TPPC-CG70-SWRMC21-CN01 - ERRATA 4 rev 1.pdf
PDF 430 KB Posted
- Solicitation number
- N00024-20-R-4401
About this file
This is a solicitation for the USS LAKE ERIE (CG 70) FY21 Selected Restricted Availability (SRA). The solicitation seeks maintenance, modernization, and repair services for the availability, which is expected to require substantial facilities including a Ticonderoga class capable pier and human resources. The availability is competed on a coast-wide basis and will not be set aside for small businesses. Interested parties must register in SAM to participate and monitor beta.SAM.gov for the solicitation release and amendments. Attachments with specifications, work items, milestones, pricing, and compartment closeout will be provided by request. The Navy anticipates a single award by August 2020 for an availability start date of November 2020. The place of performance is a contractor's facility on the West Coast.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.
SHIP: USS LAKE ERIE (CG 70)
TPPC-CG70-SWRMC21-CN01
ERRATA NUMBER:
SPECIFICATION NUMBER:
THE FOLLOWING ITEMS ARE REPLACED:
343-10-001
456-90-001
980-90-015
168-12-001
438-90-002
980-90-016
DATED: 5/7/2020 10:54:26AMPage 1 of 1
SHIP: USS LAKE ERIE (CG 70) ITEM NO: 168-12-001 (E4)
COAR: 16 PCN: PE01-L434
CSWT FILE NO: 168-016 (CG 47) CMP: NONE
REVISED: 11 Oct 2018 PLANNER: SOLTERO, JUAN
COLE, RANDOLPH
DAVIS, EDGAR
HODGES, CHAD
MALONE, LISA
SSP: TPPC-CG70-SWRMC21-CN01 1 of 6 ITEM NO: 168-12-001
ERRATA NO. 4
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Door, Aluminum, Double, Exterior; repair
1.2 Location of Work:
1.2.1 Weapons Equipment Storeroom (01-398-2-A)
1.3 Identification:
1.3.1 Quantity (One EA), Door, WTRTT, DBL, 60 Inch by 73 Inch, Individually Dogged, With 2 Inch Sill, (13 PSI EXT/5 PSI INT), Mod to Aluminum, Exterior, (01-414-2)
2. REFERENCES:
2.1 Stanard Items, (FY21)
2.2 S9086-UF-STM-010/CH-600 Rev 4, Structural Closures
2.3 167-6011975 Rev R, List Of Structural Doors (Non-Ballistic) Module 4
2.4 123-6963593, Aluminum Double Door 60 X 73 Clear Opening Details
2.5 123-6963592, Aluminum Double Door 60 X 73 Clear Opening Arrangement
2.6 S9CG0-BP-SRM-010/CG-47 CL, CG 47 Class Superstructure Cracking Repair
2.7 167-7044216 Rev B, Aluminum Doors Watertight, Quick Acting Sub- Assemblies and Details
2.8 DM 980224, WTRTT Door Hinge Blade, MOD
2.9 167-7379216 Rev B, Doors Water Tight and Air Tight Hinge Upgrade-Fab and Assy Dets
2.10 605-2540769 Rev D, Label Plate Standards
2.11 167-8413989 Rev H, 167-8413989 Rev H, SHIPALT CG47-78532D Aluminum Ballistic 60 X 73 Double Door Mod
(E4)
3. REQUIREMENTS:
3.1 Remove each door panel listed in 1.3 and located in 1.2, using 2.2 through 2.6 and 2.11 for guidance.
(E4)
3.1.1 Disassemble, clean, and inspect for wear or damage each dog assembly on each door panel and frame assembly, using 2.2 through 2.6 and 2.11 for guidance.
(E4)
3.1.1.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing the description and quantity of parts requiring replacement as a result of 3.1.1, and
SSP: TPPC-CG70-SWRMC21-CN01 2 of 6 ITEM NO: 168-12-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
not listed in 3.4.2 and 3.5.1, to the SUPERVISOR.
3.1.1.2 Tag and retain each disassembled part for reassembly.
3.1.1.3 Remove each existing label plate. Retain each label
plate for template.
3.1.2 Remove each existing dog wedge on each door panel, using 2.2 through 2.5 and 2.11 for guidance.
(E4)
3.1.3 Remove each gasket from each door panel assembly, using 2.2 through 2.5 and 2.11 for guidance.
(E4)
3.1.4 Fair and straighten each door panel assembly in accordance with the warpage tolerance requirements of Paragraph 2-2.3 of 2.2.
3.2 Remove existing and install new modified structural door frame and hinge assembly listed in 1.3 and located in 1.2 in accordance with Appendix C, Sheets 10C-1 through 10C-20 of 2.6, 2.7 as modified by 2.8 and 2.9, using Paragraph 2.1 of 2.2, using 2.4 4, 2.5, and 2.5 11 for guidance.
(E4)
3.2.1 Remove existing and install new a total of 10 square feet of deteriorated bulkhead plating using Ch 4 and 5 of 2.6 for guidance as a result of report from 3.1.1.1, and as directed by the SUPERVISOR
3.2.2 Install each new insert plate in accordance with Appendix C, Sheet 10C-1 through 10C-20 of 2.6.
3.2.3 Remove existing and install new 8 linear feet of bi-metallic strip, using Appendix C, Sheets 10C-1 through 10C-20 of 2.6 for guidance.
3.2.4 Accomplish welding in accordance with the requirements of Chapters 4 and 5 of 2.6.
3.2.4.1 Accomplish the requirements of 009-09 of 2.1, for a PCP of aluminum welding.
3.2.4.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A and C, Lines One through 7.
3.2.4.3 Accomplish nondestructive testing in accordance with
Line 10.
3.2.5 Remove existing and install new 4 each hinge assemblies, 2 each on each door panel and frame listed in 1.3.1 and located in
1.2.1 in accordance with 2.7 as modified by 2.8 and 2.9, using 2.4 4,
2.5 and 2.5 11 for guidance.
(E4)
3.2.5.1 Align and install each new hinge pad, blade and gusset to each new modified door frame assembly and each existing door panel to prevent binding and to ensure free seating of gasket on knife edge.
3.2.6 Install each new dog pad (Item Numbers 46, 47, 48 and 49 of 2.d) in accordance with 2.4 and 2.5, using existing dog spindle holes for location template.
3.2.7 Drill 2 each 3/32 Inch holes in the bottom of each door panel edge, Piece 6 of 2.5, spaced equal distance from panel sides, to
SSP: TPPC-CG70-SWRMC21-CN01 3 of 6 ITEM NO: 168-12-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
allow trapped water to drain.
3.3 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 36, for electrostatic powdercoating conforming to MIL-PRF-24712, Type IV (TGIC), Class 3, for each door panel assembly listed in 1.3.1, using General Note 7 of 2.3 for color guidance, prior to installation.
3.3.1 Mask-off and protect door knife edge, each threaded and bearing surface, and each dog wedge prior to preparation and preservation operations.
3.3.2 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 36, for each new door frame assembly listed in 1.3 and located in 1.2, the new inserts installed in 3.2.1, and the new bi-metallic strip installed in 3.2.3; after weld-out is complete.
3.3.3 Remove protection installed in 3.3.1 upon completion of preparation and preservation operations.
3.4 Assemble, lubricate, and install each dog assembly on each door panel and frame assembly listed in 1.3 and located in 1.2 in accordance with 2.2, using 2.4, 2.5, 2.7 and 2.7 11 for guidance.
(E4)
3.4.1 Install each part retained in 3.1.2.1.2. (E4)
3.4.2 Fit and install each new following parts:
TOTAL
QUANTITY NAME PIECE REF. FIGURE PART
REQUIRED OF PART NO. NO. DRAWING NO. NO.
17 EA Bearing, 80 2.7 Detail 36-E
SAE-AS81934,
AL 5086
HARD ANODIZED TO
MIL-A-8625 CL 1,
TYPE III
17 EA Flanged Bearing, 82 2.7 Detail 36-D
SAE-AS81934,
AL 5086
HARD ANODIZED TO
MIL-A-8625 CL 1,
TYPE III
17 EA Seal, With TEFLON 83 2.7
Rings, NITRILE, AS 568A Uniform
O-Ring Dash No.120, SSP: TPPC-CG70-SWRMC21-CN01 4 of 6 ITEM NO: 168-12-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
GREEN, TWEED & CO.
P/N 121-12200-173
-0170 or Equal
17 EA O-Ring, NITRILE, 84 2.7
MS 29513-121
17 EA Set Screw, Socket, 85 2.7
Headless, CRES, FF-S-200, Type I, Style 5, 12-28UNF-3A
17 EA Nut, HEX, SLF LKG, 86 2.7
CRES 316,
7/8-9UNC-2B
34 EA Washer, CRES, 87 2.7
ASTM A 276 Type 316
Cond A
7 EA Dog Wedge, RH 92 2.7
10 EA Dog Wedge, LH 93 2.7
8 FT Dielectric Barrier, 165 2.7
Expanded PTFE, COML, 2 Inch Wide X .020
Inch THK, Adhesive
Backed, W.L. GORE
AND ASSOCIATES,
or equal
7 EA Dog Catch Spring, 9 2.5
CRES Strip
14 EA Dog Catch MACH 50 2.5
Screw, CRES
34 EA Csk Mach Screw, 51 2.5
CRES 304,
5/16-18C-2A, one Inch Lg
3.4.2.1 Drill and counter-sink each new dog wedge to align with each existing dog wedge screw hole.
3.4.2.2 Plug weld, drill and tap each existing dog wedge hole
SSP: TPPC-CG70-SWRMC21-CN01 5 of 6 ITEM NO: 168-12-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
that will not align to each new dog wedge.
3.4.2.3 Install GORTEX expanded teflon tape between each dog
wedge and door panel and frame.
3.4.2.4 Coat the Inside Diameter and Outside Diameter of each dog bearing with silicone compound conforming to MIL-S-8660 prior to assembly.
3.4.3 Install new gasket, conforming to A-A-59588 CL 3B GR 30, on each door panel assembly in accordance with Paragraph 2-1.15.3 of 2.2 and General Note 34 of 2.3, using 2.4, 2.5, 2.7 and 2.7 11 for guidance.
(E4)
3.5 Install each door panel assembly listed in 1.3 and located in 1.2 in accordance with Chapters 2 and 3 of 2.2, using 2.3 through 2.7 for guidance.
3.5.1 Modify each hinge assembly in accordance with 2.9 by
installing the following new parts:
TOTAL
QUANTITY NAME PIECE REF. FIGURE PART
REQUIRED OF PART NO. NO. DRAWING NO. NO.
4 EA Yoke Assembly, Std 001 2.9
4 EA Hinge Yoke, Std 003 2.9
4 EA Hinge Pin 005 2.9
4 EA Yoke Pin 006 2.9
4 EA Yoke Pin Spacer 007 2.9
4 EA Hinge Pin Spacer 008 2.9
4 EA Cotter Pin 009 2.9
4 EA Cotter Pin 010 2.9
16 EA Washer, Flat 011 2.9
8 EA Bushing, Hinge Pin 012 2.9
8 EA Bushing, Yoke Pin 013 2.9
24 EA Thrust Washer 014 2.9
3.5.2 Install each new label plate in accordance with 2.10, using each label plate retained in 3.1.1.3 for template.
3.5.2.1 Install each new label plate with a bead of 3M COMPANY No. 468 MP, or equal.
3.5.2.2 Install each new CRES 316 drive pin, using Sheet 12 of
2.10 for guidance.
3.5.2.3 Seal label plate perimeters with DOW CORNING COMPANY
MULTI-PURPOSE SEALANT No. 472, or equal.
3.5.3 Adjust each door dog and hinge assembly to obtain 1/8 inch gasket compression around entire perimeter of each door panel, using
SSP: TPPC-CG70-SWRMC21-CN01 6 of 6 ITEM NO: 168-12-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2.2 for guidance.
3.5.4 Accomplish the requirements of 009-25 of 2.1 for a chalk test of each door listed in 1.3 and located in 1.2.
3.5.5 Accomplish the requirements of 009-25 of 2.1 for a Local Air Hose test on each door listed in 1.3 and located in 1.2. Allowable leakage: None.
3.5.5.1 Dog closed each door panel, prior to the test, by one man using one-handed operation. Undog each door panel open, upon completion of test, using one-handed operation. Use of pipe extensions or other devices to increase leverage will not be allowed for test purposes.
(V)(G) "OPERATIONAL TEST"
3.5.6 Accomplish an operational test of each door listed in 1.3 and located in 1.2, using 2.2 for guidance. Cycle the door open and close 4 times, using minimal effort to dog and undog the door.
Binding and sticking not allowed.
3.5.6.1 Correct by adjustment and retest in accordance with
3.5.3 through 3.5.6, if binding or sticking of the dogging mechanism or between the panel and frame assemblies occurs during operational test.
3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: USS LAKE ERIE (CG 70) ITEM NO: 343-10-001 (E4)
COAR: 16 PCN: See Attachment A
CSWT FILE NO: 343-093 (CG 47) CMP: NONE
REVISED: 11 Oct 2018 PLANNER: See Attachment B
SSP: TPPC-CG70-SWRMC21-CN01 1 of 9 ITEM NO: 343-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Ship Service Gas Turbine Generator (SSGTG) Intake and Exhaust System; repair
1.2 Location of Work:
1.2.1 Engine Room Number One (5-174-0-E)
1.2.2 Engine Room Number 2 (5-300-0-E)
1.2.3 Ship Service Generator Number 3 Room (3-426-1-E)
1.2.4 01 Level/ Frame 466 (VLS Deck) Starboard
1.2.5 Intake Trunk No. One (01-212-2-X)
1.2.6 Generator No. 3 Exhaust Room (1-426-1-Q)
1.2.7 Uptake Truck No. 2 (01-300-1-T)
1.2.8 Uptake Trunk No. One (01-196-2-T)
1.3 Identification:
1.3.1 Quantity (One EA), Exhaust Stack No. One, FR 193-221
1.3.2 Quantity (One EA), Exhaust Stack No. 2, FR 299-327
1.3.3 Quantity (One EA), Exhaust Stack No. 3, FR 427-472
1.3.4 Quantity (3 EA), Exhaust Duct, SSGTG No. One, 2 and 3
1.3.5 Quantity (3 EA), Blow-in Door Assemblies, SSGTG No. One, 2 and
1.3.6 Quantity (3 EA), Demister Module, SSGTG No. One, 2 and 3
1.3.7 Quantity (One EA), 90 Degree Exhaust Elbow Assembly, ID No.
D4, Sheet 7 (Section 6-A), Sheet 16 (Elevation 4-B) of 2.6
1.3.8 Quantity (2 EA), Flange Plate, ID No. J2, Sheet 12 (Detail 4- D), of 2.6
1.3.9 Quantity (2 EA) Retainer Strap, Detail 44-E on sheet 6 of 2.19
2. REFERENCES:
2.1 Standard Items, (FY21)
2.2 893-5921738 Rev V, List of Insulation & Lagging Mchry & Piping
2.3 162-6011900 Rev E, Strl Assy 408 Stack No.1 Fr 193-221 Abv 04 Lvl
MDL 4
2.4 162-6011969 Rev E, Structural Assembly 412 Stack No 2 Fr 299-327 Above 04 Lvl MDL 4
2.5 S9513-AG-MMA-010 Rev 2, CG 47 Class Welded Honeycomb Mixing Tubes and Generator Exhaust Ducts Above 01 Level Maintenance
SSP: TPPC-CG70-SWRMC21-CN01 2 of 9 ITEM NO: 343-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2.6 343-6013007 Rev G, SS/Gen Air Intake & Exh Engine Room No. 1 Fwd
2.7 343-6013009 Rev F, SS Generator Air Intake and Exhaust Engine Room No. 2 Aft
2.8 343-6013011 Rev F, Hangers and Supports Air Intake and Exhaust Ducting, Gen 1, 2, & 3
2.9 050-01062 Rev E, Duct Assembly, Generator Exhaust-Complete
2.10 343-5920766 Rev P, SS/Gen Air Intake & Exhaust Gen No 3
2.11 343-5920764 Rev F, SS Gen Air Intake Blow-In-Doors
2.12 34311-3-700 Rev A, Gas Turbine Generator Blow-In Door and Heater Functional Test
2.13 S9251-BQ-MMA-010 Rev 4, Propulsion Gas Turbine, Intake Moisture Separator System
2.14 320-6012977 Rev D, Gas Turbine Air Intake Elec Sys Dk Plan & Elem Wrg Diag
2.15 SSPC, Systems and Specifications, SSPC Painting Manual, Volume 2
2.16 DM 10-623B, Quality Assurance Requirements for Welding 5XXX Series Aluminum Structures for CG-47 Class
2.17 25911-2-702 Rev A, Gas Turbine Generator Exhaust System Tightness Test
2.18 MIL-STD-777, Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships
2.19 343-8530780, ShipAlt CG47-83171K, Mod to GTG No. 3 Exhaust
3. REQUIREMENTS:
3.1 Protect, blank, wrap, cover, or mask equipment and each opening to preclude damage and prevent entry of contaminants into each gas turbine engine and generator to include each foreign object debris (FOD) screen, uptake spaces, engine room, machinery, equipment, valves, vent system, and other openings prior to cleaning operation.
3.2 Remove each access and manhole cover in way of repairs of each gas turbine generator intake and exhaust system located in 1.2.
3.2.1 Matchmark, identify and retain each access and manhole cover for reinstallation.
3.3 Remove existing and install new a total of 15 each missing or broken manhole cover studs for accesses opened in 3.2 conforming to MIL-DTL- 1222, Type IV, Grade 304.
3.3.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column C, Lines One through 7.
3.4 Accomplish the requirements of 009-11 of 2.1, for areas surrounding access and manhole covers removed in 3.2.
3.4.1 Accomplish the requirements of 009-32 of 2.1 for each surface to be insulated with the exception of non-ferrous and corrosion resistant steel (CRES) piping, plating, and vent ducting.
SSP: TPPC-CG70-SWRMC21-CN01 3 of 9 ITEM NO: 343-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
(I) "VISUAL INSPECTION"
3.5 Accomplish a visual inspection of the exterior of each SSGTG exhaust stacks and trunks listed in 1.3.1, 1.3.2 and 1.3.3 for lagging discoloration, deterioration, cracks and areas of damage or distortion using 2.2 through 2.4 for guidance.
3.5.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.
3.6 Accomplish the following repairs to each SSGTG exhaust stack listed in 1.3.1, and 1.3.2, using 2.2 through 2.4 for guidance, as designated by the SUPERVISOR.
3.6.1 Remove existing and install new a total of 10 square feet of interior insulation.
3.6.1.1 Accomplish the requirements of 009-11 of 2.1.
3.6.1.2 Accomplish the requirements of 009-32 of 2.1 for new
insulation, lagging, and reusable covers to match surrounding area.
3.7 Remove existing and install new up to a total of 100 linear feet of exterior lagging for each SSGTG uptake trunk, uptake stack and elbow.
3.7.1 Accomplish the requirements of 009-11 of 2.1.
3.7.1.1 Accomplish the requirements of 009-32 of 2.1 for new
insulation, lagging, and reusable covers to match surrounding area.
(V)(G) "VISUAL INSPECTION"
3.8 Accomplish a visual inspection of the interior and exterior surface of each exhaust duct listed in 1.3.3, for structural integrity, deterioration, cracks and areas of damage or distortion using 2.5 through
2.10 for guidance.
3.9 Accomplish the following repairs for the interior and exterior surface of each exhaust duct listed in 1.3.3, using 2.5 through 2.10 for guidance, as designated by the SUPERVISOR.
3.9.1 Remove existing and install new a total of 5 linear feet of the exhaust duct.
3.9.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A and D, Lines One through 7.
3.9.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Column A, Lines One through 7.
3.9.4 Accomplish the requirements of 009-25 of 2.1 for an air hose test for each weld repair.
3.10 Accomplish approximately 2 linear feet of weld repair to volcano upper ring on No. 3 GTG Exhaust located in 1.2.4, using 2.19 for
SSP: TPPC-CG70-SWRMC21-CN01 4 of 9 ITEM NO: 343-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
guidance. See Sheet 6, Detail 47-A.
3.10.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column D, Lines One through 7.
3.11 Remove existing damaged, fabricate and install new retainer strips listed in 1.3.9, located in 1.2.4, in accordance with 2.19.
3.11.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column D, Lines One through 7.
(V)(G) "VISUAL INSPECTION"
3.12 Accomplish a visual inspection of the lagging in each SSGTG located in 1.2 for wear, deterioration, damage or missing, using 2.2 for guidance.
3.13 Accomplish the following repairs for lagging of each SSGTG located in 1.2, using 2.2 for guidance, as designated by SUPERVISOR.
3.13.1 Remove existing and install new a total of 15 square feet of lagging for each SSGTG intake trunk.
3.13.2 Remove existing and install new a total of 72 square feet of lagging for each SSGTG uptake trunk.
3.13.3 Accomplish the requirements of 009-11 of 2.1.
3.13.3.1 Accomplish the requirements of 009-32 of 2.1 for new insulation, lagging, and reusable covers to match surrounding area.
3.14 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 49, for each aluminum region of SSGTG located in 1.2.
3.15 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 20 for preservation of SSGTG No. One, No. 2 Exhaust Casing Foundations and SSGTG No. 3 Exhaust Room, located in 1.2.6 through 1.2.8, using Section 5A on sheet 9 of 2.7 and Section 4A on sheet 10 of 2.6 for location guidance on casing foundations.
(I) "VISUAL INSPECTION"
3.16 Accomplish a visual inspection of each blow-in door in 1.3.5, each foreign object debris (FOD) screen and moisture separator drain pipe associated to locations in 1.2 for cracks, deterioration and each area of damage or distortion, using 2.11 through 2.13 for guidance.
3.16.1 Remove and inspect each blow-in door for warping, excessive corrosion, damaged, worn or missing parts.
3.16.1.1 Match mark, identify and retain each blow-in door for re-installation.
3.16.2 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.16 and 3.16.1 to the SUPERVISOR.
3.17 Accomplish repairs of each blow-in door based on the report in (E2)
SSP: TPPC-CG70-SWRMC21-CN01 5 of 9 ITEM NO: 343-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.13.16.2, and using 2.11 through 2.13 for guidance.
3.17.1 Straighten each blow-in door to original configuration prior to install.
3.17.2 Remove existing and install new gasket in each blow-in door.
3.17.3 Fit and install each blow-in door removed in 3.13.16.1 to its original position.
(E4)
3.17.3.1 Ensure each latching mechanism and hinge assembly is lubricated and free for movement.
3.17.4 Accomplish the requirements of 009-25 of 2.1 for a chalk test of each structural closure repaired in 3.17.
(V)(G) "OPERATIONAL TEST"
3.17.5 Accomplish an operational test of each blow-in door, in accordance with 2.12.
(I) "VISUAL INSPECTION"
3.18 Accomplish a visual inspection of each demister module listed in
1.3.6 for cracking, deterioration, damage or distortion, using 2.6, 2.7, and 2.14 for guidance.
3.18.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.18 to the SUPERVISOR.
3.19 Accomplish the following repairs for each demister listed in 1.3.6, in accordance with 2.6, 2.7, and 2.14.
3.19.1 Hand tool clean each demister module. Accomplish the
requirements of Surface Preparation Specification SSPC-SP 2 of 2.15.
3.19.2 Vee-out and weld repair a total of 10 linear feet of areas found to be defective based on report listed in 3.18.1, as directed by the SUPERVISOR.
3.19.3 Accomplish the requirements of 009-12 of 2.1 including Table 2, Lines One through 7, and Column C, using 2.16 for guidance.
3.20 Remove existing, fabricate and install new each elbow assembly to include each flange listed in 1.3.7 and 1.3.8 and located in 1.2.1, using
2.6 and 2.17 for guidance.
3.20.1 Restore each piping flange mating surface exposed by
disassembly of piping system. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by a hand tool. Maintain phonographic finish on each flange that has it.
3.20.2 Template exact size, configuration, and location from each existing shipboard condition.
3.20.3 Ensure each new material conforms to 2.18, including Category
SSP: TPPC-CG70-SWRMC21-CN01 6 of 9 ITEM NO: 343-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
and Group O-1.
3.20.4 Accomplish the requirements of 009-12 of 2.1, including Table One, Column A, Lines One through 10.
3.20.5 Accomplish the requirements of 009-11 of 2.1.
3.20.5.1 Accomplish the requirements of 009-32 of 2.1 for new insulation, lagging, and reusable covers to match surrounding area.
(V)(G) "STRAIN FREE"
3.20.6 Align the piping to each equipment. Piping must be supported independently and must not impose a strain.
3.21 Remove protective covering installed in 3.1, and inspect for presence of contamination and damage. Allowable foreign matter or debris:
None.
3.21.1 Remove dust and debris, brush down, and vacuum entire
interior surfaces of each intake.
(V)(G) "CLEANLINESS INSPECTION"
3.22 Inspect each intake and exhaust area listed in 1.3 for completion of work and inspect for presence of contamination and damage. Allowable foreign matter or debris: None.
3.23 Install each access and manhole cover removed in 3.2 with new gasket of wire inserted fiberglass cloth equal to or exceeding Claremont Ferratex 25.
3.23.1 Install new zinc coated steel nuts conforming to MIL-DTL- 1222, Type One, grade 5 and CRES washers conforming to FFW-92, Type A, Grade One, Class B. Accesses shall be torqued to 25 FT LBS.
(V)(G) "OPERATIONAL TIGHTNESS TEST"
3.24 Accomplish an operational tightness test of each exhaust system listed in 1.3 and located in 1.2 at operational temperature and pressure in accordance with 2.17. Allowable leakage: None.
3.25 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
5.2 PUSH MATERIAL:
SSP: TPPC-CG70-SWRMC21-CN01 7 of 9 ITEM NO: 343-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. None.
SSP: TPPC-CG70-SWRMC21-CN01 8 of 9 ITEM NO: 343-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Attachment A
PCN Identification
EM01-ZC28 GTG EXHAUST - RPR
EM01-ZC29 GTG INTAKE - RPR
EM04-ZAW0 GTG EXHAUST - RPR
EM04-ZAW1 GTG INTAKE - RPR
EM02-ZC72 GTG EXHAUST - RPR
ES01-NNB1 COATING DAMAGED
EM02-ZC71 GTG INTAKE - RPR
PE19-L002 NR1 GTG EXHAUST ELBOW; REPLACE
SSP: TPPC-CG70-SWRMC21-CN01 9 of 9 ITEM NO: 343-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Attachment B
Planners
SOLTERO, JUAN
COLE, RANDOLPH
CONNER, JAMES
HERNANDEZ, GENARO
MALONE, LISA
REED, SAMUEL
ROBERTS, JAMES
SHIP: USS LAKE ERIE (CG 70) ITEM NO: 438-90-002 (E4)
COAR: 30 PCN: PE20-L022
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 Apr 2019 PLANNER: MALONE, LISA
CHUA, PATRICK
COLE, RANDOLPH
WENCESLAO, JAY
SSP: TPPC-CG70-SWRMC21-CN01 1 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: ShipAlt CG47-73856K, Integrated Ship Control; accomplish
(OPTION ITEM)
(E4)
1.2 Location of Work:
1.2.1 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable.
1.4 Security Classification of Equipment, Components, Spaces and Documents: The Equipment, Space or Document is classified and subject to the applicable provisions of the National Industrial Security Program Operating Manual, DOD 5220.22M (0584-LP-179-6400).
1.4.1 Spaces:
1.4.1.1 Pilot House (05-149-0-C) (CONFIDENTIAL)
1.4.1.2 Aegis Radar Room No. One (04-140-1-C) (CONFIDENTIAL)
1.4.1.3 MK-99 Transmitter Room (03-162-2-C) (CONFIDENTIAL)
1.4.1.4 Combat System Maintenance Control Repair 8 and Technical Library (1-159-0-C) (CONFIDENTIAL)
1.4.1.5 Combat System Maintenance Control Repair 8 and Technical Library (1-159-0-C) (CONFIDENTIAL)
1.4.1.6 Radio Central (02-220-0-C) (SECRET)
1.4.1.7 Combat Information Center (02-138-0-C) (CONFIDENTIAL)
1.4.1.8 Computer Central (01-138-0-C) (CONFIDENTIAL)
1.4.1.9 AEGIS Radar Room No. 3 (01-220-0-C) (CONFIDENTIAL)
1.4.1.10 Sonar Room No. One (2-28-0-Q) (CONFIDENTIAL)
1.4.1.11 IC & Gyro Room No. One & Load Center (2-127-0-C)
(CONFIDENTIAL)
1.4.1.12 Central Control Station (2-272-0-C) (CONFIDENTIAL)
1.4.1.13 IC & Gyro Room No. 2 (3-382-0-C) (CONFIDENTIAL)
2. REFERENCES:
2.1 Standard Items, (FY21)
2.2 DM 10-623 Rev B, SERMC, Quality Assurance Requirements for Welding of 5XXX Series Aluminum Structural for CG-47 Class
2.3 S9CG0-BP-SRM-010/CG47 CL , Superstructure Cracking Repair
SSP: TPPC-CG70-SWRMC21-CN01 2 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2.4 185-8530347 Rev A, ShipAlt CG47-73856K ISC Upgrade Foundation Ripout
2.5 185-8530348 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 1 Foundations
2.6 185-8530349 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 2 (01 Lvl & Abv) Foundations
2.7 185-8530350 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 2 (IB to Mn Dk) Foundations
2.8 185-8530351 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 3 Foundations
2.9 185-8530352 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 4 Foundations
2.10 185-8530353 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 5 Foundations
2.11 621-8530373 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Joiner Bhd
2.12 622-8530374 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to False Decks
2.13 622-8530375 Rev A, ShipAlt CG47-73856K ISC Upgrade Misc Grating & Handrail Mod
2.14 624-8530376 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Joiner Doors
2.15 512-8530369 Rev A, ShipAlt CG47-73856K ISC-Upgrade Mod to HVAC Sys
2.16 640-8530379 Rev A, ShipAlt CG47-73856K ISC-Upgrade Mod to Furniture
2.17 671-8530380 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Stowages
2.18 558-8530370 Rev A, ShipAlt CG47-73856K ISC Upgrade Misc Piping System Mod Fr 260-Fwd
2.19 558-8530371 Rev A, ShipAlt CG47-73856K ISC Upgrade Misc Piping System Mod Fr 260 Aft
2.20 101-8530345 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Compt & Access
2.21 401-8530357 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 1 Mod to Arr
2.22 401-8530358 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 2 Mod to Arr
2.23 401-8530359 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 3 Mod to Arr
2.24 401-8530360 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 4 Mod to Arr
2.25 401-8530361 Rev A, ShipAlt CG47-73856K ISC Upgrade Fire Zone 5 Mod to Arr
2.26 631-8530377 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Paint
SSP: TPPC-CG70-SWRMC21-CN01 3 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Schedule
2.27 634-8530378 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Deck Covering
2.28 602-8530372 Rev A, ShipAlt CG47-73856K ISC Upgrade Mod to Label Plates
2.29 304-8799287, CG47 Class Integrated Design Drawing for CG70 Cable Routing
2.30 304-8799290, CG47 Class Integrated Drawing Design for CG70 Cable Way Mod
2.31 4720-CG70-FY21 Rev 08, Ship Alteration Material Summary (4720/3)
2.32 00IDDCG70P162, RLAR 00IDDCG70P162 (E3)
2.33 73856CG70P161, RLAR 73856CG70P161 (E3)
2.34 REV16, 4720-CG70-SRA21-A09-ISSUE-SUPPL--REV16 (E3)
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-09 of 2.1 for Welding 5XXX Series Aluminum Structures for CG-47 Class in accordance with 2.2 and 2.3.
3.1.1 Each weld to each deck and each longitudinal bulkhead that are associated with a Structural Ship Alteration are critical welds, regardless if the Alteration is in a critical region and regardless of where welding occurs.
3.1.2 Accomplish the requirements of 2.32, 2.33, and 2.34 in their entirety.
(E3)
3.2 Accomplish the requirements of 2.4 through 2.20 and 2.26 through
2.28 and applicable portions of 2.29 through 2.30 including all general, local, special, test and rip-out notes, using 2.21 through 2.25 for guidance and material listed in 5.3. (See Note 4.1)
3.2.1 Work is to be completed in accordance with the schedule in Attachment A.
3.2.2 Cut and fit all raw material provided as GFM in 5.3 to the appropriate size for install.
3.2.3 Accomplish the requirements of 009-65 of 2.1.
3.2.4 Chip and grind each surface flush and smooth in way of each removal and repair.
3.2.5 Vee out and weld 10 linear feet of linear indications, based on liquid penetrant inspection of base metal conducted in 3.2 and as directed by the SUPERVISOR.
3.2.6 Accomplish 10 square feet of aluminum base metal repairs, based on liquid penetrant inspection of base metal conducted in 3.2 and as directed by the SUPERVISOR.
3.2.6.1 Each base metal repair weld area shall not exceed 2
inches in diameter.
SSP: TPPC-CG70-SWRMC21-CN01 4 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.2.6.2 Each surface shall be ground to sound metal prior to
clad welding.
3.2.6.3 Fill local pits and grooves with weld material prior to application of principal build up layers.
3.2.6.4 Surfaces of completed base metal repair welds shall be ground smooth with plate surface.
3.2.6.5 Submit one legible copy, in hard copy or approved
transferrable media, of a bi-weekly report listing amount of welding conducted in 3.2.5 and 3.2.6 to the SUPERVISOR. Total cost greater or less than the specified requirements will be subject to an equitable adjustment.
3.2.7 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A, B, and C, Lines One through 7.
3.2.7.1 Accomplish nondestructive testing in accordance with
Lines 9, 10 and 11.
(V)(G) "STRAIN FREE"
3.2.8 Align the piping to each joint and fitting. Piping must be supported independently and must not impose a strain.
3.2.9 Accomplish the requirements of 009-12 of 2.1, including Table One, Columns A and B, Lines One through 10.
3.2.10 Accomplish the requirements of 009-25 of 2.1 for an air hose test of new and disturbed watertight boundary bulkhead/deck welds, and cable penetrations. Allowable leakage: None
(V)(G) "VENTILATION TEST"
3.2.11 Accomplish testing and balancing of HVAC system with the requirements of Test Note T-1 and T-2 of 2.15. Allowable leakage at new and disturbed joints: none
3.2.12 Isolate each component subject to damage and clean the new and modified fresh water, chilled water, oily waste, and JP-5 piping system to a cleanliness level that results in the internal surfaces being visually free of grease, oil, flux, scale, dirt, loose particles, and other contamination foreign to the base metal. Tap water residues on metals and light superficial rust on carbon steel surfaces, caused by a short time exposure to the atmosphere, are permitted. Light dust on cleaned surfaces is not objectionable, provided that the quantity and size of the particle does not adversely affect system operation.
3.2.13 Isolate each component subject to damage and clean the new and modified firemain, seawater, weather deck drain, and condensate drain piping system to a cleanliness level that results in the internal system surfaces being cleaned free of contamination and remaining residue on the surface does not interfere with the operation of or damage system components.
SSP: TPPC-CG70-SWRMC21-CN01 5 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.2.14 Accomplish the requirements of 009-71 of 2.1 for new and disturbed piping as follows:
3.2.14.1 Accomplish a hydrostatic test for new and disturbed JP- 5 piping in accordance with Test Note T-2 on sheet 7 of 2.19.
Allowable leakage: None.
3.2.14.2 Accomplish a static test on new and disturbed weather deck drain piping in accordance with Test Note T-2 on sheet 6 of
2.19. Allowable leakage: None.
3.2.14.3 Accomplish a static test on new and disturbed chilled water piping in accordance with Test Note T-3 on sheet 10 of
2.19. Allowable leakage: None.
3.2.14.4 Accomplish a static test on new and disturbed
condensate drain piping in accordance with Test Note T-2 on sheet 13 of 2.19. Allowable leakage: None.
(V)(G) "OPERATIONAL TEST"
3.2.15 Accomplish an operational test on new and disturbed firemain, seawater, oily waste, JP-5, chilled water, condensate drain, wash water and fresh water piping in accordance with Test Note T-M080G of
2.18 and Test Notes T-2 on sheets 5, 7, 10, 11, 12 and 15 of 2.19.
Allowable leakage: None
3.2.16 Accomplish the requirements of 009-87 of 2.1.
3.2.17 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 6, Columns A, B, D and E for preservation of steel surfaces in accordance with 2.26.
3.2.18 Accomplish the requirements of 009-26 of 2.1, including Attachments B and C, in accordance with 2.27.
3.2.18.1 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 28, Columns A and B, for Aluminum Decks.
3.2.18.2 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 6, Columns A and B, for Steel Decks.
3.2.19 Accomplish the requirements of 009-11 of 2.1 for new or disturbed lagging and insulation.
3.2.19.1 Accomplish the requirements of 009-12 of 2.1 for each new fastener (stud) to support insulation and lagging.
3.2.19.2 Accomplish the requirements of 009-32 of 2.1 for each surface to be insulated with the exception of non-ferrous and corrosion resistant steel (CRES) piping, plating, and vent ducting.
3.2.19.3 Accomplish the requirements of 009-32 of 2.1 for new insulation, lagging, and reusable covers to match each surrounding area.
3.3 Accomplish the requirements of 2.28 for label plates.
3.4 Accomplish the requirements of 009-32 of 2.1 for each new and
SSP: TPPC-CG70-SWRMC21-CN01 6 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
disturbed surface.
4. NOTES:
4.1 AIT is doing all of the electrical, fiber, and equipment mounting.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 1 KT
Kit fo ShipAlt 73856K 2.31 3.2
SSP: TPPC-CG70-SWRMC21-CN01 7 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
ATTACHMENT A 438-90-002
USS Lake Erie (CG 70) 73856K EQUIPMENT & CABLE INSTALL SCHEDULE AND TEST
REQUIREMENT DATES: Rev:
Equipment A+Date
Date to turnover for connection by
AIT or Completion/Testin g Date
Comments Compartment Bulls Eye
ISC Turnover 1 A+110 10-Mar-21
Lighting Distribution Sys Mod Complete to support energizing power to all equipment for A+110.
A+110 10-Mar-21 SHIP WIDE SHIP
WIDE
Network Switch 1 A+110 10-Mar-21 Sonar 2-28-0-Q
Network Switch 2 A+110 10-Mar-21 CSMC 1-159-0-Q
Network Switch 3 A+110 10-Mar-21 CCS 2-272-0-C
Network Switch 4 A+110 10-Mar-21 AFT IC 3-382-0-C
All FICB's A+110 10-Mar-21 SHIP WIDE SHIP
WIDE
UPS 1 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
FAN RM 03-138-2-
Q
UPS 2 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
FAN RM 03-188-0-
Q
UPS 3 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
PLT STAGE 2-58-0-Q
UPS 4 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
MER 1 5-174-0-E
UPS 5 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
ECSE 3-245-2-Q
UPS 6 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
MER 2 5-300-0-E
SSP: TPPC-CG70-SWRMC21-CN01 8 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
UPS 7 Maintenance Bypass Switch & Anciliary
Equipment A+110 10-Mar-21
Date
(POWER
UP Date)
NIXIE 2-506-1-Q
CPU RACK #2 A+110 10-Mar-21 CCS 2-272-0-C
SOSU-11 A+110 10-Mar-21 CCS 2-272-0-C
SOSU-9 A+110 10-Mar-21 CCS 2-272-0-C
SOSU-13 A+110 10-Mar-21 CCS 2-272-0-C
DAU-17A A+110 10-Mar-21 CCS 2-272-0-C
DAU-17B A+110 10-Mar-21 CCS 2-272-0-C
CPU RACK #1 A+110 10-Mar-21 CCS 2-272-0-C
ICAS EQUIPMENT RACK A+110 10-Mar-21 CCS 2-272-0-C
SOSU-10 A+110 10-Mar-21 CCS 2-272-0-C
SOSU-12 A+110 10-Mar-21 CCS 2-272-0-C
PROPULSION BACKUP
LAN SWITCH ENCL IN
CCS
A+110 10-Mar-21 CCS 2-272-0-C
RELAY ENCL NO. 2 A+110 10-Mar-21 AUX 2 5-260-0-E
RSOS-8 A+110 10-Mar-21 AUX 2 5-260-0-E
ISC Turnover 2 A+118 18-Mar-21
Lighting Distribution Sys Mod Complete to support energizing power to all equipment for A+118.
A+118 18-Mar-21 SHIP WIDE SHIP
WIDE
Macinery Control Connection Boxes, Connections/Modification s Complete to Support all
Equipment in
A+118 18-Mar-21 SHIP WIDE SHIP
WIDE
Damage Control Connection Boxes, Connections/Modification s Complete to Support all
Equipment in
A+118 18-Mar-21 SHIP WIDE SHIP
WIDE
Misc IC System Mod Dwg A+118 18-Mar-21
Complete and tested before Earliest Event, Undocking or
MST/PCD
(Date)
SHIP WIDE SHIP
WIDE
SSP: TPPC-CG70-SWRMC21-CN01 9 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
PROPULSION BACKUP
LAN SWITCH ENCL IN
MER 1
A+118 18-Mar-21 MER 1 5-174-0-E
RSOS-7 A+118 18-Mar-21 CSMC 1-159-0-Q
RSOS-1 A+118 18-Mar-21 REPAIR 2 1-94-2-Q
DAU-10 A+118 18-Mar-21 MER 1 5-174-0-E
DAU-8A A+118 18-Mar-21 MER 1 5-174-0-E
RSOS-3 A+118 18-Mar-21 MER 1 5-174-0-E
RSOS-4 A+118 18-Mar-21 MER 1 5-174-0-E
DAU-11 A+118 18-Mar-21 MER 1 5-174-0-E
DAU-8B A+118 18-Mar-21 MER 1 5-174-0-E
RSOS-2 A+118 18-Mar-21 MER 1 5-174-0-E
DAU-12B A+118 18-Mar-21 AUX 1 5-220-0-E
DAU-18A A+118 18-Mar-21 MER 1 5-174-0-E
RSOS-5 A+118 18-Mar-21 REPAIR 5 1-226-2-Q
RSOS-6 A+118 18-Mar-21 AUX 1 5-220-0-E
RELAY ENCLOSURE
NO4/ DSLC A+118 18-Mar-21 MER 1 5-174-0-E
ISC Turnover 3 A+125 25-Mar-21
Lighting Distribution Sys Mod Complete to support energizing power to all equipment A+77.
A+125 25-Mar-21 SHIP WIDE SHIP
WIDE
Macinery Control Connection Boxes, Connections/Modification s Complete to Support all
Equipment in
A+125 25-Mar-21 SHIP WIDE SHIP
WIDE
Damage Control Connection Boxes, Connections/Modification s Complete to Support all
Equipment in
A+125 25-Mar-21 SHIP WIDE SHIP
WIDE
RSOS-9 A+125 25-Mar-21 HELO HNGR 02-292-0- Q
DAU-19B A+125 25-Mar-21 MER 2 5-300-0-E
RELAY ENCLOSURE NO
1 A+125 25-Mar-21 ECSE 1 3-245-2-Q
DAU-12A A+125 25-Mar-21 ECSE 1 3-245-2-Q
SSP: TPPC-CG70-SWRMC21-CN01 10 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
DAU-19A A+125 25-Mar-21 MER 2 5-300-0-E
DAU-26B A+125 25-Mar-21 JP-5 PMP
RM 3-398-0-E
DAU-18B A+125 25-Mar-21 MER 2 5-300-0-E
DAU-20 A+125 25-Mar-21 MER 2 5-300-0-E
RSOS-10 A+125 25-Mar-21 MER 2 5-300-0-E
RSOS-14 A+125 25-Mar-21 MER 2 5-300-0-E
RELAY ENCLOSURE NO
3 A+125 25-Mar-21 JP-5 PMP
RM 3-398-0-E
RELAY ENCLOSURE NO
5/ DSLC A+125 25-Mar-21 MER 2 5-300-0-E
RELAY ENCLOSURE NO
6/ DSLC A+125 25-Mar-21 ECSE 2 2-439-2-Q
PROPULSION BACKUP
LAN SWITCH ENCL IN
MER 2
A+125 25-Mar-21 MER 2 5-300-0-E
DAU-27 A+125 25-Mar-21 ECSE 2 2-439-2-Q
RSOS-12 A+125 25-Mar-21 REPAIR 3 2-446-2-Q
RSOS-13 A+125 25-Mar-21 3 SWBD 2-464-3-Q
RSOS-15 A+125 25-Mar-21 MER 2 5-300-0-E
DAU-26A A+125 25-Mar-21 SD STRM 3-382-1-A
RSOS-11 A+125 25-Mar-21 JP-5 PMP
RM 3-398-0-E
DAU-21 A+125 25-Mar-21 MER 2 5-300-0-E
ISC Turnover 4 A+139 08-Apr-21 Lighting Distribution Sys Mod Complete to support energizing power to all equipment for A+139.
A+139 08-Apr-21 SHIP WIDE SHIP
WIDE
Macinery Control Connection Boxes, Connections/Modification s Complete to Support all
Equipment in
A+139 08-Apr-21 SHIP WIDE SHIP
WIDE
Damage Control Connection Boxes, Connections/Modification s Complete to Support all
Equipment in
A+139 08-Apr-21 SHIP WIDE SHIP
SSP: TPPC-CG70-SWRMC21-CN01 11 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
FLUX-GATE A+139 08-Apr-21 PLT HS 05-149-0- C
SCS-2 CPU A+139 08-Apr-21 C CNTRL 03-138-0- C
LOCAL SCS-2 KVM
AMPL A+139 08-Apr-21 C CNTRL 03-138-0-
C
NAV - 4 CPU A+139 08-Apr-21 C CNTRL 03-138-0- C
LOCAL NAV-4 KVM
AMPL A+139 08-Apr-21 C CNTRL 03-138-0-
C
NAV - 3 CPU A+139 08-Apr-21 C CNTRL 03-138-0- C
LOCAL NAV-3 KVM
AMPL A+139 08-Apr-21 C CNTRL 03-138-0-
C
NAV 2 DISPLAY A+139 08-Apr-21 CIC 02-138-0- C
CONN RACK A+139 08-Apr-21 CIC 02-138-0- C
DAU-4 A+139 08-Apr-21 C CNTRL 03-138-2- Q
IBS RADAR INTERFACE
RACK A+139 08-Apr-21 XMTR RM 03-162-2-
C
PC RACK I (NAV 1& 5)
IBS BACKUP LAN ) A+139 08-Apr-21 RADAR RM
04-140-1- C
LAN SWITCH
ENCLOSURE A+139 08-Apr-21 CIC 02-138-0-
C
MCS HMI CPU RACK A+139 08-Apr-21 RADAR RM
04-140-1- C
REMOTE SCS-2 KVM
AMPL(VMS) A+139 08-Apr-21 CO 04-140-2-
L
NAV - 4 DISPLAY A+139 08-Apr-21 CO 04-140-2- L
REMOTE NAV-4 KVM
AMPL(VMS) A+139 08-Apr-21 CO 04-140-2-
L
REMOTE NAV-4 KVM
AMPL(HMI) A+139 08-Apr-21 CO 04-140-2-
L
NAV - 3 DISPLAY A+139 08-Apr-21 CHRT RM 04-164-1- C
REMOTE NAV-3 KVM
AMPL A+139 08-Apr-21 CHRT RM 04-164-1-
C
NAV - 1 DISPLAY A+139 08-Apr-21 PLT HS 05-149-0- C
REMOTE NAV-1 KVM
AMPL A+139 08-Apr-21 PLT HS 05-149-0-
C
HELM A+139 08-Apr-21 PLT HS 05-149-0- C
SCS - 2 DISPLAY A+139 08-Apr-21 PLT HS 05-149-0-
SSP: TPPC-CG70-SWRMC21-CN01 12 of 12 ITEM NO: 438-90-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
C
REMOTE SCS-2 KVM
AMPL A+139 08-Apr-21 PLT HS 05-149-0-
C
NAV 2 ENCLOSURE A+139 08-Apr-21 CIC 02-138-0- C
NAV - 5 DISPLAY A+139 08-Apr-21 CIC 02-138-0- C
DAU-3 A+139 08-Apr-21 FAN RM 03-188-0- Q
CONN DISPLAY A+139 08-Apr-21 PLT HS 05-149-0- C
REMOTE CONN KVM
AMPL A+139 08-Apr-21 PLT HS 05-149-0-
C
LEE HELM A+139 08-Apr-21 PLT HS 05-149-0- C
CL BWDU (MON + CPU
OH) A+139 08-Apr-21 PLT HS 05-149-0-
C Port BWDU A+139 08-Apr-21 WD 05 WD 05
Stbd BWDU A+139 08-Apr-21 WD 05 WD 05
EOOW DESK A+139 08-Apr-21 CCS 2-272-0-C
Hydra Equipment A+145 14-Apr-21
Hydra install complete and ready to test by
Date.
Testing complete by
MST/PCD
SHIP WIDE SHIP
SHIP: USS LAKE ERIE (CG 70) ITEM NO: 456-90-001 (E4)
COAR: 91 PCN: EXSA-ZBK1
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 Apr 2019 PLANNER: See Attachment A
SSP: TPPC-CG70-SWRMC21-CN01 1 of 4 ITEM NO: 456-90-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: ShipAlt CG47-92873K, RME Deactivated/Remove…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .