T34_44_6_Manning_Walkthrough_02_16_14.pdf
PDF 82 KB Posted
- Attached to
- T-34/T-44/T-6 Contractor Logistics Support
- Solicitation number
- N00019-14-R-0018
About this file
Manning Walkthrough
View the file
Other files
Show 40 more
Latest 50 of 151 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIR-4.10E
Manning
FIRM FIXED PRICE and LABOR HOUR
Reference EXAMPLE
Contractor Productive Work Year (Hours): 1700
FFP AND LABOR HOUR EXAMPLE
Shift Source Company Category Title FTE Hours
Prime Contractor Labor Hours
Prime Contractor Direct Labor
Note A CLIN 0001 - T-34 NAS CC Aircraft Maintenance
Schedule Maintenance Mechanic I 1 CBA Union Mechanic I 16 27,200
Inspection Manager 1 FPRA Prime Contractor XX Manager 2 3,400
Sr Support Equipment Mechanic 1 CBA Union Mechanic II 23 39,100
Mechanic 1 CBA Union A&P Mechanic 16 27,200
Plane Captain 1 CBA Union Plane Captain 43 73,100
Aircrew Survival Equip Tech I 1 CBA Union Parachute Rigger 8 13,600
Aircrew Survival Equip Tech II 1 CBA Union Parachute Rigger 3 5,100
Aircraft Washer 2 CBA Union Aircraft Washer 12 20,400
ALSS QA Inspector 1 CBA Union ALSS Inspector 2 3,400
Mechanic - Avionics 2 CBA Union Avionics Technician 23 39,100
Note C Etc. etc etc etc etc etc etc
CLIN Total 148 251,600
CLIN 0040 - T-6 Flight Hour Generated Maintenance
SLIN 0040AA - T-6 Flight Hour Generated Maintenance, NAS Whiting Field
Maintenance Mechanic I 1 CBA Union Mechanic I 2 960
Maintenance Mechanic II 2 CBA Union ALSS Technician 4 6,800
Supervisor 1 FPRA Site Manager Manager 1 1,700
Mechanic - Egress 1 CBA Union AME Technician 5 8,500
Etc. etc etc etc etc etc etc
SLIN Total 12 17960
Note B CLIN 0004 - T-34 Satellite Site Support 6 10,425
Direct LaborLabor Rate
* Note A: Include a breakout of Labor categories for the following selected CLINs/SLINs: 0001, 0X02, 0X20, 0X21, 0X37AB, 0X38,0039AC, 0139AB, 0239AB, 0339AB, 0439AB and 0X40AA - 0X40AC only. Provide a separate breakout for the base and option years. Do not breakout by work center. Provide a single total number of FTEs and labor hours for each labor category under each of the requested CLINs/SLINs above. Ensure ALSS and Egress Technicians are specifically identified separate from other Mechanics/Technicians. Although the manning evaluation will focus on the above selected CLINs/SLINs, the Government reserves the right to evaluate proposed manning (total FTEs and labor category breakout) for all CLINs/SLINs utilizing data in Attachment L-12 Manning Supplement provided as part of the price proposal.
* Note B: For all other CLINs (including LH CLINs) only provide a one-line total for FTEs and total labor hours.
* Note C: Insert rows as necessary to accommodate all labor categories that fall under the above selected CLINs/SLINs above.
File details come from the government source that posted it. Updated .