ATTACHMENT_69_-_PWS_Encl_12_T-34_SIRG_01-50-T34C-600-6-2.pdf

PDF 129 KB Posted

Attached to
T-34/T-44/T-6 Contractor Logistics Support
Solicitation number
N00019-14-R-0018
Issued by

About this file

Attachment 69 PWS Encl 12 T34 SIRG

View the file

Other files

File Type Posted
N00019-14-R-0018_AMD_0004.pdf PDF
Q A_7_-_25FEB2014.pdf PDF
Q A_6_-_24FEB2014.pdf PDF
Q A__5_21FEB2014.pdf PDF
N00019-14-R-0018_AMD_0003.pdf PDF
Att_L-8_Vol_4_SuppSvcPr_20140219.xls XLS spreadsheet
Exhibit_A_Signed_CDRLs.pdf PDF
Q A_4_-_19FEB2014.pdf PDF
Q A_3_-_18FEB2014.pdf PDF
Government_Manpower_Estimate__02_16_2014.xlsx XLSX spreadsheet
T34_44_6_Manning_Walkthrough_02_16_14.pdf PDF
T34_44_6_Proposal_Guidance_02_16_14.pdf PDF
T34_44_6_Proposal_Dev_Guidance_-_Price_02_16_14.pdf PDF
Q A__2_-_13FEB2014.pdf PDF
N00019-14-R-0018_AMD_0002.pdf PDF
ATTACHMENT_63_-_Encl_9_Applicable_Documents_10_FEB_14.xlsx XLSX spreadsheet
N00019-14-R-0018_Q A_7FEB2014.pdf PDF
N00019-14-R-0018_AMD_0001.pdf PDF
ATTACHMENT_119-_CBA_Ft._Bragg.pdf PDF
ATTACHMENT_111-_CBA_MOAs_6_FEB_2014.pdf PDF
ATTACHMENT_01_-_T34_T44_T6_6_FEB_2014.pdf PDF
ATTACHMENT_66_-_PWS_Encl_11_Satellite_Site_FHs_T-34_20140205.xls XLS spreadsheet
ATTACHMENT_63_-_Encl_9_Applicable_Documents_6_FEB_14.xlsx XLSX spreadsheet
ATTACHMENT_30_-_PWS_Encl_2_IMRL_Supplement_3_CTW-4.pdf PDF
ATTACHMENT_52_-_PWS_Encl_7_OS_Component_Repair_List_T-44.xlsx XLSX spreadsheet
ATTACHMENT_124_-_CBA_Fallon_25_Jul_2011.PDF PDF
ATTACHMENT_71_-_PWS_Encl_12_T-34_SIRG_01-50-T34C-600-6.pdf PDF
ATTACHMENT_61_-_Encl_8_T-34_El-Centro.pdf PDF
ATTACHMENT_55_-_Encl_8__T-44_Paint_Scheme.pdf PDF
ATTACHMENT_50_-_PWS_Encl_6_T44A-C_MEL.pdf PDF
ATTACHMENT_63_-_Encl_9_Applicable_Documents_19_Jan_14.xlsx XLSX spreadsheet
ATTACHMENT_126_-_WD_05-2006_(Rev_13_Ft_Rucker).PDF PDF
ATTACHMENT_118_-_WD_05-2394_(Rev_14_Ft_Bragg).PDF PDF
ATTACHMENT_128_-_Encl_15_CNATRA_Inst_4355.4A.pdf PDF
ATTACHMENT_91_-_PWS_APPENDIX_A_Logbooks_Records.pdf PDF
ATTACHMENT_1_-_T34_T44_T6_28_JAN_2013.pdf PDF
N00019-14-R-0018_FINAL_RFP_30JAN2014.pdf PDF
ATTACHMENT_35_-_PWS_Encl_2_Sat_Site_Ft_Bragg_GFP.xls XLS spreadsheet
EXHIBIT_C_OAWR_Tracker.xls XLS spreadsheet
ATTACHMENT_44_-_PWS_Encl_5_ALSS_T-6_NAS_WF CC.pdf PDF
ATTACHMENT_20_-_PWS_Encl_1_Fac_-_FRC_SE.pdf PDF
ATTACHMENT_77_-_PWS_Encl_13_T44A_SIRG_01-50-T44A-600-6-1.pdf PDF
Att_L-3_Ann_B_Labor_Hr_Data_Req_20140129.docx DOCX document
ATTACHMENT_84_-_PWS_Encl_14_T44C_SIRG_01-50-T44C-600-6-4.1.pdf PDF
ATTACHMENT_09_-_PMF.pdf PDF
ATTACHMENT_41_-_PWS_Encl_4_-_T-44C_Corrosion_Control_Plan.pdf PDF
ATTACHMENT_15_-_PWS_Encl_1_Fac_-_Sat_Site_NAF_El_Centro.pdf PDF
ATTACHMENT_98_-_APPENDIX_H_Acronyms.pdf PDF
ATTACHMENT_96_-_APPENDIX_F_Definitions.pdf PDF
ATTACHMENT_82_-_PWS_Encl_14_T44C_SIRG_01-50-T44C-600-6-4.2.pdf PDF
Show 40 more

Latest 50 of 151 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 69 N00019-14-R-0018

PWS Enclosure 12 T-34 SIRG: 01-50-T34C-600-6-2

NAVAIR (PMA 273) 01-50-T34C-600-6-2

U.S. NAVY T-34C

TURBO MENTOR

SEVEN DAY INSPECTION

REQUIREMENTS

February 1, 2005

T-34C

Seven Day Inspection Requirements

MAINTENANCE REQUIREMENTS CARD

CARD NUMBER

i

DATE

February 1, 2005

CHANGE #

Original

CARD NUMBER: NAVAIR (PMA 273) 01-50-T34C-600-6-2

TITLE: SEVEN DAY INSPECTION CHECKLIST

ELEC PWR

N/A

WORK AREA

WUC

ITEM

TASK DESCRIPTION/REQUIREMENT

HYD PWR

INTRODUCTION

This checklist contains abbreviated inspection requirements that are necessary to determine and ensure the integrity of the aircraft for flight.

APPLICATION

Seven Day Inspection requirements shall be accomplished every seven calendar days and have an allowable deviation requirement of plus or minus three calendar days.

When an aircraft is in an Out Of Reporting Status the Seven Day Inspection Requirements may be waived during the period of time the aircraft is physically Out Of Reporting.

When the aircraft is placed back in a Reporting Status, the Seven Day Inspection Requirements must be completed prior to the aircraft being made available for flight. At the same time the baseline for the Seven Day Inspection Requirements shall also be reestablished in the tracking system used for the aircraft.

CAUTION

Ensure area around aircraft is free of foreign objects and all safety items are properly positioned, removed or installed, as applicable.

ii

DATE

February 1, 2005

CHANGE #

Original

CARD NUMBER: NAVAIR (PMA 273) 01-50-T34C-600-6-2

TITLE: SEVEN DAY INSPECTION CHECKLIST

Change Summary:

Card Number Date Revision i February 1, 2005 Original ii February 1, 2005 Original

1 February 1, 2005 Original

2 February 1, 2005 Original

3 February 1, 2005 Original

4 February 1, 2005 Original

DATE

February 1, 2005

CHANGE #

Original

CARD NUMBER: NAVAIR (PMA 273) 01-50-T34C-600-6-2

TITLE: SEVEN DAY INSPECTION CHECKLIST

ELEC PWR

1.

1.a.

1.b.

1.c.

1.d.

1.e.

1.f.

1.g.

1.h.

1.i.

1.i.1.

1.i.2.

THINK SAFETY

NB 6 Parachute, Front Cockpit:

Serial Number Record

Check Exterior Of Container For Fraying, Contamination, Dampness, Oil or Acid Stains, Other Obvious Damage

Check Exposed Spring Opening Bands For Damage, Security, Correct

Number

Check Harness For Fraying, Correct Number, Condition Of Harness Keepers

Check External Tackings, 13 Total Correct Number and Security

Check Back Pad Attachment

Check Exterior Hardware For Damage and Corrosion

Check Ripcord Handle Pockets For Obstructions and Security Of

Handles In The Pockets

Ripcord Protector and Base Plate Protector Flaps Open

Through The Cable Eye Check Ripcord

Check For Security Exposed Grommets and Cones

DATE

February 1, 2005

CHANGE #

Original

CARD NUMBER: NAVAIR (PMA 273) 01-50-T34C-600-6-2

TITLE: SEVEN DAY INSPECTION CHECKLIST

1.i.3.

1.i.4.

1.i.5.

1.i.6.

1.i.7.

2.

2.a.

2.b.

2.c.

2.d.

2.e.

2.f.

2.g.

NB 6 Parachute, Front Cockpit (Continued):

Check Ripcord Cable Loose or Bent Pins, Broken

Strands, Corrosion

Check Snap Fasteners For Security and Corrosion

Check Exposed Ripcord Arming Cable For Dents, Nicks, Cuts, Corrosion, Security

Check Exposed Power Cable For Dents, Nicks, Cuts, Corrosion, Security

Ripcord Protector and Base Plate Protector Flaps Close

NB 6 Parachute, Rear Cockpit:

Serial Number Record

Check Exterior Of Container For Fraying, Contamination, Dampness, Oil or Acid Stains, Other Obvious Damage

Check Exposed Spring Opening Bands For Damage, Security, Correct

Number

Check Harness For Fraying, Correct Number, Condition Of Harness Keepers

Check External Tackings, 13 Total Correct Number and Security

Check Back Pad Attachment

Check Exterior Hardware For Damage and Corrosion

DATE

February 1, 2005

CHANGE #

Original

CARD NUMBER: NAVAIR (PMA 273) 01-50-T34C-600-6-2

TITLE: SEVEN DAY INSPECTION CHECKLIST

2.

2.h.

2.i.

2.i.1.

2.i.2.

2.i.3.

2.i.4.

2.i.5.

2.i.6.

2.i.7.

NB 6 Parachute, Rear Cockpit (Continued):

Check Ripcord Handle Pockets For Obstructions and Security Of

Handles In The Pockets

Ripcord Protector and Base Plate Protector Flaps Open

Through The Cable Eye Check Ripcord

Check For Security Exposed Grommets and Cones

Check Ripcord Cable Loose or Bent Pins, Broken

Strands, Corrosion

Check Snap Fasteners For Security and Corrosion

Check Exposed Ripcord Arming Cable For Dents, Nicks, Cuts, Corrosion, Security

Check Exposed Power Cable For Dents, Nicks, Cuts, Corrosion, Security

Ripcord Protector and Base Plate Protector Flaps Close

No Further Entries On This Card

DATE

February 1, 2005

CHANGE #

Original

CARD NUMBER: NAVAIR (PMA 273) 01-50-T34C-600-6-2

TITLE: SEVEN DAY INSPECTION CHECKLIST

ELEC PWR

3.

3.a.

3.b.

3.c.

3.d.

3.e.

3.f.

4.

4.a.

4.b.

Lubrication Requirements:

Note 1: Utilize VV-L-800 General Purpose Lubricating Oil to lubricate the following items.

Piano Hinge Battery Access Door

Piano Hinge Avionics Bay Access Door

Piano Hinge Rudder Trim Tab

Piano Hinge Elevator Trim Tabs

Piano Hinge Aileron Trim Tabs

Piano Hinge Cowling Doors

Landing Gear Oleo Struts:

Note 2: Utilizing Mil-H-83282C Hydraulic Fluid to clean, wipe down and coat the exposed chrome areas of the landing gear oleo struts.

Nose Landing Gear Clean/Wipe Down and Coat

With a Light Film

Main Landing Gear, Both Clean/Wipe Down and Coat

With a Light Film

No Further Entries On This Card

File details come from the government source that posted it. Updated .