N00019-10-R-0097 Final RFP.pdf
PDF 2 MB Posted
- Attached to
- TH-57 Contractor Logistics Support Federal contract opportunity
- Solicitation number
- N00019-10-R-0097
About this file
Final RFP
View the file
Other files for this federal contract opportunity
Show all 50
TH-57 Contractor Logistics Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 14 Jun 2012
X
A
X B
X C X D
EX
X
G
F 190 - 199
200 - 246
X H 247 - 253
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 253
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00019 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 5 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2
3 - 129
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
130 - 132
133 - 135
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
137 - 139 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 140 - 144 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 145 - 167 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
168 - 188
PART II - CO NTRACT CLAUSES
NAVAL AIR SYSTEMS COMMAND
AIR-2.2.4.1 - BLDG 2272, SUITE 453
47123 BUSE RD
PATUXENT RIVER MD 20670
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
30 Apr 2012
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N00019-10-R-0097
Section A - Solicitation/Contract Form
A-1
SF 33 CONTINUATION
Block 7: Issuing Office Full Address:
NAVAL AIR SYSTEMS COMMAND
ATTN: NOELLE REIMERS, PROCURING CONTRACTING OFFICER, AIR 2.2.4.1A
ATTN: CHRISTA MCCARTHY, CONTRACT SPECIALIST, AIR 2.2.4.1.3
47123 BUSE ROAD, BLDG 2272, FLOOR 4
PATUXENT RIVER, MD 20670-1127
Block 9: See Section L for a complete list of copies required for solicitation submittal for each proposal Volume.
Block 12: The Offer validity date shall be 31 August 2013. The Block 12 fill-in shall be completed in accordance with this date.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
Fixed Maintenance for NAS Whiting Field
FFP
FOB: Destination
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AA 11 Months OPTION Fixed Maintenance 78 A/C
FFP
Aircraft Daily
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AB 11 Months OPTION Fixed Maintenance 83 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AC 11 Months OPTION Fixed Maintenance 88 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AD 11 Months OPTION Fixed Maintenance 93 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AE 11 Months OPTION Fixed Maintenance 96 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0002 11 Months Satellite Site Support for NAS Pax River
UNIT UNIT PRICE ESTIMATED AMOUNT
0003 6 Each Additional One Aircraft for One Day
UNIT UNIT PRICE ESTIMATED AMOUNT
0004 22 Each Scheduled Depot - ACI
FFP
Aircraft Condition Inspection (ACI)
UNIT UNIT PRICE ESTIMATED AMOUNT
Unscheduled Depot
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AA 6 Each Engine Overhaul
FFP
due to Metal Contamination
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AB 2 Each Replace Cabin Roof
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AC 1 Each Replace Forward Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AD 1 Each Replace Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AE 1 Each Replace Cabin Roof & Forward Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AF 2 Each Replace Cabin Roof & Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AG 4 Each Replace Forward & Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AH 1 Each Replace Cabin Roof and Forward
FFP
and Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AJ 5 Each Replace Cabin Roof
FFP
in conjunction with ACI
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AK 12 Each Replace Forward Lower Shell
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AL 2 Each Replace Aft Lower Shell
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AM 4 Each Replace Cabin Roof and Forward
FFP
Lower Shell in conjunction with ACI
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AN 1 Each Replace Cabin Roof and
FFP
Aft Lower Shell in conjunction with ACI
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AP 1 Each Replace Forward and
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AQ 1 Each Replace Cabin Roof and
FFP
Forward and Aft Lower Shell in conjunction with ACI
UNIT UNIT PRICE ESTIMATED AMOUNT
0006 71,500 Flight
Hours
Flight Hour Generated Maintenance
ITEM NO SUPPLIES/SERVICES EST.
UNIT UNIT PRICE EST. AMOUNT
On-site Conditional Maintenance
LH
TOT ESTIMATED PRICE
CEILING PRICE
UNIT UNIT PRICE EST. AMOUNT
0007AA 7,000 Labor
Airframe On-site Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
0007AB 5,800 Labor
Engines On-site Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
Depot Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
0008AA 50,000 Labor
Airframe Depot Conditional Maintenance
Airframe Repair
UNIT UNIT PRICE EST. AMOUNT
0008AB 15,000 Labor
Engines Depot Conditional Maintenance
Engine Repair
UNIT UNIT PRICE EST. AMOUNT
0009 2,400 Labor
Off-Site Emergency Repair Services
Contractor
UNIT UNIT PRICE EST. AMOUNT
0010 800 Labor
Engineering and Technical Services
UNIT UNIT PRICE EST. AMOUNT
0011 2,000 Labor
Modifications - Development
ITEM NO SUPPLIES/SERVICES EST .
UNIT UNIT PRICE AMOUNT
Material and Subcontractor Labor
COST
ESTIMATED COST
UNIT UNIT PRICE AMOUNT
0012AA Lot Material and Subcontractor Labor
COST
Flight Operations
UNIT UNIT PRICE AMOUNT
0012AB Lot Material and Subcontractor Labor
COST
Aircraft Inspection (ACI)
UNIT UNIT PRICE AMOUNT
0012AC Lot Material and Subcontractor Labor
COST
In-Service Repair (ISR)
UNIT UNIT PRICE AMOUNT
0012AD Lot Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0012AE Lot Material and Subcontractor Labor
COST
Program Related Logistics (PRL)
UNIT UNIT PRICE AMOUNT
0012AF Lot Material and Subcontractor Labor
COST
Non-Standard Repairs
UNIT UNIT PRICE AMOUNT
0012AG Lot Material and Subcontractor Labor
COST
Patuxent River
UNIT UNIT PRICE AMOUNT
0012AH Lot Material and Subcontractor Labor
COST
Modification Development
UNIT UNIT PRICE AMOUNT
0012AJ Lot Material and Subcontractor Labor
COST
Modification Production
UNIT UNIT PRICE AMOUNT
0013 Lot Off-Site Emergency Repair Services
COST
Subcontractor
UNIT UNIT PRICE AMOUNT
0014 Lot Travel and Per Diem
UNIT UNIT PRICE ESTIMATED AMOUNT
Technical Data IAW
Exhibit A
NSP
In Support of CLINs XX01-XX14 and XX16-XX18
UNIT UNIT PRICE ESTIMATED AMOUNT
Performance Measurement Framework
FFP
Incentive
UNIT UNIT PRICE ESTIMATED AMOUNT
0016AA 1 Lot Performance Measurement Framework
FFP
Incentive - First Quarter
UNIT UNIT PRICE ESTIMATED AMOUNT
0016AB 1 Lot Performance Measurement Framework
FFP
Incentive - Second Quarter
UNIT UNIT PRICE ESTIMATED AMOUNT
0016AC 1 Lot Performance Measurement Framework
FFP
Incentive - Third Quarter
UNIT UNIT PRICE ESTIMATED AMOUNT
0016AD 1 Lot Performance Measurement Framework
FFP
Incentive - Fourth Quarter
UNIT UNIT PRICE EST. AMOUNT
0017 2,000 Labor
Modifications - Production
UNIT UNIT PRICE ESTIMATED AMOUNT
Weekend/Holiday Flight Operations
FFP
Per Day
UNIT UNIT PRICE ESTIMATED AMOUNT
0018AA 25 Each Weekend/Holiday Flight Operations
FFP
50 Aircraft
UNIT UNIT PRICE ESTIMATED AMOUNT
0018AB 40 Each Weekend/Holiday Flight Operations
FFP
93 Aircraft
UNIT UNIT PRICE ESTIMATED AMOUNT
0019 1 Months Transition Phase-In
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Fixed Maintenance for NAS Whiting Field
UNIT UNIT PRICE ESTIMATED AMOUNT
0101AA 12 Months OPTION Fixed Maintenance 78 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0101AB 12 Months OPTION Fixed Maintenance 83 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0101AC 12 Months OPTION Fixed Maintenance 88 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0101AD 12 Months OPTION Fixed Maintenance 93 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0101AE 12 Months OPTION Fixed Maintenance 96 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0102 12 Months OPTION Satellite Site Support for NAS Pax River
UNIT UNIT PRICE ESTIMATED AMOUNT
0103 6 Each OPTION Additional One Aircraft for One Day
UNIT UNIT PRICE ESTIMATED AMOUNT
0104 24 Each OPTION Scheduled Depot - ACI
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Unscheduled Depot
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AA 6 Each OPTION Engine Overhaul
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AB 2 Each OPTION Replace Cabin Roof
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AC 1 Each OPTION Replace Forward Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AD 1 Each OPTION Replace Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AE 1 Each OPTION Replace Cabin Roof & Forward Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AF 2 Each OPTION Replace Cabin Roof & Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AG 4 Each OPTION Replace Forward & Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AH 1 Each OPTION Replace Cabin Roof and Forward
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AJ 5 Each OPTION Replace Cabin Roof
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AK 12 Each OPTION Replace Forward Lower Shell
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AL 2 Each OPTION Replace Aft Lower Shell
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AM 4 Each OPTION Replace Cabin Roof and Forward
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AN 1 Each OPTION Replace Cabin Roof and
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AP 1 Each OPTION Replace Forward and
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0105AQ 1 Each OPTION Replace Cabin Roof and
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0106 78,000 Flight
OPTION Flight Hour Generated Maintenance
UNIT UNIT PRICE EST. AMOUNT
OPTION On-site Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
0107AA 7,000 Labor
OPTION Airframe On-site Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
0107AB 5,800 Labor
OPTION Engines On-site Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
OPTION Depot Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
0108AA 50,000 Labor
OPTION Airframe Depot Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
0108AB 15,000 Labor
OPTION Engines Depot Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
0109 2,400 Labor
OPTION Off-Site Emergency Repair Services
UNIT UNIT PRICE EST. AMOUNT
0110 800 Labor
OPTION Engineering and Technical Services
UNIT UNIT PRICE EST. AMOUNT
0111 2,000 Labor
OPTION Modifications - Development
UNIT UNIT PRICE AMOUNT
OPTION Material and Subcontractor Labor
UNIT UNIT PRICE AMOUNT
0112AA Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0112AB Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0112AC Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0112AD Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0112AE Lot OPTION Material and Subcontractor Labor
COST
PRL
UNIT UNIT PRICE AMOUNT
0112AF Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0112AG Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0112AH Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0112AJ Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0113 Lot OPTION Off-Site Emergency Repair Services
COST
UNIT UNIT PRICE AMOUNT
0114 Lot OPTION Travel and Per Diem
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Technical Data IAW
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE EST. AMOUNT
0116AA 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0116AB 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0116AC 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0116AD 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE AMOUNT
0117 2,000 Labor
OPTION Modifications - Production
UNIT UNIT PRICE AMOUNT
OPTION Weekend/Holiday Flight Operations
FFP
UNIT UNIT PRICE AMOUNT
0118AA 25 Each OPTION Weekend/Holiday Flight Operations
FFP
UNIT UNIT PRICE AMOUNT
0118AB 40 Each OPTION Weekend/Holiday Flight Operations
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Fixed Maintenance for NAS Whiting Field
UNIT UNIT PRICE ESTIMATED AMOUNT
0201AA 12 Months OPTION Fixed Maintenance 78 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0201AB 12 Months OPTION Fixed Maintenance 83 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0201AC 12 Months OPTION Fixed Maintenance 88 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0201AD 12 Months OPTION Fixed Maintenance 93 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0201AE 12 Months OPTION Fixed Maintenance 96 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0202 12 Months OPTION Satellite Site Support for NAS Pax River
UNIT UNIT PRICE ESTIMATED AMOUNT
0203 6 Each OPTION Additional One Aircraft for One Day
UNIT UNIT PRICE ESTIMATED AMOUNT
0204 24 Each OPTION Scheduled Depot - ACI
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Unscheduled Depot
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AA 6 Each OPTION Engine Overhaul
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AB 2 Each OPTION Replace Cabin Roof
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AC 1 Each OPTION Replace Forward Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AD 1 Each OPTION Replace Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AE 1 Each OPTION Replace Cabin Roof & Forward Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AF 2 Each OPTION Replace Cabin Roof & Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AG 4 Each OPTION Replace Forward & Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AH 1 Each OPTION Replace Cabin Roof and Forward
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AJ 5 Each OPTION Replace Cabin Roof
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AK 12 Each OPTION Replace Forward Lower Shell
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AL 2 Each OPTION Replace Aft Lower Shell
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AM 4 Each OPTION Replace Cabin Roof and Forward
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AN 1 Each OPTION Replace Cabin Roof and
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AP 1 Each OPTION Replace Forward and
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0205AQ 1 Each OPTION Replace Cabin Roof and
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0206 78,000 Flight
UNIT UNIT PRICE EST. AMOUNT
OPTION On-site Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
0207AA 7,000 Labor
UNIT UNIT PRICE EST. AMOUNT
0207AB 5,800 Labor
UNIT UNIT PRICE EST. AMOUNT
OPTION Depot Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
0208AA 50,000 Labor
UNIT UNIT PRICE EST. AMOUNT
0208AB 15,000 Labor
UNIT UNIT PRICE EST. AMOUNT
0209 2,400 Labor
UNIT UNIT PRICE EST. AMOUNT
0210 800 Labor
UNIT UNIT PRICE EST. AMOUNT
0211 2,000 Labor
UNIT UNIT PRICE AMOUNT
OPTION Material and Subcontractor Labor
UNIT UNIT PRICE AMOUNT
0212AA Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0212AB Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0212AC Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0212AD Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0212AE Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0212AF Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0212AG Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0212AH Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0212AJ Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0213 Lot OPTION Off-Site Emergency Repair Services
COST
UNIT UNIT PRICE AMOUNT
0214 Lot OPTION Travel and Per Diem
UNIT UNIT PRICE ESTIMATED AMOUNT
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE EST. AMOUNT
0216AA 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0216AB 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0216AC 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0216AD 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE AMOUNT
0217 2,000 Labor
UNIT UNIT PRICE AMOUNT
OPTION Weekend/Holiday Flight Operations
FFP
UNIT UNIT PRICE AMOUNT
0218AA 25 Each OPTION Weekend/Holiday Flight Operations
FFP
UNIT UNIT PRICE AMOUNT
0218AB 40 Each OPTION Weekend/Holiday Flight Operations
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Fixed Maintenance for NAS Whiting Field
UNIT UNIT PRICE ESTIMATED AMOUNT
0301AA 12 Months OPTION Fixed Maintenance 78 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0301AB 12 Months OPTION Fixed Maintenance 83 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0301AC 12 Months OPTION Fixed Maintenance 88 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0301AD 12 Months OPTION Fixed Maintenance 93 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0301AE 12 Months OPTION Fixed Maintenance 96 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0302 12 Months OPTION Satellite Site Support for NAS Pax River
UNIT UNIT PRICE ESTIMATED AMOUNT
0303 6 Each OPTION Additional One Aircraft for One Day
UNIT UNIT PRICE ESTIMATED AMOUNT
0304 24 Each OPTION Scheduled Depot - ACI
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Unscheduled Depot
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AA 6 Each OPTION Engine Overhaul
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AB 2 Each OPTION Replace Cabin Roof
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AC 1 Each OPTION Replace Forward Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AD 1 Each OPTION Replace Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AE 1 Each OPTION Replace Cabin Roof & Forward Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AF 2 Each OPTION Replace Cabin Roof & Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AG 4 Each OPTION Replace Forward & Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AH 1 Each OPTION Replace Cabin Roof and Forward
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AJ 5 Each OPTION Replace Cabin Roof
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AK 12 Each OPTION Replace Forward Lower Shell
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AL 2 Each OPTION Replace Aft Lower Shell
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AM 4 Each OPTION Replace Cabin Roof and Forward
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AN 1 Each OPTION Replace Cabin Roof and
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AP 1 Each OPTION Replace Forward and
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0305AQ 1 Each OPTION Replace Cabin Roof and
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0306 78,000 Flight
UNIT UNIT PRICE EST. AMOUNT
OPTION On-site Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
0307AA 7,000 Labor
UNIT UNIT PRICE EST. AMOUNT
0307AB 5,800 Labor
UNIT UNIT PRICE EST. AMOUNT
OPTION Depot Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
0308AA 50,000 Labor
UNIT UNIT PRICE EST. AMOUNT
0308AB 15,000 Labor
UNIT UNIT PRICE EST. AMOUNT
0309 2,400 Labor
UNIT UNIT PRICE EST. AMOUNT
0310 800 Labor
UNIT UNIT PRICE EST. AMOUNT
0311 2,000 Labor
UNIT UNIT PRICE AMOUNT
OPTION Material and Subcontractor Labor
UNIT UNIT PRICE AMOUNT
0312AA Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0312AB Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0312AC Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0312AD Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0312AE Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0312AF Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0312AG Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0312AH Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0312AJ Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0313 Lot OPTION Off-Site Emergency Repair Services
COST
UNIT UNIT PRICE AMOUNT
0314 Lot OPTION Travel and Per Diem
UNIT UNIT PRICE ESTIMATED AMOUNT
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE EST. AMOUNT
0316AA 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0316AB 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0316AC 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0316AD 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE AMOUNT
0317 2,000 Labor
UNIT UNIT PRICE AMOUNT
OPTION Weekend/Holiday Flight Operations
FFP
UNIT UNIT PRICE AMOUNT
0318AA 25 Each OPTION Weekend/Holiday Flight Operations
FFP
UNIT UNIT PRICE AMOUNT
0318AB 40 Each OPTION Weekend/Holiday Flight Operations
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Fixed Maintenance for NAS Whiting Field
UNIT UNIT PRICE ESTIMATED AMOUNT
0401AA 12 Months OPTION Fixed Maintenance 78 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0401AB 12 Months OPTION Fixed Maintenance 83 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0401AC 12 Months OPTION Fixed Maintenance 88 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0401AD 12 Months OPTION Fixed Maintenance 93 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0401AE 12 Months OPTION Fixed Maintenance 96 A/C
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0402 12 Months OPTION Satellite Site Support for NAS Pax River
UNIT UNIT PRICE ESTIMATED AMOUNT
0403 6 Each OPTION Additional One Aircraft for One Day
UNIT UNIT PRICE ESTIMATED AMOUNT
0404 24 Each OPTION Scheduled Depot-ACI
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Unscheduled Depot
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AA 6 Each OPTION Engine Overhaul
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AB 2 Each OPTION Replace Cabin Roof
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AC 1 Each OPTION Replace Forward Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AD 1 Each OPTION Replace Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AE 1 Each OPTION Replace Cabin Roof & Forward Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AF 2 Each OPTION Replace Cabin Roof & Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AG 4 Each OPTION Replace Forward & Aft Lower Shell
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AH 1 Each OPTION Replace Cabin Roof and Forward
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AJ 5 Each OPTION Replace Cabin Roof
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AK 12 Each OPTION Replace Forward Lower Shell
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AL 2 Each OPTION Replace Aft Lower Shell
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AM 4 Each OPTION Replace Cabin Roof and Forward
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AN 1 Each OPTION Replace Cabin Roof and
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AP 1 Each OPTION Replace Forward and
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0405AQ 1 Each OPTION Replace Cabin Roof and
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0406 78,000 Flight
UNIT UNIT PRICE EST. AMOUNT
OPTION On-site Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
0407AA 7,000 Labor
UNIT UNIT PRICE EST. AMOUNT
0407AB 5,800 Labor
UNIT UNIT PRICE EST. AMOUNT
OPTION Depot Conditional Maintenance
UNIT UNIT PRICE EST. AMOUNT
0408AA 50,000 Labor
UNIT UNIT PRICE EST. AMOUNT
0408AB 15,000 Labor
UNIT UNIT PRICE EST. AMOUNT
0409 2,400 Labor
UNIT UNIT PRICE EST. AMOUNT
0410 800 Labor
UNIT UNIT PRICE EST. AMOUNT
0411 2,000 Labor
UNIT UNIT PRICE AMOUNT
OPTION Material and Subcontractor Labor
UNIT UNIT PRICE AMOUNT
0412AA Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0412AB Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0412AC Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0412AD Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0412AE Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0412AF Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0412AG Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0412AH Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0412AJ Lot OPTION Material and Subcontractor Labor
COST
UNIT UNIT PRICE AMOUNT
0413 Lot OPTION Off-Site Emergency Repair Services
COST
UNIT UNIT PRICE AMOUNT
0414 Lot OPTION Travel and Per Diem
UNIT UNIT PRICE ESTIMATED AMOUNT
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE EST. AMOUNT
0416AA 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0416AB 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0416AC 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0416AD 1 Lot OPTION Performance Measurement Framework
FFP
UNIT UNIT PRICE AMOUNT
0417 2,000 Labor
UNIT UNIT PRICE AMOUNT
OPTION Weekend/Holiday Flight Operations
FFP
UNIT UNIT PRICE AMOUNT
0418AA 25 Each OPTION Weekend/Holiday Flight Operations
FFP
UNIT UNIT PRICE AMOUNT
0418AB 40 Each OPTION Weekend/Holiday Flight Operations
FFP
CLAUSES INCORPORATED BY FULL TEXT
5252.204-9501 NATIONAL STOCK NUMBERS (NAVAIR)(MAR 2007)
(a) This clause applies to supplies that are stock numbered under Federal Catalog System procedures.
(b) Unless otherwise authorized by the Contracting Officer, in writing, the Contractor shall not deliver any supplies until the supplies have been marked with a National Stock Number. All available National Stock Numbers will be furnished by the Government. If National Stock Numbers are not furnished by the Government in time to meet the delivery schedule for the supplies, the Contractor may present the supplies that are scheduled for delivery to the Contracting Officer for acceptance. The Contracting Officer may accept such supplies without National Stock
Numbers and the Government will pay the Contractor, provided that title to the supplies is vested in the
Government.
(c) The term ―Federal Stock Number‖ (FSN), which may be referred to in the specifications of this contract or elsewhere in this contract, shall mean ―National Stock Number‖ (NSN), and the term ―Federal Item Identification
Number‖, wherever it appears, shall mean ―National Item Identification Number‖.
(As used in the foregoing clause, the term ―Contracting Officer‖ shall mean the ―Administrative Contracting
Officer‖ (ACO) with respect to provisioned items and other supplies ordered by the ACO.)
B-1
CONTRACT LINE ITEM NUMBERING
B-1.1) Contract Line Item Number (CLINs) in Section B are numbered in accordance with the following numbering system. The second character in each CLIN or Subcontract Line Item Number (SLINs) corresponds to each performance period as follows: CLIN XX02 in the Base Period is CLIN 0002, Option Period 1 is CLIN 0102, Option Period 2 is CLIN 0202, Option Period 3 is CLIN 0302, and Option Period 4 is CLIN 0402.
B-1.2) CLINs have been aligned to the same effort throughout the Periods of Performance (PoP) of this solicitation. Not all SLINs will be used in each Option period.
B-2
CONTRACT CLIN TYPES
The line items listed in Section B represent a hybrid contract type consisting of Firm Fixed Price (FFP), Cost
Reimbursable (CR), and Labor Hour (LH) CLINs.
Item No. Contract Type
CLINs XX01 – XX06, XX16, XX18 Firm Fixed Price
XX19
CLINs XX07 – XX11, XX17 Labor Hour
CLINs XX12 – XX14 Cost Reimbursable
B-3
PRICING NOTES
B-3.1 - CLIN XX01 – Upon contract award and exercise of each one-year option, the Government will designate one of the SLINs associated with CLIN XX01 as the aircraft daily requirement for that period of performance. This
SLIN designation may be changed at any time during that period of performance by bilateral agreement of the parties, or, may be changed unilaterally by the Government with 60-days written notice to the contractor. Such written notice will be provided by the ACO or PCO.
B-3.2 - CLIN XX03 – This CLIN is to purchase one additional aircraft for one day.
B-3.3 - CLIN XX06 – See Clause H-3, Flight Hour Generated Maintenance Ordering and Payment (Applicable to
CLINs 0X06).
B-3.4 - CLINs XX08 and XX12 - The Government has estimated 65,000 Labor Hours on CLIN XX08 to allow the prime contractor to perform its own Depot Conditional Maintenance if it chooses. If so chosen, the estimated quantity of CLIN XX12 will be decremented by the extended cost (number of Labor Hours * unit price) outsourced to the Subcontractor.
B-3.5 - CLIN XX12 – (Material and Subcontractor Labor) consists of CR SLINs. Unit is LOT. Fee is unallowable. Indirect costs are allowable, including any subcontractor mark-ups/burdens (for example, outsourcing the procurement service associated with processing the orders for direct parts, repair parts, and/ or materials).
Contractor mark-ups are limited to one subcontractor tier only. Unless other clauses in this contract limit the amount of burden allowed on cost-reimbursable items, the contractor shall be allowed its normal burdens in accordance with FAR 52.216-7, ―Allowable Cost and Payment‖ and actual shipping costs, however, the
Contractor’s allowable burdens on this CLIN shall not exceed those proposed for contractor performance in accordance with Clause G-3 of this contract. Included in the proposed Section B amount is the Government estimated amount plus the contractor's added indirect costs/burdens.
B-3.6 - CLIN XX13 – (Off-Site Emergency Repair Services (Subcontractor)) is CR for off-site emergency repair services performed by a subcontractor for each PoP. Unit is LOT. Fee is unallowable. Indirect costs are allowable for CLIN XX13, including any subcontractor mark-ups/burdens (for example, outsourcing the procurement service associated with processing the orders for direct parts, repair parts, and/ or materials). Contractor mark-ups are limited to one subcontractor tier only. Unless other clauses in this contract limit the amount of burden allowed on cost-reimbursable items, the contractor shall be allowed its normal burdens in accordance with FAR 52.216-7, ―Allowable Cost and Payment‖, however, the Contractor’s allowable burdens on this CLIN shall not exceed those proposed for contractor performance in accordance with Clause G-3 of this contract. Included in the proposed
Section B amount is the Government estimated amount plus the contractor's added indirect costs/burdens.
B-3.7 - CLIN XX14 – (Travel and Per Diem) is CR. The Government will reimburse the Contractor for travel and per diem costs on the basis of maximum allowable actual costs incurred up to the daily equivalent allowed for a
Government employee in accordance with the Department of Defense (DOD) Civilian Personnel Joint Travel
Regulations and the Federal Travel Regulations, prescribed by the General Services Administration, and the
Standardized Regulations (Government Civilians, Foreign Areas), as prescribed by the Department of State. Travel and Per Diem costs incurred in the replacement of personnel or while attending non-Government mandated training courses will not be reimbursed. The Contractor may include its allowable, allocable, and reasonable charges in accordance with FAR 52.216-7, "Allowable Cost and Payment,‖ for burden on cost-reimbursable travel and per diem costs, however, the contractor allowable burdens on this CLIN shall not exceed those proposed for contractor performance in accordance with Clause G-3 of this contract. Fee/Profit is unallowable on the actual cost of reimbursable travel and per diem. Included in the proposed Section B amount is the Government estimated amount plus the contractor's added indirect costs/burdens.
B-3.8 - CLIN XX18 – The Government may exercise these SLINs to fly on a weekend day or holiday. The number of aircraft, 50 and 93, identify the quantity of aircraft that can be flown for that day.
B-3.9 - CLIN 0019 – See Clause F-1(a), Term of Contract (Base).
B-4
PERFORMANCE INCENTIVE (CLINs 0X16)
CLIN XX16 Performance Measurement Framework Incentive (PMFI) is a firm fixed unit price as calculated in accordance with (IAW) Clause H-1, Performance Measurement Framework (PMF) and invoiced in IAW G-1, Invoicing Instructions- Payment of Services and Performance Incentive (CLINs XX16). If applicable, each SLIN for the PMF will be issued as a FFP order when the applicable incentive is calculated IAW clause H-1 of this contract.
Section C - Descriptions and Specifications
C-1
PERFORMANCE WORK STATEMENT (PWS)
Section C provides tasking alignment between the CLIN structure and applicable PWS (Attachment 1) sections.
The Contractor shall, in conformance with the Contract Provisions set forth in Sections B, D, E, F, G, H, and I furnish all personnel, materials, services, and facilities necessary to perform the requirements set forth in Section C and the PWS, Attachment 1 listed in Section J and attached hereto.
C-2
CONTRACT LINE ITEMS (CLINS)
The descriptions and specifications set forth below shall apply with equal force to the basic contract period CLINs and all corresponding option year CLINs:
Base Performance Period - 00XX series
Option I - 01XX series
Option II - 02XX series
Option III - 03XX series
Option IV - 04XX series
CLIN 0001, Option Items XX01 - Fixed Maintenance for NAS Whiting Field: - The Contractor shall comply with the requirements specified in Section 5.1 through 5.1.1.6, Section 5.1.1.8 through 5.1.1.14, Section 5.1.1.18 through
5.1.1.19, Section 5.2 through 5.2.4, Section 5.2.6 through 5.2.8.2, Section 5.3.1.3.2 through 5.3.1.5, Section 5.6 through 5.6.5.6, Section 5.6.6.11 through 5.6.6.12.3, Section 5.7 through 5.7.6.20, Section 5.7.7 through 5.7.7.8, Section 5.10 through 5.11.3, Section 5.11.5 through 5.11.13, Section 5.12.5 through 5.12.5.3, Section 5.12.6 through
5.13.11, Section 5.14 through 5.14.3, Section 5.14.5 through 5.14.6.3, Section 5.14.6.5 through 5.14.20.4, Section
5.15 through 5.16.4, Section 5.17.3, Section 5.18.2 through 5.18.2.4, Section 5.18.6, Section 5.20 through 5.20.1.9, Section 5.20.1.11, Section 5.20.2 through 5.20.3, Section 7.10 through 7.12, and Section 10.0 through 10.4 of the
PWS. Upon contract award and exercise of each one-year option, the Government will designate one of the SLINs associated with CLIN XX01 as the aircraft daily requirement for that period of performance. This SLIN designation may be changed at any time during that period of performance by bilateral agreement of the parties, or, may be changed unilaterally by the Government with 60-days written notice to the contractor. Such written notice will be provided by the ACO or PCO.
CLIN 0002, Option Items XX02, - Satellite Site Support for NAS Patuxent River, MD: - The Contractor shall comply with the requirements specified in Section 5.12.5 through 5.12.5.3, Section 5.21.1, and Section 10.0 through 10.4 of the PWS.
CLIN 0003, Option Items XX03, - Additional One Aircraft for One Day: - The Contractor shall comply with the requirements specified in Section 5.1 through 5.1.1.6, Section 5.1.1.8 through 5.1.1.14, Section 5.1.1.18 through
5.1.1.19, Section 5.2 through 5.2.4, Section 5.2.6 through 5.2.8.2, Section 5.3.1.3.2 through 5.3.1.5, Section 5.6 through 5.6.5.1.3, Section 5.6.6.9, Section 5.6.6.11 through 5.6.6.12.3, Section 5.7 through 5.7.6.20, Section 5.7.7 through 5.7.7.8, Section 5.10 through 5.11.3, Section 5.11.5 through 5.11.13, Section 5.12.5 through 5.12.5.3, Section 5.12.6 through 5.13.11, Section 5.14 through 5.14.3, Section 5.14.5 through 5.14.6.3, Section 5.14.6.5 through 5.14.20.4, Section 5.15 through 5.16.4, Section 5.17.3, Section 5.18.2 through 5.18.2.4, Section 5.18.6, Section 5.20 through 5.20.1.9, Section 5.20.1.11, Section 5.20.2 through 5.20.3, Section 7.10 through 7.12, and
Section 10.0 through 10.4 of the PWS. For each PoP, the Government may exercise one or more of the SLINs associated with CLIN XX03.
CLIN 0004, Option Items XX04, - Scheduled Depot – Aircraft Conditional Inspection (ACI): - The Contractor shall comply with the requirements specified in Section 5.1.1.7 through 5.1.1.7.7, Section 5.14.20 through 5.14.20.4, and
Section 10.0 through 10.4 of the PWS.
CLIN 0005, Option Items XX05, - Unscheduled Depot: - The Contractor shall comply with the requirements specified in Section 5.1.4.3 through 5.1.4.4, Section 5.4 through 5.4.10, Section 5.13.8 through 5.13.11, and Section
10.0 through 10.4 of the PWS.
CLIN 0006, Option Items XX06, - Flight Hour Generated Maintenance: - The Contractor shall comply with the requirements specified in Section 5.1 through 5.1.1.6, Section 5.1.1.12 through 5.1.1.14, Section 5.1.1.18, Section
5.1.1.22, Section 5.3.1 through 5.3.1.3.1, Section 5.4.1 through 5.4.8.3, Section 5.4.10, Section 5.6.1 through
5.6.4.4, Section 5.6.5.1 through 5.6.6.7, Section 5.6.6.12 through 5.6.6.12.3, Section 5.13.8 through 5.13.11, and
Section 10.0 through 10.4 of the PWS. Section H-4 applies to CLIN XX06.
CLIN 0007, Option Items XX07, - On-Site Conditional Maintenance: - The Contractor shall comply with the requirements specified in Section 5.1.3.1 through 5.1.3.1.3, Section 5.1.4.2, Section 5.1.4.3.3 through 5.1.4.3.8, Section 5.1.4.4.1 through 5.1.4.4.2, Section 5.1.5.1 through5.1.5.2, Section 5.3.1 through 5.3.1.3.1, Section 5.13.8 through 5.13.11, Section 5.17.1 through 5.17.3, and Section 10.0 through 10.4 of the PWS.
CLIN 0008, Option Items XX08, - Depot Conditional Maintenance: - The Contractor shall comply with the requirements specified in Section 5.1.1.5, Section 5.1.4.3.1 through 5.1.4.3.3, Section 5.1.4.3.6 through 5.1.4.3.8, Section 5.1.4.4.1, Section 5.1.4.4.2, Section 5.1.5.1, Section 5.3.1 through 5.3.1.3.1, Section 5.4.1 through 5.4.7, Section 5.4.8.1 through 5.4.8.3, Section 5.4.10, Section 5.13.8 through 5.13.11, Section 5.17.1 through 5.17.2, and
CLIN 0009, Option Items XX09, - Off-Site Emergency Repair Services (Contractor): - The Contractor shall comply with the requirements specified in Section 5.1.1.17 through 5.1.1.17.2 of the PWS.
CLIN 0010, Option Items XX10, - Engineering and Technical Services: - The Contractor shall comply with the requirements specified in Section 5.18.4 through 5.18.4.3, Section 5.22.1 through 5.22.7, and Section 10.0 through
10.4 of the PWS.
CLIN 0011, Option Items XX11, - Modifications - Development: - The Contractor shall comply with the requirements specified in Section 5.1.4.4 through 5.1.4.4.2, Section 5.13.12, Section 5.18.3 through 5.18.4.3, Section 5.18.6, and Section 10.0 through 10.4 of the PWS.
CLIN 0012, Option Items XX12, - Material and SubContractor Labor: - The Contractor shall comply with the requirements specified in Section 5.1 through 5.1.1, Section 5.1.1.2, Section 5.1.1.5, Section 5.1.4.2 through
5.1.4.3.8, Section 5.1.4.4.1, Section 5.1.4.4.2, Section 5.2.1 through 5.2.8.1, Section 5.3.1 through 5.3.1.3.1, Section
5.4.1 through 5.4.10, Section 5.6.1, Section 5.13.8 through 5.13.12 through 5.13.13, Section 5.17.1 through 5.17.2, Section 5.18.1 through 5.18.5, Section 9.0 through 9.1, and Section 10.0 through 10.4 of the PWS.
CLIN 0013, Option Items XX13, - Off-Site Emergency Repair Services (SubContractor): - The Contractor shall comply with the requirements specified in Section 5.1.1.17 through 5.1.1.17.2, Section 5.4.1 through through5.4.10, and Section 5.13.8 through 5.13.11 of the PWS.
CLIN 0014, Option Items XX14, - Travel and Per Diem: - The Contractor shall travel in support of the TH-57 program requirements specified in Section 5.20.1.8, Section 5.20.5, Section 5.20.7 through 5.20.7.1.4, Section
5.20.7.1, Section 8.0, and Section 10.0 through 10.4 of the PWS. The Contractor will be reimbursed for travel required in order to perform maintenance outside of a 50 mile radius IAW FAR 31.2, Section H-3, and Section 8.0 of Attachment 1, PWS.
CLIN 0015, Option Items XX15, - Technical Data IAW Exhibit A: - The Contractor shall comply with the requirements specified in Section 6.0 through 6.4, and Section 10.0 through 10.4 of the PWS.
CLIN 0016, Option Items XX16, - Performance Measurement Framework Incentive, - The Contractor shall comply with the requirements specified in Section 5.0, Section 5.5 through 5.5.2, Section 5.7.1 through 5.7.1.1, Section 5.8 through 5.8.2, and Section 5.14.8.1 through 5.14.8.1.1 of the PWS.
CLIN 0017, Option Items XX17, - Modifications - Production: - The Contractor shall comply with the requirements specified in Section 5.1.4.4 through 5.1.4.4.2, and Section 5.18.1 through 5.18.3, Section 5.18.5 through 5.18.6, and
CLIN 0018, Option Items XX18, - Weekend/Holiday Flight Operations Per Day: - The Contractor shall comply with the requirements specified in Section 5.1 through 5.1.1.6, Section 5.1.1.8 through 5.1.1.14, Section 5.1.1.18 through
5.1.1.19, Section 5.2 through 5.2.4, Section 5.2.6 through 5.2.8.2, Section 5.3.1.3.2 through 5.3.1.5, Section 5.6 through 5.6.5.1.3, Section 5.6.5.7 through 5.6.5.8, Section 5.6.6.11 through 5.6.6.12.3, Section 5.7 through 5.7.6.20, Section 5.7.7 through 5.7.7.8, Section 5.10 through 5.11.3, Section 5.11.5 through 5.11.13, Section 5.12.5 through
5.12.5.3, Section 5.12.6 through 5.13.11, Section 5.14 through 5.14.3, Section 5.14.5 through 5.14.6.3, Section
5.14.6.5 through 5.14.20.4, Section 5.15 through 5.16.4, Section 5.17.3, Section 5.18.2 through 5.18.2.4, Section
5.18.6, Section 5.20 through 5.20.1.9, Section 5.20.1.11, Section 5.20.2 through 5.20.3, Section 7.10 through 7.12, and Section 10.0 through 10.4 of the PWS. For each PoP, the Government may exercise one or more of the SLINs associated with CLIN XX18.
CLIN 0019, – Transition Phase-In: - The Contractor shall comply with the requirements specified in Section 5.14.1 of the PWS.
C-3
ORDER OF PRECEDENCE
For the purposes of FAR clause 52.215-8, ―Order of Precedence – Uniform Contract Format,‖ any portion of the contractor’s proposal that is incorporated into the contract by reference shall be considered a ―Specification;‖ thus, the contractor’s proposal will have a lower precedence than the PWS, which is an ―Attachment.‖
C-4
TRANSITION
The Contractor shall perform the TRANSITION (Phase-In/Phase-Out) requirements specified in Section 5.14.1 and
5.14.2 of the PWS. For Transition Phase-In, the Contractor shall be granted access on a non-interference basis during the Transition period to all sites, facilities, and non-proprietary technical documents and will be allowed to observe the incumbent in the performance of all required maintenance and support. A Transition Phase-In period
IAW Section 5.14.1 of the PWS shall commence after award, on the first day of the following month and will have a one month period of performance. The Base Full Performance Period shall commence immediately following the
Transition period. Responsibility for full performance in accordance with the PWS will begin on the first day of the
Base Full Performance Period. The Contractor shall comply with the Transition Phase-Out procedures IAW Section
5.14.2 of the PWS no less than thirty days before completion or termination of this Contract.
Section D - Packaging and Marking
D-1
MARKING OF DATA DELIVERABLES
Administrative and Technical Data Deliverables shall not be marked Proprietary unless otherwise directed per the
Contract Data Requirements List (CDRL) DD Form 1423 instructions.
CLAUSES INCORPORATED BY FULL TEXT
5252.223-9502 HAZARDOUS MATERIAL (NAVAIR)(APR 2009) -
(a) Packaging, Packing, Marking, Labeling and Certification of Hazardous materials for shipment by any mode or combination of transportation modes shall be prepared (properly classed, described, packaged, marked, labeled, transport vehicle placarded, etc.) for shipment in acco
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .