Question: Sample Problem 2 states: "The plan shall be based on the technical content of the Advanced Capabilities Build 16 (ACB 16), provided on Classified ViewNet..." The AEGIS SI&T CD provided to the offerors only contained ACB 12 information. A compliant response to this sample problem requires the information related to the changes introduced by ACB 16.
It is requested that the government provide the ACB 16 change information required to answer Sample Problem 2.
Answer: The Government will remove the reference to “Classified ViewNet” in a forthcoming amendment.
ACB 16 data provided on the Classified CD include:
CIWS Data:
CIWS Overview (briefing) IDD for CIWS (spec)
IDD between AN/SLQ-32(V) EWS and Combat System Product Line (addresses
SEWIP)
MH60R Track Management:
20110208 SSDS QPR_SSR CV-TSC Update (pitch)
Supplemental Information:
MH60R Concept of Integration SEWIP Concept of Integration Configuration Definition Document for AEGIS ... DDG103-112
Subsystem Specification (SSS) for the AN/SLQ32 (addresses SEWIP) include an IDD for AN/SLQ-32(V), An ACB 16 overview will be provided on Viewnet in a new folder titled “ACB 16.”
SI&T – Question 79 RFP Section:
L
Page:
RFP Para., Clause, or Other Definitive Citation:
Volume II, Sample Problem 2. Waterfront Test Program Development
Document Name:
Final RFP
Document Date:
09/05/13
Question: NAVSEA Tracking Number C119 response dated 11 September 2013 states that redline PDFs of the Technical Data Package (TDP) artifacts are an acceptable submittal format for Sample Problem #1. Multiple elements of the TDP artifacts, including ICDs, Flow Diagrams, and CBDs do not comply with Section L formatting requirements for Times New Roman font type, no smaller than 8-point font size, and 1 inch margins all around on 8½ x 11 or 11 x 17 size paper.
Given the response to Bidder Question C119, would the Government prefer the Offeror assume that it is acceptable for TDP artifacts to deviate from the Section L-specified font type, font size, and margin requirements when necessary? If not, would the Government allow the Offeror to use ANSI E or Arch E sized drawings to ensure font and margin compliance?
Answer: For Sample Problem 1, offerors may submit TDP artifacts on ANSI E size paper to ensure font and margin compliance where necessary. This change will be incorporated in a forthcoming solicitation amendment.
The change in the solicitation will be reflected as follows:
From (reflecting the response to Question 08): “Fold out pages may be used for diagrams, charts or graphic material only and may not exceed 11 inches by 17 inches, except for Sample Problem 2. For Sample Problem 2, offerors may submit the TSN on ANSI E sized paper. Fold out pages, including ANSI E pages for Sample Problem 2, will be counted as two pages.”
To: “Fold out pages may be used for diagrams, charts or graphic material only and may not exceed 11 inches by 17 inches, except for Sample Problems 1 and 2. For Sample Problem 1, offerors may submit TDP artifacts, including ICDs, Flow Diagrams, and CBDs on ANSI E sized paper. Fold out pages, including ANSI E pages for Sample Problem 1, will be counted as two pages. For Sample Problem 2, offerors may submit the TSN on ANSI E sized paper. Fold out pages, including ANSI E pages for Sample Problem 2, will be counted as two pages.”
SI&T – Question 82
L
Page:
Pg. 345
RFP Para., Clause, or Other Definitive Citation:
Sample Problem #1, Part A
Document Name:
Final RFP
Question: Sample Problem 2 states "Offeror shall develop and provide an integrated shipboard test sequence network that may be implemented at either a new construction builder's yard or an AEGIS Modernization yard." The introduction to the sample problems states "the offeror shall provide details to demonstrate applied knowledge, understanding, and process required to develop full content TDPs as well as planning and execution of the waterfront test program for DDG 109 USS JASON DUNHAM via the four (4) Sample Problems below."
Is it the Navy's intent for the offerors to submit two separate TSNs, one for new construction and one for modernization even though DDG 109 is an in-service ship? Or is the intent for the offeror to only submit on TSN for an AEGIS modernization yard for the DDG 109 upgrade to
ACB 16?
Answer: Offerors are to submit one TSN for an AEGIS new construction program using ACB
16. DDG 109 is to be treated as a new construction program for purposes of responding to the sample problem.
SI&T – Question 83
L
Page:
RFP Para., Clause, or Other Definitive Citation:
Volume II Sample Problem 2 - Waterfront test program Development
Document Name:
Final RFP