Bidder Questions Nos. 1-17.xlsx

XLSX spreadsheet 824 KB Posted

Attached to
Amendment 0009 USS LAKE ERIE (CG-70) FY21 Selected Restricted Availability (SRA)
Solicitation number
N00024-20-R-4401
Issued by

About this file

This document contains a federal contract opportunity solicitation and related files for a ship maintenance availability. The Naval Sea Systems Command issued solicitation N00024-20-R-4401 for execution of the FY21 USS LAKE ERIE (CG 70) Selected Restricted Availability, combining maintenance, modernization, and repair. The work requires a contractor with substantial pier and human resources capable of completing, coordinating, and integrating multiple ship areas. Based on complexity, magnitude and duration, the requirement will not be set aside for small business. Interested parties must register in the System for Award Management and monitor beta.SAM.gov for release of the solicitation and amendments. The solicitation and non-posted attachments will be provided to contractors submitting a signed letter stating they are a Department of Defense contractor. The Government anticipates a single award by August 2020 for an availability start of November 2020 at the contractor's facility on the West Coast.

View the file

Other files

File Type Posted
N0002420R4401_A0009_CONFORMED.pdf PDF
N0002420R4401_A0009.pdf PDF
N0002420R4401_A0008_CONFORMED.pdf PDF
N0002420R4401_A0008.pdf PDF
Bidder Question Nos. 81 - 101.pdf PDF
N0002420R4401_A0007_CONFORMED.pdf PDF
N0002420R4401_A0007.pdf PDF
N0002420R4401_A0006.pdf PDF
Bidder Question Nos. 72 - 80.pdf PDF
N0002420R4401_A0006_CONFORMED.pdf PDF
TPPC-CG70-SWRMC21-CN01 - ERRATA 5 Rev 1.pdf PDF
N0002420R4401_A0005.pdf PDF
N0002420R4401_A0005_CONFORMED.pdf PDF
TPPC-CG70-SWRMC21-CN01 - ERRATA 4 rev 1.pdf PDF
Bidder Question Nos. 47 - 71.pdf PDF
N0002420R4401_A0004_CONFORMED.pdf PDF
Bidder Question Nos. 39 - 46.pdf PDF
N0002420R4401_A0004.pdf PDF
Bidder Questions Nos. 31 - 38.pdf PDF
N0002420R4401_A0003.pdf PDF
Bidders Questions Nos. 18 - 30.xlsx XLSX spreadsheet
Bidders Questions Nos. 18-30.pdf PDF
N0002420R4401_A0002_Conformed.pdf PDF
Bidders Questions Nos. 18 - 30.pdf PDF
N0002420R4401_A0002.pdf PDF
N0002420R4401_A0001.docx DOCX document
N0002420R4401_A0001 Conformed.docx DOCX document
Attachment J-8 GFM LIST CG70_FY21_SRA.xlsx XLSX spreadsheet
Attachment S-3 PPI Form CG70_FY21_SRA.docx DOCX document
Attachment S-5 Eligibility Criteria Data Sheet CG70_FY21_SRA.docx DOCX document
Attachment S-7 Proposal Assessment 21_SRA_CG_70.xlsx XLSX spreadsheet
Attachment J-5 QASP CG70_FY21_SRA.pdf PDF
CDRLs.zip ZIP file
Attachment J-7 Schedule Model Review CG70_FY21_SRA.pdf PDF
N00024-20-R-4401.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&As

Solicitation #:N00024-20-R-4401 USS LAKE ERIE (CG 70) SRA
NAVSEA POC:Dan Magrino, daniel.magrino@navy.mil, (202) 781-3544
Jackie Black, jacqueline.black@navy.mil, (202) 781-1088
Master #Question AreaPara #Date ReceivedContractor QuestionGovernment Response
1J-1, WI No. 514-21-0013.22-Apr-20Work item 514-21-001. Paragraph 3.2. Calls out accomplish the requirements of 009-92 of 2.1 for the equipment listed in 1.3... and provided in 5.1…” Contractor notes that there is no material provided in 5.1. Can customer please provide clarification if material to accomplish paragraph 3.2 is to be provided as GFM in paragraph 5.1?The contractor must procure material referenced in paragraph 3.2. No GFM will be provided. Errata No. 2 provides clarification.
2RFP / J-4N/A2-Apr-20Neither the RFP nor Attachment J3 contain VATEP provisions but Attachment J-4, “Total Proposed Evaluated Price” tab contains a line item for proposing a VATEP. Please clarify this discrepancy.Amendment 001 provides a revised J-4. Please refer to Attachment J-4, Revision 1.
3J-4N/A2-Apr-20RFP Attachment J-4, “Total Proposed Evaluated Price” tab contains some erroneous formulas/links resulting in errors. Please advise.Amendment 001 provides a revised J-4. Please refer to Attachment J-4, Revision 1.
4J-4N/A2-Apr-20Please provide guidance on the split for pricing Section B sub-CLINs 000401 and 000402 since they aren’t listed separately on Attachment J-4.Please price the total pricing on Attachment J-4, and allocate according to SCLINs in Section B. Total pricing for CLIN 0004 should be identical in J-4 and Section B.
5J-4N/A2-Apr-20Please provide guidance on the split for pricing Section B sub-CLINs 002301 and 002302 since they aren’t listed separately on Attachment J-4.Please price the total pricing on Attachment J-4, and allocate according to SCLINs in Section B. Total pricing for CLIN 0023 should be identical in J-4 and Section B.
6RFP, Section C2.222-Apr-20RFP Section C, page 49, paragraph 2, sub paragraph .22, “DRY-DOCK CERTIFICATTION” doesn’t appear to be applicable to this RFP. Please advise.Section C is revised. Please refer to Amendment 0001.
7RFP, Section IN/A2-Apr-20RFP 52.211-11 – “LIQUIDATED DAMAGES” doesn’t specify a maximum on the Contract Complete or for the aggregate of all Milestones. A maximum liquidated damage of 10% of the awarded contract price is normally specified. Please advise.Please refer to Clasue 52.211-11, paragraph (a).
8J-4N/A2-Apr-20RFP Attachment J-4; Please advise of which work items in Attachment J-4 are only to be priced by out-of-homeport offerors.Contractors must price all work items - there are no non-homeport Wis.
9J-1, WI No. 992-11-0063.1.23-Apr-20Work Item 992-11-006. Paragraph 3.1.2 states “Provide hardware infrastructure including uninterruptible power supplies to support migration of ship's network to the berthing barge.” The current posture of the network is normally assessed during pre-installation check out. This is when the required material is identified. Does the government know what materials are needed in order to effectively price para 3.1.2. Please advise.The Contractor must provide all materials to support LAN transfer, including power and supporting services to acocmplish work item.
10J-1, WI No. 992-11-0073.16-Apr-20Work Item 992-11-007. Paragraph 3.1 states “Provide one lockable, weatherproof stowage space, containing 15,000 square feet floor space,” This amount of square feet seems excessive for a CG SRA. Requesting a reduction in overall square foot requirement. Recommend 5,000 square feet which is comparable to recent CG SRA requirements.The contractor is required to comply with paragraph 3.1 of this work item, including the provision of 15,000 feet of floor space. No errata will be issued.
11J-1, WI No. 992-11-0073.26-Apr-20
Work Item 992-11-007. Paragraph 3.2 states “Locate stowage space within three miles of the vessel.” KTR requesting the requirement be changed to location of stowage space to be “within reasonable proximity of the vessel”.The contractor is required to comply with paragraph 3.2 of this work item. No errata will be issued.
12J-1, WI No. 331-11-0013.16-Apr-20Work item 331-11-001. Paragraph 3.1 calls out for replacement of cable identified in 3.1 (1.3.1 Quantity (1200 LF), Cable, Self-Regulating Heating, 2800 Series, P/N 2508-11500, FN 69 of 2.3). The manufacturer of this cable is noting that the part number provided is not for a 2800 series cable but instead a 2500 series cable. They specified that 2800 series cable part numbers begin with “280_” and include a letter. Can customer provide clarification on the Cable called out in 1.3.1? Please confirm or provide correct part numbers for the 2800 series cable called out for replacement.The contrator is responsible for procuring the material identified in paragraphs 1.3 and 3.1 using paragraph 2.3 for guidance.
13Misc.N/A7-Apr-20Is it the Government's intent to provide marked documents considered Covered Defense Information (CDI) IAW DFAR 252.204-7012 for N00024-20-R-4401?Yes, please refer to Tab 2, 'Restricted References' in this file, for a complete list of references that are considered Controlled Unclassified Information (CUI) IAW DFAR 252.204-7012.
14J-1, WI No. 311-33-0013.27-Apr-20Work Item No. 311-33-001. paragraph 3.2 calls out to use Chapter 10 of 2.5 for guidance. Contractor notes that there is no Chapter 10 in 2.5. Is this a typo? If so, make corrections and re-distribute.Chapter 10 of S6430-AE-TED-010 Rev 7, Piping Devices, Flexible Hose Assemblies listed in 2.5, is PERIODIC INSPECTION, starts on page 10-1.
15J-1, WI No. 123-10-0013.7.17-Apr-20Work Item No. 123-10-001. Para 3.7.1 states “Weld fill, drill, and tap a total of 2 each stripped manhole cover bolting ring holes for each tank opened in 3.1.” Please concur that the combined number of stripped manhole cover bolting ring holes to weld fill, drill, and tap is 80 EA for para 3.7.1.Concur to 80 each total (2 per tank). The Contractor shall adjust coverage as needed among the tanks listed in 1.2.
16J-1, WI No. 508-11-0023.1, 3.27-Apr-20Work Item 508-11-002. Para 3.1 states “Remove and dispose of existing damaged and deteriorated insulation and lagging from the system and components identified in 1.3.1 and located in 1.2.2 using 2.2 and 2.3 for guidance.” Para 3.2 states “Provide 80 mandays of labor and 8,000 dollars of material to accomplish lagging and insulation removals, repairs and installations work not previously identified in the Work Item, as directed by the SUPERVISOR. If the total costs are less than the authorized manday and dollar amounts, remaining funds will be subject to recoupment. The contractor is not authorized to exceed these limits. Unlike the way WI 508-11-001 is written, the order in which the paragraphs are written here makes it seem like the removal and disposal of the lagging identified in 3.1 will be separate from the directed labor efforts identified in para 3.2,. Is it the intent of this work item to price the removals separate from the directed efforts identified in para 3.2? Will an Errata be provided to remove para 3.1 or make it a sub paragraph to the directed efforts in 3.2 much like in WI 508-11-001?The contractor shall price the material and labor requirements identified in 1.3 and 3.1. In addition, the contractor shall price the material and labor requirements uitlizing 3.2 to accomplish the basic. No errata required.
17J-1, WI No. 631-11-0053.17-Apr-20WI 631-11-005 Chemical- Resistant Floor Covering System; replace. Para 3.1 states “Accomplish the requirements of 009-O26 of 2.1, including Attachment C, for the removal of existing and installation of new chemical resistant decking listed in 1.2 and identified in 1.3 using 2.2 and 2.3 for guidance.” Estimator believes the standard item called out should be 009-26 of 2.1 vice 009-O26 of 2.1. Please concur or advise.Concur, 009-26 of 2.1 vice 009-O26 of 2.1.

Restricted References

Restricted Reference List
WI No.DescriptionReference
110-90-001ShipAlt CG47-83186K, 02-04 Level Structural Improvement; accomplish7624117_A Instructions for Ventilation Testing and Balancing
130-11-004Deck Plate; repair6011847_W Structural Assy 301 Innerbottom to 01 Level Fr 427-472
156-11-00105 Level Deck House Structural RepairS9CGO-BP-SRM-010 Superstructure Cracking Repair
168-11-001Door Watertight Exterior; replaceS9086-UF-STM-010/CH-600 Structural Closures
168-12-001Door, Aluminum, Double, Exterior; repairS9086-UF-STM-010/CH-600 Structural Closures
243-11-001Starboard Propulsion Shaft, Bulkhead Seal; overhaulS9620-AA-MMA-010 Seal, Bulkhead (24.375")
243-12-001Port Propulsion Shaft, Bulkhead Seal; overhaulS9243-C6-MMO-010 Seal, Bulkhead Centrax Type A (19.000") Part Number M-7024-E100
243-12-001Port Propulsion Shaft, Bulkhead Seal; overhaulS9620-AA-MMA-010 Seal Bulkhead 24.375 Model (M-7625-D)
244-12-001Port Line Shaft Bearing (2D) Center Chock; replaceS9244-AF-MMA-010 Disc Lubricated Propulsion Line Shaft Bearing Bearing A: Drawing Number 79101 Bearing B: Drawing Number 79102
251-30-001Gas Turbine Module (GTM) Intake; partial repairS9251-BQ-MMA-010 Propulsion Gas Turbine, Intake Moisture Separator System
251-30-001Gas Turbine Module (GTM) Intake; partial repair6011844_F Structural Assy 218 1st Platf Pltg Fr 171-217
259-10-001Gas Turbine Module (GTM) Intake; partial repairS9513-AG-MMA-010 CG47 Class Welded Honeycomb Mixing Tubes And Generator Exhaust Ducts Above 01 Level Maintenance
264-32-001Main Reduction Gear (MRG) and Controllable Pitch Propeller (CPP) Lube Oil Purifier Heater Number 2; cleanS9545-AB-MMO-010 Propulsion Lube Oil Heater with Control System
264-32-001Main Reduction Gear (MRG) and Controllable Pitch Propeller (CPP) Lube Oil Purifier Heater Number 2; clean052-072820-003_10 Oil Immersion Flange Heater LO Purifier Heater
324-80-001CG47 Class AER 76101, Replace Dossert Lug Connector; accomplishS9324-CL-MMA-010 Main Power Distribution Switchboards for CG 52 and On Model 2797-C
324-80-001CG47 Class AER 76101, Replace Dossert Lug Connector; accomplishS9324-DH-MMA-010 60 Hertz Load Centers
343-10-001Ship Service Gas Turbine Generator (SSGTG) Intake and Exhaust System; repairS9513-AG-MMA-010 CG 47 Class Welded Honeycomb Mixing Tubes and Generator Exhaust Ducts Above 01 Level Maintenance
343-10-001Ship Service Gas Turbine Generator (SSGTG) Intake and Exhaust System; repairS9251-BQ-MMA-010 Propulsion Gas Turbine, Intake Moisture Separator System
343-11-001Exhaust Duct Ship Service Gas Turbine Generator (SSGTG) One; repair5920767_F Hangers and Supports Air Intake and Exhaust Ducting, Gen One 2 & 3
343-12-001Generator Exhaust Duct Ship Service Gas Turbine Generator (SSGTG) 2; repair5920767_F Hangers and Supports Air Intake and Exhaust Ducting, Gen 1, 2 & 3
437-21-001Fuel Oil Storage Tank Level Indicator (TLI) System; repairS9261-AQ-MMA-010 Change C, Fuel Control System for CG47 through CG73
437-21-001Fuel Oil Storage Tank Level Indicator (TLI) System; repairSN572-AH-MMA-010 Change C, Tank Level Indicators
463-53-001Sonar Cooling Skid; preserveS9536-AF-AEG-010/HD-1074/SQS AEGIS Electronic Equipment, Water Cooler HD-1074/SQS
512-11-001Toxic Gas Damper Ventilation; replaceS6230-BQ-MMO-010 Toxic Gas Damper System for CG 47 Class Ship
512-11-003Fan Room; repair6013439_C Insulation & Lagging Schedule Vent & Air Cond
512-11-004Fan Room Preserve; accomplishS6263-AC-MMA-010 CG 47 Class Individual Controllers
512-11-005Ventilation Cleaning; accomplish7624117_A Instructions for Ventilation Testing and Balancing
513-10-001Emergency Air Damper/Louver and Remote Operating Assembly; replaceS9505-AG-MMM-010 Rigid Rod Valve Remote Control System
514-11-001Fan Coil Unit; install7624117_A Instructions for Ventilation Testing and Balancing
514-11-002Fan Coil Assembly; replaceS9511-AG-MMA-010 Fan Coil Assemblies (Type 1) Models FCA-21 Through FCA-25
524-21-001Sea Water Service Pump; replaceS6225-KM-MMA-010 Seawater Service Pump Model Number 10LRN-12
526-80-001CG47 Class AER 68141D, Overboard Discharge Modification; accomplish6011847_W Structural Assy 301 Innerbottom to 01 Level Fr 427-472
526-80-001CG47 Class AER 68141D, Overboard Discharge Modification; accomplish6011844_F Structural Assy 218 1st Platf Pltg Fr 171-217
551-51-001Number 2 High Pressure Air Compressor (HPAC) Class B Overhaul; accomplishS9550-BZ-MMA-010 Air Compressor, Model 5R5-75A, 3000 PSIG, High Pressure
551-61-001Masker Air Regulating Valve; repairS6435-H2-MMA-010, Change A 4-Inch Bleed Air Regulating Valve
561-11-001Steering Gear Follow-up Linkage, Bushing and Ram; repairS9561-A2-MMA-010 Steering Gear, Electro-Hydraulic, Model M20423
582-11-001Port Capstan; overhaulS9581-AS-MMO-010 Electric-Hydraulic Anchor Windlass
582-11-001Port Capstan; overhaulS9581-A8-TRS-010 Change G, Electro-Hydraulic Windlass Overhaul Procedures
588-21-002Recovery Assist Securing and Traversing (RAST) Track Plate, Side Plate and Trough; repair and preserveS9CGO-BP-SRM-010/CG-47 CL Superstructure Cracking Repair
593-20-001Remote Valve Operator; repairS6435-JL-MMM-010 Cryogenic Valves
623-10-001Vertical Ladder and Climber Safety Rail; replaceS6360-AC-MMO-010 Corrosion Control Manual for CG 49 and Follow
623-10-002Vertical Ladder; installS6360-AC-MMO-010 Change B, Corrosion Control Manual for CG49 and Follow
623-12-001Foremast Vertical Ladder; installS6360-AC-MMO-010 Change B, Corrosion Control Manual for CG 49 and Follow
623-12-002Glass Reinforced Plastic (GRP) Vertical Ladder; replaceS6360-AC-MMO-010 Corrosion Control Manual for CG49 and Follow
624-11-001alanced Joiner Door; remove, store and installS9167-AS-MMO-010 Maintenance and Repair for the Balanced Joiner Door
635-11-001Fan Room Insulation; replace6013439_C Insulation & Lagging Schedule Vent & Air Cond
644-11-001NAVSEA Habitability Improvement Program; accomplish7624117_A Instructions for ventilation Testing and Balancing
721-61-001Harpoon Launcher Support Structure and Foundation; preserveL09-01-14 Harpoon Weapon System Topside Equipment Refurbishment Guidance for Surface Ships
721-61-001Harpoon Launcher Support Structure and Foundation; preserve4G20-02-95E Harpoon Weapon System Launch Support Structure Refurbishment Procedures
721-61-001Harpoon Launcher Support Structure and Foundation; preserve5920511_E Fdn-Harpoon Lchr No.1& 2 Main Deck Fr 513 & 521 Mdl 3
772-21-001AFT Ammunition Strikedown Elevator; overhaul and preserveSG818-BQ-MMM-010 Forward and Aft Ammunition Elevators in CG 47 Class Ships
980-00-001OrdAlt CG47-70920K, MK45 Gun Mount Fuze Setter Dial and Sightglass, Alteration Installation Team (AIT) Support Service; provideS9086-RS-STM-010/CH-512 Fans
980-90-001ShipAlt and OrdAlt CG47-79719K, AN/SRQ-4 Full Rate Production and Switch Board (SWBD) to Support AN/SRQ-4 KU Band, Alteration Installation Team (AIT) Support Service; provideS9086-RS-STM-010/CH-512 Fans
980-90-003ShipAlt CG47-89472K, Consolidated Afloat Networks and Enterprise Services (CANES) Hardware 1.2, Alteration Installation Team (AIT) Support Service; provideS9086-RS-STM-010/CH-512 Fans
980-90-005ShipAlt CG47-86539K, C2P Tech Refresh and CG47-91899K, C2P Link 11/22 Dts, Alteration Installation Team (AIT) Support Service; provideS9086-RS-STM-010/CH-512 Fans
980-90-007ShipAlt CG47-84924K, PEOC41 ICOP Infrastructure, Alteration Installation Team (AIT) Support Service; provideS9086-RS-STM-010/CH-512 Fans
980-90-009ShipAlt CG47-80897K, NMT AN/WSC-9(V)XX Q/KA/, Alteration Installation Team (AIT) Support Service; provideS9086-RS-STM-010/CH-512 Fans
980-90-010ShipAlt 89715K, SSEE INC F SFF, Alteration Installation Team (AIT) Support Service; provideS9086-RS-STM-010/CH-512 Fans
980-90-011ShipAlt CG47-84694K, PEOC4I DMR IW and MUOS, Alteration Installation Team (AIT) Support Service; provideS9086-RS-STM-010/CH-512 Fans
980-90-014ShipAlt 00413.01K, 00413.02K, Convert CFC-114 Chill Water (CW) Air Conditioning (AC) Plants, Alteration Installation Team (AIT) Support Service; provideS9086-RS-STM-010/CH-512 Fans
980-90-015ShipAlt CG47-81798K, Navmacs Technical Refresh, Alteration Installation Team (AIT) Support ServiceS9086-RS-STM-010/CH-512 Fans
992-11-003Temporary Service; provideS9086-US-STM-010/CH-611R2 Fenders and Separators
992-11-003Temporary Service; provideS9086-RS-STM-010/CH-512 Fans
993-31-003Dry Air Lay-Up; accomplishSE000-00-EIM-110 Navy Installation and Maintenance Book (NIMB) Installation Standards
993-31-003Dry Air Lay-Up; accomplish5921050_H Radar Sys AN/SPY-1A Ckt R-EZ Cable Blk & Rtg Diag
993-31-003Dry Air Lay-Up; accomplishSE211-P0-MMA-010 Radar Set AN/SPS-55
993-31-003Dry Air Lay-Up; accomplishSE211-R9-MMC-010 Radar Set AN/SPS-64(V)9 Description, Operation and Maintenance
993-31-005Temporary Main Reduction Gear (MRG) Dehumidifier System; provideS9510-AT-MMA-010 Dehumidifier, Desiccant, Model GC-150