RFP 8 Feb 12.pdf

PDF 2 MB Posted

Attached to
TH-57 Contractor Logistics Support Federal contract opportunity
Solicitation number
N00019-10-R-0097
Issued by
Department of the Navy Naval Air Systems Command

About this file

RFP 8 Feb 12

View the file

Other files for this federal contract opportunity

Other files attached to TH-57 Contractor Logistics Support, newest first.
File Type Posted
Amend_0005_21_Feb_13.doc DOC document
N00019-10-R-0097-0004.pdf PDF
Industry Questions 6182012.pdf PDF
N00019-10-R-0097AMEND0003.pdf PDF
CDRLs A001-A041_2012.06.06.pdf PDF
Attachment 1 TH-57 PWS 2012.06.13Rev1.pdf PDF
Attachment 9 Applicable Documents_2012.06.13.pdf PDF
N00019-10-R-0097AMEND0002.pdf PDF
Amendment 1 Extension.pdf PDF
FRFP Q A 7 June 12 Posted.pdf PDF
FRFP Q A 22 May 12 Posted.pdf PDF
Post RFP Release Q A 5-10-12.docx DOCX document
Attachment 9 Applicable Documents.xlsx XLSX spreadsheet
Attachment 8 Government Furnished Property List.xlsx XLSX spreadsheet
Attachment 10 CBA.pdf PDF
Attachment 1 TH-57 PWS.pdf PDF
Attachment L-2 PP01 - Past perf Questionnaire.doc DOC document
Attachment 2 Supplement to the Exhibits Explanation of CDRL.doc DOC document
Attachment L-7 - Relevant Contract Table.xlsx XLSX spreadsheet
Attachment L-1 EXP-01 Attachment Contractor Corporate Experience Tables.xlsx XLSX spreadsheet
Attachment L-5 PA-02 PRIME CONTRACTOR COST SUMMARY.xls XLS spreadsheet
Attachment L-6 PA-03 SUBCONTRACTOR COST SUMMARY.xls XLS spreadsheet
Attachment 4 Supplement CDRL Submission Rangernet Inst.docx DOCX document
N00019-10-R-0097 Final RFP.pdf PDF
Attachment L-4 PA-01 Price Exhibit B.xlsx XLSX spreadsheet
Attachment 11 AWD.pdf PDF
Attachment 13 Daily Aircraft Status Report.xlsx XLSX spreadsheet
CDRLs A001-A041.docx DOCX document
One-on-One Q A Posted.docx DOCX document
Sign-in Sheet.pdf PDF
Attachment 10 TH-57 NAS Whiting Field FL 2009 - 2010 CBA.pdf PDF
Attachment 4 Supplement CDRL Submission Rangernet Inst.docx DOCX document
Attachment L-5 PA-02 PRIME CONTRACTOR COST SUMMARY.xls XLS spreadsheet
Attachment 9_PWS Enclosure 3_Applicable Documents.xlsx XLSX spreadsheet
Attachment L-7 - Relevant Contract Table.xlsx XLSX spreadsheet
Attachment L-4 PA-01 Price Exhibit B.xlsx XLSX spreadsheet
Attachment 8_PWS Enclosure 2_Government Furnished Property —
Attachment 11 AWD.pdf PDF
Attachment 7_PWS Enclosure 1_Real Property.xlsx XLSX spreadsheet
Attachment 3 Supplement to Exhibits Distribution Statments n Technical Documents.doc DOC document
CDRLs A001-A041.docx DOCX document
Attachment L-2 PP01 - Past perf Questionnaire.doc DOC document
Attachment 1 TH-57 PWS.pdf PDF
Attachment L-6 PA-03 SUBCONTRACTOR COST SUMMARY.xls XLS spreadsheet
Attachment L-3 PP02 Summary of Relevant Past Performance Contract Data.xls XLS spreadsheet
DRAFT TH57 Enclosure 3 Applicable Documents.xlsx XLSX spreadsheet
DRAFT SECTION B Supplies or Services and Prices.xlsx XLSX spreadsheet
DRAFT Section B2 - Pricing Notes.docx DOCX document
DRAFT Section C Description and Specification or Work Statement.docx DOCX document
DRAFT SECTION H Special Contract Requirements.docx DOCX document
Show all 50

TH-57 Contractor Logistics Support has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 13 May 2012

X

A

X B

X C X D

EX

X

G

F 176 - 183

184 - 228

X H 229 - 234

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

1 234

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00019 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 5 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2

3 - 119

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

120 - 123

124 - 125

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

127 - 129 X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 130 - 136 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 137 - 154 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

155 - 174

PART II - CO NTRACT CLAUSES

NAVAL AIR SYSTEMS COMMAND, AIR 2.2.4.1

47123 BUSE ROAD, BLDG 2272, FLOOR 4

PATUXENT RIVER MD 20670-1127

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N00019-10-R-0097

Section A - Solicitation/Contract Form

A-1

SF 33 CONTINUATION

Block 7: Issuing Office Full Address:

NAVAL AIR SYSTEMS COMMAND

ATTN: NOELLE REIMERS, PROCURING CONTRACTING OFFICER, AIR 2.2.4.1A

ATTN: CHRISTA MCCARTHY, CONTRACT SPECIALIST, AIR 2.2.4.1.3

47123 BUSE ROAD, BLDG 2272, FLOOR 4

PATUXENT RIVER, MD 20670-1127

Block 9: See Section L for a complete list of copies required for solicitation submittal for each proposal Volume.

Block 12: The Offer validity date shall be 31 August 2013. The Block 12 fill-in shall be completed in accordance with this date.

Section B - Supplies or Services and Prices

B-1

CONTRACT LINE ITEM NUMBERING

B-1.1) Contract Line Item Number (CLINs) in Section B are numbered in accordance with the following numbering system. The second character in each CLIN or Subcontract Line Item Number (SLINs) corresponds to each performance period as follows: CLIN XX02 in the Base Period is CLIN 0002, Option Period 1 is CLIN 0102, Option Period 2 is CLIN 0202, Option Period 3 is CLIN 0302, and Option Period 4 is CLIN 0402.

B-1.2) CLINs have been aligned to the same effort throughout the Periods of Performance (PoP) of this solicitation. Not all SLINs will be used in each Option period.

B-2

CONTRACT CLIN TYPES

The line items listed in Section B represent a hybrid contract type consisting of Firm Fixed Price (FFP), Cost

Reimbursable (CR), and Labor Hour (LH) CLINs.

Item No. Contract Type

CLINs XX01 – XX06, XX16, XX18 Firm Fixed Price

XX19

CLINs XX07 – XX11, XX17 Labor Hour

CLINs XX12 – XX14 Cost Reimbursable

B-3

PRICING NOTES

B-3.1 - CLIN XX01 – Only one SLIN will be exercised per option period.

B-3.2 - CLIN XX03 – This CLIN is to purchase one additional aircraft for one day.

B-3.3 - CLIN XX06 – See Clause H-3, Flight Hour Generated Maintenance Ordering and Payment (Applicable to

CLINs 0X06).

B-3.4 - CLINs XX08 and XX12 - The Government has estimated 65,000 Manhours on CLIN XX08 to allow the prime contractor to perform its own Depot Conditional Maintenance if it chooses. If so chosen, the estimated quantity of CLIN XX12 will be decremented by the extended cost (number of Manhours * unit price) outsourced to the Subcontractor.

B-3.5 - CLIN XX12 – (Material and Subcontractor Labor) consists of CR SLINs. Unit is LOT. Fee is unallowable. Indirect costs are allowable, including any subcontractor mark-ups/burdens (for example, outsourcing the procurement service associated with processing the orders for direct parts, repair parts, and/ or materials).

Contractor mark-ups are limited to one subcontractor tier only. Unless other clauses in this contract limit the amount of burden allowed on cost-reimbursable items, the contractor shall be allowed its normal burdens in accordance with

FAR 52.216-7, “Allowable Cost and Payment” and actual shipping costs, however, the Contractor’s allowable burdens on this CLIN shall not exceed those proposed for contractor performance in accordance with Clause G-3 of this contract. Included in the proposed Section B amount is the Government estimated amount plus the contractor's added indirect costs/burdens.

B-3.6 - CLIN XX13 – (Off-Site Emergency Repair Services (Subcontractor)) is CR for off-site emergency repair services performed by a subcontractor for each PoP. Unit is LOT. Fee is unallowable. Indirect costs are allowable for CLIN XX13, including any subcontractor mark-ups/burdens (for example, outsourcing the procurement service associated with processing the orders for direct parts, repair parts, and/ or materials). Contractor mark-ups are limited to one subcontractor tier only. Unless other clauses in this contract limit the amount of burden allowed on cost-reimbursable items, the contractor shall be allowed its normal burdens in accordance with FAR 52.216-7, “Allowable Cost and Payment”, however, the Contractor’s allowable burdens on this CLIN shall not exceed those proposed for contractor performance in accordance with Clause G-3 of this contract. Included in the proposed

Section B amount is the Government estimated amount plus the contractor's added indirect costs/burdens.

B-3.7 - CLIN XX14 – (Travel and Per Diem) is CR. The Government will reimburse the Contractor for travel and per diem costs on the basis of maximum allowable actual costs incurred up to the daily equivalent allowed for a

Government employee in accordance with the Department of Defense (DOD) Civilian Personnel Joint Travel

Regulations and the Federal Travel Regulations, prescribed by the General Services Administration, and the

Standardized Regulations (Government Civilians, Foreign Areas), as prescribed by the Department of State. Travel and Per Diem costs incurred in the replacement of personnel or while attending non-Government mandated training courses will not be reimbursed. The Contractor may include its allowable, allocable, and reasonable charges in accordance with FAR 52.216-7, "Allowable Cost and Payment,” for burden on cost-reimbursable travel and per diem costs, however, the contractor allowable burdens on this CLIN shall not exceed those proposed for contractor performance in accordance with Clause G-3 of this contract. Fee/Profit is unallowable on the actual cost of reimbursable travel and per diem. Included in the proposed Section B amount is the Government estimated amount plus the contractor's added indirect costs/burdens.

B-3.8 - CLIN XX18 – The Government may exercise these SLINs to fly on a weekend day or holiday. The number of aircraft, 50 and 93, identify the quantity of aircraft that can be flown for that day.

B-3.9 - CLIN 0019 – See Clause F-1(a), Term of Contract (Base).

B-4

PERFORMANCE INCENTIVE (CLINs 0X16)

CLIN XX16 Performance Measurement Framework Incentive (PMFI)) is a firm fixed unit price as calculated in accordance with (IAW) Clause H-1, Performance Measurement Framework (PMF). If applicable, each SLIN for the

PMF will be issued as a FFP order when the applicable incentive is calculated IAW clause H-1 of this contract.

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

Fixed Maintenance for NAS Whiting Field

FFP

FOB: Destination

ESTIMATED

NET AMT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AA 11 Months OPTION Fixed Maintenance 78 A/C

FFP

Individual Aircraft Daily

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AB 11 Months OPTION Fixed Maintenance 83 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AC 11 Months OPTION Fixed Maintenance 88 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AD 11 Months OPTION Fixed Maintenance 93 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AE 11 Months OPTION Fixed Maintenance 96 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0002 11 Months Satellite Site Support for NAS Pax River

UNIT UNIT PRICE ESTIMATED AMOUNT

0003 6 Each Additional One Aircraft for One Day

UNIT UNIT PRICE ESTIMATED AMOUNT

0004 22 Each Scheduled Depot - ACI

FFP

Aircraft Condition Inspection (ACI)

UNIT UNIT PRICE ESTIMATED AMOUNT

Unscheduled Depot

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AA 6 Each Engine Overhaul

FFP

due to Metal Contamination

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AB 2 Each Replace Cabin Roof

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AC 1 Each Replace Forward Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AD 1 Each Replace Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AE 1 Each Replace Cabin Roof & Forward Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AF 2 Each Replace Cabin Roof & Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AG 4 Each Replace Forward & Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AH 1 Each Replace Cabin Roof and Forward

FFP

and Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AJ 5 Each Replace Cabin Roof

FFP

in conjunction with ACI

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AK 12 Each Replace Forward Lower Shell

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AL 2 Each Replace Aft Lower Shell

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AM 4 Each Replace Cabin Roof and Forward

FFP

Lower Shell in conjunction with ACI

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AN 1 Each Replace Cabin Roof and

FFP

Aft Lower Shell in conjunction with ACI

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AP 1 Each Replace Forward and

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AQ 1 Each Replace Cabin Roof and

FFP

Forward and Aft Lower Shell in conjunction with ACI

UNIT UNIT PRICE ESTIMATED AMOUNT

0006 71,500 Flight

Hours

Flight Hour Generated Maintenance

ITEM NO SUPPLIES/SERVICES EST.

UNIT UNIT PRICE EST. AMOUNT

On-site Conditional Maintenance

LH

TOT ESTIMATED PRICE

CEILING PRICE

UNIT UNIT PRICE EST. AMOUNT

0007AA 7,000 Labor

Airframe On-site Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

0007AB 5,800 Labor

Engines On-site Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

Depot Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

0008AA 50,000 Labor

Airframe Depot Conditional Maintenance

Airframe Repair

UNIT UNIT PRICE EST. AMOUNT

0008AB 15,000 Labor

Engines Depot Conditional Maintenance

Engine Repair

UNIT UNIT PRICE EST. AMOUNT

0009 2,400 Labor

Off-Site Emergency Repair Services

Contractor

UNIT UNIT PRICE EST. AMOUNT

0010 800 Labor

Engineering and Technical Services

UNIT UNIT PRICE EST. AMOUNT

0011 2,000 Labor

Modifications - Development

ITEM NO SUPPLIES/SERVICES EST .

UNIT UNIT PRICE AMOUNT

Material and Subcontractor Labor

COST

ESTIMATED COST

UNIT UNIT PRICE AMOUNT

0012AA Lot Material and Subcontractor Labor

COST

Flight Operations

UNIT UNIT PRICE AMOUNT

0012AB Lot Material and Subcontractor Labor

COST

Aircraft Inspection (ACI)

UNIT UNIT PRICE AMOUNT

0012AC Lot Material and Subcontractor Labor

COST

In-Service Repair (ISR)

UNIT UNIT PRICE AMOUNT

0012AD Lot Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0012AE Lot Material and Subcontractor Labor

COST

Program Related Logistics (PRL)

UNIT UNIT PRICE AMOUNT

0012AF Lot Material and Subcontractor Labor

COST

Non-Standard Repairs

UNIT UNIT PRICE AMOUNT

0012AG Lot Material and Subcontractor Labor

COST

Patuxent River

UNIT UNIT PRICE AMOUNT

0012AH Lot Material and Subcontractor Labor

COST

Modification Development

UNIT UNIT PRICE AMOUNT

0012AJ Lot Material and Subcontractor Labor

COST

Modification Production

UNIT UNIT PRICE AMOUNT

0013 Lot Off-Site Emergency Repair Services

COST

Subcontractor

UNIT UNIT PRICE AMOUNT

0014 Lot Travel and Per Diem

UNIT UNIT PRICE ESTIMATED AMOUNT

Technical Data IAW

Exhibit A

NSP

UNIT UNIT PRICE ESTIMATED AMOUNT

Performance Measurement Framework

FFP

Incentive

UNIT UNIT PRICE ESTIMATED AMOUNT

0016AA 1 Lot Performance Measurement Framework

FFP

Incentive - First Quarter

UNIT UNIT PRICE ESTIMATED AMOUNT

0016AB 1 Lot Performance Measurement Framework

FFP

Incentive - Second Quarter

UNIT UNIT PRICE ESTIMATED AMOUNT

0016AC 1 Lot Performance Measurement Framework

FFP

Incentive - Third Quarter

UNIT UNIT PRICE ESTIMATED AMOUNT

0016AD 1 Lot Performance Measurement Framework

FFP

Incentive - Fourth Quarter

UNIT UNIT PRICE EST. AMOUNT

0017 2,000 Labor

Modifications - Production

UNIT UNIT PRICE ESTIMATED AMOUNT

Weekend/Holiday Flight Operations

FFP

Per Day

UNIT UNIT PRICE ESTIMATED AMOUNT

0018AA 25 Each Weekend/Holiday Flight Operations

FFP

50 Aircraft

UNIT UNIT PRICE ESTIMATED AMOUNT

0018AB 40 Each Weekend/Holiday Flight Operations

FFP

93 Aircraft

UNIT UNIT PRICE ESTIMATED AMOUNT

0019 1 Months Transition Phase-In

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Fixed Maintenance for NAS Whiting Field

UNIT UNIT PRICE ESTIMATED AMOUNT

0101AA 12 Months OPTION Fixed Maintenance 78 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0101AB 12 Months OPTION Fixed Maintenance 83 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0101AC 12 Months OPTION Fixed Maintenance 88 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0101AD 12 Months OPTION Fixed Maintenance 93 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0101AE 12 Months OPTION Fixed Maintenance 96 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0102 12 Months OPTION Satellite Site Support for NAS Pax River

UNIT UNIT PRICE ESTIMATED AMOUNT

0103 6 Each OPTION Additional One Aircraft for One Day

UNIT UNIT PRICE ESTIMATED AMOUNT

0104 24 Each OPTION Scheduled Depot - ACI

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Unscheduled Depot

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AA 6 Each OPTION Engine Overhaul

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AB 2 Each OPTION Replace Cabin Roof

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AC 1 Each OPTION Replace Forward Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AD 1 Each OPTION Replace Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AE 1 Each OPTION Replace Cabin Roof & Forward Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AF 2 Each OPTION Replace Cabin Roof & Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AG 4 Each OPTION Replace Forward & Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AH 1 Each OPTION Replace Cabin Roof and Forward

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AJ 5 Each OPTION Replace Cabin Roof

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AK 12 Each OPTION Replace Forward Lower Shell

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AL 2 Each OPTION Replace Aft Lower Shell

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AM 4 Each OPTION Replace Cabin Roof and Forward

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AN 1 Each OPTION Replace Cabin Roof and

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AP 1 Each OPTION Replace Forward and

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0105AQ 1 Each OPTION Replace Cabin Roof and

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0106 78,000 Flight

OPTION Flight Hour Generated Maintenance

UNIT UNIT PRICE EST. AMOUNT

OPTION On-site Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

0107AA 7,000 Labor

OPTION Airframe On-site Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

0107AB 5,800 Labor

OPTION Engines On-site Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

OPTION Depot Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

0108AA 50,000 Labor

OPTION Airframe Depot Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

0108AB 15,000 Labor

OPTION Engines Depot Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

0109 2,400 Labor

OPTION Off-Site Emergency Repair Services

UNIT UNIT PRICE EST. AMOUNT

0110 800 Labor

OPTION Engineering and Technical Services

UNIT UNIT PRICE EST. AMOUNT

0111 2,000 Labor

OPTION Modifications - Development

UNIT UNIT PRICE AMOUNT

OPTION Material and Subcontractor Labor

UNIT UNIT PRICE AMOUNT

0112AA Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0112AB Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0112AC Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0112AD Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0112AE Lot OPTION Material and Subcontractor Labor

COST

PRL

UNIT UNIT PRICE AMOUNT

0112AF Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0112AG Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0112AH Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0112AJ Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0113 Lot OPTION Off-Site Emergency Repair Services

COST

UNIT UNIT PRICE AMOUNT

0114 Lot OPTION Travel and Per Diem

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Technical Data IAW

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE EST. AMOUNT

0116AA 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0116AB 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0116AC 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0116AD 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE AMOUNT

0117 2,000 Labor

OPTION Modifications - Production

UNIT UNIT PRICE AMOUNT

OPTION Weekend/Holiday Flight Operations

FFP

UNIT UNIT PRICE AMOUNT

0118AA 25 Each OPTION Weekend/Holiday Flight Operations

FFP

UNIT UNIT PRICE AMOUNT

0118AB 40 Each OPTION Weekend/Holiday Flight Operations

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Fixed Maintenance for NAS Whiting Field

UNIT UNIT PRICE ESTIMATED AMOUNT

0201AA 12 Months OPTION Fixed Maintenance 78 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0201AB 12 Months OPTION Fixed Maintenance 83 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0201AC 12 Months OPTION Fixed Maintenance 88 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0201AD 12 Months OPTION Fixed Maintenance 93 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0201AE 12 Months OPTION Fixed Maintenance 96 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0202 12 Months OPTION Satellite Site Support for NAS Pax River

UNIT UNIT PRICE ESTIMATED AMOUNT

0203 6 Each OPTION Additional One Aircraft for One Day

UNIT UNIT PRICE ESTIMATED AMOUNT

0204 24 Each OPTION Scheduled Depot - ACI

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Unscheduled Depot

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AA 6 Each OPTION Engine Overhaul

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AB 2 Each OPTION Replace Cabin Roof

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AC 1 Each OPTION Replace Forward Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AD 1 Each OPTION Replace Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AE 1 Each OPTION Replace Cabin Roof & Forward Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AF 2 Each OPTION Replace Cabin Roof & Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AG 4 Each OPTION Replace Forward & Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AH 1 Each OPTION Replace Cabin Roof and Forward

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AJ 5 Each OPTION Replace Cabin Roof

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AK 12 Each OPTION Replace Forward Lower Shell

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AL 2 Each OPTION Replace Aft Lower Shell

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AM 4 Each OPTION Replace Cabin Roof and Forward

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AN 1 Each OPTION Replace Cabin Roof and

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AP 1 Each OPTION Replace Forward and

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0205AQ 1 Each OPTION Replace Cabin Roof and

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0206 78,000 Flight

UNIT UNIT PRICE EST. AMOUNT

OPTION On-site Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

0207AA 7,000 Labor

UNIT UNIT PRICE EST. AMOUNT

0207AB 5,800 Labor

UNIT UNIT PRICE EST. AMOUNT

OPTION Depot Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

0208AA 50,000 Labor

UNIT UNIT PRICE EST. AMOUNT

0208AB 15,000 Labor

UNIT UNIT PRICE EST. AMOUNT

0209 2,400 Labor

UNIT UNIT PRICE EST. AMOUNT

0210 800 Labor

UNIT UNIT PRICE EST. AMOUNT

0211 2,000 Labor

UNIT UNIT PRICE AMOUNT

OPTION Material and Subcontractor Labor

UNIT UNIT PRICE AMOUNT

0212AA Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0212AB Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0212AC Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0212AD Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0212AE Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0212AF Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0212AG Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0212AH Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0212AJ Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0213 Lot OPTION Off-Site Emergency Repair Services

COST

UNIT UNIT PRICE AMOUNT

0214 Lot OPTION Travel and Per Diem

UNIT UNIT PRICE ESTIMATED AMOUNT

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE EST. AMOUNT

0216AA 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0216AB 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0216AC 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0216AD 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE AMOUNT

0217 2,000 Labor

UNIT UNIT PRICE AMOUNT

OPTION Weekend/Holiday Flight Operations

FFP

UNIT UNIT PRICE AMOUNT

0218AA 25 Each OPTION Weekend/Holiday Flight Operations

FFP

UNIT UNIT PRICE AMOUNT

0218AB 40 Each OPTION Weekend/Holiday Flight Operations

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Fixed Maintenance for NAS Whiting Field

UNIT UNIT PRICE ESTIMATED AMOUNT

0301AA 12 Months OPTION Fixed Maintenance 78 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0301AB 12 Months OPTION Fixed Maintenance 83 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0301AC 12 Months OPTION Fixed Maintenance 88 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0301AD 12 Months OPTION Fixed Maintenance 93 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0301AE 12 Months OPTION Fixed Maintenance 96 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0302 12 Months OPTION Satellite Site Support for NAS Pax River

UNIT UNIT PRICE ESTIMATED AMOUNT

0303 6 Each OPTION Additional One Aircraft for One Day

UNIT UNIT PRICE ESTIMATED AMOUNT

0304 24 Each OPTION Scheduled Depot - ACI

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Unscheduled Depot

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AA 6 Each OPTION Engine Overhaul

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AB 2 Each OPTION Replace Cabin Roof

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AC 1 Each OPTION Replace Forward Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AD 1 Each OPTION Replace Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AE 1 Each OPTION Replace Cabin Roof & Forward Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AF 2 Each OPTION Replace Cabin Roof & Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AG 4 Each OPTION Replace Forward & Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AH 1 Each OPTION Replace Cabin Roof and Forward

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AJ 5 Each OPTION Replace Cabin Roof

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AK 12 Each OPTION Replace Forward Lower Shell

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AL 2 Each OPTION Replace Aft Lower Shell

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AM 4 Each OPTION Replace Cabin Roof and Forward

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AN 1 Each OPTION Replace Cabin Roof and

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AP 1 Each OPTION Replace Forward and

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0305AQ 1 Each OPTION Replace Cabin Roof and

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0306 78,000 Flight

UNIT UNIT PRICE EST. AMOUNT

OPTION On-site Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

0307AA 7,000 Labor

UNIT UNIT PRICE EST. AMOUNT

0307AB 5,800 Labor

UNIT UNIT PRICE EST. AMOUNT

OPTION Depot Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

0308AA 50,000 Labor

UNIT UNIT PRICE EST. AMOUNT

0308AB 15,000 Labor

UNIT UNIT PRICE EST. AMOUNT

0309 2,400 Labor

UNIT UNIT PRICE EST. AMOUNT

0310 800 Labor

UNIT UNIT PRICE EST. AMOUNT

0311 2,000 Labor

UNIT UNIT PRICE AMOUNT

OPTION Material and Subcontractor Labor

UNIT UNIT PRICE AMOUNT

0312AA Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0312AB Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0312AC Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0312AD Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0312AE Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0312AF Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0312AG Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0312AH Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0312AJ Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0313 Lot OPTION Off-Site Emergency Repair Services

COST

UNIT UNIT PRICE AMOUNT

0314 Lot OPTION Travel and Per Diem

UNIT UNIT PRICE ESTIMATED AMOUNT

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE EST. AMOUNT

0316AA 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0316AB 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0316AC 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0316AD 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE AMOUNT

0317 2,000 Labor

UNIT UNIT PRICE AMOUNT

OPTION Weekend/Holiday Flight Operations

FFP

UNIT UNIT PRICE AMOUNT

0318AA 25 Each OPTION Weekend/Holiday Flight Operations

FFP

UNIT UNIT PRICE AMOUNT

0318AB 40 Each OPTION Weekend/Holiday Flight Operations

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Fixed Maintenance for NAS Whiting Field

UNIT UNIT PRICE ESTIMATED AMOUNT

0401AA 12 Months OPTION Fixed Maintenance 78 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0401AB 12 Months OPTION Fixed Maintenance 83 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0401AC 12 Months OPTION Fixed Maintenance 88 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0401AD 12 Months OPTION Fixed Maintenance 93 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0401AE 12 Months OPTION Fixed Maintenance 96 A/C

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0402 12 Months OPTION Satellite Site Support for NAS Pax River

UNIT UNIT PRICE ESTIMATED AMOUNT

0403 6 Each OPTION Additional One Aircraft for One Day

UNIT UNIT PRICE ESTIMATED AMOUNT

0404 24 Each OPTION Scheduled Depot-ACI

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Unscheduled Depot

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AA 6 Each OPTION Engine Overhaul

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AB 2 Each OPTION Replace Cabin Roof

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AC 1 Each OPTION Replace Forward Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AD 1 Each OPTION Replace Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AE 1 Each OPTION Replace Cabin Roof & Forward Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AF 2 Each OPTION Replace Cabin Roof & Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AG 4 Each OPTION Replace Forward & Aft Lower Shell

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AH 1 Each OPTION Replace Cabin Roof and Forward

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AJ 5 Each OPTION Replace Cabin Roof

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AK 12 Each OPTION Replace Forward Lower Shell

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AL 2 Each OPTION Replace Aft Lower Shell

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AM 4 Each OPTION Replace Cabin Roof and Forward

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AN 1 Each OPTION Replace Cabin Roof and

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AP 1 Each OPTION Replace Forward and

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0405AQ 1 Each OPTION Replace Cabin Roof and

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0406 78,000 Flight

UNIT UNIT PRICE EST. AMOUNT

OPTION On-site Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

0407AA 7,000 Labor

UNIT UNIT PRICE EST. AMOUNT

0407AB 5,800 Labor

UNIT UNIT PRICE EST. AMOUNT

OPTION Depot Conditional Maintenance

UNIT UNIT PRICE EST. AMOUNT

0408AA 50,000 Labor

UNIT UNIT PRICE EST. AMOUNT

0408AB 15,000 Labor

UNIT UNIT PRICE EST. AMOUNT

0409 2,400 Labor

UNIT UNIT PRICE EST. AMOUNT

0410 800 Labor

UNIT UNIT PRICE EST. AMOUNT

0411 2,000 Labor

UNIT UNIT PRICE AMOUNT

OPTION Material and Subcontractor Labor

UNIT UNIT PRICE AMOUNT

0412AA Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0412AB Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0412AC Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0412AD Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0412AE Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0412AF Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0412AG Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0412AH Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0412AJ Lot OPTION Material and Subcontractor Labor

COST

UNIT UNIT PRICE AMOUNT

0413 Lot OPTION Off-Site Emergency Repair Services

COST

UNIT UNIT PRICE AMOUNT

0414 Lot OPTION Travel and Per Diem

UNIT UNIT PRICE ESTIMATED AMOUNT

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE EST. AMOUNT

0416AA 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0416AB 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0416AC 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0416AD 1 Lot OPTION Performance Measurement Framework

FFP

UNIT UNIT PRICE AMOUNT

0417 2,000 Labor

UNIT UNIT PRICE AMOUNT

OPTION Weekend/Holiday Flight Operations

FFP

UNIT UNIT PRICE AMOUNT

0418AA 25 Each OPTION Weekend/Holiday Flight Operations

FFP

UNIT UNIT PRICE AMOUNT

0418AB 40 Each OPTION Weekend/Holiday Flight Operations

FFP

CLAUSES INCORPORATED BY FULL TEXT

5252.204-9501 NATIONAL STOCK NUMBERS (NAVAIR)(MAR 2007)

(a) This clause applies to supplies that are stock numbered under Federal Catalog System procedures.

(b) Unless otherwise authorized by the Contracting Officer, in writing, the Contractor shall not deliver any supplies until the supplies have been marked with a National Stock Number. All available National Stock Numbers will be furnished by the Government. If National Stock Numbers are not furnished by the Government in time to meet the delivery schedule for the supplies, the Contractor may present the supplies that are scheduled for delivery to the Contracting Officer for acceptance. The Contracting Officer may accept such supplies without National Stock

Numbers and the Government will pay the Contractor, provided that title to the supplies is vested in the Government.

(c) The term “Federal Stock Number” (FSN), which may be referred to in the specifications of this contract or elsewhere in this contract, shall mean “National Stock Number” (NSN), and the term “Federal Item Identification

Number”, wherever it appears, shall mean “National Item Identification Number”.

(As used in the foregoing clause, the term “Contracting Officer” shall mean the “Administrative Contracting Officer”

(ACO) with respect to provisioned items and other supplies ordered by the ACO.)

5252.211-9504 LEVEL OF EFFORT (TIME-AND-MATERIALS AND LABOR-HOUR CONTRACTS)

(NAVAIR) (NOV 1999)

(a) Task orders shall establish an anticipated level of effort (projected man-hours) for each CLIN or SLIN and a

Ceiling Price for that task order. The ceiling price shall be the sum of: (1) the projected prime Contractor hours multiplied by the appropriate hourly rates prescribed in the schedule; and (2) the estimated amount of materials priced in accordance with the clause entitled, Payments Under Time-and-Materials and Labor-Hour Contracts, including estimated subcontract costs calculated in the same manner as the prime Contractor using the subcontract price schedules.

(b) The Contractor may use any combination of hours of labor categories listed in any single task order, if necessary to perform that task order. Labor categories not shown may not be used without a task order modification.

The Contractor may use any combination of prime Contractor labor, subcontractor labor, and other material expense in accomplishing the statement of work within the limits expressed below.

(c) The NAVAIR clause 5252.232-9507, "Limitation of Funds - Time and Material and Labor-Hour Contracts", applies independently to each task order under this contract and nothing in this provision amends the rights or responsibilities of the parties hereto under that clause. In addition, the notifications required by this clause are separate and distinct from any specified in the NAVAIR 5252.232-9507.

(d) The Contractor shall notify the Procuring Contracting Officer immediately in writing whenever it has reason to believe that:

(1) The level of effort the Contractor expects to incur under any order in the next 60 days, when added to the level of effort previously expended in the performance of that order, will exceed seventy-five (75%) percent of the level of effort established for that order; or

(2) The level of effort required to perform a particular order will be greater than the level of effort established for that order.

As part of the notification, the Contractor shall provide the Contracting Officer a revised estimate of the level of effort required to perform the order. As part of the notification, the Contractor also shall submit any proposal for adjustment to the ceiling price that it deems would be equitable if the Government were to increase the level of effort as proposed by the Contractor. Any such upward adjustment shall be prospective only (i.e. will apply only to effort expended after a modification (if any) is issued.

(e) Within thirty days after completion of the work under each task order, the Contractor shall submit the following information directly, in writing, to the ordering officer, the COR and the Defense Contract Audit Agency office to which vouchers are submitted.

(1) The total number of man-hours of direct labor, including subcontract labor, expended and a breakdown of this total showing the number of man-hours expended in each CLIN or SLIN listed in the task order schedule, including the identification of the key employees utilized.

(2) The total labor price plus estimated total allowable material cost incurred under the task order,

(3) In the case of a cost under run, the amount by which the task order amount may be reduced to recover excess funds.

(f) In the event that less than one hundred (100%) percent of the established level of effort for a task order is expended, the Government may require continued performance subject to the remaining obligation.

Section C - Descriptions and Specifications

C-1

PERFORMANCE WORK STATEMENT (PWS)

Section C provides tasking alignment between the CLIN structure and applicable PWS (Attachment 1) sections. The

Contractor shall, in conformance with the Contract Provisions set forth in Sections B, D, E, F, G, H, and I furnish all personnel, materials, services, and facilities necessary to perform the requirements set forth in Section C and the

PWS, Attachment 1 listed in Section J and attached hereto.

C-2

CONTRACT LINE ITEMS (CLINS)

The descriptions and specifications set forth below shall apply with equal force to the basic contract period CLINs and all corresponding option year CLINs:

Base Performance Period - 00XX series

Option I - 01XX series

Option II - 02XX series

Option III - 03XX series

Option IV - 04XX series

CLIN 0001, Option Items XX01 - Fixed Maintenance for NAS Whiting Field: - The Contractor shall comply with the requirements specified in Section 5.1 through 5.1.1.6, Section 5.1.1.8 through 5.1.1.14, Section 5.1.1.18 through

5.1.1.19, Section 5.2 through 5.2.4, Section 5.2.6 through 5.2.8.2, Section 5.3.1.3.2 through 5.3.1.5, Section 5.6 through 5.6.5.6, Section 5.6.6.11 through 5.6.6.12.3, Section 5.7 through 5.7.6.20, Section 5.7.7 through 5.7.7.8, Section 5.10 through 5.11.3, Section 5.11.5 through 5.11.13, Section 5.12.5 through 5.12.5.3, Section 5.12.6 through

5.13.11, Section 5.14 through 5.14.3, Section 5.14.5 through 5.14.6.3, Section 5.14.6.5 through 5.14.20.4, Section

5.15 through 5.16.4, Section 5.17.3, Section 5.18.2 through 5.18.2.4, Section 5.18.6, Section 5.20 through 5.20.1.9, Section 5.20.1.11, Section 5.20.2 through 5.20.3, Section 7.10 through 7.12, and Section 10.0 through 10.4 of the

PWS. For each PoP, the Government will exercise one of the SLINs associated with CLIN XX01.

CLIN 0002, Option Items XX02, - Satellite Site Support for NAS Patuxent River, MD: - The Contractor shall comply with the requirements specified in Section 5.12.5 through 5.12.5.3, Section 5.21.1, and Section 10.0 through 10.4 of the PWS.

CLIN 0003, Option Items XX03, - Additional One Aircraft for One Day: - The Contractor shall comply with the requirements specified in Section 5.1 through 5.1.1.6, Section 5.1.1.8 through 5.1.1.14, Section 5.1.1.18 through

5.1.1.19, Section 5.2 through 5.2.4, Section 5.2.6 through 5.2.8.2, Section 5.3.1.3.2 through 5.3.1.5, Section 5.6 through 5.6.5.1.3, Section 5.6.6.9, Section 5.6.6.11 through 5.6.6.12.3, Section 5.7 through 5.7.6.20, Section 5.7.7 through 5.7.7.8, Section 5.10 through 5.11.3, Section 5.11.5 through 5.11.13, Section 5.12.5 through 5.12.5.3, Section 5.12.6 through 5.13.11, Section 5.14 through 5.14.3, Section 5.14.5 through 5.14.6.3, Section 5.14.6.5 through 5.14.20.4, Section 5.15 through 5.16.4, Section 5.17.3, Section 5.18.2 through 5.18.2.4, Section 5.18.6, Section 5.20 through 5.20.1.9, Section 5.20.1.11, Section 5.20.2 through 5.20.3, Section 7.10 through 7.12, and

Section 10.0 through 10.4 of the PWS. For each PoP, the Government may exercise one or more of the SLINs associated with CLIN XX03.

CLIN 0004, Option Items XX04, - Scheduled Depot – Aircraft Conditional Inspection (ACI): - The Contractor shall comply with the requirements specified in Section 5.1.1.7 through 5.1.1.7.7, Section 5.14.20 through 5.14.20.4, and

Section 10.0 through 10.4 of the PWS.

CLIN 0005, Option Items XX05, - Unscheduled Depot: - The Contractor shall comply with the requirements specified in Section 5.1.4.3 through 5.1.4.4, Section 5.4 through 5.4.10, Section 5.13.8 through 5.13.11, and Section

10.0 through 10.4 of the PWS.

CLIN 0006, Option Items XX06, - Flight Hour Generated Maintenance: - The Contractor shall comply with the requirements specified in Section 5.1 through 5.1.1.6, Section 5.1.1.12 through 5.1.1.14, Section 5.1.1.18, Section

5.1.1.22, Section 5.3.1 through 5.3.1.3.1, Section 5.4.1 through 5.4.8.3, Section 5.4.10, Section 5.6.1 through

5.6.4.4, Section 5.6.5.1 through 5.6.6.7, Section 5.6.6.12 through 5.6.6.12.3, Section 5.13.8 through 5.13.11, and

Section 10.0 through 10.4 of the PWS. Section H-4 applies to CLIN XX06.

CLIN 0007, Option Items XX07, - On-Site Conditional Maintenance: - The Contractor shall comply with the requirements specified in Section 5.1.3.1 through 5.1.3.1.3, Section 5.1.4.2, Section 5.1.4.3.3 through 5.1.4.3.8, Section 5.1.4.4.1 through 5.1.4.4.2, Section 5.1.5.1 through5.1.5.2, Section 5.3.1 through 5.3.1.3.1, Section 5.13.8 through 5.13.11, Section 5.17.1 through 5.17.3, and Section 10.0 through 10.4 of the PWS.

CLIN 0008, Option Items XX08, - Depot Conditional Maintenance: - The Contractor shall comply with the requirements specified in Section 5.1.1.5, Section 5.1.4.3.1 through 5.1.4.3.3, Section 5.1.4.3.6 through 5.1.4.3.8, Section 5.1.4.4.1, Section 5.1.4.4.2, Section 5.1.5.1, Section 5.3.1 through 5.3.1.3.1, Section 5.4.1 through 5.4.7, Section 5.4.8.1 through 5.4.8.3, Section 5.4.10, Section 5.13.8 through 5.13.11, Section 5.17.1 through 5.17.2, and

CLIN 0009, Option Items XX09, - Off-Site Emergency Repair Services (Contractor): - The Contractor shall comply with the requirements specified in Section 5.1.1.17 through 5.1.1.17.2 of the PWS.

CLIN 0010, Option Items XX10, - Engineering and Technical Services: - The Contractor shall comply with the requirements specified in Section 5.18.4 through 5.18.4.3, Section 5.22.1 through 5.22.7, and Section 10.0 through

10.4 of the PWS.

CLIN 0011, Option Items XX11, - Modifications - Development: - The Contractor shall comply with the requirements specified in Section 5.1.4.4 through 5.1.4.4.2, Section 5.13.12, Section 5.18.3 through 5.18.4.3, Section 5.18.6, and Section 10.0 through 10.4 of the PWS.

CLIN 0012, Option Items XX12, - Material and SubContractor Labor: - The Contractor shall comply with the requirements specified in Section 5.1 through 5.1.1, Section 5.1.1.2, Section 5.1.1.5, Section 5.1.4.2 through

5.1.4.3.8, Section 5.1.4.4.1, Section 5.1.4.4.2, Section 5.2.1 through 5.2.8.1, Section 5.3.1 through 5.3.1.3.1, Section

5.4.1 through 5.4.10, Section 5.6.1, Section 5.13.8 through 5.13.12 through 5.13.13, Section 5.17.1 through 5.17.2, Section 5.18.1 through 5.18.5, Section 9.0 through 9.1, and Section 10.0 through 10.4 of the PWS.

CLIN 0013, Option Items XX13, - Off-Site Emergency Repair Services (SubContractor): - The Contractor shall comply with the requirements specified in Section 5.1.1.17 through 5.1.1.17.2, Section 5.4.1 through through5.4.10, and Section 5.13.8 through 5.13.11 of the PWS.

CLIN 0014, Option Items XX14, - Travel and Per Diem: - The Contractor shall travel in support of the TH-57 program requirements specified in Section 5.20.1.8, Section 5.20.5, Section 5.20.7 through 5.20.7.1.4, Section

5.20.7.1, Section 8.0, and Section 10.0 through 10.4 of the PWS. The Contractor will be reimbursed for travel required in order to perform maintenance outside of a 50 mile radius IAW FAR 31.2, Section H-3, and Section 8.0 of Attachment 1, PWS.

CLIN 0015, Option Items XX15, - Technical Data IAW Exhibit A: - The Contractor shall comply with the requirements specified in Section 6.0 through 6.4, and Section 10.0 through 10.4 of the PWS.

CLIN 0016, Option Items XX16, - Performance Measurement Framework Incentive, - The Contractor shall comply with the requirements specified in Section 5.0, Section 5.5 through 5.5.2, Section 5.7.1 through 5.7.1.1, Section 5.8 through 5.8.2, and Section 5.14.8.1 through 5.14.8.1.1 of the PWS.

CLIN 0017, Option Items XX17, - Modifications - Production: - The Contractor shall comply with the requirements specified in Section 5.1.4.4 through 5.1.4.4.2, and Section 5.18.1 through 5.18.3, Section 5.18.5 through 5.18.6, and

CLIN 0018, Option Items XX18, - Weekend/Holiday Flight Operations Per Day: - The Contractor shall comply with the requirements specified in Section 5.1 through 5.1.1.6, Section 5.1.1.8 through 5.1.1.14, Section 5.1.1.18 through

5.1.1.19, Section 5.2 through 5.2.4, Section 5.2.6 through 5.2.8.2, Section 5.3.1.3.2 through 5.3.1.5, Section 5.6 through 5.6.5.1.3, Section 5.6.5.7 through 5.6.5.8, Section 5.6.6.11 through 5.6.6.12.3, Section 5.7 through 5.7.6.20, Section 5.7.7 through 5.7.7.8, Section 5.10 through 5.11.3, Section 5.11.5 through 5.11.13, Section 5.12.5 through

5.12.5.3, Section 5.12.6 through 5.13.11, Section 5.14 through 5.14.3, Section 5.14.5 through 5.14.6.3, Section

5.14.6.5 through 5.14.20.4, Section 5.15 through 5.16.4, Section 5.17.3, Section 5.18.2 through 5.18.2.4, Section

5.18.6, Section 5.20 through 5.20.1.9, Section 5.20.1.11, Section 5.20.2 through 5.20.3, Section 7.10 through 7.12, and Section 10.0 through 10.4 of the PWS. For each PoP, the Government may exercise one or more of the SLINs associated with CLIN XX18.

CLIN 0019, – Transition Phase-In: - The Contractor shall comply with the requirements specified in Section 5

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .