ATTACHMENT_96_-_APPENDIX_F_Definitions.pdf

PDF 223 KB Posted

Attached to
T-34/T-44/T-6 Contractor Logistics Support
Solicitation number
N00019-14-R-0018
Issued by

About this file

Attachment 96 Appendix F

View the file

Other files

File Type Posted
N00019-14-R-0018_AMD_0004.pdf PDF
Q A_7_-_25FEB2014.pdf PDF
Q A_6_-_24FEB2014.pdf PDF
Q A__5_21FEB2014.pdf PDF
N00019-14-R-0018_AMD_0003.pdf PDF
Att_L-8_Vol_4_SuppSvcPr_20140219.xls XLS spreadsheet
Exhibit_A_Signed_CDRLs.pdf PDF
Q A_4_-_19FEB2014.pdf PDF
Q A_3_-_18FEB2014.pdf PDF
Government_Manpower_Estimate__02_16_2014.xlsx XLSX spreadsheet
T34_44_6_Manning_Walkthrough_02_16_14.pdf PDF
T34_44_6_Proposal_Guidance_02_16_14.pdf PDF
T34_44_6_Proposal_Dev_Guidance_-_Price_02_16_14.pdf PDF
Q A__2_-_13FEB2014.pdf PDF
N00019-14-R-0018_AMD_0002.pdf PDF
ATTACHMENT_63_-_Encl_9_Applicable_Documents_10_FEB_14.xlsx XLSX spreadsheet
N00019-14-R-0018_Q A_7FEB2014.pdf PDF
N00019-14-R-0018_AMD_0001.pdf PDF
ATTACHMENT_119-_CBA_Ft._Bragg.pdf PDF
ATTACHMENT_111-_CBA_MOAs_6_FEB_2014.pdf PDF
ATTACHMENT_01_-_T34_T44_T6_6_FEB_2014.pdf PDF
ATTACHMENT_66_-_PWS_Encl_11_Satellite_Site_FHs_T-34_20140205.xls XLS spreadsheet
ATTACHMENT_63_-_Encl_9_Applicable_Documents_6_FEB_14.xlsx XLSX spreadsheet
ATTACHMENT_30_-_PWS_Encl_2_IMRL_Supplement_3_CTW-4.pdf PDF
ATTACHMENT_52_-_PWS_Encl_7_OS_Component_Repair_List_T-44.xlsx XLSX spreadsheet
ATTACHMENT_124_-_CBA_Fallon_25_Jul_2011.PDF PDF
ATTACHMENT_71_-_PWS_Encl_12_T-34_SIRG_01-50-T34C-600-6.pdf PDF
ATTACHMENT_61_-_Encl_8_T-34_El-Centro.pdf PDF
ATTACHMENT_55_-_Encl_8__T-44_Paint_Scheme.pdf PDF
ATTACHMENT_50_-_PWS_Encl_6_T44A-C_MEL.pdf PDF
ATTACHMENT_63_-_Encl_9_Applicable_Documents_19_Jan_14.xlsx XLSX spreadsheet
ATTACHMENT_126_-_WD_05-2006_(Rev_13_Ft_Rucker).PDF PDF
ATTACHMENT_69_-_PWS_Encl_12_T-34_SIRG_01-50-T34C-600-6-2.pdf PDF
ATTACHMENT_118_-_WD_05-2394_(Rev_14_Ft_Bragg).PDF PDF
ATTACHMENT_128_-_Encl_15_CNATRA_Inst_4355.4A.pdf PDF
ATTACHMENT_91_-_PWS_APPENDIX_A_Logbooks_Records.pdf PDF
ATTACHMENT_1_-_T34_T44_T6_28_JAN_2013.pdf PDF
N00019-14-R-0018_FINAL_RFP_30JAN2014.pdf PDF
ATTACHMENT_35_-_PWS_Encl_2_Sat_Site_Ft_Bragg_GFP.xls XLS spreadsheet
EXHIBIT_C_OAWR_Tracker.xls XLS spreadsheet
ATTACHMENT_44_-_PWS_Encl_5_ALSS_T-6_NAS_WF CC.pdf PDF
ATTACHMENT_20_-_PWS_Encl_1_Fac_-_FRC_SE.pdf PDF
ATTACHMENT_77_-_PWS_Encl_13_T44A_SIRG_01-50-T44A-600-6-1.pdf PDF
Att_L-3_Ann_B_Labor_Hr_Data_Req_20140129.docx DOCX document
ATTACHMENT_84_-_PWS_Encl_14_T44C_SIRG_01-50-T44C-600-6-4.1.pdf PDF
ATTACHMENT_09_-_PMF.pdf PDF
ATTACHMENT_41_-_PWS_Encl_4_-_T-44C_Corrosion_Control_Plan.pdf PDF
ATTACHMENT_15_-_PWS_Encl_1_Fac_-_Sat_Site_NAF_El_Centro.pdf PDF
ATTACHMENT_98_-_APPENDIX_H_Acronyms.pdf PDF
ATTACHMENT_82_-_PWS_Encl_14_T44C_SIRG_01-50-T44C-600-6-4.2.pdf PDF
Show 40 more

Latest 50 of 151 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 96 N00019-14-R-0018

PWS Appendix F - Definitions

APPENDIX F – DEFINITIONS

CLS PERFORMANCE WORK STATEMENT

T-34/T-44/T-6

Administrative Contracting

Officer (ACO)

The Government employee responsible for the overall administration of the contract is the ACO.

Aircraft Condition

Inspection (ACI)

The specifications establishing requirements for the AIRCRAFT to carefully inspect those areas not normally accessible at the Site and to restore the aircraft to a high level of operational availability and revitalized appearance. ACI is the AIRCRAFT Scheduled

Depot-Level Maintenance (SDLM) requirement.

Ammunition and Explosives

(AE)

All items of ammunition; propellants, liquid and solid, high explosives; guided missiles; warheads, devices; pyrotechnics;

chemical agents; their components, and associated substances, presenting real or potential hazards to life and property.

Aviation Maintenance

Management Team

(AMMT) Inspection (Navy-peculiar requirement)

An inspection performed by the NAVAIR inspection team to evaluate the maintenance practices and programs required under the most current 4790 CNAF Instruction and the requirements of this PWS. These inspections will generally be scheduled through the PMA and the inspection team based on availability and operational commitments. Frequency of the AMMT visits generally varies between 18 and 24 months.

Aircraft-on-Ground (AOG) Term used to indicate an aircraft is Not Mission Capable (NMC) when aircraft is grounded for maintenance or non-available spare parts.

Back-shop The support services to provide the necessary repair, overhaul, testing and modification of components removed from the airframe.

Catastrophic Failure

Applies only to Over & Above cost to repair Engines when cost to repair exceeds 80% of the replacement cost.

Conditional Maintenance Conditional maintenance requirements are unscheduled events required as a result of specific over-limit condition or as a result of circumstances or events which create an administrative requirement for an inspection and any aircraft maintenance action requiring O&A 40 hours to complete.

Data All management, scientific engineering and logistics information, reports, and documentation which are required.

Defect Any non-conformance of a characteristic with specified requirements.

Disassembly Teardown of the item or parts sufficient to permit the type and amount of inspection and work required.

Engine

A built-up engine with all accessories in a Quick Engine Change

(QEC) configuration.

Engine Accessories

All external items containing the fuel, ignition and control systems that are normally removed for rework, or are replaced without disassembly of the engine.

Engine Accessory Parts

All assemblies, subassemblies or components and detail parts pertinent to engine accessories.

Engine Overhaul Engine overhaul is the process of engine disassembly sufficient to inspect all of the parts of the basic engine and installed accessory components. Overhaul includes disassembly, cleaning, inspection, repair, replacement and/or servicing of parts (as required), reassembly and successful test-cell run to ensure engine integrity and that the engine is producing specification-level performance.

Engine Parts

All items of the basic engine, excluding engine accessories and parts.

Engine Repair Engine repair is the necessary preparation, fault isolation, disassembly, inspection, replacement of parts, adjustment, re-assembly, calibration, and testing accomplished in restoring items to serviceable status to allow for continued safe and reliable engine operation to the next scheduled overhaul.

Flight A flight begins when the aircraft first moves forward on its takeoff run or takes off vertically from rest at any point of support and ends after airborne flight when the aircraft is on the surface and either; (a) the engines are stopped, (b) the aircraft has been on the surface for 5 minutes, or (c) a change is made in the pilot in command. A series of landings is considered part of one flight.

Fully Mission Capable

(FMC)

The condition status that indicates the aircraft is capable of safe flight and can perform all the prescribed missions required by the applicable Minimum Equipment List (MEL)/MESL/Mission

Essential Sub-System Matrix (MESM).

Functional Check Flight

(FCF)

Functional check flight made in order to certify systems’ integrity and verify that aircraft system performances meet Government-approved criteria.

Inspect or Check

An examination of an item to determine identity, condition, and proper installation.

Mandatory Replacement of

Parts & Materials

Parts that are always (100% of the time) replaced regardless of their condition.

Maintenance Engineering

Directive (MED)

USN-peculiar changes to maintenance procedures directed by the

Program Management, Air (PMA) team and deemed technically necessary by the Lead Engineer.

Mission A pre-planned sequence of one or more sorties flown by one aircraft that has been assigned a specific mission number.

Mission Capable (MC)

MC is defined as the sum of Fully Mission Capable (FMC) and

Partial Mission Capable (PMC).

Mission Essential List

(MEL) or Mission Essential

Subsystems List (MESL), or

Minimum

Equipment/System Matrix or

Mission Essential

Subsystems Matrix (MESM)

– see Appendix F.

Components which are critical to flight. The list may not deviate from requirements of the Operator’s Manual limitations section, emergency procedures, or safety-of-flight messages.

Air Conditioning System

Aircraft Survivability Equipment (ASE) as applicable

Autopilot

Cockpit Voice Recorder

Flight Data Recorder

Flight Director

Flight Management System (FMS)

Global Positioning System

Ground Proximity Warning System (GPWS)

Internal Communication System (ICS)

Landing Lights

Pressurization System

Radio Altimeter

Strobe Lights

Taxi Lights

Weather Radar

Modification

Changes in form/fit or function of a system, equipment or airframe.

Not Mission Capable (NMC)

The material condition of an aircraft indicating that it is not capable of performing any one of its missions (as defined in the applicable MEL/MESL/MESM Appendix F), or when a required maintenance action causes the aircraft to be non-airworthy.

NMC time starts when the Contractor is notified of an inoperable condition.

NMC time ends when the Contractor notifies the On-Site

Government Representative (OSGR) or Pilot-In-Command (PIC) that the aircraft is ready for pre-flight inspection or test flight.

If the aircraft is determined to be NMC as a result of a pre-flight inspection or test flight and the cause is attributable to the original fault, NMC time shall continue from the original time of discovery, provided the preflight or test flight inspection is performed within 24 hours after notification is provided to the

OSGR or PIC by the Contractor.

If panels and equipment are removed to conduct area inspections and cannot be replaced within a two-hour time frame, then the entire inspection is considered to have impacted mission capability and shall be documented as NMC. The two-hour rule applies to scheduled maintenance only.

When a new discrepancy is found during pre-flight or test flight, NMC time will start when the OSGR notifies the Contractor of the inoperable condition.

If a new discrepancy is found when the aircraft is not located at the Site (aircraft is off-Site) or when the aircraft is located at the

Site and Contractor personnel are not available, NMC time will start when the Government notifies the Contractor of the inoperable condition. In either case, NMC time will start not later than one hour after time of discovery/flight termination.

Aircraft shall be considered NMC for reporting purposes when the Contractor fails to correct PMC items within 10 days for

Continental United Status (CONUS) and 20 days for OCONUS, unless PMA/PMO waiver granted.

Aircraft shall be considered NMC for reporting purposes when the Contractor fails to correct one or multiple non-grounding discrepancies (except those pending SA incorporation, inspection or corrosion) within 20 days, unless PMA/PMO waiver granted.

Not Mission Capable

Maintenance (NMCM)

The material condition of an aircraft when it is not available for a mission because of scheduled or unscheduled maintenance as required by the PWS.

Scheduled maintenance time for reporting purposes includes routine, detail, calendar, engine and special inspections when the combination of inspection requirements is such that it requires placing the aircraft in an inoperable condition. Scheduled maintenance time does not include time spent performing daily, preflight, turnaround, post-flight or corrosion inspections when the requirements do not require placing the aircraft in an inoperable condition.

Not Mission Capable (NMC)

– MEL/MESL/MESM

Discrepancies against any system on the MEL/MESL/MESM will be considered NMC for the purpose of determining MC rates, if the discrepancy is not corrected within 10 calendar days for

CONUS aircraft and 20 calendar days for OCONUS aircraft.

After the stated time period expires, the aircraft will be carried as

NMC even though the local Commander may elect to fly the aircraft (if other grounding criteria do not exist). If the

Government elects to fly an aircraft against which reduced payment under this provision is being assessed, the Contractor shall be exempt from reduced payment for that aircraft for the duration of the flight.

Any discrepancy against any system on the MEL/MESL/MESM will be included in Daily Status Reports / CDRL A001 (i) and

A002 (ii).

Not Mission Capable Supply

(NMCS)

The material condition of an aircraft when it is not available for a mission because parts or material are not available as required by the PWS.

Noted but not Corrected

(NBNC)

Noted but not corrected (NBNC) discrepancies found during ACI which should normally be discovered and repaired at operating sites prior to ACI induction.

On-Condition Replacement

Parts & Material

Those parts and material replaced based upon their condition (i.e.

broken, worn, out of tolerance limits, configuration change, etc.)

Out-of-Reporting

(synonymous with NRT)

Applicable for contract reporting purposes only and is used to account for aircraft that are undergoing ACI, in preservation, etc.

Partial Mission Capable

(PMC)

The condition status that indicates the aircraft is capable of safe flight and can perform at least one, but not all, of its missions prescribed because of an inoperable/missing item listed in the

MEL/MESL/MESM excluding discrepancies against any system in which aircraft is considered NMC.

Recording of PMC time starts when it is first known that a discrepancy exists, except when caused by an in-flight malfunction, then the time starts at the termination of the flight.

PMC time stops when maintenance has been successfully completed.

Planned Maintenance – as requested on CDRL A001(i)

Supplemental Format

Any “planned maintenance” action which would preclude

TAIRCRAFT aircraft from being “Ready for Training”; i.e. 56 day corrosion inspection, 14 day wash, clearing non-NMCM

Awaiting Maintenance (AWM) discrepancies, etc.

Primary Mission A primary mission shall include day or night flight under

Instrument Flight Rule (IFR) conditions, into High Density Air

Traffic Control Zones and through known icing weather and conditions to altitudes requiring cabin pressurization.

Procuring Contracting

Officer (PCO)

The individual authorized to enter into contract for supplies and services on behalf of the Government.

Program Management, Air

(PMA)

General term used throughout this PWS to refer to the USN

Government Program office.

Program Management

Office (PMO)

General term used throughout this PWS to refer to the United

States Air Force (USAF) Government Program office.

Ready for Issue (RFI) See “Serviceable.”

Ready for Production Is a mission capable aircraft with all inspections and servicing complete that is ready for immediate release as "Safe for Flight" and assignment to the flight schedule.

Real Property Real Property means land and rights in land, ground improvements, utility distribution systems, and buildings and other structures. It does not include foundations and other work necessary for installing special tooling, special test equipment, or plant equipment.

Repair

The restoration or replacement of materiel parts or components as necessitated by wear and tear, damage, failure, or the like, in order to maintain the specific item of materiel in an efficient operating condition.

Repairable

Any system which can be repaired and returned to service.

Reporting Time (RT)

The total time in which an aircraft is either mission capable (MC) or not mission capable (NMC).

Requisitioned Government –

Furnished Property (RGFP)

Requisitioned Government-Furnished Property (RGFP) is to be used to specify Government Property authorized for contractor requisition from DoD supply sources.

Safe for Flight (SFF) The material condition of an aircraft which, considering mission requirements and environmental conditions, permits it to be launched, flown and landed safely and ensures the aircrew has, as a minimum, the operable equipment for safe flight required by:

NAVAIR 01 Series Manual, Aircraft NATOPS; OPNAVINST

3710.7, General NATOPS; and MESM (provided on

COMNAVAIRFOR'S web portal), Subsystem Capability and

Impact Reporting (Safely Flyable Column).

Safe for Flight Certification The decision process performed by authorized and designated personnel that certifies all W&B requirements have been satisfied, all applicable MRCs have been complied with (or a deviation has been attained from the appropriate authorities), all previously known discrepancies that precluded safe flight have been corrected, and all known discrepancies (evaluated separately and collectively) do not preclude safe flight.

Safety of Flight (SOF) Defects that could possibly cause harm to personnel and/or result in failure of equipment, supplies, and services; or to materially reduce the usability of the equipment, supplies, or services for their intended purpose.

Scheduled Government –

Furnished Property (SGFP)

Scheduled Government-Furnished Property (SGFP) is to be used to specify the Government Property to be furnished, including major end items being provided under a modification or upgrade contract; or repairables being provided under a repair, modification, or overhaul contract.

Service Actions (SA) Service Actions consist of Manufacturer Service Bulletins (SB), Information Letters and Service Instructions (SI), as well as FAA

Airworthiness Directives (AD), Service-applicable USN

AIRCRAFT Maintenance Engineering Directives (MED) or

USAF AIRCRAFT Maintenance Action Directives (MAD), Technical Directives (TD), and mandatory or optional

Manufacturer Service Bulletins (optional SB require Service approval for incorporation).

Serviceable

Capable of meeting the requirement and performing the function for which designed or modified. Meets all test requirements established by the work specification.

Service Life Maintenance

Management (SLMM)

SLMM is a program that requires a focused management of aircraft utilization to maintain the greatest number of aircraft in a flyable status for the longest extent possible. SLMM is a direct function of management ensuring the requirements of the contract are being met through oversight, the proper management and utilization of aircraft to meet the Government’s requirements through an even distribution of flight hours.

Sites All USN/USAF AIRCRAFT based-locations, particularly those where scheduled maintenance and inspections occur. Sites include those where mission operations originate.

Sortie A sortie is an event designated on the DFS which may include multiple flights.

Support Equipment (SE)

Includes all ground equipment, tools, and associated test, support, and control equipment, computers and software required to support and maintain the aircraft.

Technical Directives (TD)

Special instructions and efforts (service, repairs, modifications and inspection) such as those required by the Government, including Maintenance Engineering Directives (MED), Maintenance Airworthiness Directives (MAD), Instructions and

Bulletins (i.e.: Safety-of-flight and grounding bulletins), Modifications, and various Changes (e.g.: Interim, Record, Rapid

Action Maintenance Engineering Changes). Technical Directives include FAA Airworthiness Directives (AD), Manufacturer

Service Bulletins (SB) and Service Instructions (SI). There are both mandatory and optional technical directives (TD).

Up-gripes All pending uncorrected maintenance discrepancies

EXCLUDING TDs, pending inspections, corrosion gripes, and awaiting parts (AWP) gripes.

Working Day All days when the Government directs work to be performed.

File details come from the government source that posted it. Updated .