states, “Reference 2.6 is Kitted material for this ShipAlt”. Contractor notes that upon review of reference 2.6 4720‐CG70‐FY21 Rev 02, Ship Alteration Material Summary (4720/3) for ShipAlt CG47‐92873K it states “THIS SHIP ALT DOES NOT HAVE GOVERNMENT FURNISHED MATERIAL”. Paragraph 3.2.1.1 states, “Cut and fit all raw material provided as GFM in 5.3 to the appropriate size for install”. Contractor notes that IAW references 2.2 through 2.4 and 2.6 there is no GFM material to be cut and fitted applicable to this specification. Contractor’s Question: Can the Customer provide clarification as to the intent of paragraphs 3.2.1 and 3.2.1.1 and listing Kitted Material in 5.3 and will an Errata be issued revising this specification?

No GFM will be provided. Reference to GFM will be removed from Paragraph 3.2.1, which deletes subparagraph 3.2.1.1. Errata No. 4 provides clarification.

J‐1, WI No. 651‐

90‐001 3.1 16‐Apr‐20

Work Item 651‐90‐001, ShipAlt CG47‐83409K, Advanced Food Service; accomplish. Paragraph 3.1 states, “Accomplish the requirements of 2.2, 2.4 through 2.12, 2.14 through 2.21 and applicable portions of 2.22, including all general, local, special, test and rip‐out notes, and material provided in 5.3 using 2.3 and 2.13 as guidance”.

Contractor notes that both reference 2.3 and 2.13 are both identified for Pre‐Fab and since they are not identified to be accomplished this would lead to a reasonable conclusion that Pre‐Fab has contracted out under another contract and supported by reference 2.28, 4720‐CG70‐FY21 Rev 13, Ship Alteration Material Summary (4720/3) that states “SHALL BE FURNISHED PREFABRICATED BY MANUFACTURER AND SHIPPED TO INSTALLER”. Paragraph 3.1.3 states, “Cut and fit each raw material provided as GFM in 5.3 to the appropriate size for install”. Contractor notes that this paragraph makes it unclear if the Pre‐Fab is being provided as GFM or just as the raw material listed in references 2.28. Contractor’s Question: Can the Customer provide clarification regarding to if the Contractor is performing the Pre‐Fab related to references 2.3 and 2.13 or will these Assemblies be provided as prefabricated GFM and will an Errata be issued revising this specification?

Pre‐fabricated assemblies referenced in 2.3 and 2.13 will be provided as GFM.

57 RFP, Section L N/A 16‐Apr‐20

Contractor’s Question: In order to depressurize the planning schedule and afford all contractors ample time to prepare/submit accurate proposals, and to allow for adequate time for subcontractor/vendor solicitations/evaluations/selections, request the PPI deadline be move from Friday 17 April 2020, 3:00 pm, Eastern Standard Time to Monday 01 May 2020 3:00 pm, Eastern Standard Time and the proposal due date be extended from 26 May 2020 at 10:00 am, Eastern Standard Time to 09 June 2020 at 10:00 am, Eastern Standard Time. A 14‐day proposal due date extension, or roughly ~10 additional planning days.

The Government granted a PPI extension through April 24, 2020, however, the Government will not grant an extension for proposal submission.

58 N/A N/A 16‐Apr‐20 In an effort to protect the health and safety of our employees during a ship check please answer the following questions. Question (A) ‐ Has the USS Lake Erie had any confirmed COVID 19 cases? Question (B) ‐ If so, please identify the potentially contaminated areas / spaces on the ship.

(A) No as of 5 May 2020

(B) N/A

J‐1, WI No. 438‐

90‐002 2.5 17‐Apr‐20 Work item 438‐90‐002. Ref 2.5 DRW 8530348, Find numbers 100, 102 and 118 specifics that this material will be provided as GFM. KTR has reviewed the 4720 GFM ship alt kit called out in paragraph 5.3, and does not see the find number called out on the list. Please provide clarification if these pieces of material will be provided as GFM.

Find numbers 100, 102, and 118 from DRW 8530348 will be provided as GFM.

J‐1, WI No. 438‐

90‐002 2.5 17‐Apr‐20

Work item 438‐90‐002. Ref 2.5 DRW 8530348, Find numbers 130‐136 are stated to be assemblies. Material list for assemblies are not provided on drawing but referred on 185‐8799889. This reference was not provided with RFP package. Can government please provide reference 185‐8799889 or provide assemblies find numbers 130‐136 as

GFM?

Find numbers 130‐136 from DRW 8530348 will be proveded as

GFM.

J‐1, WI No. 438‐

90‐002 2.6 17‐Apr‐20

Work item 438‐90‐002. Ref 2.6 DRW 8530349, Find numbers 186‐193 are stated to be assemblies. Material list for assemblies are not provided on drawing but referred on 185‐8799889. This reference was not provided with RFP package. Can government please provide reference 185‐8799889 or provide assemblies find 186‐193 as GFM?

Find numbers 186‐193 from DRW 8530349 will be proveded as

GFM.

J‐1, WI No. 438‐

90‐002 2.6 17‐Apr‐20 Work item 438‐90‐002. Ref 2.6 DRW 8530349, Find numbers 117, 136, 140 and 162‐169 specifics that this material will be provided as GFM. KTR has reviewed the 4720 GFM ship alt kit called out in paragraph 5.3, and does not see the find number called out on the list. Please provide clarification if these pieces of material will be provided as GFM

Find numbers 117, 136, 140, and 162‐169 from DRW 8530349 will be proveded as GFM.

J‐1, WI No. 438‐

90‐002 2.7 17‐Apr‐20

Work item 438‐90‐002. Ref 2.7 DRW 8530350, Find numbers 112, 115, 125 and 134 specifics that this material will be provided as GFM. KTR has reviewed the 4720 GFM ship alt kit called out in paragraph 5.3, and does not see the find number called out on the list. Please provide clarification if these pieces of material will be provided as GFM. Find numbers 112, 115, 125, and 134 from DRW 8530350 will be proveded as GFM.

J‐1, WI No. 438‐

90‐002 2.8 17‐Apr‐20

Work item 438‐90‐002. Ref 2.8 DRW 8530351, Find numbers 113, 121‐122, 128, 130‐131, 139, 150, 162 and 172‐183 are stated to be assemblies. Material list for assemblies are not provided on drawing but referred on 185‐8799889. This reference was not provided with RFP package. Can government please provide reference 185‐8799889 or provide assemblies find numbers 113, 121‐122, 128, 130‐131, 139, 150, 162 and 172‐183 as GFM?

Find numbers 113, 121‐122, 128, 130‐131, 139, 150, 162 and 172‐ 183 will from DRW 8530351 be provided as GFM.

J‐1, WI No. 438‐

90‐002 2.9 17‐Apr‐20

Work item 438‐90‐002. Ref 2.9 DRW 8530352, Find numbers 130‐132 are stated to be assemblies. Material list for assemblies are not provided on drawing but referred on 185‐8799889. This reference was not provided with RFP package. Can government please provide reference 185‐8799889 or provide assemblies find numbers 130‐132 as GFM? Find numbers 130‐132 from DRW 8530352 will be provided as GFM.

J‐1, WI No. 438‐

90‐002 2.9 17‐Apr‐20

Work item 438‐90‐002. Ref 2.9 DRW 8530352, Find numbers 107‐108 and 144‐145 specifics that this material will be provided as GFM. KTR has reviewed the 4720 GFM ship alt kit called out in paragraph 5.3, and does not see the find number called out on the list. Please provide clarification if these pieces of material will be provided as GFM. Find numbers 107‐108 and 144‐145 from DRW 8530352 will be provided as GFM.

J‐1, WI No. 438‐

90‐002 2.10 17‐Apr‐20

Work item 438‐90‐002. Ref 2.10 DRW 8530353, Find numbers 132‐137 and 144‐145 are stated to be assemblies. Material list for assemblies are not provided on drawing but referred on 185‐8799889. This reference was not provided with RFP package. Can government please provide reference 185‐8799889 or provide assemblies find numbers 132‐137 and 144‐145 as GFM?

Find numbers 132‐137 and 144‐145 from DRW 8530353 will be provided as GFM.

J‐1, WI No. 438‐

90‐002 2.10 17‐Apr‐20 Work item 438‐90‐002. Ref 2.10 DRW 8530353, Find numbers 122‐123 specifics that this material will be provided as GFM. KTR has reviewed the 4720 GFM ship alt kit called out in paragraph 5.3, and does not see the find number called out on the list. Please provide clarification if these pieces of material will be provided as GFM. Find numbers 122‐123 from DRW 8530353 will be provided as GFM.

69 RFP, Section C C‐217‐H0005 17‐Apr‐20

With regard to RFP, Section C ‐ Descriptions and Specifications, CLAUSES INCORPORATED BY FULL TEXT, C‐217‐H005 GROWTH AND NEW WORK (NAVSEA) (JAN 2019), the • Contractor has submitted pre‐proposal inquiries (PPIs) which have identified disparities in the Specification package and has received subsequent revisions to the specifications through Errata 1. Although the deadline to submit PPIs has passed, the contractor continues to identify anomalies within the specifications and submit PPIs for correction. Contractor’s Question: Are there any other known errors or omissions to the contract package that the Customer is aware of, as there are no others reasonably apparent to us?

Pursuant to C‐217‐H005, 'Growth and New Work' the contractor is under an obligation to address any errors or omissions reasoanbly apparent to the contractor prior to proposal submission. The PPI deadline was extended through April 24, 2020 and the ship check deadline has been extended through May 13, 2020. The contractor is encouraged to perform its due diligence in submitting its proposal.

J‐1, WI No. 512‐

11‐002 1.3 22‐Apr‐20 Item 512‐11‐002 Paragraph 1.3 identifies Vaneaxial Fan R01‐230‐3 as being a size A16A4W6 however reference 2.4 identifies this Fan as being a size A3‐1/2A4W6 which will not require a 009‐05. Please review and advise:

The fan identifed in 1.3 is the correct size. The bidder is encourged to ship check in order to verify the actual size and access path in accordance with 009‐05.

71 J‐2 N/A 24‐Apr‐20 As per Government’s response to Question 13, is it the Government’s intent to provide stamped copies as per DFAR 252.204‐7012 of documents listed in Restricted References tab?