Attachment_29_-_Cost_and_Software_Data_Reporting_(CSDR)_Plan.xls
XLS spreadsheet 78 KB Posted
- Solicitation number
- N0002413R5100
About this file
Attachment 29 - Cost and Software Data Reporting (CSDR) Report
View the file
Other files
Show 40 more
Latest 50 of 74 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 2794, Pg 1 (CSDR Plan)
COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1. MAJOR PROGRAM | a. NAME: | AEGIS Ship Integration and Test | |||||||||||
| b. PHASE/MILESTONE | c. PRIME MISSION PRODUCT | 2. WBS SYSTEM TYPE | 3. SUBMISSION TYPE | 4. CURRENT SUBMISSION DATE (YYYYMMDD) | 5. LAST APPROVED PLAN DATE (YYYYMMDD) | ||||||||
| Pre-A | B | C-FRP | ACB16 Integration and Test | Electronic System | X | INITIAL | |||||||
| A | X | C-LRIP | O&S | CHANGE | 20130814 | ||||||||
| 6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code) | 6b. TELEPHONE NUMBER (Include Area Code) | 6c. FAX NUMBER (Include Area Code) | 6d. E-MAIL ADDRESS | ||||||||||
| Kitty Sutherland |
1333 Issac Hull Ave SE Bldg 197 Suite 2E-2641
| Washington, DC 20376 | 202-781-2569 | 202-781-4548 | kitty.sutherland@navy.mil | |||||||||||
| 7. PLAN TYPE | 8. PREPARING ORGANIZATION | 9a. CONTRACTOR NAME/ADDRESS | 9b. CONTRACT NUMBER | 9c. APPROPRIATION | 10. APPROVED PLAN NUMBER | |||||||||
| PROGRAM | X | CONTRACT (PRIME) | i. PERFORMING ORGANIZATION | ii. DIVISION | TBD | X | RDT&E | N-12-B-C6 | ||||||
| CONTRACT (SUB) | PEO IWS 1.0 | TBD | X | PROCUREMENT | ||||||||||
| X | O&M | |||||||||||||
| 11. WBS ELEMENT CODE | 12. | |||||||||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | |||||||||||||
| (X if applicable) | DD 1921-3 (CBDR): | |||||||||||||
| X | ||||||||||||||
| a. PROGRAM/ | ||||||||||||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||||||||||||
| SUBCONTRACT | a. CWBS | |||||||||||||
| DICTIONARY | b. DD 1921 | |||||||||||||
| (CDSR) | c. DD 1921-1 | |||||||||||||
| (FCHR) | d. DD 1921-2 | |||||||||||||
| (PCR) | e. DD 1921-4 | |||||||||||||
| (CSR) | f. SRDR |
FORMATS
| 1.0 | 1.0 | AEGIS Ship Integration and Test | X | X | |||||||
| 1.1 | 1.1 | Prime Mission Product (PMP) 1...n (Specify) | X | X | |||||||
| 1.1.1 | 1.1.1 | PMP Subsystem 1...n (Specify) | X | X | X | ||||||
| 1.1.2 | 1.1.2 | Radar | X | X | X | X | |||||
| 1.1.2.1 | 1.1.2.1 | PMP Subsystem Hardware 1...n (Specify) | X | X | |||||||
| 1.1.2.2 | 1.1.2.2 | PMP Subsystem Software Release 1...n | X | X | |||||||
| 1.1.2.3 | 1.1.2.3 | Subsystem Integration, Assembly, Test and Checkout | X | X | |||||||
| 1.1.3 | 1.1.3 | Network | X | X | X | X | |||||
| 1.1.4 | 1.1.4 | PMP Subsystem Hardware 1...n (Specify) | X | X | X | ||||||
| 1.1.5 | 1.1.5 | PMP Subsystem Software Release 1...n | X | X | X | ||||||
| 1.1.6 | 1.1.6 | Subsystem Integration, Assembly, Test and Checkout | X | X | X | ||||||
| 1.1.7 | 1.1.7 | Storage | X | X | X | ||||||
| 1.1.8 | 1.1.8 | PMP Subsystem Hardware 1...n (Specify) | X | X | X | ||||||
| 1.1.9 | 1.1.9 | PMP Subsystem Software Release 1...n | X | X | X | ||||||
| 1.1.10 | 1.1.10 | Subsystem Integration, Assembly, Test and Checkout | X | X | X | ||||||
| 1.1.11 | 1.1.11 | Processing | X | X | X | ||||||
| 1.1.12 | 1.1.12 | PMP Subsystem Hardware 1...n (Specify) | X | X | X | ||||||
| 1.1.13 | 1.1.13 | PMP Subsystem Software Release 1...n | X | X | X | ||||||
| 1.1.14 | 1.1.14 | Subsystem Integration, Assembly, Test and Checkout | X | X | X | ||||||
| 1.1.15 | 1.1.15 | Display | X | X | X | X | |||||
| 1.1.15.1 | 1.1.15.1 | PMP Subsystem Hardware 1...n (Specify) | X | X | |||||||
| 1.1.15.2 | 1.1.15.2 | PMP Subsystem Software Release 1...n | X | X | |||||||
| 1.1.15.3 | 1.1.15.3 | Subsystem Integration, Assembly, Test and Checkout | X | X | |||||||
| 1.1.16 | 1.1.16 | Communicators | X | X | X | X | |||||
| 1.1.17 | 1.1.17 | Training | X | X | X | X | |||||
| 1.1.18 | 1.1.18 | Simulation | X | X | X | X | |||||
| 1.1.19 | 1.1.19 | EW | X | X | X | X | |||||
| 1.1.20 | 1.1.20 | PMP Integration, Assembly, Test and Checkout | X | X | X | ||||||
| 1.2 | 1.2 | Platform Integration, Assembly, Test and Checkout | X | X | |||||||
| 1.2.1 | 1.2.1 | Combat System Waterfront Integration | X | X | X | ||||||
| 1.2.1.1 | 1.2.1.1 | Ship Integration | X | X | |||||||
| 1.2.1.2 | 1.2.1.2 | Installation Support | X | X | |||||||
| 1.2.1.3 | 1.2.1.3 | Availability Planning and Ship Support | X | X | |||||||
| 1.2.1.4 | 1.2.1.4 | On-Site Combat System Technical Support | X | X | |||||||
| 1.2.1.5 | 1.2.1.5 | Shipyard On-Site Test Program Implementation | X | X | |||||||
| 1.2.1.6 | 1.2.1.6 | Waterfront Project Engineering and Technical Support | X | X | |||||||
| 1.2.2 | 1.2.2 | Waterfront Combat System Test Execution | X | X | X | ||||||
| DD FORM 2794, MAY 2011 | PREVIOUS EDITION IS OBSOLETE | ||||||||||
| 11. WBS ELEMENT CODE | 12. | ||||||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | ||||||||||
| (X if applicable) | DD 1921-3 (CBDR): | ||||||||||
| X | |||||||||||
| a. PROGRAM/ | |||||||||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | ||||||||||
| SUBCONTRACT | a. CWBS | ||||||||||
| DICTIONARY | b. DD 1921 | ||||||||||
| (CDSR) | c. DD 1921-1 | ||||||||||
| (FCHR) | d. DD 1921-2 | ||||||||||
| (PCR) | e. DD 1921-4 | ||||||||||
| (CSR) | f. SRDR |
FORMATS
| 1.2.3 | 1.2.3 | Waterfront Combat System Test Execution Closeout | X | X | X | |||||
| 1.3 | 1.3 | System Engineering | X | X | ||||||
| 1.3.1 | 1.3.1 | Test Engineering | X | X | X | |||||
| 1.3.2 | 1.3.2 | Technical Data Packages (TDPs), Shipboard Integrations | X | X | X | |||||
| 1.3.3 | 1.3.3 | Rough Order Of Magnitude (ROM) Level Engineering Packages (RLEP) | X | X | X | |||||
| 1.3.4 | 1.3.4 | Technical Documentation Development | X | X | X | |||||
| 1.3.4.1 | 1.3.4.1 | TDP and Test Package/Procedure Development | X | X | ||||||
| 1.3.4.2 | 1.3.4.2 | Technical Documentation | X | X | ||||||
| 1.3.5 | 1.3.5 | Topside Analysis | X | X | X | |||||
| 1.3.6 | 1.3.6 | Feasibility Studies | X | X | X | |||||
| 1.3.7 | 1.3.7 | Reliability Engineering | X | X | X | |||||
| 1.3.8 | 1.3.8 | Configuration Management Support | X | X | X | |||||
| 1.3.9 | 1.3.9 | Lifecycle Engineering | X | X | X | |||||
| 1.3.10 | 1.3.10 | BMD Engineering | X | X | X | |||||
| 1.3.11 | 1.3.11 | Combat System Alignment | X | X | X | |||||
| 1.3.12 | 1.3.12 | Sonar Self-Noise | X | X | X | |||||
| 1.3.13 | 1.3.13 | Interoperability (Strike Configuration Planning) | X | X | X | |||||
| 1.4 | 1.4 | Program Management | X | X | X | |||||
| 1.5 | 1.5 | System Test and Evaluation | X | X | ||||||
| 1.5.1 | 1.5.1 | Post Delivery Test and Trials | X | X | X | |||||
| 1.5.1.1 | 1.5.1.1 | LFT&E | X | X | ||||||
| 1.5.1.2 | 1.5.1.2 | CSSQT | X | X | ||||||
| 1.5.1.3 | 1.5.1.3 | DT | X | X | ||||||
| 1.5.1.4 | 1.5.1.4 | FCT | X | X | ||||||
| 1.5.1.5 | 1.5.1.5 | OT | X | X | ||||||
| 1.5.2 | 1.5.2 | Post Shakedown Availability | X | X | X | |||||
| 1.5.3 | 1.5.3 | Aegis Weapon System (AWS) Element Assessments 1...n (specify) | X | X | X | |||||
| 1.5.3.1 | 1.5.3.1 | Computer/Mission Critical Enclosure (MCE) | X | X | ||||||
| 1.5.3.2 | 1.5.3.2 | Displays | X | X | ||||||
| 1.5.3.3 | 1.5.3.3 | Fire Control System (FCS) | X | X | ||||||
| 1.5.3.4 | 1.5.3.4 | Operational Readiness Test System (ORTS) | X | X | ||||||
| 1.5.3.5 | 1.5.3.5 | Radar Transmitter | X | X | ||||||
| 1.5.3.6 | 1.5.3.6 | Radar Signal Processor | X | X | ||||||
| 1.5.3.7 | 1.5.3.7 | AEGIS Local Area Network (LAN) Interconnection System (ALIS) | X | X | ||||||
| 1.5.3.8 | 1.5.3.8 | Peripherals | X | X | ||||||
| 1.5.3.9 | 1.5.3.9 | Electronic Cooling Water System (ECWS) | X | X | ||||||
| 1.5.3.10 | 1.5.3.10 | Power System | X | X | ||||||
| 1.5.4 | 1.5.4 | Environmental Qualification Testing | X | X | X | |||||
| 1.6 | 1.6 | Training | X | X | ||||||
| 1.6.1 | 1.6.1 | New Construction Test Team Training | X | X | X | |||||
| 1.6.2 | 1.6.2 | Equipment | X | X | ||||||
| 1.6.3 | 1.6.3 | Documents and Coursework | X | X | ||||||
| 1.7 | 1.7 | Data | X | X | ||||||
| 1.8 | 1.8 | Peculiar Support Equipment | X | X | ||||||
| 1.9 | 1.9 | Common Support Equipment | X | X | ||||||
| 1.10 | 1.10 | Operational/Site Activation - Land Based Test Site (LBTS) | X | N/A | ||||||
| 1.11 | 1.11 | Industrial Facilities | X | X | ||||||
| 1.12 | 1.12 | Initial Spares and Repair Parts | X | X | ||||||
| DD FORM 2794, MAY 2011 | PREVIOUS EDITION IS OBSOLETE | |||||||||
| 11. WBS ELEMENT CODE | 12. | |||||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | |||||||||
| (X if applicable) | DD 1921-3 (CBDR): | |||||||||
| X | ||||||||||
| a. PROGRAM/ | ||||||||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||||||||
| SUBCONTRACT | a. CWBS | |||||||||
| DICTIONARY | b. DD 1921 | |||||||||
| (CDSR) | c. DD 1921-1 | |||||||||
| (FCHR) | d. DD 1921-2 | |||||||||
| (PCR) | e. DD 1921-4 | |||||||||
| (CSR) | f. SRDR |
FORMATS
| Subtotal Cost | X | ||
| Reporting Contractor G&A | X | ||
| Reporting Contractor Undistributed Budget | X | ||
| Reporting Contractor Management Reserve | X | ||
| Reporting Contractor FCCM | X | ||
| Total Cost | X | ||
| Reporting Contractor Profit/Loss or Fee | X | ||
| Total Price | X | ||
| DD FORM 2794, MAY 2011 | PREVIOUS EDITION IS OBSOLETE |
DD Form 2794, Pg 2 (CSDR Plan)
| 14. CSDR SUBMISSION DATES | ||||||
| a. | ||||||
| SUBMISSION | b. | |||||
| FORM(S) | c. | |||||
| EVENT | d. AS OF DATE | e. DUE DATE | ||||
| (YYYYMMDD) | (YYYYMMDD) | |||||
| 1 | CWBS Dictionary | Submitted with First Cost Report Assumes 15 January 2015 award | 20150424 | 20150725 | ||
| 2 | SRDR Initial | Initial SRDR Report | 20150327 | 20150601 | ||
| 3 | 1921, 1921-1 | Interim Report #1 | 20160401 | 20160606 | ||
| 4 | 1921, 1921-1 | Interim Report #2 | 20170331 | 20170605 | ||
| 5 | SRDR Final | Final SRDR Report | 20180330 | 20180604 | ||
| 6 | 1921, 1921-1 | Final Cost Report, when 95% of contract costs have been incurred | 20180330 | 20180604 | ||
| 15. REMARKS | ||||||
| 1. Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable. | ||||||
| 2. DD Form 1921-3 Contractor Business Data Report: | ||||||
| a.The Contractor Business Data Report is prepared by and for the business entity (e,g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government. | ||||||
| b. Reports are submitted annually at the end of the contractor's fiscal year. | ||||||
| c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years. | ||||||
| DD FORM 2794 (PAGE 2), MAY 2011 | PREVIOUS EDITION IS OBSOLETE |