CDRLs A001-A041_2012.06.06.pdf

PDF 2 MB Posted

Attached to
TH-57 Contractor Logistics Support Federal contract opportunity
Solicitation number
N00019-10-R-0097
Issued by
Department of the Navy Naval Air Systems Command

About this file

Exhibit A CDRLs (AMD 0002)

View the file

Other files for this federal contract opportunity

Other files attached to TH-57 Contractor Logistics Support, newest first.
File Type Posted
Amend_0005_21_Feb_13.doc DOC document
N00019-10-R-0097-0004.pdf PDF
N00019-10-R-0097AMEND0003.pdf PDF
N00019-10-R-0097AMEND0002.pdf PDF
cba 29 Apr 12.PDF PDF
Amendment 1 Extension.pdf PDF
FRFP Q A 7 June 12 Posted.pdf PDF
FRFP Q A 22 May 12 Posted.pdf PDF
Post RFP Release Q A 5-10-12.docx DOCX document
Attachment 9 Applicable Documents.xlsx XLSX spreadsheet
Attachment 8 Government Furnished Property List.xlsx XLSX spreadsheet
Attachment 10 CBA.pdf PDF
Attachment L-5 PA-02 PRIME CONTRACTOR COST SUMMARY.xls XLS spreadsheet
Attachment L-6 PA-03 SUBCONTRACTOR COST SUMMARY.xls XLS spreadsheet
Attachment 4 Supplement CDRL Submission Rangernet Inst.docx DOCX document
N00019-10-R-0097 Final RFP.pdf PDF
Attachment L-4 PA-01 Price Exhibit B.xlsx XLSX spreadsheet
Attachment 11 AWD.pdf PDF
Attachment 13 Daily Aircraft Status Report.xlsx XLSX spreadsheet
CDRLs A001-A041.docx DOCX document
Attachment L-3 PP02 Summary of Relevant Past Performance Contract Data.xls XLS spreadsheet
Attachment 3 Supplement to Exhibits Distribution Statments n Technical Documents.doc DOC document
Attachment 7 PWS Enclosure 1 Real Property.xlsx XLSX spreadsheet
Attachment 1 TH-57 PWS.pdf PDF
Attachment L-2 PP01 - Past perf Questionnaire.doc DOC document
Attachment 2 Supplement to the Exhibits Explanation of CDRL.doc DOC document
One-on-One Q A Posted.docx DOCX document
Sign-in Sheet.pdf PDF
TH-57 Pre-Solicitation Conf_20 Mar 2012.pptx PPTX presentation
Attachment 10 TH-57 NAS Whiting Field FL 2009 - 2010 CBA.pdf PDF
Attachment 4 Supplement CDRL Submission Rangernet Inst.docx DOCX document
Attachment L-5 PA-02 PRIME CONTRACTOR COST SUMMARY.xls XLS spreadsheet
Attachment 7_PWS Enclosure 1_Real Property.xlsx XLSX spreadsheet
Attachment 3 Supplement to Exhibits Distribution Statments n Technical Documents.doc DOC document
CDRLs A001-A041.docx DOCX document
Attachment L-2 PP01 - Past perf Questionnaire.doc DOC document
RFP 8 Feb 12.pdf PDF
Attachment 1 TH-57 PWS.pdf PDF
Attachment L-6 PA-03 SUBCONTRACTOR COST SUMMARY.xls XLS spreadsheet
Attachment L-3 PP02 Summary of Relevant Past Performance Contract Data.xls XLS spreadsheet
Attachment L-1 EXP-01 Attachment Contractor Corporate Experience Tables.xlsx XLSX spreadsheet
Attachment 9_PWS Enclosure 3_Applicable Documents.xlsx XLSX spreadsheet
Attachment L-7 - Relevant Contract Table.xlsx XLSX spreadsheet
Attachment L-4 PA-01 Price Exhibit B.xlsx XLSX spreadsheet
DRAFT TH57 Enclosure 3 Applicable Documents.xlsx XLSX spreadsheet
DRAFT Section C Description and Specification or Work Statement.docx DOCX document
DRAFT SECTION H Special Contract Requirements.docx DOCX document
DRAFT SECTION B Supplies or Services and Prices.xlsx XLSX spreadsheet
DRAFT Section B2 - Pricing Notes.docx DOCX document
TH-57 Draft PWS dated 6-2-11 .docx DOCX document
Show all 50

TH-57 Contractor Logistics Support has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TH-57 CLS N00019-10-R-0097

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001 TECHNICAL REPORT - STUDY/SERVICES OVER AND ABOVE WORK REQUEST (OAWR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B (SEE BLK 16) SEE BLK 16 DCMA

7. DD 250 REQ

9. DIST

STATEMENT

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD (SEE BLK 16) REQUIRED ASREQ ASREQ

a. ADDRESSEE

b. COPIES

8. APP CODE

C (SEE BLK 16)

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.

Draft

Final

A (SEE BLK 16) 0 ASREQ Reg Repro

16. REMARKS DCMA 1

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA

REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.

BLOCK 4: TAILOR DID CONTENT TO INCLUDE TH-57 O-LEVEL, I-LEVEL & D-LEVEL REPAIR.

SUPPLEMENTAL INSTRUCTIONS LISTED BELOW.

THE DATA FOR EACH AIRCRAFT TYPE SHOULD BE REPORTED WITHIN A SEPARATE MS EXCEL

FILE WITH COLUMN HEADINGS AS THE FOLLOWING:

1. DATE OF P&E REPORT

2. ASSIGNED OAWR NUMBER

3. AIRCRAFT PROGRAM IDENTIFICATION

4. BUNO NUMBER

5. CONTRACT NUMBER

6. CLIN/ACRN

7. T/M/S

8. SITE

9. NATIONAL STOCK NUMBER (NSN), IF APPLICABLE

10. NOMENCLATURE (NOUN)

11. SERIAL NUMBER, IF APPLICABLE

12. PART NUMBER

13. ITEMS RETURNED TO THE VENDOR(S) FOR REPAIR OR REPLACEMENT

14. QTY

15. COVERED UNDER WARRANTY DURING THIS PERIOD (COMPLETE

DOCUMENTATION ON WARRANTY LIST CDRL A010)

16. CONTRACTOR’S NAME

17. CONTRACTOR’S CAGE CODE

18. CONTRACTOR’S DODAAC

19. DELIVERY DATE (DATE OF DD250)

20. PROJECTED SHIPPING DATE (DATE ITEM RETURNED TO VENDOR)

DESTINATION

21. PROJECTED IN-SERVICE DATES (DATE WHEN ITEM RETURNED TO FIELD)

22. DATE RECEIVED BY REPAIR FACILITY

23. GOV’T REPAIR AUTHORIZATION DATE

24. TOTAL DISASSEMBLY MANHOURS

25. CALCULATION OF TOTAL ESTIMATED (MANHOURS X UNIT COST) COST

26. CALCULATION OF TOTAL ACTUAL (MANHOURS X UNIT COST) COST

SEE PAGE 2 - CDRL A001,OVER AND ABOVE WORK REQUEST (OAWR)-PAGE 1:2 (CONT’D)

SEE BLK 16

15. TOTAL ▬▬▬▬► 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

CDR David Padula, PMA-273F TH-57 IPTL

Alja Musarro, PMA-273A Deputy Program Manager

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TH-57 CLS N00019-10-R-0097

16. REMARKS

CDRL A001 OVER AND ABOVE WORK REQUEST (OAWR) PAGE 2:2 (CONT’D)

27. ESTIMATED UNIT PRICE

28. ESTIMATED EXTENDED PRICE

29. ESTIMATED MANHOURS

30. ESTIMATED DURATION IN NUMBER OF DAYS NECESSARY TO EFFECT REPAIRS

31. SPECIAL REQUIREMENTS NECESSARY (FIXTURE REQUIRED, ETC.)

32. LEVEL OF MAINTENANCE REQUIRED FOR REPAIR (0-LEVEL, I-LEVEL & D-LEVEL)

33. PART(S) REQUIRED

A. NATIONAL STOCK NUMBER (NSN), IF APPLICABLE

B. NOMENCLATURE (NOUN)

C. SERIAL NUMBER, IF APPLICABLE

D. PART NUMBER

E. QTY REQUIRED

F. SUB-CONTRACTOR’S NAME

G. SUB-CONTRACTOR’S CAGE CODE

H. SUB-CONTRACTOR’S DODAAC

34. REQUIRED REPAIR ACTIONS

35. ADDITIONALLY, FOR CORROSION, REPORT TYPE AND SEVERITY DEFECTS DISCOVERED DURING ACI INCLUDING:

i.COMPLETE DESCRIPTION OF DEFECT INCLUDING SIZE, SEVERITY, AND CRITICALITY, MAJOR OR MINOR.

1. ACCURATE LOCATION OF THE DEFECT.

2. DESCRIPTION OF CORRECTIVE ACTION TAKEN.

3. ACI TASK NUMBER WHEN DEFECT DISCOVERED.

4. DESCRIBE ANY SPECIAL WORK REQUESTED BY THE SERVICE, ANY DIFFICULTIES ENCOUNTERED WHILE

PERFORMING THE WORK, AND THE NUMBER OF MANHOURS TO COMPLETE.

36. REASON FOR RETURN /MALFUNCTION CODE

37. EXTENT OF THE REPAIRS REQUIRED, INCLUDING MAJOR COMPONENTS TO BE REPAIRED OR REPLACED AND STRUCTURAL REPAIR REQUIRED

38. PARTS AND/OR MATERIAL REQUIRED FOR BY PART NUMBER NOMENCLATURE AND PRICE

39. ESTIMATED DELIVERY DATE FOR MATERIAL/PARTS

40. ACTUAL UNIT PRICE (AT COMPLETION OF REPAIR)

41. ACTUAL EXTENDED PRICE (AT COMPLETION OF REPAIR)

42. TOTAL ACTUAL DURATION IN NUMBER OF DAYS NECESSARY TO EFFECT REPAIRS

BLOCK 5: PWS PARAS. 5.1.1.7, 5.1.4.4.2, 5.1.5.1, 5.4.8.2, 5.4.8.3, 5.18.2.1.1

BLOCK 7: INSPECTION AND ACCEPTANCE REQUIREMENTS ARE LISTED IN DFARS 252.217-7028.

BLOCK 8: REFER TO SECTION E OF THIS CONTRACT FOR TERMS AND CONDITIONS FOR INSPECTIONS AND ACCEPTANCE OF ADMINISTRATIVE TECHNICAL DATA AND INFORMATION. CONTRACTOR HAS 10 CALENDAR DAYS, FROM RECEIPT OF THE GOVERNMENT, FOR RE-SUBMITTAL IF REJECTED.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF

CONTRACTOR REPORTS.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA

SUBMISSION RANGERNET INSTRUCTIONS”.

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 2 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TH-57 CLS N00019-10-R-0097

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 TECHNICAL REPORT - STUDY/SERVICES AIRCRAFT CONDITION INSPECTION (ACI) REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B (SEE BLK 16) PWS PARA. 5.1.1.7, 5.1.1.7.6 PMA 273 TH-57 IPTL

9. DIST

STATEMENT

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

C (SEE BLK 16)

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.

Draft

Final

N/A N/A SEE BLK 16 Reg Repro

PMA-273 TH-57 IPTL 1

SEE ATTACHMENT 2 “EXPLANATION OF CDRLS” FOR ADDITIONAL INFORMATION FOR CDRL

INTERPRETATION

BLOCK 4: TAILOR DID SO THE CONTRACTOR SHALL DELIVER A REPORT THAT MEETS THE

INTENT OF OPNAVINST 4790.2.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO

THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA

DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY.

REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.

BLOCKS 12 & 13: THE CONTRACTOR SHALL DELIVER FIRST & SUBSEQUENT SUBMISSIONS

WITHIN 5 WORKING DAYS AFTER COMPLETION OF ACI.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS:

CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET

INSTRUCTIONS”.

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP _____ TM ____ OTHER MFFP

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TH-57 CLS N00019-10-R-0097

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003 CORROSION PREVENTION AND CONTROL PLAN CORROSION CONTROL PROGRAM

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MFFP-81403 (SEE BLOCK 16) PWS PARA. 5.1.1.12 PMA-273 TH-57 AIR 4.1.1.9

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD REQUIRED ANNLY 30 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE

C (SEE BLK 16)

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBM. Draft Final

A (SEE BLK 16) N/A SEE BLK 16 Reg Repro

16. REMARKS PMA-273 TH-57 AIR-4.1.1.9 1

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA

REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.

BLOCK 4: TAILOR DID PARAGRAPH 7.1 TO REMOVE CANCELLED MIL-STD-1568 AS

GUIDANCE AND REFER TO SUPPLEMENTAL INSTRUCTIONS FROM CORROSION

PREVENTION AND CONTROL, PLANNING GUIDEBOOK SPIRAL 3, DTD SEPTEMBER 2007

(LOCATED ON HTTP://WWW.CORRDEFENSE.ORG). SECTION 2.2.4 & APPENDIX C OF THE

CPC GUIDEBOOK PROVIDES FOR CONTENTS OF A CORROSION PREVENTION AND

CONTROL PLAN.

BLOCK 8: REFER TO SECTION E OF THIS CONTRACT FOR TERMS AND CONDITIONS FOR

INSPECTIONS AND ACCEPTANCE OF ADMINISTRATIVE TECHNICAL DATA AND INFORMATION.

THE CONTRACTOR HAS 30 CALENDAR DAYS FROM RECEIPT FROM THE GOVERNMENT,

FOR RE-SUBMITTAL, IF REJECTED.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO

THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA

DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY.

REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.

BLOCK 13: THE CONTRACTOR SHALL DELIVER SUBSEQUENT SUBMISSIONS AT THE END

OF FY + 5 CALENDAR DAYS AND TO COMPLY WITH CHANGES TO THE CONTRACT OR

MAINTENANCE MANUALS.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE

EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET

CNATRA N4 1

15. TOTAL ▬▬▬▬► 2

http://www.assistdocs.com/search/document_details.cfm?ident_number=205885&StartRow=101&PaginatorPageNumber=3&title=CORROSION&status%5Factive=on&search%5Fmethod=BASIC http://www.corrdefense.org/

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TH-57 CLS N00019-10-R-0097

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A004 TECHNICAL REPORT - STUDY/SERVICES MONTHLY MAINTENANCE PLAN (MMP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B (SEE BLK 16) PWS PARAS. 5.1.1.19, 5.2.3 PMA-273 TH-57 IPTL

9. DIST

STATEMENT

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED MTHLY 45 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE

C (SEE BLK 16)

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.

Draft

Final

N/A 0 EOM + 5 DAYS Reg Repro

BLOCK 4: TAILOR DID TO INCLUDE SUPPLEMENTAL INSTRUCTIONS LISTED BELOW.

THE CONTRACTOR SHALL PROVIDE A MONTHLY MAINTENANCE PLAN IAW CNAFINST 4790.2,

INCLUDING A LIST OF PROJECTED SIGNIFICANT MAINTENANCE ACTIONS AND REQUIREMENTS

FOR THE NEXT 90 DAYS IAW ACCEPTABLE COMMERCIAL OPERATING PROCEDURES MAY BE

IMPLEMENTED IF APPROVED BY THE ACO AND NOT IN DIRECT CONFLICT WITH CNAFINST

4790.2 SERIES. ALL CONFLICTS BETWEEN APPLICABLE PUBLICATIONS AND INSTRUCTIONS,

AND ALL EXCEPTIONS, DEVIATIONS AND WAIVERS SHALL BE ADDRESSED TO THE CNATRA

ACO VIA THE LOCAL CNATRA DETACHMENT (DET) OFFICER IN CHARGE (OIC) FOR

RESOLUTION. THE MMP CONTENT INCLUDES, BUT IS NOT LIMITED TO:

A. REPLACEMENT OF LIFE LIMITED ITEMS BY DD/MM/YYYY (PROJECTED FOR 90

CALENDAR DAYS FROM DATE OF REPORT)

B. INSPECTION SCHEDULES

C. STRIP, REPAINT AND CORROSION X SCHEDULES

D. HIGH FAILURE ITEMS

E. CALIBRATION REQUIREMENTS

F. WEIGHT AND BALANCE INFO

G. PERSONNEL REQUALIFICATIONS

H. PERSONNEL CERTIFICATIONS

I. EQUIPMENT AND SUPPORT EQUIPMENT LICENSE RENEWAL

J. ON-SITE CONTRACTOR PERSONNEL ACTUAL HEAD COUNT

K. CONTRACTOR MANANGEMENT CONTACT INFORMATION

L. SIGNATURE AUTHORITIES

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO

THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA

DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY.

REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS:

15. TOTAL ▬▬▬▬►

http://assist.daps.dla.mil/quicksearch/basic_profile.cfm?ident_number=204915

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER SESS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A005 TECHNICAL REPORT - STUDY/SERVICES STRICKEN AIRCRAFT RECLAMATION AND DISPOSAL

PROGRAM REPORT (SARDIP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B (SEE BLK 16) PWS PARA. 5.1.4.3.5 PMA-273 TH-57 IPTL

9. DIST

STATEMENT

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD ASREQ SEE BLK 16

a. ADDRESSEE

b. COPIES

C (SEE BLK 16)

Draft

Final

A (SEE BLK 16) N/A SEE BLK 16 Reg Repro

16. REMARKS PMA-273 TH-57 IPTL 1

BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE. THE REPORT SHALL INCLUDE PARTS

RECOMMENDED TO REMOVE PRIOR TO AN AIRCRAFT BEING SARDIP. THE CONTENT INCLUDES,

BUT IS NOT LIMITED TO:

1. AIRCRAFT BUNO

2. PART NUMBER

3. NOMENCLATURE

4. PART UNIT PRICE

BLOCK 8: REFER TO SECTION E OF THIS CONTRACT FOR TERMS AND CONDITIONS FOR

INSPECTIONS AND ACCEPTANCE OF ADMINISTRATIVE TECHNICAL DATA AND INFORMATION.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO

THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA

DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY.

REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.

BLOCKS 12 &13: THE CONTRACTOR SHALL DELIVER FIRST AND SUBSEQUENT SUBMISSIONS

WITHIN 10 CALENDAR DAYS UPON GOVERNMENT REQUEST.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TH-57 CLS N00019-10-R-0097

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A006 TECHNICAL REPORT - STUDY/SERVICES PLANNING AND ESTIMATE (P&E) REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B (SEE BLK 16) SEE BLK 16 PMA-273 TH-57 IPTL

9. DIST

STATEMENT

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

C (SEE BLK 16)

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.

Draft

Final

N/A 0 SEE BLK 16 Reg Repro

16. REMARKS

SEE BLK 16

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA

REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.

BLOCK 4: TAILOR DID CONTENT TO INCLUDE TH-57 O-LEVEL, I-LEVEL & D-LEVEL REPAIR.

SUPPLEMENTAL INSTRUCTIONS LISTED BELOW.

THE DATA FOR EACH AIRCRAFT TYPE SHALL BE REPORTED WITHIN A SEPARATE MS EXCEL FILE

WITH COLUMN HEADINGS AS THE FOLLOWING:

43. DATE OF P&E REPORT

44. ASSIGNED P&E NUMBER

45. AIRCRAFT PROGRAM IDENTIFICATION

46. BUNO NUMBER

47. CONTRACT NUMBER

48. CLIN/ACRN

49. T/M/S

50. SITE

51. NATIONAL STOCK NUMBER (NSN), IF APPLICABLE

52. NOMENCLATURE (NOUN)

53. SERIAL NUMBER, IF APPLICABLE

54. PART NUMBER

55. ITEMS RETURNED TO THE VENDOR(S) FOR REPAIR OR REPLACEMENT

56. QTY

57. COVERED UNDER WARRANTY DURING THIS PERIOD (COMPLETE

DOCUMENTATION ON WARRANTY LIST CDRL A010)

58. CONTRACTOR’S NAME

59. CONTRACTOR’S CAGE CODE

60. CONTRACTOR’S DODAAC

61. DELIVERY DATE (DATE OF DD250)

62. PROJECTED SHIPPING DATE (DATE ITEM RETURNED TO VENDOR)

DESTINATION

63. PROJECTED IN-SERVICE DATES (DATE WHEN ITEM RETURNED TO FIELD)

64. GOV’T REPAIR AUTHORIZATION DATE

65. ESTIMATED WORK BEGIN DATE

66. ESTIMATED WORK END DATE

67. TOTAL DISASSEMBLY MANHOURS

68. CALCULATION OF TOTAL ESTIMATED (MANHOURS X UNIT COST) COST

69. CALCULATION OF TOTAL ACTUAL (MANHOURS X UNIT COST) COST

SEE PAGE 2 - CDRL A006 PLANNING AND ESTIMATE (P&E) REPORT-PAGE 1:2 (CONT’D)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER MISC

CDRL A006 PLANNING AND ESTIMATE (P&E) REPORT PAGE 2:2 (CONT’D)

70. ESTIMATED UNIT PRICE

71. ESTIMATED EXTENDED PRICE

72. ESTIMATED MANHOURS

73. ESTIMATED DURATION IN NUMBER OF DAYS NECESSARY TO EFFECT REPAIRS

74. SPECIAL REQUIREMENTS NECESSARY (FIXTURE REQUIRED, ETC.)

75. LEVEL OF MAINTENANCE REQUIRED FOR REPAIR (O-LEVEL, I-LEVEL & D-LEVEL)

76. PART(S) REQUIRED

I. NATIONAL STOCK NUMBER (NSN), IF APPLICABLE

J. NOMENCLATURE (NOUN)

K. SERIAL NUMBER, IF APPLICABLE

L. PART NUMBER

M. QTY REQUIRED

N. SUB-CONTRACTOR’S NAME

O. SUB-CONTRACTOR’S CAGE CODE

P. SUB-CONTRACTOR’S DODAAC

77. REQUIRED REPAIR ACTIONS

78. ADDITIONALLY, FOR CORROSION, REPORT TYPE AND SEVERITY DEFECTS DISCOVERED DURING ACI INCLUDE:

i.COMPLETE DESCRIPTION OF DEFECT INCLUDING SIZE, SEVERITY, AND CRITICALITY, MAJOR OR MINOR.

1. ACCURATE LOCATION OF THE DEFECT.

2. DESCRIPTION OF CORRECTIVE ACTION TAKEN.

3. ACI TASK NUMBER WHEN DEFECT DISCOVERED.

4. DESCRIBE ANY SPECIAL WORK REQUESTED BY THE SERVICE, ANY DIFFICULTIES ENCOUNTERED WHILE

PERFORMING THE WORK, AND THE NUMBER OF MANHOURS TO COMPLETE.

79. EXTENT OF THE REPAIRS REQUIRED, INCLUDING MAJOR COMPONENTS TO BE REPAIRED OR REPLACED AND STRUCTURAL REPAIR REQUIRED

80. TYPE OF PRESERVATION REQUIREMENTS ANTICIPATED, IF ANY

81. PARTS AND/OR MATERIAL REQUIRED FOR BY PART NUMBER NOMENCLATURE AND PRICE

82. ESTIMATED DELIVERY DATE FOR MATERIAL/PARTS

83. ACTUAL UNIT PRICE (AT COMPLETION OF REPAIR)

84. ACTUAL EXTENDED PRICE (AT COMPLETION OF REPAIR)

85. TOTAL ACTUAL DURATION IN NUMBER OF DAYS NECESSARY TO EFFECT REPAIRS

BLOCK 5: PWS PARAS. 5.1.4.4.2, 5.1.5.1, 5.4.8.2, 5.4.8.3, 5.18.2.1.1

BLOCK 8: CONTRACTOR HAS 15CALENDAR DAYS FROM RECEIPT OF THE GOVERNMENT, FOR RE-SUBMITTAL, IF REJECTED.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF

BLOCKS 12 & 13: THE CONTRACTOR SHALL DELIVER FIRST AND SUBSEQUENT SUBMISSIONS WITHIN 10 CALENDAR DAYS UPON GOVERNMENT REQUEST.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER SESS

A007

MAINTENANCE TEST AND SUPPORT EQUIPMENT

REQUIREMENTS LIST CONTRACTOR PROPOSED UNIQUE SUPPORT

EQUIPMENT LIST

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80294B (SEE BLK 16) PWS PARA. 5.2.8 CNATRA N4

9. DIST

STATEMENT

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX REQUIRED ASREQ SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

C (SEE BLK 16)

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.

Draft

Final

A (SEE BLK 16) N/A SEE BLK 16 Reg Repro

16. REMARKS SEE BLK 16

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA

REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.

BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE. TAILOR DID CONTENT TO ONLY INCLUDE A

REPORT OF THE FOLLOWING SUPPORT EQUIPMENT (SE):

1. SUBJECT

2. REFERENCES

3. ENCLOSURES

4. PURPOSE

5. BACKGROUND

6. MATERIAL REQUIRED (QTY, P/N, CAGE, NOMENCLATURE, NSN)

7. LIST OF SOURCE(S) & COST

8. ASSEMBLY INSTRUCTIONS (ATTACH DRAWINGS AND/OR PHOTOS)

9. PART NO. IDENTIFICATION

10. MAINTENANCE REQUIREMENTS

11. PUBLICATIONS

12. RELATED INFORMATION

13. DESCRIPTION OF MANPOWER REQUIRED

14. REPORTED BY: NAME /POSITION /SITE (INCLUDING SIGNATURE)

15. MAINTENANCE CONTRACTOR PMO: NAME (INCLUDING SIGNATURE)

16. DATE OF APPROVAL BY GOVERNMENT (IF NONE, LEAVE BLANK)

BLOCK 8: CONTRACTOR HAS 10 CALENDAR DAYS FROM RECEIPT OF THE GOVERNMENT, FOR

RE-SUBMITTAL, IF REJECTED. THE APPROVAL AUTHORITY IS BY THE ACO.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO

THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA

DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY.

REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.

BLOCKS 12 & 13: INITIAL DRAFT SHALL BE DELIVERED WITH THE PROPOSAL. THE

CONTRACTOR SHALL PROVIDE FINAL LIST 30 CALENDAR DAYS AFTER GOVERNMENT REVIEW.

UPDATES SHALL BE DELIVERED AS REQUIRED.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE

http://www.assistdocs.com/search/document_details.cfm?ident_number=204812&StartRow=1&PaginatorPageNumber=1&title=SUPPORT%20EQUIPMENT&status%5Factive=on&search%5Fmethod=BASIC

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER ILSS

A008 DEPOT MAINTENANCE STUDY CONTRACTORS COMPONENT REPAIR LISTING CHANGE

REQUEST REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ILSS-80739 (SEE BLK 16) PWS PARA. 5.3.1.4 PMA-273 TH-57 AIR – 6.6.2.9

9. DIST

STATEMENT

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX REQUIRED SEMI ANNLY 60 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE

C (SEE BLK 16)

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.

Draft

Final

A (SEE BLK 16) 0 SEE BLK 16 Reg Repro

BLOCK 4: TAILOR DID CONTENT TO INCLUDE A REPORT OF THE FOLLOWING INFORMATION

RELATIVE TO CHANGES OF THE CONTRACTORS COMPONENT REPAIR REPORT. DATA SHALL

BE IN AN MS EXCEL FILE WITH DATA SHOWN IN COLUMN FORMAT.

1. SUBJECT

2. DESCRIPTION OF CHANGE BEING REQUESTED (“NTE”, “REMOVAL” OR “COMPONENT

DATA”)

3. DESCRIPTION OF ASSEMBLY (PART NOMENCLATURE/NAME)

4. PART NUMBER AND/OR NSN

5. REFERENCES DOCUMENTS OR REPAIR MANUAL

6. ENCLOSURES AS REQUIRED

7. PURPOSE

8. BACKGROUND AND JUSTIFICATION FOR CHANGE (I.E. NEW REQUIREMENTS)

9. PRIOR (NTE) MAN HOURS APPROVED

10. DATE OF LAST NTE APPROVAL

11. NEW NTE HOURS REQUESTED

12. AVERAGE OF ACTUAL REPAIR TIME – FROM CONTRACT AWARD (MAN HOURS)

13. AVERAGE ACTUAL COSTS FOR REPAIR – FROM CONTRACT AWARD

14. RELATED INFORMATION

15. DESCRIPTION OF MANPOWER REQUIRED

16. REPORTED BY: NAME /POSITION /SITE (INCLUDING SIGNATURE)

17. MAINTENANCE CONTRACTOR PMO: NAME (INCLUDING SIGNATURE)

BLOCK 8: CONTRACTOR HAS 10 CALENDAR DAYS FROM RECEIPT OF THE GOVERNMENT, FOR RE-

SUBMITTAL, IF REJECTED.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO

THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA

DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER

TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.

BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE AT THE END OF THE SECOND QUARTER +

15 CALENDAR DAYS AND END OF THE FOURTH QUARTER + 15 CALENDAR DAYS

RESPECTFULLY.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS:

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Page

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER MGMT

A009 REPAIR/MODIFICATION/OVERHAUL STATUS REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-80933 (SEE BLK 16) PWS PARA. 5.4.7 PMA-273 TH-57 AIR-4.1.1.9

9. DIST

STATEMENT

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED MTHLY SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

C (SEE BLK 16)

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.

Draft

Final

16. REMARKS SEE BLK 16

BLOCK 4: TAILOR DID PARAGRAPH 10.2 TO INCLUDE SUPPLEMENTAL INSTRUCTIONS. THIS

REPORT TO INCLUDE ONLY APPLICABLE AIRCRAFT AND REPORTED SEPARATELY BY

AIRCRAFT TYPE, EACH WITH A SEPARATE MS EXCEL FILE CONTAINING DIFFERENT

SPREADSHEET(S) FOR EACH COMPONENT (E.G. AIRFRAMES, ROTORBLADES, AND ENGINES).

NOTE: ON SPREADSHEET, LEAVE COLUMN BLANK IF DATA TO BE PROVIDED IS NOT

APPLICABLE, DO NOT DELETE COLUMN. IF NEW REQUESTS ARE BEING MADE FOR ACO

APPROVAL, THEN BOLD FONT THE ROW.

REPORT SHALL INCLUDE AN ONGOING LISTING OF COMPONENTS TO BE REMOVED AND

PROVIDE THE FOLLOWING INFORMATION WITHIN A SPREADSHEET WITH COLUMNS HEADED

AS THE FOLLOWING:

1. DATE (ADDED TO THE REPORT)

2. COMPONENT END ITEM

3. SERIAL NUMBER

4. NUMBER OF HOURS ON COMPONENT SINCE NEW AND SINCE OVERHAUL

5. REASON FOR REMOVAL (REPAIR OR OVERHAUL)

6. FACILITY TO WHICH WILL/WAS SHIPPED FOR REPAIR OR OVERHAUL

7. ESTIMATED DATE EXPECTED TO COMPLETE REPAIR OR OVERHAUL

8. ESTIMATED PRICE OF EACH FOR THE OVERHAUL/REPAIR LABOR

9. ESTIMATED PRICE OF EACH FOR THE OVERHAUL/REPAIR MATERIAL

10. REQUESTING ACO APPROVAL FOR OVERHAUL (VERSUS REPAIR) – YES/NO

11. DATE CONTRACTOR REQUESTED FOR ACO APPROVAL FOR OVERHAUL (VERSUS

REPAIR)

12. DATE ACO APPROVAL FOR OVERHAUL (VERSUS REPAIR) – RECEIVED (OR

INDICATE “DENIED”)

13. ESTIMATED AND ACTUAL PRICE FOR OVERHAUL MATERIAL (ENGINES)

14. ESTIMATED AND ACTUAL PRICE FOR CYCLIC MATERIAL (ENGINES)

15. TECHNICAL DIRECTIVES INCORPORATED (10 CALENDAR DAYS AFTER RETURN OF

THE ENGINE FROM THE REPAIR OR OVERHAUL FACILITY)

16. TECHNICAL DIRECTIVES NOT INCORPORATED WITH REASON FOR NON-

INCORPORATION, IF APPLICABLE

17. ACTUAL DATE REMOVED (REMOVED FROM THE AIRCRAFT FOR REPAIR OR

OVERHAUL)

18. ACTUAL DATE SHIPPED TO REPAIR OR OVERHAUL FACILITY

19. ACTUAL START DATE FOR REPAIR OR OVERHAUL (DATE INDUCTED AT OVERHAUL

FACILITY)

CDRL A009 REPAIR/MODIFICATION/OVERHAUL STATUS REPORT Page 1:2 (CONT’D)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER MGMT

1. REMARKS

CDRL A009 REPAIR/MODIFICATION/OVERHAUL STATUS REPORT Page 2:2 (CONT’D)

20. ACTUAL DATE REPAIR OR OVERHAUL IS COMPLETE

21. ACTUAL DATE RECEIVED BACK ON-SITE

22. ACTUAL PRICE OF EACH FOR THE OVERHAUL/REPAIR LABOR

23. ACTUAL PRICE OF EACH FOR THE OVERHAUL/REPAIR MATERIAL

24. TOTAL ACTUAL PRICE TO OVERHAUL/REPAIR

25. FINANCIAL COMPLETION DATE

26. GENERAL MATERIAL CONDITION OF COMPONENT WHEN RECEIVED

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF

BLOCK 12: FIRST SUBMISSION SHALL BE 15 CALENDAR DAYS POST TRANSITION PERIOD.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TH-57 CLS N00019-10-R-0097

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A010 WARRANTY PERFORMANCE REPORT WARRANTY ITEMS REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81639 (SEE BLK 16) PWS PARAS. 5.4.10, 5.14.3 PMA 273 TH-57 IPTL

9. DIST

STATEMENT

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED MNTHLY SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

C (SEE BLK 16)

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.

Draft

Final

N/A 0 EOM + 5 DAYS Reg Repro

16. REMARKS

SEE BLK 16

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA

REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.

BLOCK 4: CONTRACTOR CONTENT ACCEPTABLE. THE REPORT SHALL CONTAIN WARRANTY

INFORMATION IN MS EXCEL SPREADSHEET WITH COLUMNS. SUPPLEMENTAL DATA PERTAINING TO

WARRANTED ITEMS SHALL BE REPORTED IN MS WORD FORMAT.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE

EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE

NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1

MARKING OF CONTRACTOR REPORTS.

BLOCK 12: FIRST SUBMISSION 30 DAYS POST TRANSITION PERIOD.

CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET INSTRUCTIONS”.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER QCIC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TH-57 CLS N00019-10-R-0097

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A011 QUALITY SYSTEM PLAN

QUALITY CONTROL PROGRAM PLAN UPDATES

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-QCIC-81379 (SEE BLK 16) PWS PARAS. 5.7.4, 5.7.5.1 CNATRA N4

9. DIST

STATEMENT

10. FREQUENCY

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

XX REQUIRED SEE BLK 16 SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

C (SEE BLK 16)

11. AS OF DATE

13. DATE OF

SUBSEQUENT SUBM. Draft Final

REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.

BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE. TAILOR DID AS FOLLOWS:

PARAGRAPHS 10.1, PREPARATION INSTRUCTIONS & 7.2, APPLICATION / INTERRELATIONSHIP.

THE QUALITY MANUAL SHALL BE IAW AEROSPACE STANDARD (AS) 9100B (NOT ISO 9001-

2001/ISO 9001-2008 AS STATED IN DID) AND SHALL BE IN EFFECT ON THE FIRST DAY OF

CONTRACT PERFORMANCE.

PARAGRAPH 10.4, CONTENT - INDICATE THE ORGANIZATIONAL TITLE OF PERSONS RESPONSIBLE FOR

ACCOMPLISHMENT OF ACTIVITIES AND TASKS, INSTEAD OF NAMES OF THE PERSON(S).

PARAGRAPH 10.4.1, QUALITY SYSTEM EFFECTIVENESS - INDICATE THE ORGANIZATIONAL TITLE OF PERSONS RESPONSIBLE FOR ACCOMPLISHMENT OF ACTIVITIES AND TASKS, INSTEAD OF NAMES OF

THE PERSON(S).

PARAGRAPH 10.5, THE CONTRACTORS CORPORATE QUALITY MANUAL MAY BE REFERRED TO IN THE

PLAN IN LIEU OF BEING ATTACHED.

BLOCK 8: CONTRACTOR HAS 10 CALENDAR DAYS FROM RECEIPT OF THE GOVERNMENT FOR RE-

SUBMITTAL, IF REJECTED.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE

EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE

NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1

MARKING OF CONTRACTOR REPORTS.

BLOCK 10: AS REQUIRED BUT NO LESS THAN ANNUALLY SUBMITTED.

BLOCKS 12 & 13: INITIAL DRAFT SHALL BE DELIVERED WITH PROPOSAL. CHANGES SHALL BE

INCORPORATED AND FINAL DELIVERED 30 CALENDAR DAYS AFTER CONTRACT AWARD. ALL UPDATES SHALL BE INCORPORATED INTO THE PROGRAM PLAN WITHIN 10 CALENDAR DAYS OF IDENTIFICATION.

IN ADDITION, THE CONTRACTOR SHALL ANNUALLY SUBMIT FOR REVIEW THE QUALITY CONTROL

PROGRAM PLAN TO THE GOVERNMENT AT THE END OF THE FY + 5 CALENDAR DAYS.

http://www.assistdocs.com/search/document_details.cfm?ident_number=205400&StartRow=1&PaginatorPageNumber=1&title=QUALITY&status%5Factive=on&search%5Fmethod=BASIC

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER QCIC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TH-57 CLS N00019-10-R-0097

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A012 QUALITY ASSESSMENT REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-QCIC-81187 (SEE BLK 16) PWS PARA. 5.7.5.2 PMA 273 TH-57 IPTL

9. DIST

STATEMENT

10. FREQUENCY

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

C (SEE BLK 16)

11. AS OF DATE

N/A N/A SEE BLK 16 Reg Repro

SEE BLK 16

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA

REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.

BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO

THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA

DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY.

REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.

BLOCKS 12 & 13: THE CONTRACTOR SHALL DELIVER REPORT WITHIN 15 CALENDAR DAYS UPON

GOVERNMENT REQUEST.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER STD2

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TH-57 CLS N00019-10-R-0097

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A013 PARTS MANAGEMENT PLAN OBSOLESCENCE PARTS MANAGEMENT PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SDMP-81748 (SEE BLK 16) PWS PARA. 5.10.1 PMA-273 TH-57 AIR 6.6.2.9

9. DIST

STATEMENT

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX REQUIRED QTRLY 90 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE

C (SEE BLK 16)

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.

Draft

Final

A ( SEE BLK 16) 0 EOQ + 5 DAYS Reg Repro

16. REMARKS SEE BLK 16

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS EXPLANATION OF CONTRACT DATA

BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE FOR THE PARTS MANAGEMENT PLAN. FOR

ADDITIONAL GUIDANCE REFER TO SOURCE DATA FOR DMSMS DID DI-SESS-81656 AND ASN

(RD&A) MEMO 27 JANUARY 2005.

TAILOR DID DI-SDMP-81748 REQUIREMENTS IN NUMBER 4.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO

THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA

http://www.assistdocs.com/search/document_details.cfm?ident_number=275859&StartRow=1&PaginatorPageNumber=1&doc%5Fid=DI%2DSDMP%2D81748&status%5Fall=ON&search%5Fmethod=BASIC http://www.assistdocs.com/search/document_details.cfm?ident_number=217821&StartRow=1&PaginatorPageNumber=1&doc%5Fid=DI%2DSESS%2D81656&status%5Fall=ON&search%5Fmethod=BASIC http://www.assistdocs.com/search/document_details.cfm?ident_number=275859&StartRow=1&PaginatorPageNumber=1&doc%5Fid=DI%2DSDMP%2D81748&status%5Fall=ON&search%5Fmethod=BASIC

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TH-57 CLS N00019-10-R-0097

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A014 SOURCE DATA FOR DMSMS OBSOLESCENCE PART RECOMMENDATIONS

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81656 (SEE BLK 16) PWS PARA. 5.10.2 PMA-273 TH-57 AIR-6.6.2.9

9. DIST

STATEMENT

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED MTHLY SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

C (SEE BLK 16)

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.

Draft

Final

N/A 0 EOM + 5 Reg Repro

16. REMARKS SEE BLK 16

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA

REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.

BLOCK 4: TAILOR DID TO INCLUDE INFORMATION PERTAINING TO OBSOLESCENCE ALERTS AND

RECOMMEND RESOLUTIONS OR PROVIDE ALTERNATIVES FOR CONSIDERING PLANNED

TECHNICAL REFRESH, AVAILABLE NEW TECHNOLOGIES AND PLANNED PROGRAM IN MS WORD

FORMAT. A REPORT OF FINDINGS PROVIDE REPORT DOCUMENTING CURRENT AVAILABILITY OF

PART(S), FORECASTS OF FUTURE AVAILABILITY, IDENTIFICATION OF SOURCING DEPTH, AND

IDENTIFY POSSIBLE SOLUTION OPTIONS FOR COMPONENTS, DATA SUCH AS RESOLUTIONS,

RECURRING COST, NON-RECURRING COST, COST AVOIDANCE, ALTERNATE SOURCES,

FORM/FIT/FUNCTION REPLACEMENTS, AND THE POTENTIAL FOR EXTENDED PRODUCTION AND

SUPPORTABILITY REQUIREMENTS.

DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY.

REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.

BLOCK 12: INITIAL DATA SUBMISSION SHALL BE 45 CALENDAR DAYS POST TRANSITION

PERIOD.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX15 A TDP ____ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TH-57 CLS N00019-10-R-0097

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A015 TECHNICAL REPORT – STUDY/SERVICES MANAGEMENT INFORMATION SYSTEM (MIS) REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .