N00024-13-R-5100_0001_amended.doc

DOC document 1 MB Posted

Attached to
AEGIS Combat System (ACS) Ship Integration and Test (SI&T) efforts – Final Solicitation
Solicitation number
N0002413R5100
Issued by

About this file

N00024-13-R-5100 amendment 0001 of the solicitation

View the file

Other files

File Type Posted
Attachment_17-__ACB_16_TI_16_AMT_Responsible_Test_List_(AWS).pdf PDF
N00024-13-R-5100_Bidder's_Question_Set_19.pdf PDF
N00024-13-R-5100_Amendment_0005.docx DOCX document
N00024-13-R-5100__conformed.doc DOC document
N00024-13-R-5100_Bidder's_Questions_Set_18.pdf PDF
N00024-13-R-5100_Bidder's_Question_Set_17.pdf PDF
N00024-13-R-5100_Bidder's_Questions_Set_16.pdf PDF
N00024-13-R-5100_Bidder's_Questions_Set_15.pdf PDF
Attachment_18_-_CLIN_0014_AWS_Element_Assessments_Pricing_Table.xls XLS spreadsheet
Attachment_16_-_ACB-16_TI-16_ATT_Responsible_Test_List_(AWS).pdf PDF
N00024-13-R-5100_Amendment_0004_Conformed.doc DOC document
N00024-13-R-5100_Amendment_0004.doc DOC document
Attachment_34_-_Key_Personnel_Positions_and_Definitions.pdf PDF
Attachment_23_-_Staffing_Plan_Definitions.pdf PDF
Attachment_17_-_ACB_16_TI_16_AMT_Responsible_Test_List_(AWS).pdf PDF
N00024-13-R-5100_Bidder's_Questions_Set_14.pdf PDF
N00024-13-R-5100__conformed.doc DOC document
N00024-13-R-5100_0003.doc DOC document
N00024-13-R-5100_0002_conformed.doc DOC document
Attachment_29_-_Cost_and_Software_Data_Reporting_(CSDR)_Plan.xls XLS spreadsheet
N00024-13-R-5100_Bidder's_Questions_Set_13.pdf PDF
N00024-13-R-5100_Bidder's_Questions_Set_12.pdf PDF
Exhibit_A_Contract_Data_Requirements_List_DD_Form_1423.pdf PDF
N00024-13-R-5100_0002.doc DOC document
N00024-13-R-5100_Bidder's_Questions_Set_11.pdf PDF
Attachment_14_-_AMT_Standard_Operating_Procedures.pdf PDF
Attachment_25_-_Section_L_Attachment_Cost_Evaluation_Workbook.xlsx XLSX spreadsheet
Exhibit_A_Contract_Data_Requirements_List_DD_Form_1423.pdf PDF
Attachment_3_-_ICMP_Tasks_for_AWS_-_Element_Assessments.pdf PDF
N00024-13-R-5100_0001_conformed.doc DOC document
Attachment_20_-_Government_Furnished_Property.pdf PDF
Attachment_15_-_Performance_Incentive_Fee_Plan.pdf PDF
N00024-13-R-5100_Bidder's_Question_Set_10.pdf PDF
Exhibit_A_Contract_Data_Requirements_List_DD_Form_1423.pdf PDF
N00024-13-R-5100_Bidder's_Questions_Set_9.pdf PDF
N00024-13-R-5100_Bidder's_Questions_Set_8.pdf PDF
Attachment_25_-_Section_L_Attachment_Cost_Evaluation_Workbook.xlsx XLSX spreadsheet
N00024-13-R-5100_Bidder's_Questions_Set_7.pdf PDF
N00024-13-R-5100_Bidder's_Questions_Set_6.pdf PDF
N00024-13-R-5100_Bidder's_Questions_Set_5.pdf PDF
Attachment_25_-_Section_L_Attachment_Cost_Evaluation_Workbook.xlsx XLSX spreadsheet
Attachment_20_-_Government_Furnished_Property.pdf PDF
Attachment_3_-_ICMP_Tasks_for_AWS_-_Element_Assessments.pdf PDF
N00024-13-R-5100_Bidder's_Questions_Set_4.pdf PDF
N00024-13-R-5100_Bidder's_Questions_Set_3.pdf PDF
N0024-13-R-5100_Bidder's_Questions_Set_2.pdf PDF
N00024-13-R-5100_Bidders'_Questions_Set__1.pdf PDF
Exhibit_A_-_CDRLs_DD_Form_1423.pdf PDF
Bidders_Question_and_Answers_9_11_13.pdf PDF
N00024-13-R-5100.doc DOC document
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 04-Dec-2013 02:00 PM to 18-Dec-2013 02:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

SUBCLIN 0001AA

The pricing detail quantity has increased by 10,316.00 from 6,877.00 to 17,193.00.

SUBCLIN 0002AA

The pricing detail quantity has increased by 16,764.00 from 11,176.00 to 27,940.00.

SUBCLIN 0007AA

The pricing detail quantity has increased by 5,157.00 from 3,439.00 to 8,596.00.

SUBCLIN 0009AA

The pricing detail quantity has increased by 24,501.00 from 16,334.00 to 40,835.00.

SUBCLIN 0015AA

The pricing detail quantity has increased by 72,212.00 from 48,142.00 to 120,354.00.

SUBCLIN 1001BA

The pricing detail quantity has increased by 3,438.00 from 17,194.00 to 20,632.00.

SUBCLIN 1002BA

The pricing detail quantity has increased by 5,585.00 from 27,940.00 to 33,525.00.

SUBCLIN 1007BA

The pricing detail quantity has increased by 1,719.00 from 8,597.00 to 10,316.00.

SUBCLIN 1009BA

The pricing detail quantity has increased by 8,165.00 from 40,835.00 to 49,000.00.

SUBCLIN 1015BA

The pricing detail quantity has increased by 24,071.00 from 120,355.00 to 144,426.00.

SUBCLIN 2001CA

The pricing detail quantity has increased by 3,439.00 from 20,632.00 to 24,071.00.

SUBCLIN 2002CA

The pricing detail quantity has increased by 5,588.00 from 33,527.00 to 39,115.00.

SUBCLIN 2007CA

The pricing detail quantity has increased by 1,719.00 from 10,316.00 to 12,035.00.

SUBCLIN 2009CA

The pricing detail quantity has increased by 8,168.00 from 49,002.00 to 57,170.00.

SUBCLIN 2015CA

The pricing detail quantity has increased by 24,072.00 from 144,426.00 to 168,498.00.

CLIN 3003

The CLIN description has changed from RESERVED to Option Year Three - New Construction.

The CLIN extended description Option Year Three - New Contruction Combat System Waterfront Integration and Test ACB-16/TI-16 New Construction Test Execution-One Ship(SEE NOTE A - COMPLETION INCENTIVE FEE)(SEE NOTE C - OPTION ITEM) has been added.

The pricing detail quantity 1.00 has been added.

The unit of issue Lot has been added.

CLIN 3004

The CLIN description has changed from RESERVED to Option Year Three - New Construction.

The CLIN extended description Option Year Three - New Contruction Combat System Waterfront Integration and Test ACB-16/TI-16 New Construction Test Execution-One Ship(SEE NOTE A - COMPLETION INCENTIVE FEE)(SEE NOTE C - OPTION ITEM) has been added.

The unit of issue Lot has been added.

SUBCLIN 3009DA

The pricing detail quantity has increased by 1.00 from 57,169.00 to 57,170.00.

SUBCLIN 3015DA

The pricing detail quantity has increased by 1.00 from 168,497.00 to 168,498.00.

CLIN 3017

The CLIN description has changed from RESERVED to Opt Year Three - Performance Incentive.

The CLIN extended description Option Year Three - Performance Incentive PlanPerformance Incentive associated with CLIN 3003(SEE NOTE A - COMPLETION INCENTIVE FEE)(SEE NOTE C - OPTION) has been added.

CLIN 3018

The CLIN description has changed from RESERVED to Opt Year Three - Performance Incentive.

The CLIN extended description Option Year Three - Performance Incentive PlanPerformance Incentive associated with CLIN 3004(SEE NOTE A - COMPLETION INCENTIVE FEE)(SEE NOTE C - OPTION) has been added.

SUBCLIN 4009EA

The pricing detail quantity has increased by 1.00 from 57,169.00 to 57,170.00.

CLIN 4010

The CLIN description has changed from RESERVED to Option Year Four - Modernization.

The CLIN extended description Option Year Four - Modernization Waterfront Integration Test Support ACB-16/TI-16 AEGIS Modernization Test Execution - One DD51 Class(SEE NOTE A - COMPLETION INCENTIVE FEE)(SEE NOTE C - OPTION ITEM) has been added.

The pricing detail quantity 1.00 has been added.

The unit of issue Lot has been added.

CLIN 4011

The CLIN description has changed from RESERVED to Option Year Four - Modernization.

The CLIN extended description Option Year Four - Modernization Waterfront Integration Test Support ACB-16/TI-16 AEGIS Modernization Test Execution - One DD51 Class(SEE NOTE A - COMPLETION INCENTIVE FEE)(SEE NOTE C - OPTION ITEM) has been added.

The pricing detail quantity 1.00 has been added.

The unit of issue Lot has been added.

CLIN 4012

The CLIN description has changed from RESERVED to Option Year Four - Modernization.

The CLIN extended description Option Year Four - Modernization Waterfront Integration Test Support ACB-16/TI-16 AEGIS Modernization Test Execution - One DD51 Class(SEE NOTE A - COMPLETION INCENTIVE FEE)(SEE NOTE C - OPTION ITEM) has been added.

The pricing detail quantity 1.00 has been added.

The unit of issue Lot has been added.

SUBCLIN 4015EA

The pricing detail quantity has increased by 1.00 from 168,497.00 to 168,498.00.

CLIN 4021

The CLIN description has changed from RESERVED to Option Year Four - Performance Incentive.

The CLIN extended description Option Year Four - Performance Incentive PlanPerformance Incentive associated with CLIN 4010(SEE NOTE A - COMPLETION INCENTIVE FEE)(SEE NOTE C - OPTION ITEM) has been added.

CLIN 4022

The CLIN description has changed from RESERVED to Option Year Four - Performance Incentive.

The CLIN extended description Option Year Four - Performance Incentive PlanPerformance Incentive associated with CLIN 4011(SEE NOTE A - COMPLETION INCENTIVE FEE)(SEE NOTE C - OPTION ITEM) has been added.

CLIN 4023

The CLIN description has changed from RESERVED to Option Year Four - Performance Incentive.

The CLIN extended description Option Year Four - Performance Incentive PlanPerformance Incentive associated with CLIN 4012(SEE NOTE A - COMPLETION INCENTIVE FEE)(SEE NOTE C - OPTION ITEM) has been added.

CLIN 5005

The CLIN type priced has been deleted.

The CLIN description has changed from RESERVED to Option Year Five - New Construction.

The unit of issue Man Hours has been added.

The option status has changed from No Status to Option.

CLIN 5007

The CLIN extended description has changed from Option Year Five - In-Service Ship Integration and Test Engineering and Technical Support for AEGIS In-Service Ships(SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM)(SEE NOTE F – TECHINICAL INSTRUCTIONS) to Option Year Five - In-Service Ship Integration and Test Engineering and Technical Support for AEGIS In-Service Ships(SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM)(SEE NOTE F – TECHNICAL INSTRUCTIONS).

CLIN 5008

The CLIN description has changed from RESERVED to Option Year Six - Post Delivery Support.

The CLIN extended description has changed from to (SEE NOTE B - INCENTIVE FEE/AWARD FEE)(SEE NOTE C - OPTION ITEM)(SEE NOTE F - TECHNICAL INSTRUCTIONS).

SUBCLIN 5008FA

The CLIN description has changed from RESERVED to Option Year Six - Post Delivery Support.

The CLIN extended description has changed from to (SEE NOTE B - INCENTIVE FEE/AWARD FEE)(SEE NOTE C - OPTION ITEM)(SEE NOTE F - TECHNICAL INSTRUCTIONS).

The pricing detail quantity 5,752.00 has been added.

SUBCLIN 5009FA

The pricing detail quantity has increased by 1.00 from 57,169.00 to 57,170.00.

SUBCLIN 5015FA

The pricing detail quantity has increased by 1.00 from 168,497.00 to 168,498.00.

CLIN 5029

The CLIN description has changed from RESERVED to Award Fee associated with CLIN 5005.

The CLIN extended description (SEE NOTE B - INCENTIVE FEE/AWARD FEE)(SEE NOTE C - OPTION ITEM) has been added.

SUBCLIN 5029FA

The CLIN description has changed from RESERVED to Award Fee associated with CLIN 5005.

The CLIN extended description (SEE NOTE B - INCENTIVE FEE/AWARD FEE)(SEE NOTE C - OPTION ITEM) has been added.

CLIN 5032

The CLIN description has changed from RESERVED to Award Fee associated with CLIN 5008.

The CLIN extended description (SEE NOTE B - INCENTIVE FEE/AWARD FEE)(SEE NOTE C - OPTION ITEM) has been added.

SUBCLIN 5032FA

The CLIN description has changed from RESERVED to Award Fee associated with CLIN 5008.

The CLIN extended description (SEE NOTE B - INCENTIVE FEE/AWARD FEE)(SEE NOTE C - OPTION ITEM) has been added.

SUBCLIN 6001GA

The pricing detail quantity has decreased by 6,878.00 from 24,071.00 to 17,193.00.

SUBCLIN 6002GA

The pricing detail quantity has decreased by 11,175.00 from 39,115.00 to 27,940.00.

SUBCLIN 6005GA

The pricing detail quantity has increased by 22,638.00 from 60,413.00 to 83,051.00.

SUBCLIN 6007GA

The pricing detail quantity has decreased by 3,439.00 from 12,035.00 to 8,596.00.

SUBCLIN 6008GA

The pricing detail quantity has increased by 3,287.00 from 8,216.00 to 11,503.00.

SUBCLIN 6009GA

The pricing detail quantity has decreased by 16,334.00 from 57,169.00 to 40,835.00.

SUBCLIN 6015GA

The pricing detail quantity has decreased by 48,143.00 from 168,497.00 to 120,354.00.

CLIN 6019

The contract type has changed from CPFF to CPIF.

The CLIN type priced has been deleted.

The CLIN description has changed from RESERVED to Opt. Yr Six Future ACB/Future TI AMOD.

ITEM NO

Opt. Yr Six Future ACB/Future TI AMOD

SUBCLIN 7001HA

The pricing detail quantity has decreased by 10,317.00 from 17,194.00 to 6,877.00.

SUBCLIN 7002HA

The pricing detail quantity has decreased by 16,765.00 from 27,940.00 to 11,175.00.

CLIN 7005

The CLIN description has changed from Option Year Seven - New Construction to RESERVED.

The CLIN extended description Option Year Seven - New Construction Combat System Waterfront Integration and Test Future ACB/Future TI New Construction Test Execution – One DDG 51 Class Ship(SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM)(SEE NOTE F – TECHNICAL INSTRUCTIONS) has been deleted.

SUBCLIN 7005HA

The CLIN description has changed from Option Year Seven - New Construction to RESERVED.

The CLIN extended description Option Year Seven - New Construction Combat System Waterfront Integration and Test Future ACB/Future TI New Construction Test Execution – One DDG 51 Class Ship(SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM)(SEE NOTE F – TECHNICAL INSTRUCTIONS) has been deleted.

The pricing detail quantity 30,044.00 has been deleted.

SUBCLIN 7006HA

The pricing detail quantity has increased by 21,391.00 from 60,526.00 to 81,917.00.

SUBCLIN 7007HA

The pricing detail quantity has decreased by 5,158.00 from 8,597.00 to 3,439.00.

SUBCLIN 7008HA

The pricing detail quantity has decreased by 3,492.00 from 16,433.00 to 12,941.00.

SUBCLIN 7009HA

The pricing detail quantity has decreased by 24,501.00 from 40,835.00 to 16,334.00.

SUBCLIN 7015HA

The pricing detail quantity has decreased by 72,214.00 from 120,355.00 to 48,141.00.

SUBCLIN 7019HA

The pricing detail quantity has decreased by 1,651.00 from 71,083.00 to 69,432.00.

CLIN 7020

The contract type has changed from CPFF to CPIF.

The CLIN type priced has been deleted.

The CLIN description has changed from RESERVED to Opt Yr Seven Future ACB/Future TI AMOD.

ITEM NO

Opt Yr Seven Future ACB/Future TI AMOD

CLIN 7024

The contract type has changed from CPFF to CPIF.

The CLIN description has changed from RESERVED to Opt Yr Seven Future ACB/Future TI AMOD.

ITEM NO

Opt Yr Seven Future ACB/Future TI AMOD

CLIN 7029

The CLIN description has changed from Award Fee associated with CLIN 7005 to RESERVED.

The CLIN extended description (SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM) has been deleted.

SUBCLIN 7029HA

The CLIN description has changed from Award Fee associated with CLIN 7005 to RESERVED.

The CLIN extended description has changed from (SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM) to .

SUBCLIN 8001JA

The pricing detail quantity has increased by 3,439.00 from 6,877.00 to 10,316.00.

SUBCLIN 8002JA

The pricing detail quantity has increased by 5,589.00 from 11,176.00 to 16,765.00.

CLIN 8005

The CLIN description has changed from Option Year Eight - New Construction to RESERVED.

The CLIN extended description has changed from Option Year Eight - New Construction Combat System Waterfront Integration and Test Future ACB/Future TI New Construction Test Execution – One DDG 51 Class Ship(SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM)(SEE NOTE F – TECHNICAL INSTRUCTIONS) to .

SUBCLIN 8005JA

The CLIN description has changed from Option Year Eight - New Construction to RESERVED.

The CLIN extended description Option Year Eight - New Construction Combat System Waterfront Integration and Test Future ACB/Future TI New Construction Test Execution – One DDG 51 Class Ship(SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM)(SEE NOTE F – TECHNICAL INSTRUCTIONS) has been deleted.

The pricing detail quantity 55,252.00 has been deleted.

CLIN 8006

The CLIN description has changed from Option Year Eight - New Construction to RESERVED.

SUBCLIN 8006JA

The CLIN extended description Option Year Eight - New Construction Combat System Waterfront Integration and Test Future ACB/Future TI New Construction Test Execution – One DDG 51 Class Ship(SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM)(SEE NOTE F – TECHNICAL INSTRUCTIONS) has been deleted.

The pricing detail quantity 23,854.00 has been deleted.

SUBCLIN 8007JA

The pricing detail quantity has increased by 1,720.00 from 3,439.00 to 5,159.00.

SUBCLIN 8008JA

The pricing detail quantity has decreased by 11,298.00 from 18,487.00 to 7,189.00.

SUBCLIN 8009JA

The pricing detail quantity has increased by 8,166.00 from 16,334.00 to 24,500.00.

SUBCLIN 8015JA

The pricing detail quantity has increased by 24,070.00 from 48,142.00 to 72,212.00.

SUBCLIN 8019JA

The pricing detail quantity has decreased by 2,128.00 from 69,431.00 to 67,303.00.

SUBCLIN 8020JA

The pricing detail quantity has decreased by 1,593.00 from 68,482.00 to 66,889.00.

SUBCLIN 8024JA

The pricing detail quantity has decreased by 1,053.00 from 67,816.00 to 66,763.00.

CLIN 8029

The CLIN description has changed from Award Fee associated with CLIN 8005 to RESERVED.

The CLIN extended description (SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM) has been deleted.

SUBCLIN 8029JA

The CLIN description has changed from Award Fee associated with CLIN 8005 to RESERVED.

The CLIN extended description has changed from (SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM) to .

CLIN 8030

The CLIN description has changed from Award Fee associated with CLIN 8006 to RESERVED.

The CLIN extended description has changed from (SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM) to .

SUBCLIN 8030JA

The CLIN description has changed from Award Fee associated with CLIN 8006 to RESERVED.

The CLIN extended description has changed from (SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM) to .

SUBCLIN 9001KA

The pricing detail quantity has increased by 6,877.00 from 3,439.00 to 10,316.00.

SUBCLIN 9002KA

The pricing detail quantity has increased by 11,177.00 from 5,588.00 to 16,765.00.

CLIN 9005

The CLIN description has changed from Option Year Nine - New Construction to RESERVED.

The CLIN extended description has changed from Option Year Nine - New Construction Combat System Waterfront Integration and Test Future ACB/Future TI New Construction Test Execution – One DDG 51 Class Ship(SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM)(SEE NOTE F – TECHNICAL INSTRUCTIONS) to .

SUBCLIN 9005KA

The CLIN description has changed from Option Year Nine - New Construction to RESERVED.

The CLIN extended description Option Year Nine - New Construction Combat System Waterfront Integration and Test Future ACB/Future TI New Construction Test Execution – One DDG 51 Class Ship(SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM)(SEE NOTE F – TECHNICAL INSTRUCTIONS) has been deleted.

The pricing detail quantity 27,951.00 has been deleted.

SUBCLIN 9007KA

The pricing detail quantity has increased by 3,440.00 from 1,719.00 to 5,159.00.

SUBCLIN 9008KA

The pricing detail quantity has decreased by 3,082.00 from 10,271.00 to 7,189.00.

SUBCLIN 9009KA

The pricing detail quantity has increased by 16,333.00 from 8,167.00 to 24,500.00.

SUBCLIN 9015KA

The pricing detail quantity has increased by 48,141.00 from 24,071.00 to 72,212.00.

SUBCLIN 9019KA

The pricing detail quantity has decreased by 1,065.00 from 67,305.00 to 66,240.00.

SUBCLIN 9020KA

The pricing detail quantity has decreased by 912.00 from 66,890.00 to 65,978.00.

SUBCLIN 9024KA

The pricing detail quantity has decreased by 1,024.00 from 66,764.00 to 65,740.00.

CLIN 9029

The CLIN description has changed from Award Fee associated with CLIN 9005 to RESERVED.

The CLIN extended description (SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM) has been deleted.

SUBCLIN 9029KA

The CLIN description has changed from Award Fee associated with CLIN 9005 to RESERVED.

The CLIN extended description has changed from (SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM) to .

SUBCLIN 9035AK

This SUBCLIN has been renumbered to SUBCLIN 9035KA.

SUBCLIN 9036AK

This SUBCLIN has been renumbered to SUBCLIN 9036KA.

SUBCLIN 9037AK

This SUBCLIN has been renumbered to SUBCLIN 9037KA.

The CLIN extended description has changed from (SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM) to (SEE NOTE B –INCENTIVE FEE/AWARD FEE)(SEE NOTE C – OPTION ITEM).

SUBCLIN 5005FA is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

5005FA

85,029
Man Hours
OPTION
Option Year Five - New Construction

CPIF

Option Year Five - New Construction Combat System Waterfront Integration and Test Future ACB/Future TI New Construction Test Execution – One DDG 51 Class Ship

(SEE NOTE B –INCENTIVE FEE/AWARD FEE)

(SEE NOTE C – OPTION ITEM)

(SEE NOTE F – TECHNICAL INSTRUCTIONS)

FOB: Origin

TARGET COST

TARGET FEE

TOTAL TGT COST + FEE

MINIMUM FEE

MAXIMUM FEE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

SUBCLIN 6019GA is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

6019GA

71,083
Man Hours
OPTION
Opt. Yr Six Future ACB/Future TI AMON

CPIF

(SEE NOTE B - INCENTIVE FEE/AWARD FEE)

(SEE NOTE C - OPTION ITEM)

(SEE NOTE F - TECHNICAL INSTRUCTIONS)

CLIN 6035 is added as follows:

ITEM NO

Award Fee associated with CLIN 6019

SUBCLIN 6035GA is added as follows:

ITEM NO
SUPPLIES/SERVICES

AMOUNT

6035GA

OPTION
Award Fee associated with CLIN 6019

(SEE NOTE B - INCENTIVE FEE/AWARD FEE)

(SEE NOTE C - OPTION ITEM)

SUBCLIN 7020HA is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

7020HA

68,481
Man Hours
OPTION
Opt. Yr Seven Future ACB/Future TI AMOD

CPIF

Option Year Seven - Future ACB/Future TI AMOD Test Team - One Ship

(SEE NOTE B - INCENTIVE FEE/AWARD FEE)

(SEE NOTE C - OPTION ITEM)

SUBCLIN 7024HA is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

7024HA

67,817
Man Hours
OPTION
Opt Yr Seven Future ACB/Future TI AMOD

CPIF

Option Year Seven - Future ACB/Future TI AMOD Test Team - One Ship

(SEE NOTE B - INCENTIVE FEE/AWARD FEE)

(SEE NOTE C - OPTION ITEM)

CLIN 7036 is added as follows:

ITEM NO

Award Fee associated with CLIN 7020

SUBCLIN 7036HA is added as follows:

ITEM NO
SUPPLIES/SERVICES

AMOUNT

7036HA

OPTION
Award Fee associated with CLIN 7020

CLIN 7037 is added as follows:

ITEM NO

Award Fee associated with CLIN 7024

SUBCLIN 7037HA is added as follows:

ITEM NO
SUPPLIES/SERVICES

AMOUNT

7037HA

OPTION
Award Fee associated with CLIN 7024

CLIN 8037 is added as follows:

ITEM NO

Award Fee associated with CLIN 8024

SUBCLIN 8037KA is added as follows:

ITEM NO
SUPPLIES/SERVICES

AMOUNT

8037KA

OPTION
Award Fee associated with CLIN 8024

(SEE NOTE B –INCENTIVE FEE/AWARD FEE)

(SEE NOTE C – OPTION ITEM)

The following have been modified:

NOTE B –INCENTIVE FEE/AWARD FEE

1) INCENTIVE FEE: Calculation and payment of the Incentive Fee for SLINs 0001AA, 0002AA, 0007AA, 0009AA, 0015AA; and if exercised Option SLINs 1001BA, 1002BA, 1007BA, 1009BA, 1015BA, 2001CA, 2002CA, 2007CA, 2009CA, 2015CA, 3001DA, 3002DA, 3007DA, 3009DA, 3015DA, 4001EA, 4002EA, 4007EA, 4009EA, 4015EA, 5001FA, 5002FA, 5005FA, 5007FA, 5008FA, 5009FA, 5015FA , 6001GA, 6002GA, 6005GA, 6007GA, 6008GA, 6009GA, 6015GA, 6019GA, 7001HA, 7002HA, 7006HA, 7007HA, 7008HA, 7009HA, 7015HA, 7019HA, 7020HA, 7024HA, 8001JA, 8002JA, 8007JA, 8008JA, 8009JA, 8015JA, 8019JA, 8020JA, 8024JA, 9001KA, 9002KA, 9007KA, 9008KA, 9009KA, 9015KA, 9019KA, 9020KA, 9024KA shall be in accordance with PAYMENTS OF FEE(S) (LEVEL OF EFFORT – ALTERNATE 1) (NAVSEA) (MAY 2010) and DETERMINATION OF COST INCENTIVE FEE.

CLIN
Target Fee
Min Fee
0001AA
5%
0%
0002AA
5%
0%
0007AA
5%
0%
0009AA
5%
0%
0015AA
5%
0%
1001BA
5%
0%
1002BA
5%
0%
1007BA
5%
0%
1009BA
5%
0%
1015BA
5%
0%
2001CA
5%
0%
2002CA
5%
0%
2007CA
5%
0%
2009CA
5%
0%
2015CA
5%
0%
3001DA
5%
0%
3002DA
5%
0%
3007DA
5%
0%
3009DA
5%
0%
3015DA
5%
0%
4001EA
5%
0%
4002EA
5%
0%
4007EA
5%
0%
4009EA
5%
0%
4015EA
5%
0%
5001FA
5%
0%
5002FA
5%
0%
5005FA
5%
0%
5007FA
5%
0%
5008FA
5%
0%
5009FA
5%
0%
5015FA
5%
0%
6001GA
5%
0%
6002GA
5%
0%
6005GA
5%
0%
6007GA
5%
0%
6008GA
5%
0%
6009GA
5%
0%
6015GA
5%
0%
6019GA
5%
0%
7001HA
5%
0%
7002HA
5%
0%
7006HA
5%
0%
7007HA
5%
0%
7008HA
5%
0%
7009HA
5%
0%
7015HA
5%
0%
7019HA
5%
0%
7020HA
5%
0%
7024HA
5%
0%
8001JA
5%
0%
8002JA
5%
0%
8007JA
5%
0%
8008JA
5%
0%
8009JA
5%
0%
8015JA
5%
0%
8019JA
5%
0%
8020JA
5%
0%
8024JA
5%
0%
9001KA
5%
0%
9002KA
5%
0%
9007KA
5%
0%
9008KA
5%
0%
9009KA
5%
0%
9015KA
5%
0%
9019KA
5%
0%
9020KA
5%
0%
9024KA
5%
0%

2) AWARD FEE: Award Fee under SLINs 0001AA, 0002AA, 0007AA, 0009AA, 0015AA; and if exercised Option SLINs 1001BA, 1002BA, 1007BA, 1009BA, 1015BA, 2001CA, 2002CA, 2007CA, 2009CA, 2015CA, 3001DA, 3002DA, 3007DA, 3009DA, 3015DA, 4001EA, 4002EA, 4007EA, 4009EA, 4015EA, 5001FA, 5002FA, 5005FA, 5007FA, 5008FA, 5009FA, 5015FA , 6001GA, 6002GA, 6005GA, 6007GA, 6008GA, 6009GA, 6015GA, 6019GA, 7001HA, 7002HA, 7006HA, 7007HA, 7008HA, 7009HA, 7015HA, 7019HA, 7020HA, 7024HA, 8001JA, 8002JA, 8007JA, 8008JA, 8009JA, 8015JA, 8019JA, 8020JA, 8024JA, 9001KA, 9002KA, 9007KA, 9008KA, 9009KA, 9015KA, 9019KA, 9020KA, 9024KA shall be in accordance with the DETERMINATION OF FEE (NAVSEA) (DEC 2010). As an example, the Award Fee associated with CLIN 0001AA will be accumulated and earned under CLIN 0027AA. The Award Fee is separated for administrative purposes only. The Contractor shall report all costs under CLIN 0001AA, or the respective primary CLIN.

AWARD FEE POOL: The maximum fee structure for CPAF SLINs that may be proposed is summarized as follows:

SLIN
Base

Fee Award

Fee

0001AA
0%
5%
0002AA
0%
5%
0007AA
0%
5%
0009AA
0%
5%
0015AA
0%
5%
1001BA
0%
5%
1002BA
0%
5%
1007BA
0%
5%
1009BA
0%
5%
1015BA
0%
5%
2001CA
0%
5%
2002CA
0%
5%
2007CA
0%
5%
2009CA
0%
5%
2015CA
0%
5%
3001DA
0%
5%
3002DA
0%
5%
3007DA
0%
5%
3009DA
0%
5%
3015DA
0%
5%
4001EA
0%
5%
4002EA
0%
5%
4007EA
0%
5%
4009EA
0%
5%
4015EA
0%
5%
5001FA
0%
5%
5002FA
0%
5%
5005FA
0%
5%
5007FA
0%
5%
5008FA
0%
5%
5009FA
0%
5%
5015FA
0%
5%
6001GA
0%
5%
6002GA
0%
5%
6005GA
0%
5%
6007GA
0%
5%
6008GA
0%
5%
6009GA
0%
5%
6015GA
0%
5%
6019GA
0%
5%
7001HA
0%
5%
7002HA
0%
5%
7006HA
0%
5%
7007HA
0%
5%
7008HA
0%
5%
7009HA
0%
5%
7015HA
0%
5%
7019HA
0%
5%
7020HA
0%
5%
7024HA
0%
5%
8001JA
0%
5%
8002JA
0%
5%
8007JA
0%
5%
8008JA
0%
5%
8009JA
0%
5%
8015JA
0%
5%
8019JA
0%
5%
8020JA
0%
5%
8024JA
0%
5%
9001KA
0%
5%
9002KA
0%
5%
9007KA
0%
5%
9008KA
0%
5%
9009KA
0%
5%
9015KA
0%
5%
9019KA
0%
5%
9020KA
0%
5%
9024KA
0%
5%

3) Table: The Offeror shall utilize the labor hours provided in the table below as the Government Estimate for each CLIN/SLIN. The Government labor hour estimate shall be used as the basis for the Offeror’s proposed cost and fees per hour. The average level of effort labor rates calculation established for CLINs 0001, 0002, 0005, 0006, 0007, 0008, 0009, 0013, 0015, 0019, 0020, and 0024 are as follows:

CLIN/SLIN
Labor Hours
Estimated Target Cost
Target Fee
Award Fee
Total
0001 (includes 0001AA, 1001BA, 2001CA, 3001DA, 4001EA, 5001FA, 6001GA, 7001HA, 8001JA, 9001KA)
178,811
$* Per Sect B
$* Per Sect B
$* Per Sect B
$* Per Sect B

Rate/Hour

$* Cost per Hour
$* Target Fee per Hour
$* Award Fee per Hour
$*Rate per Hour
0002 (includes 0002AA, 1002BA, 2002CA, 3002DA, 4002EA, 5002FA, 6002GA, 7002HA, 8002JA, 9002KA)
290,570
$* Per Sect B
$* Per Sect B
$* Per Sect B
$* Per Sect B

Rate/Hour

$* Cost per Hour
$* Target Fee per Hour
$* Award Fee per Hour
$*Rate per Hour
0005 (includes 5005FA and 6005GA)
168,080
$* Per Sect B
$* Per Sect B
$* Per Sect B
$* Per Sect B

Rate/Hour

$* Cost per Hour
$* Target Fee per Hour
$* Award Fee per Hour
$*Rate per Hour
0006 (includes 7006HA)
81,917
$* Per Sect B
$* Per Sect B
$* Per Sect B
$* Per Sect B

Rate/Hour

$* Cost per Hour
$* Target Fee per Hour
$* Award Fee per Hour
$*Rate per Hour
0007 (includes 0007AA, 1007BA, 2007CA, 3007DA, 4007EA, 5007FA, 6007GA, 7007HA, 8007JA, 9007KA)
89,405
$* Per Sect B
$* Per Sect B
$* Per Sect B
$* Per Sect B

Rate/Hour

$* Cost per Hour
$* Target Fee per Hour
$* Award Fee per Hour
$*Rate per Hour
0008 (includes 5008FA, 6008GA, 7008HA, 8008JA, 9008KA)
44,574
$* Per Sect B
$* Per Sect B
$* Per Sect B
$* Per Sect B

Rate/Hour

$* Cost per Hour
$* Target Fee per Hour
$* Award Fee per Hour
$*Rate per Hour
0009 (includes 0009AA, 1009BA, 2009CA, 3009DA, 4009EA, 5009FA, 6009GA, 7009HA, 8009JA, 9009KA)
424,684
$* Per Sect B
$* Per Sect B
$* Per Sect B
$* Per Sect B

Rate/Hour

$* Cost per Hour
$* Target Fee per Hour
$* Award Fee per Hour
$*Rate per Hour
0015 (includes 0015AA, 1015BA, 2015CA, 3015DA, 4015EA, 5015FA, 6015GA, 7015HA, 8015JA, 9015KA)
1,251,691
$* Per Sect B
$* Per Sect B
$* Per Sect B
$* Per Sect B

Rate/Hour

$* Cost per Hour
$* Target Fee per Hour
$* Award Fee per Hour
$*Rate per Hour
0019 (includes 6019GA, 7019HA, 8019JA, 9019KA)
274,058
$* Per Sect B
$* Per Sect B
$* Per Sect B
$* Per Sect B

Rate/Hour

$* Cost per Hour
$* Target Fee per Hour
$* Award Fee per Hour
$*Rate per Hour
0020 (includes 7020HA, 8020JA 9020KA)
201,348
$* Per Sect B
$* Per Sect B
$* Per Sect B
$* Per Sect B

Rate/Hour

$* Cost per Hour
$* Target Fee per Hour
$* Award Fee per Hour
$*Rate per Hour
0024 (includes 7024HA, 8024JA, 9024KA)
200,320
$* Per Sect B
$* Per Sect B
$* Per Sect B
$* Per Sect B

Rate/Hour

$* Cost per Hour
$* Target Fee per Hour
$* Award Fee per Hour
$*Rate per Hour

NOTE C - Option item to which the option clause in SECTION I-2 (52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)) applies and which is to be supplied only if and to the extent said option is exercised. As stated under Note A, the performance incentive CLINs 4017, 4018, 5017, 5018, 5021, 5022, 5023, 6017, 6018, 6021, 6022, 6023, 7017, 7018, 7021, 7022, 7023, 8017, 8018, 8021, 8022, 8023, 9017, 9018, 9021, 9022 and 9023 are only separated for administrative purposes. The latest option exercise date for performance incentive fee CLINs will be the same date as the primary CLIN. For example, the latest Option exercise date for CLIN 5003 is the latest Option exercise date for CLIN 5017. In addition, as stated under Note B, the award fee CLINs 0001AA, 0002AA, 0007AA, 0009AA, 0015AA; and if exercised Option SLINs 1001BA, 1002BA, 1007BA, 1009BA, 1015BA, 2001CA, 2002CA, 2007CA, 2009CA, 2015CA, 3001DA, 3002DA, 3007DA, 3009DA, 3015DA, 4001EA, 4002EA, 4007EA, 4009EA, 4015EA, 5001FA, 5002FA, 5005FA, 5007FA, 5005FA, 5009FA, 5015FA , 6001GA, 6002GA, 6005GA, 6007GA, 6008GA, 6009GA, 6015GA, 6019GA, 7001HA, 7002HA, 7006HA, 7007HA, 7008HA, 7009HA, 7015HA, 7019HA, 7020HA, 7024HA, 8001JA, 8002JA, 8007JA, 8008JA, 8009JA, 8015JA, 8019JA, 8020JA, 8024JA, 9001KA, 9002KA, 9007KA, 9008KA, 9009KA, 9015KA, 9019KA, 9020KA, 9024KA are separated for administrative purposes. The latest option exercise date for the award fee CLINs will be the same date as the primary CLIN. The latest option exercise dates are as follows:

CLIN/SLIN
Latest Option Exercise Date
0026
01/30/2024
1001BA
01/30/2016
1002BA
01/30/2016
1007BA
01/30/2016
1009BA
01/30/2016
1014
01/30/2016
1015BA
01/30/2016
1016BA
01/30/2016
2001CA
01/30/2017
2002CA
01/30/2017
2007CA
01/30/2017
2009CA
01/30/2017
2014
01/30/2017
2015CA
01/30/2017
2016CA
01/30/2017
3001DA
01/30/2018
3002DA
01/30/2018
3007DA
01/30/2018
3009DA
01/30/2018
3014
01/30/2018
3015DA
01/30/2018
3016DA
01/30/2018
4001EA
01/30/2019
4002EA
01/30/2019
4003
01/30/2019
4004
01/30/2019
4007EA
01/30/2019
4009EA
01/30/2019
4014
01/30/2019
4015EA
01/30/2019
4016EA
01/30/2019
5001FA
01/30/2020
5002FA
01/30/2020
5003
01/30/2020
5004
01/30/2020
5005FA
01/30/2020
5007FA
01/30/2020
5008FA
01/30/2020
5009FA
01/30/2020
5010
01/30/2020
5011
01/30/2020
5012
01/30/2020
5014
01/30/2020
5015FA
01/30/2020
5016FA
01/30/2020
6001GA
01/30/2021
6002GA
01/30/2021
6003
01/30/2021
6004
01/30/2021
6005GA
01/30/2021
6007GA
01/30/2021
6008GA
01/30/2021
6009GA
01/30/2021
6010
01/30/2021
6011
01/30/2021
6012
01/30/2021
6014
01/30/2021
6015GA
01/30/2021
6016GA
01/30/2021
6019GA
01/30/2021
7001HA
01/30/2022
7002HA
01/30/2022
7003
01/30/2022
7004
01/30/2022
7006HA
01/30/2022
7007HA
01/30/2022
7008HA
01/30/2022
7009HA
01/30/2022
7010
01/30/2022
7011
01/30/2022
7012
01/30/2022
7014
01/30/2022
7015HA
01/30/2022
7016HA
01/30/2022
7019HA
01/30/2022
7020HA
01/30/2022
7024HA
01/30/2022
8001JA
01/30/2023
8002JA
01/30/2023
8003
01/30/2023
8004
01/30/2023
8007JA
01/30/2023
8008JA
01/30/2023
8009JA
01/30/2023
8010
01/30/2023
8011
01/30/2023
8012
01/30/2023
8014
01/30/2023
8015JA
01/30/2023
8016JA
01/30/2023
8019JA
01/30/2023
8020JA
01/30/2023
8024JA
01/30/2023
9001KA
01/30/2024
9002KA
01/30/2024
9003
01/30/2024
9004
01/30/2024
9007KA
01/30/2024
9008KA
01/30/2024
9009KA
01/30/2024
9010
01/30/2024
9011
01/30/2024
9012
01/30/2024
9014
01/30/2024
9015KA
01/30/2024
9016KA
01/30/2024
9019KA
01/30/2024
9020KA
01/30/2024
9024KA
01/30/2024

NOTE D – OTHER DIRECT COSTS (ODC) - Other direct costs (ODCs) associated with Base Year SLINs 0001AA-0015AA, travel and per diem, and materials incidental to engineering performance for SLINs 0001AA-0015AA, are to be included on a cost-only basis (non-fee-bearing) under CLIN 0016AA. The same ODC pricing methodology for the Base Year CLINs is applicable to each Option Year (One through Nine). See FAR 16.302 for a description of this cost-only contract type. The total ODC and incidental material estimate for the entire contract (sum of all option years) is $31,500,000. As described in Section L, all offers shall include a total cost of $31,500,000 for ODCs, under this contract based on the following distribution:

0016AA
1016BA
2016CA
3016DA
4016EA
5016FA
6016GA
7016HA
8016JA
9016KA
$1.0M
$2.4M
$2.9M
$3.3M
$4.0M
$4.7M
$4.6M
$3.6M
$3.0M
$2.0M

As described in Section M, this cost will not be evaluated for cost realism purposes. Section C provides additional details regarding the ODCs and incidental materials included under this CLIN.

NOTE F – TECHNICAL INSTRUCTIONS – Applicable to SLINs 0001AA, 0002AA, 0007AA, 0009AA, 0015AA; and if exercised Option SLINs 1001BA, 1002BA, 1007BA, 1009BA, 1015BA, 2001CA, 2002CA, 2007CA, 2009CA, 2015CA, 3001DA, 3002DA, 3007DA, 3009DA, 3015DA, 4001EA, 4002EA, 4007EA, 4009EA, 4015EA, 5001FA, 5002FA, 5005FA, 5007FA, 5008FA, 5009FA, 5015FA , 6001GA, 6002GA, 6005GA, 6007GA, 6008GA, 6009GA, 6015GA, 6019GA, 7001HA, 7002HA, 7006HA, 7007HA, 7008HA, 7009HA, 7015HA, 7019HA, 7020HA, 7024HA, 8001JA, 8002JA, 8007JA, 8008JA, 8009JA, 8015JA, 8019JA, 8020JA, 8024JA, 9001KA, 9002KA, 9007KA, 9008KA, 9009KA, 9015KA, 9019KA, 9020KA, 9024KA. The Government will issue Technical Instructions in accordance with NAVSEA 5252.242-9115 TECHNICAL INSTRUCTIONS included in Section H of this contract. The amount of labor hours included under these SLINs is an estimated amount of labor hours, and does not indicate that the Government will necessarily task this amount or any at all. The contractor shall not perform any efforts under these CLINs until and unless tasked by the Government via the Contracting Officer’s Representative (COR) with the concurrence of the Contracting Officer. For purposes of final fee determination at contract close-out, the final fee calculations in accordance with Section B clause DETERMINATION OF FEE (NAVSEA) (DEC 2010), Section H Special Contract Requirement 5252.216-9122 LEVEL OF EFFORT, and DETERMINATION OF COST INCENTIVE FEE any fee adjustments shall be calculated at the total CLIN level (e.g., 0001, 0002, etc.) and not at the individual SLIN level (e.g., 0001AA, 0002AA, etc.).

DETERMINATION OF FEE (NAVSEA) (DEC 2010)

(a) Minimum Fee

The base fee, as set forth in Section B of this contract, shall constitute a minimum fee to be paid for the performance of this contract. The Base Fee shall be paid in accordance with the clause of this contract entitled "FIXED FEE" (FAR 52.216‑8).

(b) Award Fee

In addition to the minimum (or base fee) to be paid hereunder, if any, the Contractor may earn an award fee as determined by the Fee Determining Official (FDO). The Government's purpose in granting an award fee is to encourage and reward superior Contracting effort directed toward performance of this contract. The specifics for evaluation are set forth in paragraphs that follow.

(c) Award Fee Board

The Contractor's performance evaluation for each period will be conducted by an Award Fee Board (AFB) of not more than eight members consisting of:

(1) The Chairperson

(2) Program Office Technical/Acquisition Representative

(3) Program Office Technical/Acquisition Representative

(4) Procuring Contracting Officer

(5) NAVSEA Representative

(6) Contract Administration Office Representative

(7) TYCOM, TDA or Field Activity Representative

(8) Recorder (Non‑voting Participant)

(d) Fee Determining Official

The FDO, [TBD], shall make determinations of the award fee due to the Contractor based upon the performance evaluation conducted by the Award Fee Board established pursuant to paragraph (c) above.

(e) Award Fee Determination and Reclama Procedures

(1) Within ten (10) days after the end of each evaluation period, the Contractor shall furnish to the AFB such information as may be reasonably required, including an Earned Value Management System (EVMS) summary for each contract line item under review, to assist the AFB in evaluating the Contractor’s performance during that evaluation period.

(2) The Award Fee Board evaluation will be scheduled as soon as possible after the end of each evaluation period. The Board may consider reports, both oral and written, from all interested parties. The Board shall arrive at a consensus on the performance rating and advise the FDO of its recommendation including the reasons, rationale, and justifications therefore. The Board findings shall be presented to the Contractor who will then be provided an opportunity to provide written comments on the evaluation findings to the FDO within five (5) working days. In such case, these comments shall be considered by the FDO in establishing the award fee earned.

(3) The FDO shall provide the Procuring Contracting Officer (PCO) a final performance evaluation and determination of the award fee earned for that period within five (5) working days after receipt of the Board’s findings or the Contractor’s written comments, whichever is later.

(4) Within ten (10) working days after receipt of the FDO’s final determination and the Procurement Request (PR) that includes the funding associated with the FDO’s final determination amount, the Contracting Officer shall issue a unilateral modification to the contract to provide for the award fee earned for that period.

(f) Fee Determination Official’s Determination

Determinations of the FDO with respect to the amount of the award fee to be paid to the Contractor and the methodology for determining the award fee are unilateral decisions made solely at the discretion of the Government.

(g) Evaluation Categories and Factors The Contractor's performance during each evaluation period will be judged based on the categories listed in the table below. The Government reserves the right to make changes in evaluation categories and factors or weights assigned to evaluation categories by unilateral modification. The Contractor may propose performance objectives for any period, however; only those received at least thirty (30) days prior to the start of an evaluation period will be considered for that evaluation period. The Contractor will be notified of changes in the evaluation categories and factors as well as adjustments to the weighting of categories, if any, prior to commencement of each evaluation period. Unsatisfactory performance under an award fee criterion may result in increased weighting for that factor in subsequent evaluation periods.

Unsatisfactory
Satisfactory
Very Good
Excellent

A.

Time of Delivery.

(A-1) Adherence to plan schedule.
Late on 10% of plans without prior agreement.
Occasionally late plans without justification.
Meets plan schedule.
Delivers all plans on schedule and meets Government requirements on schedule.

(A-2)

Action on Anticipated delays.

Exposes changes but is slow to resolve plans.
Anticipates changes and advises the Government but misses 10% of plan completion.
Keeps Government posted on delays, resolves independently on plans.
Anticipates in good time, advises Government, resolves independently and meets shipyard need dates.

B.

Quality of Work.

(B-1)

Quality and Assurance Reduction of Open Integration Issues

20% Open Issues resulting from integrating vendor products with shipyard products
10% Open Issues resulting from integrating vendor products with shipyard products
5% Open Issues resulting from integrating vendor products with shipyard products
0% Open Issues resulting from integrating vendor products with shipyard products
(B-2) Engineering Competence.
Satisfactory but dependent on Government to identify and resolve problems without constructive recommendations.
Maintains normal contact with associated activities depending on Government for assistance with problems.
Maintains independent contact with all associated activities, including PARMS, keeping them informed with little assistance from Government.
Maintains expert contact, keeping Government informed, obtaining info from PARMs without prompting.

(B-3)

Independence and Initiative

Requires Government involvement to stay on schedule and expects Government resolution of most problems.
Normal interest and desire to provide workable plans with average assistance & direction by Government.
Complete and accurate job. Free of Inconsistencies with little or no direction.
Develops complete and accurate plans, seeks out problem areas and resolves with no negative schedule impact.
CATEGORY
CRITERIA
RATING

ITEM FACTOR

EVAL. RATING

CATEGORY FACTOR

EFFICIENCY RATING

A Time of Delivery (45%)
TIME OF DELIVERY

A-1

Adherence to Plan Schedule

_______
x
0.60
=
_________

A-2

Action on Anticipated Delays

_______
x
0.40
=
_________

Total Item Weighed Rating

x
0.30
=
__________
CATEGORY
CRITERIA
RATING

ITEM FACTOR

EVAL. RATING

CATEGORY FACTOR

EFFICIENCY RATING

B.

Quality of Work

(55%)

QUALITY OF WORK

B-1

Q&A

_______
x
0.35
=
_________
B-2 Engineering Competence
_______
x
0.45
=
_________
B-3 Independence and Initiative
_______
x
0.20
=
_________

Total Item Weighed Rating

_________
x
0.40
=
__________

(h) Evaluation Periods/Award Fee Pool

(1) The following evaluation periods and associated award fee pools are hereby established. The Government reserves the right to adjust the evaluation period and allocation of award fee pool available for each period by unilateral contract modification, which shall be issued, if at all, prior to the start of the affected evaluation period(s).

PERIOD

AWARD FEE

AWARD FEE

NO. EVALUATION PERIOD

AVAILABLE

EARNED

1st Award through 30 June 2015

$TBD

2nd 1 July 2015 through 31 December 2015

3rd 1 January 2016 through 30 June 2016

4th 1 July 2016 through 31 December 2016

5th 1 January 2017 through 30 June 2017

6th 1 July 2017 through 31 December 2017

7th 1 January 2018 through 30 June 2018

8th 1 July 2018 through 31 December 2018

9th 1 January 2019 through 30 June 2019

10th 1 July 2019 through 31 December 2019

11th 1 January 2020 through 30 June 2020

12th 1 July 2020 through 31 December 2020

13th 1 January 2021 through 30 June 2021

14th 1 July 2021 through 31 December 2021

15th 1 January 2022 through 30 June 2022

16th 1 July 2022 through 31 December 2022

17th 1 January 2023 through 30 June 2023

18th 1 July 2023 through 31 December 2023

19th 1 January 2024 through 30 June 2024

20th 1 July 2024 through 31 December 2024

(2) There will be no rollover of unearned award fee.

(i) Performance Ratings

(1) In evaluating Contractor performance, the adjective and numerical ratings are as follows:

NUMERICAL

RATING/

ADJECTIVE % OF AWARD FEE

RATING POOL EARNED

CRITERIA/DEFINITION OF RATING

EXCELLENT

>91-100% The Contractor has met the basic (minimum essential) requirements of the contract, and has met more than 90% of the award fee criteria established in the award fee plan.

VERY GOOD

>76-90% The Contractor has met the basic (minimum essential) requirements of the contract, and has met more than 75% but not more than 90% of the award fee criteria established in the award fee plan.

SATISFACTORY

>50-75% The Contractor has met the basic (minimum essential) requirements of the contract, and has met more than 50% but not more than 75% of the award fee criteria established in the award fee plan.

UNSATISFACTORY

0%

The Contractor has failed to meet the basic (minimum essential) requirements of the contract.

(j) Maximum Fee In no event shall the total fee (base fee plus award fee) under this contract exceed 5% percent of total estimated cost.

(k) Payment of Award Fee The Contractor shall be paid award fee, if any, upon submittal of a proper invoice or voucher to the cognizant Payment Office, together with a copy of the unilateral modification to the contract authorizing payment of award fee for the applicable Evaluation Period. The Contractor's invoice shall show the amount of award fee payable to each sub‑line item, which shall be directly proportionate to the amount of allowable Estimated Cost (exclusive of base fee and FCCOM) incurred by the Contractor during the Evaluation Period. The Contractor's invoice must cite the appropriate accounting data in order for payment to be affected. There will be no provisional, interim or advance billing of award fee prior to a final determination of the FDO and execution by the contracting officer of a contract modification authorizing payment.

PAYMENTS OF FEE (S) (COMPLETION) (NAVSEA) (MAY 1993)

Applicable to Option CLINs 3003, 4003, 5003, 6003, 7003, 8003, 9003; 3003, 4004, 5004, 6004, 7004, 8004, 9004; 4010, 5010, 6010, 7010, 8010, 9010; 4011, 5011, 6011, 7011, 8011, 9011; 4012, 5012, 6012, 7012, 8012, and 9012

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, "fixed fee" in cost-plus-fixed-fee type contracts for completion and phase type contracts.

(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE FEE", (FAR 52.216-10), as applicable. Such payments shall be equal to TBD percent (TBD%) of the allowable cost of each invoice submitted by and payable to the Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST AND PAYMENT" (FAR 52.216-7), subject to the withholding terms and conditions of the "FIXED FEE" or "INCENTIVE FEE" clause, as applicable (percentage of fee is based on fee dollars divided by estimated cost dollars, including facilities capital cost of money). Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.

(c) In the event of discontinuance of the work under this contract, or any specified phase of the contract, in accordance with the clause of this contract entitled "LIMITATION OF FUNDS" (FAR 52.232-22) or "LIMITATION OF COST" (FAR 52.232-20), as applicable, the fee shall be equitably adjusted by mutual agreement to reflect the diminution of work. If the adjusted fee is less than the sum of all fee payments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the adjusted fee exceeds all payments made to the Contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.

(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) in accordance with paragraph (c) above, or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.

PAYMENT OF FEES(S) (LEVEL OF EFFORT – ALTERNATE I) (NAVSEA) (MAY 2010)

Applicable to SLINs 0001AA, 0002AA, 0007AA, 0009AA, 0015AA; and if exercised Option SLINs 1001BA, 1002BA, 1007BA, 1009BA, 1015BA, 2001CA, 2002CA, 2007CA, 2009CA, 2015CA, 3001DA, 3002DA, 3007DA, 3009DA, 3015DA, 4001EA, 4002EA, 4007EA, 4009EA, 4015EA, 5001FA, 5002FA, 5005FA, 5007FA, 5008FA, 5009FA, 5015FA , 6001GA, 6002GA, 6005GA, 6007GA, 6008GA, 6009GA, 6015GA, 6019GA, 7001HA, 7002HA, 7006HA, 7007HA, 7008HA, 7009HA, 7015HA, 7019HA, 7020HA, 7024HA, 8001JA, 8002JA, 8007JA, 8008JA, 8009JA, 8015JA, 8019JA, 8020JA, 8024JA, 9001KA, 9002KA, 9007KA, 9008KA, 9009KA, 9015KA, 9019KA, 9020KA, 9024KA.

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts for level of effort type contracts.

(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE FEE", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST AND PAYMENT" (FAR 52.216-7), subject to the withholding terms and conditions of the "FIXED FEE" or "INCENTIVE FEE" clause, as applicable, and shall be paid at the hourly rate(s) specified above per man-hour performed and invoiced. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.

DETERMINATION OF COST INCENTIVE FEE

Applicable to Applicable to SLINs 0001AA, 0002AA, 0007AA, 0009AA, 0015AA; and if exercised Option SLINs 1001BA, 1002BA, 1007BA, 1009BA, 1015BA, 2001CA, 2002CA, 2007CA, 2009CA, 2015CA, 3001DA, 3002DA, 3007DA, 3009DA, 3015DA, 4001EA, 4002EA, 4007EA, 4009EA, 4015EA, 5001FA, 5002FA, 5005FA, 5007FA, 5008FA, 5009FA, 5015FA , 6001GA, 6002GA, 6005GA, 6007GA, 6008GA, 6009GA, 6015GA, 6019GA, 7001HA, 7002HA, 7006HA, 7007HA, 7008HA, 7009HA, 7015HA, 7019HA, 7020HA, 7024HA, 8001JA, 8002JA, 8007JA, 8008JA, 8009JA, 8015JA, 8019JA, 8020JA, 8024JA, 9001KA, 9002KA, 9007KA, 9008KA, 9009KA, 9015KA, 9019KA, 9020KA, 9024KA.

(a) The cost incentive fee payable shall be calculated in accordance with FAR 52.216-10 included in Section I of this contract. The final target cost and target fee amounts shall be based upon the actual level of effort the contractor delivers, and shall be calculated as follows:

(1) The final target cost for each Item shall be determined by multiplying the total allowable hours worked, including subcontractor hours, under the applicable Item by the cost-per-hour rate in the Target Cost column of the table identified under Note B above. This cost-per-hour rate includes facilities capital cost of money (FCCOM).

(2) The final target fee for each Item shall be determined by multiplying the total allowable hours worked, including subcontractor hours, under the applicable Item by the fee-per-hour rate in the Target Fee column of the table identified under Note B above.

(b) The final fee payable to the contractor shall be based on the total allowable cost incurred by the contractor as compared to the final target cost as calculated under paragraph (a)(1) above. The final fee payable shall be adjusted using the final target fee as calculated under paragraph (a)(2) above, and the adjustments as described under FAR 52.216-10(e) included in Section I of this contract.

(End of Clause)

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified in Section C:

“3.2 NEW CONSTRUCTION COMBAT SYSTEM WATERFRONT INTEGRATION AND TEST

Item 0002AA and if Options are exercised Items 1002BA, 2002CA, 3002DA, 4002EA, 5002FA, 6002GA, 7002HA, 8002JA, and 9002KA.

As directed by specific Technical Instruction (TI), the Contractor shall perform the following tasks.

The Contractor shall provide on-site resident and temporary duty (TDY) personnel at the shipyards as members of the AEGIS Test Team (ATT) in the execution of the AEGIS Combat System Test Program for the DDG 51 class ships. The on-site Contractor personnel shall be headed by a Contractor test manager who shall closely work with the AEGIS Test Officers (ATO) and AEGIS Test Managers (ATM) in matters concerning the test program and ship construction process.

The Contractor shall ensure that the combat system is fully integrated with the ship systems by providing the special skills required to assist Program Executive Office (PEO) Integrated Warfare Systems (IWS) in the acquisition and installation of combat system equipment in DDG-51 Class ships in the areas of Subsystem, System and Ship Integration; Combat System Integration; Reliability, Maintainability, and Availability (RM&A); Standardization; C4I; Electromagnetic Compatibility (EMC); Interoperability; Safety; Quality Assurance; Human Factors Engineering; and Combat System Operations/Manning.

References - MIL-STD-810G, MIL-STD-1399, MIL-STD-1310H, MIL-STD-2042B, NAVSEAINST S9095 AD-TRQ-010/TSTP, S9095-AD-TRQ-010/TSTP, NAVSEA T9050-AA-DIR-010/AEGIS, MIL-STD-882D.”

and:

“3.2.2 ADVANCE PLANNING ACTIVITIES

1. The Contractor shall analyze new components, design modifications, revised processes, ships space arrangements, Topside arrangement studies and installation/test procedures for impact on ship design and system technical requirements.

2. The Contractor shall coordinate system engineering support of ship Engineering Change Proposal (ECP) activities and review all combat system related changes to ship documentation and impacts to combat system space arrangements, Topside arrangements and other ship design and system technical requirements as requested by the Government.

3. The Contractor shall provide on-site engineering review of test documentation prior to commencement of industrial testing.

4. The Contractor shall provide validation of shipboard test documentation at a land-based test site such as Combat System Engineering Development Site (CSEDS) or Surface Combat Systems Center(SCSC), Wallops Island or when necessary aboard ships.

5. The Contractor shall work with the Participating Acquisition Resource Manager (PARM) in preparation of element level ship test procedures to ensure that test procedures are delivered to the ATT ninety (90) days in advance of the applicable ship test.

6. The Contractor shall review Government provided test procedures for technical content and format ensuring traceability.

7. The Contractor shall…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .