Contract Data Requirements List DD Form 1423
View the file
Other files for this federal contract opportunity
Show all 50
TH-57 Contractor Logistics Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER MISC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A001 |
| TECHNICAL REPORT - STUDY/SERVICES |
| OVER AND ABOVE WORK REQUEST (OAWR) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MISC-80508B (SEE BLK 16) |
| SEE BLK 16 |
| DCMA |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD (SEE BLK 16) |
| REQUIRED |
| ASREQ |
| ASREQ |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C (SEE BLK 16) |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
A (SEE BLK 16)
| 0 |
| ASREQ |
| Reg |
| Repro |
| 16. REMARKS |
| DCMA |
SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.
BLOCK 4: TAILOR DID CONTENT TO INCLUDE TH-57 O-LEVEL, I-LEVEL & D-LEVEL REPAIR. SUPPLEMENTAL INSTRUCTIONS LISTED BELOW.
THE DATA FOR EACH AIRCRAFT TYPE SHOULD BE REPORTED WITHIN A SEPARATE MS EXCEL FILE WITH COLUMN HEADINGS AS THE FOLLOWING:
1. DATE OF P&E REPORT
2. ASSIGNED OAWR NUMBER
3. AIRCRAFT PROGRAM IDENTIFICATION
4. BUNO NUMBER
5. CONTRACT NUMBER
6. CLIN/ACRN
7. T/M/S
8. SITE
9. NATIONAL STOCK NUMBER (NSN), IF APPLICABLE
10. NOMENCLATURE (NOUN)
11. SERIAL NUMBER, IF APPLICABLE
12. PART NUMBER
13. ITEMS RETURNED TO THE VENDOR(S) FOR REPAIR OR REPLACEMENT
14. QTY
15. COVERED UNDER WARRANTY DURING THIS PERIOD (COMPLETE DOCUMENTATION ON WARRANTY LIST CDRL A010)
16. CONTRACTOR’S NAME
17. CONTRACTOR’S CAGE CODE
18. CONTRACTOR’S DODAAC
19. DELIVERY DATE (DATE OF DD250)
20. PROJECTED SHIPPING DATE (DATE ITEM RETURNED TO VENDOR) DESTINATION
21. PROJECTED IN-SERVICE DATES (DATE WHEN ITEM RETURNED TO FIELD)
22. DATE RECEIVED BY REPAIR FACILITY
23. GOV’T REPAIR AUTHORIZATION DATE
24. TOTAL DISASSEMBLY MANHOURS
25. CALCULATION OF TOTAL ESTIMATED (MANHOURS X UNIT COST) COST
26. CALCULATION OF TOTAL ACTUAL (MANHOURS X UNIT COST) COST
SEE PAGE 2 - CDRL A001,OVER AND ABOVE WORK REQUEST (OAWR)-PAGE 1:2 (CONT’D)
SEE BLK 16
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CDR David Padula, PMA-273F TH-57 IPTL
Alja Musarro, PMA-273A Deputy Program Manager
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 1 of 2 Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER MISC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
16. REMARKS
CDRL A001 OVER AND ABOVE WORK REQUEST (OAWR) PAGE 2:2 (CONT’D)
27. ESTIMATED UNIT PRICE
28. ESTIMATED EXTENDED PRICE
29. ESTIMATED MANHOURS
30. ESTIMATED DURATION IN NUMBER OF DAYS NECESSARY TO EFFECT REPAIRS
31. SPECIAL REQUIREMENTS NECESSARY (FIXTURE REQUIRED, ETC.)
32. LEVEL OF MAINTENANCE REQUIRED FOR REPAIR (0-LEVEL, I-LEVEL & D-LEVEL)
33. PART(S) REQUIRED
a. NATIONAL STOCK NUMBER (NSN), IF APPLICABLE
b. NOMENCLATURE (NOUN)
c. SERIAL NUMBER, IF APPLICABLE
d. PART NUMBER
e. QTY REQUIRED
f. SUB-CONTRACTOR’S NAME
g. SUB-CONTRACTOR’S CAGE CODE
h. SUB-CONTRACTOR’S DODAAC
34. REQUIRED REPAIR ACTIONS
35. ADDITIONALLY, FOR CORROSION, REPORT TYPE AND SEVERITY DEFECTS DISCOVERED DURING ACI INCLUDING:
i. COMPLETE DESCRIPTION OF DEFECT INCLUDING SIZE, SEVERITY, AND CRITICALITY, MAJOR OR MINOR.
1. ACCURATE LOCATION OF THE DEFECT.
2. DESCRIPTION OF CORRECTIVE ACTION TAKEN.
3. ACI TASK NUMBER WHEN DEFECT DISCOVERED.
4. DESCRIBE ANY SPECIAL WORK REQUESTED BY THE SERVICE, ANY DIFFICULTIES ENCOUNTERED WHILE PERFORMING THE WORK, AND THE NUMBER OF MANHOURS TO COMPLETE.
36. REASON FOR RETURN /MALFUNCTION CODE
37. EXTENT OF THE REPAIRS REQUIRED, INCLUDING MAJOR COMPONENTS TO BE REPAIRED OR REPLACED AND STRUCTURAL REPAIR REQUIRED
38. PARTS AND/OR MATERIAL REQUIRED FOR BY PART NUMBER NOMENCLATURE AND PRICE
39. ESTIMATED DELIVERY DATE FOR MATERIAL/PARTS
40. ACTUAL UNIT PRICE (AT COMPLETION OF REPAIR)
41. ACTUAL EXTENDED PRICE (AT COMPLETION OF REPAIR)
42. TOTAL ACTUAL DURATION IN NUMBER OF DAYS NECESSARY TO EFFECT REPAIRS
BLOCK 5: PWS PARAS. 5.1.1.7, 5.1.4.4.2, 5.1.5.1, 5.4.8.2, 5.4.8.3, 5.18.2.1.1
BLOCK 7: INSPECTION AND ACCEPTANCE REQUIREMENTS ARE LISTED IN DFARS 252.217-7028.
BLOCK 8: REFER TO SECTION E-2 OF THIS CONTRACT FOR TERMS AND CONDITIONS FOR INSPECTIONS AND ACCEPTANCE OF ADMINISTRATIVE TECHNICAL DATA AND INFORMATION. CONTRACTOR HAS 10 CALENDAR DAYS, FROM RECEIPT OF THE GOVERNMENT, FOR RE-SUBMITTAL IF REJECTED.
BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.
BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET INSTRUCTIONS”.
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER MISC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A002 |
| TECHNICAL REPORT - STUDY/SERVICES |
| AIRCRAFT CONDITION INSPECTION (ACI) REPORT |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MISC-80508B (SEE BLK 16) |
| PWS PARA. 5.1.1.7, 5.1.1.7.6 |
| PMA 273 TH-57 IPTL |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C (SEE BLK 16) |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
N/A
| N/A |
| SEE BLK 16 |
| Reg |
| Repro |
16. REMARKS
PMA-273 TH-57 IPTL
SEE ATTACHMENT 2 “EXPLANATION OF CDRLS” FOR ADDITIONAL INFORMATION FOR CDRL INTERPRETATION
BLOCK 4: TAILOR DID SO THE CONTRACTOR SHALL DELIVER A REPORT THAT MEETS THE INTENT OF OPNAVINST 4790.2.
BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.
BLOCKS 12 & 13: THE CONTRACTOR SHALL DELIVER FIRST & SUBSEQUENT SUBMISSIONS WITHIN 5 WORKING DAYS AFTER COMPLETION OF ACI.
BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET INSTRUCTIONS”.
SEE BLK 16
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CDR David Padula, PMA-273F TH-57 IPTL
Alja Musarro, PMA-273A Deputy Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP _____ |
| TM ____ |
| OTHER MFFP |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A003 |
| CORROSION PREVENTION AND CONTROL PLAN |
| CORROSION CONTROL PROGRAM |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MFFP-81403 (SEE BLOCK 16) |
| PWS PARA. 5.1.1.12 |
| PMA-273 TH-57 AIR 4.1.1.9 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| ANNLY |
| 30 DAC |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C (SEE BLK 16) |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
A (SEE BLK 16)
| N/A |
| SEE BLK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| PMA-273 TH-57 AIR-4.1.1.9 |
SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.
BLOCK 4: TAILOR DID PARAGRAPH 7.1 TO REMOVE CANCELLED MIL-STD-1568 AS GUIDANCE AND REFER TO SUPPLEMENTAL INSTRUCTIONS FROM CORROSION PREVENTION AND CONTROL, PLANNING GUIDEBOOK SPIRAL 3, DTD SEPTEMBER 2007 (LOCATED ON HTTP://WWW.CORRDEFENSE.ORG). SECTION 2.2.4 & APPENDIX C OF THE CPC GUIDEBOOK PROVIDES FOR CONTENTS OF A CORROSION PREVENTION AND CONTROL PLAN.
BLOCK 8: REFER TO SECTION E-2 OF THIS CONTRACT FOR TERMS AND CONDITIONS FOR INSPECTIONS AND ACCEPTANCE OF ADMINISTRATIVE TECHNICAL DATA AND INFORMATION.
THE CONTRACTOR HAS 30 CALENDAR DAYS FROM RECEIPT FROM THE GOVERNMENT, FOR RE-SUBMITTAL, IF REJECTED.
BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.
BLOCK 13: THE CONTRACTOR SHALL DELIVER SUBSEQUENT SUBMISSIONS AT THE END OF FY + 5 CALENDAR DAYS AND TO COMPLY WITH CHANGES TO THE CONTRACT OR MAINTENANCE MANUALS.
BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET INSTRUCTIONS”.
CNATRA N4
SEE BLK 16
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CDR David Padula, PMA-273F TH-57 IPTL
Alja Musarro, PMA-273A Deputy Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER MISC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A004 |
| TECHNICAL REPORT - STUDY/SERVICES |
| MONTHLY MAINTENANCE PLAN (MMP) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MISC-80508B (SEE BLK 16) |
| PWS PARAS. 5.1.1.19, 5.2.3 |
| PMA-273 TH-57 IPTL |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| MTHLY |
| 45 DAC |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C (SEE BLK 16) |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
N/A
| 0 |
| EOM + 5 DAYS |
| Reg |
| Repro |
16. REMARKS
SEE BLK 16
SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.
BLOCK 4: TAILOR DID TO INCLUDE SUPPLEMENTAL INSTRUCTIONS LISTED BELOW.
THE CONTRACTOR SHALL PROVIDE A MONTHLY MAINTENANCE PLAN IAW CNAFINST 4790.2, INCLUDING A LIST OF PROJECTED SIGNIFICANT MAINTENANCE ACTIONS AND REQUIREMENTS FOR THE NEXT 90 DAYS IAW ACCEPTABLE COMMERCIAL OPERATING PROCEDURES MAY BE IMPLEMENTED IF APPROVED BY THE ACO AND NOT IN DIRECT CONFLICT WITH CNAFINST 4790.2 SERIES. ALL CONFLICTS BETWEEN APPLICABLE PUBLICATIONS AND INSTRUCTIONS, AND ALL EXCEPTIONS, DEVIATIONS AND WAIVERS SHALL BE ADDRESSED TO THE CNATRA ACO VIA THE LOCAL CNATRA DETACHMENT (DET) OFFICER IN CHARGE (OIC) FOR RESOLUTION. THE MMP CONTENT INCLUDES, BUT IS NOT LIMITED TO:
A. REPLACEMENT OF LIFE LIMITED ITEMS BY DD/MM/YYYY (PROJECTED FOR 90 CALENDAR DAYS FROM DATE OF REPORT)
B. INSPECTION SCHEDULES
C. STRIP, REPAINT AND CORROSION X SCHEDULES
D. HIGH FAILURE ITEMS
E. CALIBRATION REQUIREMENTS
F. WEIGHT AND BALANCE INFO
G. PERSONNEL REQUALIFICATIONS
H. PERSONNEL CERTIFICATIONS
I. EQUIPMENT AND SUPPORT EQUIPMENT LICENSE RENEWAL
J. ON-SITE CONTRACTOR PERSONNEL ACTUAL HEAD COUNT
K. CONTRACTOR MANANGEMENT CONTACT INFORMATION
L. SIGNATURE AUTHORITIES
BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.
BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET INSTRUCTIONS”.
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CDR David Padula, PMA-273F TH-57 IPTL
Alja Musarro, PMA-273A Deputy Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER SESS |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A005 |
| TECHNICAL REPORT - STUDY/SERVICES |
| STRICKEN AIRCRAFT RECLAMATION AND DISPOSAL PROGRAM REPORT (SARDIP) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MISC-80508B (SEE BLK 16) |
| PWS PARA. 5.1.4.3.5 |
| PMA-273 TH-57 IPTL |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
DD
| ASREQ |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
C (SEE BLK 16)
| Draft |
| Final |
A (SEE BLK 16)
| N/A |
| SEE BLK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| PMA-273 TH-57 IPTL |
SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.
BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE. THE REPORT SHALL INCLUDE PARTS RECOMMENDED TO REMOVE PRIOR TO AN AIRCRAFT BEING SARDIP. THE CONTENT INCLUDES, BUT IS NOT LIMITED TO:
1. AIRCRAFT BUNO
2. PART NUMBER
3. NOMENCLATURE
4. PART UNIT PRICE
BLOCK 8: REFER TO SECTION E-2 OF THIS CONTRACT FOR TERMS AND CONDITIONS FOR INSPECTIONS AND ACCEPTANCE OF ADMINISTRATIVE TECHNICAL DATA AND INFORMATION.
BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.
BLOCKS 12 &13: THE CONTRACTOR SHALL DELIVER FIRST AND SUBSEQUENT SUBMISSIONS WITHIN 10 CALENDAR DAYS UPON GOVERNMENT REQUEST.
BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET INSTRUCTIONS”.
SEE BLK 16
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CDR David Padula, PMA-273F TH-57 IPTL
Alja Musarro, PMA-273A Deputy Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER MISC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A006 |
| TECHNICAL REPORT - STUDY/SERVICES |
| PLANNING AND ESTIMATE (P&E) REPORT |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MISC-80508B (SEE BLK 16) |
| SEE BLK 16 |
| PMA-273 TH-57 IPTL |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C (SEE BLK 16) |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
N/A
| 0 |
| SEE BLK 16 |
| Reg |
| Repro |
16. REMARKS
SEE BLK 16
SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.
BLOCK 4: TAILOR DID CONTENT TO INCLUDE TH-57 O-LEVEL, I-LEVEL & D-LEVEL REPAIR. SUPPLEMENTAL INSTRUCTIONS LISTED BELOW.
THE DATA FOR EACH AIRCRAFT TYPE SHALL BE REPORTED WITHIN A SEPARATE MS EXCEL FILE WITH COLUMN HEADINGS AS THE FOLLOWING:
43. DATE OF P&E REPORT
44. ASSIGNED P&E NUMBER
45. AIRCRAFT PROGRAM IDENTIFICATION
46. BUNO NUMBER
47. CONTRACT NUMBER
48. CLIN/ACRN
49. T/M/S
50. SITE
51. NATIONAL STOCK NUMBER (NSN), IF APPLICABLE
52. NOMENCLATURE (NOUN)
53. SERIAL NUMBER, IF APPLICABLE
54. PART NUMBER
55. ITEMS RETURNED TO THE VENDOR(S) FOR REPAIR OR REPLACEMENT
56. QTY
57. COVERED UNDER WARRANTY DURING THIS PERIOD (COMPLETE DOCUMENTATION ON WARRANTY LIST CDRL A010)
58. CONTRACTOR’S NAME
59. CONTRACTOR’S CAGE CODE
60. CONTRACTOR’S DODAAC
61. DELIVERY DATE (DATE OF DD250)
62. PROJECTED SHIPPING DATE (DATE ITEM RETURNED TO VENDOR) DESTINATION
63. PROJECTED IN-SERVICE DATES (DATE WHEN ITEM RETURNED TO FIELD)
64. GOV’T REPAIR AUTHORIZATION DATE
65. ESTIMATED WORK BEGIN DATE
66. ESTIMATED WORK END DATE
67. TOTAL DISASSEMBLY MANHOURS
68. CALCULATION OF TOTAL ESTIMATED (MANHOURS X UNIT COST) COST
69. CALCULATION OF TOTAL ACTUAL (MANHOURS X UNIT COST) COST
SEE PAGE 2 - CDRL A006 PLANNING AND ESTIMATE (P&E) REPORT-PAGE 1:2 (CONT’D)
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CDR David Padula, PMA-273F TH-57 IPTL
Alja Musarro, PMA-273A Deputy Program Manager
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 1 of 2 Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER MISC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
16. REMARKS
CDRL A006 PLANNING AND ESTIMATE (P&E) REPORT PAGE 2:2 (CONT’D)
70. ESTIMATED UNIT PRICE
71. ESTIMATED EXTENDED PRICE
72. ESTIMATED MANHOURS
73. ESTIMATED DURATION IN NUMBER OF DAYS NECESSARY TO EFFECT REPAIRS
74. SPECIAL REQUIREMENTS NECESSARY (FIXTURE REQUIRED, ETC.)
75. LEVEL OF MAINTENANCE REQUIRED FOR REPAIR (O-LEVEL, I-LEVEL & D-LEVEL)
76. PART(S) REQUIRED
i. NATIONAL STOCK NUMBER (NSN), IF APPLICABLE
j. NOMENCLATURE (NOUN)
k. SERIAL NUMBER, IF APPLICABLE
l. PART NUMBER
m. QTY REQUIRED
n. SUB-CONTRACTOR’S NAME
o. SUB-CONTRACTOR’S CAGE CODE
p. SUB-CONTRACTOR’S DODAAC
77. REQUIRED REPAIR ACTIONS
78. ADDITIONALLY, FOR CORROSION, REPORT TYPE AND SEVERITY DEFECTS DISCOVERED DURING ACI INCLUDE:
i. COMPLETE DESCRIPTION OF DEFECT INCLUDING SIZE, SEVERITY, AND CRITICALITY, MAJOR OR MINOR.
1. ACCURATE LOCATION OF THE DEFECT.
2. DESCRIPTION OF CORRECTIVE ACTION TAKEN.
3. ACI TASK NUMBER WHEN DEFECT DISCOVERED.
4. DESCRIBE ANY SPECIAL WORK REQUESTED BY THE SERVICE, ANY DIFFICULTIES ENCOUNTERED WHILE PERFORMING THE WORK, AND THE NUMBER OF MANHOURS TO COMPLETE.
79. EXTENT OF THE REPAIRS REQUIRED, INCLUDING MAJOR COMPONENTS TO BE REPAIRED OR REPLACED AND STRUCTURAL REPAIR REQUIRED
80. TYPE OF PRESERVATION REQUIREMENTS ANTICIPATED, IF ANY
81. PARTS AND/OR MATERIAL REQUIRED FOR BY PART NUMBER NOMENCLATURE AND PRICE
82. ESTIMATED DELIVERY DATE FOR MATERIAL/PARTS
83. ACTUAL UNIT PRICE (AT COMPLETION OF REPAIR)
84. ACTUAL EXTENDED PRICE (AT COMPLETION OF REPAIR)
85. TOTAL ACTUAL DURATION IN NUMBER OF DAYS NECESSARY TO EFFECT REPAIRS
BLOCK 5: PWS PARAS. 5.1.4.4.2, 5.1.5.1, 5.4.8.2, 5.4.8.3, 5.18.2.1.1
BLOCK 8: CONTRACTOR HAS 15CALENDAR DAYS FROM RECEIPT OF THE GOVERNMENT, FOR RE-SUBMITTAL, IF REJECTED.
BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.
BLOCKS 12 & 13: THE CONTRACTOR SHALL DELIVER FIRST AND SUBSEQUENT SUBMISSIONS WITHIN 10 CALENDAR DAYS UPON GOVERNMENT REQUEST.
BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET INSTRUCTIONS”.
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER SESS |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A007 |
| MAINTENANCE TEST AND SUPPORT EQUIPMENT REQUIREMENTS LIST |
| CONTRACTOR PROPOSED UNIQUE SUPPORT EQUIPMENT LIST |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-80294B (SEE BLK 16) |
| PWS PARA. 5.2.8 |
| CNATRA N4 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| ASREQ |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C (SEE BLK 16) |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
A (SEE BLK 16)
| N/A |
| SEE BLK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| SEE BLK 16 |
SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.
BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE. TAILOR DID CONTENT TO ONLY INCLUDE A REPORT OF THE FOLLOWING SUPPORT EQUIPMENT (SE):
1. SUBJECT
2. REFERENCES
3. ENCLOSURES
4. PURPOSE
5. BACKGROUND
6. MATERIAL REQUIRED (QTY, P/N, CAGE, NOMENCLATURE, NSN)
7. LIST OF SOURCE(S) & COST
8. ASSEMBLY INSTRUCTIONS (ATTACH DRAWINGS AND/OR PHOTOS)
9. PART NO. IDENTIFICATION
10. MAINTENANCE REQUIREMENTS
11. PUBLICATIONS
12. RELATED INFORMATION
13. DESCRIPTION OF MANPOWER REQUIRED
14. REPORTED BY: NAME /POSITION /SITE (INCLUDING SIGNATURE)
15. MAINTENANCE CONTRACTOR PMO: NAME (INCLUDING SIGNATURE)
16. DATE OF APPROVAL BY GOVERNMENT (IF NONE, LEAVE BLANK)
BLOCK 8: CONTRACTOR HAS 10 CALENDAR DAYS FROM RECEIPT OF THE GOVERNMENT, FOR RE-SUBMITTAL, IF REJECTED. THE APPROVAL AUTHORITY IS BY THE ACO.
BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.
BLOCKS 12 & 13: INITIAL DRAFT SHALL BE DELIVERED WITH THE PROPOSAL. THE CONTRACTOR SHALL PROVIDE FINAL LIST 30 CALENDAR DAYS AFTER GOVERNMENT REVIEW. UPDATES SHALL BE DELIVERED AS REQUIRED.
BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET INSTRUCTIONS”.
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CDR David Padula, PMA-273F TH-57 IPTL
Alja Musarro, PMA-273A Deputy Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER ILSS |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A008 |
| DEPOT MAINTENANCE STUDY |
| CONTRACTORS COMPONENT REPAIR LISTING CHANGE REQUEST REPORT |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-ILSS-80739 (SEE BLK 16) |
| PWS PARA. 5.3.1.4 |
| PMA-273 TH-57 AIR – 6.6.2.9 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| SEMI ANNLY |
| 60 DAC |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C (SEE BLK 16) |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
A (SEE BLK 16)
| 0 |
| SEE BLK 16 |
| Reg |
| Repro |
16. REMARKS
SEE BLK 16
SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.
BLOCK 4: TAILOR DID CONTENT TO INCLUDE A REPORT OF THE FOLLOWING INFORMATION RELATIVE TO CHANGES OF THE CONTRACTORS COMPONENT REPAIR REPORT. DATA SHALL BE IN AN MS EXCEL FILE WITH DATA SHOWN IN COLUMN FORMAT.
1. SUBJECT
2. DESCRIPTION OF CHANGE BEING REQUESTED (“NTE”, “REMOVAL” OR “COMPONENT DATA”)
3. DESCRIPTION OF ASSEMBLY (PART NOMENCLATURE/NAME)
4. PART NUMBER AND/OR NSN
5. REFERENCES DOCUMENTS OR REPAIR MANUAL
6. ENCLOSURES AS REQUIRED
7. PURPOSE
8. BACKGROUND AND JUSTIFICATION FOR CHANGE (I.E. NEW REQUIREMENTS)
9. PRIOR (NTE) MAN HOURS APPROVED
10. DATE OF LAST NTE APPROVAL
11. NEW NTE HOURS REQUESTED
12. AVERAGE OF ACTUAL REPAIR TIME – FROM CONTRACT AWARD (MAN HOURS)
13. AVERAGE ACTUAL COSTS FOR REPAIR – FROM CONTRACT AWARD
14. RELATED INFORMATION
15. DESCRIPTION OF MANPOWER REQUIRED
16. REPORTED BY: NAME /POSITION /SITE (INCLUDING SIGNATURE)
17. MAINTENANCE CONTRACTOR PMO: NAME (INCLUDING SIGNATURE)
BLOCK 8: CONTRACTOR HAS 10 CALENDAR DAYS FROM RECEIPT OF THE GOVERNMENT, FOR RE-SUBMITTAL, IF REJECTED.
BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.
BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE AT THE END OF THE SECOND QUARTER + 15 CALENDAR DAYS AND END OF THE FOURTH QUARTER + 15 CALENDAR DAYS RESPECTFULLY.
BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET INSTRUCTIONS”.
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CDR David Padula, PMA-273F TH-57 IPTL
Alja Musarro, PMA-273A Deputy Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Page
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER MGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A009 |
| REPAIR/MODIFICATION/OVERHAUL STATUS REPORT |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-80933 (SEE BLK 16) |
| PWS PARA. 5.4.7 |
| PMA-273 TH-57 AIR-4.1.1.9 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| MTHLY |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C (SEE BLK 16) |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
N/A
| 0 |
| EOM + 5 DAYS |
| Reg |
| Repro |
| 16. REMARKS |
| SEE BLK 16 |
SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.
BLOCK 4: TAILOR DID PARAGRAPH 10.2 TO INCLUDE SUPPLEMENTAL INSTRUCTIONS. THIS REPORT TO INCLUDE ONLY APPLICABLE AIRCRAFT AND REPORTED SEPARATELY BY AIRCRAFT TYPE, EACH WITH A SEPARATE MS EXCEL FILE CONTAINING DIFFERENT SPREADSHEET(S) FOR EACH COMPONENT (E.G. AIRFRAMES, ROTORBLADES, AND ENGINES).
NOTE: ON SPREADSHEET, LEAVE COLUMN BLANK IF DATA TO BE PROVIDED IS NOT APPLICABLE, DO NOT DELETE COLUMN. IF NEW REQUESTS ARE BEING MADE FOR ACO APPROVAL, THEN BOLD FONT THE ROW.
REPORT SHALL INCLUDE AN ONGOING LISTING OF COMPONENTS TO BE REMOVED AND PROVIDE THE FOLLOWING INFORMATION WITHIN A SPREADSHEET WITH COLUMNS HEADED AS THE FOLLOWING:
1. DATE (ADDED TO THE REPORT)
2. COMPONENT END ITEM
3. SERIAL NUMBER
4. NUMBER OF HOURS ON COMPONENT SINCE NEW AND SINCE OVERHAUL
5. REASON FOR REMOVAL (REPAIR OR OVERHAUL)
6. FACILITY TO WHICH WILL/WAS SHIPPED FOR REPAIR OR OVERHAUL
7. ESTIMATED DATE EXPECTED TO COMPLETE REPAIR OR OVERHAUL
8. ESTIMATED PRICE OF EACH FOR THE OVERHAUL/REPAIR LABOR
9. ESTIMATED PRICE OF EACH FOR THE OVERHAUL/REPAIR MATERIAL
10. REQUESTING ACO APPROVAL FOR OVERHAUL (VERSUS REPAIR) – YES/NO
11. DATE CONTRACTOR REQUESTED FOR ACO APPROVAL FOR OVERHAUL (VERSUS REPAIR)
12. DATE ACO APPROVAL FOR OVERHAUL (VERSUS REPAIR) – RECEIVED (OR INDICATE “DENIED”)
13. ESTIMATED AND ACTUAL PRICE FOR OVERHAUL MATERIAL (ENGINES)
14. ESTIMATED AND ACTUAL PRICE FOR CYCLIC MATERIAL (ENGINES)
15. TECHNICAL DIRECTIVES INCORPORATED (10 CALENDAR DAYS AFTER RETURN OF THE ENGINE FROM THE REPAIR OR OVERHAUL FACILITY)
16. TECHNICAL DIRECTIVES NOT INCORPORATED WITH REASON FOR NON-INCORPORATION, IF APPLICABLE
17. ACTUAL DATE REMOVED (REMOVED FROM THE AIRCRAFT FOR REPAIR OR OVERHAUL)
18. ACTUAL DATE SHIPPED TO REPAIR OR OVERHAUL FACILITY
19. ACTUAL START DATE FOR REPAIR OR OVERHAUL (DATE INDUCTED AT OVERHAUL FACILITY)
CDRL A009 REPAIR/MODIFICATION/OVERHAUL STATUS REPORT Page 1:2 (CONT’D)
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CDR David Padula, PMA-273F TH-57 IPTL
Alja Musarro, PMA-273A Deputy Program Manager
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 1 of 2 Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) |
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER MGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
1. REMARKS
CDRL A009 REPAIR/MODIFICATION/OVERHAUL STATUS REPORT Page 2:2 (CONT’D)
20. ACTUAL DATE REPAIR OR OVERHAUL IS COMPLETE
21. ACTUAL DATE RECEIVED BACK ON-SITE
22. ACTUAL PRICE OF EACH FOR THE OVERHAUL/REPAIR LABOR
23. ACTUAL PRICE OF EACH FOR THE OVERHAUL/REPAIR MATERIAL
24. TOTAL ACTUAL PRICE TO OVERHAUL/REPAIR
25. FINANCIAL COMPLETION DATE
26. GENERAL MATERIAL CONDITION OF COMPONENT WHEN RECEIVED
BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.
BLOCK 12: FIRST SUBMISSION SHALL BE 15 CALENDAR DAYS POST TRANSITION PERIOD.
BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET INSTRUCTIONS”.
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER MISC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A010 |
| WARRANTY PERFORMANCE REPORT |
| WARRANTY ITEMS REPORT |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-81639 (SEE BLK 16) |
| PWS PARAS. 5.4.10, 5.14.3 |
| PMA 273 TH-57 IPTL |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| MNTHLY |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C (SEE BLK 16) |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
N/A
| 0 |
| EOM + 5 DAYS |
| Reg |
| Repro |
16. REMARKS
SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.
BLOCK 4: CONTRACTOR CONTENT ACCEPTABLE. THE REPORT SHALL CONTAIN WARRANTY INFORMATION IN MS EXCEL SPREADSHEET WITH COLUMNS. SUPPLEMENTAL DATA PERTAINING TO WARRANTED ITEMS SHALL BE REPORTED IN MS WORD FORMAT.
BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.
BLOCK 12: FIRST SUBMISSION 30 DAYS POST TRANSITION PERIOD.
BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET INSTRUCTIONS”.
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CDR David Padula, PMA-273F TH-57 IPTL
Alja Musarro, PMA-273A Deputy Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER QCIC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A011 |
| QUALITY SYSTEM PLAN |
| QUALITY CONTROL PROGRAM PLAN UPDATES |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-QCIC-81379 (SEE BLK 16) |
| PWS PARAS. 5.7.4, 5.7.5.1 |
| CNATRA N4 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| SEE BLK 16 |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C (SEE BLK 16) |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
A (SEE BLK 16)
| N/A |
| SEE BLK 16 |
| Reg |
| Repro |
16. REMARKS
SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.
BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE. TAILOR DID AS FOLLOWS:
PARAGRAPHS 10.1, PREPARATION INSTRUCTIONS & 7.2, APPLICATION / INTERRELATIONSHIP.
THE QUALITY MANUAL SHALL BE IAW AEROSPACE STANDARD (AS) 9100B (NOT ISO 9001-
2001/ISO 9001-2008 AS STATED IN DID) AND SHALL BE IN EFFECT ON THE FIRST DAY OF
CONTRACT PERFORMANCE.
PARAGRAPH 10.4, CONTENT - INDICATE THE ORGANIZATIONAL TITLE OF PERSONS RESPONSIBLE FOR ACCOMPLISHMENT OF ACTIVITIES AND TASKS, INSTEAD OF NAMES OF THE PERSON(S).
PARAGRAPH 10.4.1, QUALITY SYSTEM EFFECTIVENESS - INDICATE THE ORGANIZATIONAL TITLE OF PERSONS RESPONSIBLE FOR ACCOMPLISHMENT OF ACTIVITIES AND TASKS, INSTEAD OF NAMES OF THE PERSON(S).
PARAGRAPH 10.5, THE CONTRACTORS CORPORATE QUALITY MANUAL MAY BE REFERRED TO IN THE PLAN IN LIEU OF BEING ATTACHED.
BLOCK 8: CONTRACTOR HAS 10 CALENDAR DAYS FROM RECEIPT OF THE GOVERNMENT FOR RE-SUBMITTAL, IF REJECTED.
BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.
BLOCK 10: AS REQUIRED BUT NO LESS THAN ANNUALLY SUBMITTED.
BLOCKS 12 & 13: INITIAL DRAFT SHALL BE DELIVERED WITH PROPOSAL. CHANGES SHALL BE INCORPORATED AND FINAL DELIVERED 30 CALENDAR DAYS AFTER CONTRACT AWARD. ALL UPDATES SHALL BE INCORPORATED INTO THE PROGRAM PLAN WITHIN 10 CALENDAR DAYS OF IDENTIFICATION. IN ADDITION, THE CONTRACTOR SHALL ANNUALLY SUBMIT FOR REVIEW THE QUALITY CONTROL PROGRAM PLAN TO THE GOVERNMENT AT THE END OF THE FY + 5 CALENDAR DAYS.
BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET INSTRUCTIONS”.
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CDR David Padula, PMA-273F TH-57 IPTL
Alja Musarro, PMA-273A Deputy Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER QCIC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A012 |
| QUALITY ASSESSMENT REPORT |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-QCIC-81187 (SEE BLK 16) |
| PWS PARA. 5.7.5.2 |
| PMA 273 TH-57 IPTL |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C (SEE BLK 16) |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
N/A
| N/A |
| SEE BLK 16 |
| Reg |
| Repro |
16. REMARKS
SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.
BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE.
BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.
BLOCKS 12 & 13: THE CONTRACTOR SHALL DELIVER REPORT WITHIN 15 CALENDAR DAYS UPON GOVERNMENT REQUEST.
BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4 “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION RANGERNET INSTRUCTIONS”.
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CDR David Padula, PMA-273F TH-57 IPTL
Alja Musarro, PMA-273A Deputy Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| XX15 |
| A |
| TDP ____ |
| TM _____ |
| OTHER STD2 |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| TH-57 CLS |
| N00019-10-R-0097 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A013 |
| PARTS MANAGEMENT PLAN |
| OBSOLESCENCE PARTS MANAGEMENT PLAN |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SDMP-81748 (SEE BLK 16) |
| PWS PARA. 5.10.1 |
| PMA-273 TH-57 AIR 6.6.2.9 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| QTRLY |
| 90 DAC |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| C (SEE BLK 16) |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
A ( SEE BLK 16)
| 0 |
| EOQ + 5 DAYS |
| Reg |
| Repro |
| 16. REMARKS |
| SEE BLK 16 |
SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS EXPLANATION OF CONTRACT DATA REQUIREMENTS LIST” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.
BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE FOR THE PARTS MANAGEMENT PLAN.