This document contains questions and answers related to solicitation number N00024-18-R-4339 for the Surface Ship Support Barge (SSSB) Dismantlement and Disposal project. The Navy seeks to dismantle and dispose of the SSSB, which will require draining remaining water from the barge, securing loose equipment, and preparing the vessel for blue water towing. Bidders must submit a decommissioning work plan and towing plan by the proposal due date. The Navy will provide applicable characterization data and regulatory information to qualified bidders attending a mandatory ship check. The question submission period was extended to January 10, 2020 to allow for additional post-site visit questions.

View the file

Other files for this federal contract opportunity

Other files attached to Surface Ship Support Barge (SSSB) Dismantlement and Disposal, newest first.
File Type Posted
SSSB Q&A 23 Jan 2020.pdf PDF
Amendment 2 N00024-18-R-4339.pdf PDF
Amendment 2 Conformed N00024-18-R-4339-0002.pdf PDF
Attachment J-2 - SSSB GFI Package List 13 Jan 2020.pdf PDF
NNS Drawing 0100-4561 SSSB Trim and Stability Booklet and Loading Manual.pdf PDF
SSSB Inclining Experiment Report.pdf PDF
SSSB 5-Ton Hoist & Bridge Crane Manual Drawings.pdf PDF
SSSB Q&A 26 Dec 2019.pdf PDF
SSSB RFP Q&A - 20 Nov 2019.pdf PDF
Amendment 1 Conformed Copy N00024-18-R-4339.pdf PDF
Amendment 1 N00024-18-R-4339.pdf PDF
J-4 Updated NRC and Navy Interagency Agreement.pdf PDF
Attachment_J-14_-_DD_2345.pdf PDF
Attachment_S-5_-_NN-1421.doc DOC document
Attachment_J-8_-_1_of_4_NUREG-1757_Vol_1.pdf PDF
Attachment_J-8_-_4_of_4_NUREG-1757_Vol_2.pdf PDF
Attachment_J-12_-_NN-801_AOR_Optional_IT_Cert.pdf PDF
Attachment_J-2_-_SSSB_GFI_Package_List.pdf PDF
Attachment_J-13_-_Agreement_for_Protection_of_U-NNPI.pdf PDF
Attachment_S-1_-_Pricing_Workbook_Spreadsheet.xlsx XLSX spreadsheet
Attachment_J-11_-_NN-801_Control_and_Protection_of_U-NNPI.pdf PDF
Attachment_J-7_-_Framework_for_Regulation_of_SSSB_Dismantlement_and_Disposal.pdf PDF
Attachment_J-8_-_3_of_4_NUREG-1757_Vol_2.pdf PDF
Attachment_J-10_-_NRC_Inspection_Manual_Chapters.pdf PDF
Attachment_J-1_-_Ser_08B-19-03823_of_2_Aug_19.pdf PDF
Attachment_S-3_-_Access_to_NNS_and_Dosimetry.pdf PDF
Attachment_S-2_-_Access_to_SSSB_U-NNPI.pdf PDF
SSSB_DRFP_Q&A_Final.pdf PDF
Industry_Day_Attendees_30_July_2019.pdf PDF
Pre-Solicitation_Industry_Day_SSSB_Dismantlement_and_Disposal_Presentation.pdf PDF
Attachment_J-1-_Recent_and_Relevant_Past_Performance_References.docx DOCX document
Attachment_J-3_Pricing_Workbork_Spreadsheet.xlsx XLSX spreadsheet
Attachment_J-6_-_Access_to_NNS_and_Dosimetry.pdf PDF
Attachment_J-5_-_Post_Solicitation_Access_to_SSSB_U-NNPI.pdf PDF
Attachment_J-14_-_2_of_2_NRC_Inspection_Manual_Chapter_2690_ML12039041_5.pdf PDF
Attachment_J-11_-_Framework_for_Regulation_of_SSSB_Dismantlement_and_Disposal.pdf PDF
Attachment_J-18_-_DD_Form_2345.pdf PDF
Attachment_J-15_-_NN-801_AOR_Optional_IT_Cert.pdf PDF
Attachment_J-2_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_J-12_-_2_of_2_NUREG-1757_Vol_2_ML06300025_2.pdf PDF
Attachment_J-12_-_1_of_2_NUREG-1757_Vol_1_ML06300024_3.pdf PDF
Attachment_J-14_-_1_of_2_NRC_Inspection_Manual_Chapter_2561_ML17348A400.pdf PDF
Attachment_J-13_-_U.S._Navy_Towing_Manual.pdf PDF
Attachment_J-17_-_Agreement_for_Protection_of_U-NNPI.pdf PDF
Attachment_J-16_-_NN-801_Control_and_Protection_of_U-NNPI.pdf PDF
N00024-18-R-4339_Draft_RFP.pdf PDF
DRAFT_Exhibit_A_CDRLs_SSSB_DD.pdf PDF
Surface_Ship_Support_Barge_(SSSB)_Dismantlement_and_Disposal_Industry_Attendees.pdf PDF
SSSB_Industry_Day_Questions_and__Answers.pdf PDF
Industry_Day__SSSB_Dismantlement_and_Disposal_Presentation__vFinal.pdf PDF
Show all 50

Surface Ship Support Barge (SSSB) Dismantlement and Disposal has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-18-R-4339 Question Submittal Form Attachment S-4

Question Number

Question Source

Pg. or Paragraph Question Answer

1 RFP SOW, Paragraph 4.3.1, Note pertaining to temporary liquid transfer and treatment system.

Will the temporary liquid transfer and treatment system equipment be left in a condition so that it can be reused to dewater the remaining 24" of water once the SSSB is at the dismantlement site?

As with all other SSSB systems, the Decommissioning Contractor is free to use such systems, but no warranty is made about the usability of such systems, or their suitability for service that may be different than the original use. In this case, the Navy would note that the water quality of the remaining water will likely be different from the current pool water quality. When the pool is drained to the low level, the residual water will no longer be temperature controlled or recirculated through the processing system. Thus, even if fully operable, the system used to remove the pool water may not be suitable for water that has been stagnant and not temperature controlled.

2 RFP Section B, Section L Please resolve the misalignment between the CLIN pricing table in Section L and the CLIN summary breakout in RFP Section B, pages 2‐8.

See first solicitation Amendment.

3 RFP Section C, Paragraph

4.1.1 Decommissioning Work Plan

Additional characterization and preparatory work, including rigging for sea, will be required to prepare the SSSB for blue water tow. Can this shipping preparatory work (i.e., securing/patching the hull, removing or securing loose equipment) be done at the Newport News Shipyard prior to development of the Decommissioning Work Plan.

There will not be a period of unrestricted access to the SSSB prior to transfer of possession. Any needed additional work preparatory to transit outside the Hampton Roads Area will need to be done after transfer of possession.

4 RFP Section L

5.2 Volume I – Technical Approach

Subparagraph (h)

There is limited information available about the stability and seaworthiness of the SSSB, limited time for the site visit, and a short duration between the site visit and the proposal due date.

Based on this, it is our understanding and intent to deliver a Towing Plan that summarizes the required content as identified in sections L&M, and including placeholders for the detail required in the Navy Towing Manual Chapter 8, with the final Towing Plan submitted following contract award. Does this meet NAVSEA's elegibility requirement for the deliverable in Section L&M.

Yes.

5 RFP Section L, P. 69, Paragraph 2.0 Communication with the

Government

Will the Government extend the Q&A period to December 27 to allow post site visit questions?

Yes. See first solicitation Amendment. The Government added an additional ship check period from 6‐10 Jan 2020. Questions will be accepted through 10 Jan 2020.

6 RFP Section C, Paragraph 3.0, Applicable Documents

How and when will bidders get the Government furnished information referenced in Section 3.0?

The Government Furnished Information (GFI) will be provided during the mandatory ship check or mailed shortly afterwards. Note that to participate in the mandatory ship check and receive GFI containing U‐NNPI, applicable security requirements and certifications will need to be made to the Contracting Officer. A request for the GFI package must be emailed to the Contracting Specialist (see attachment S‐2).

SSSB ‐ N00024‐18‐R‐4339 ‐ RFP Q&A