Attachment L-4 PA-01 Price Exhibit B.xlsx
XLSX spreadsheet 267 KB Posted
- Attached to
- TH-57 Contractor Logistics Support
- Solicitation number
- N00019-10-R-0097
About this file
Attachment L-4 PA-01 Price Exhibit B
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE
| SECTION L ATTACHMENT 4 | |||||
| SECTION B "SUPPLIES OR SERVICES AND PRICES/COST | |||||
| ITEM | SUPPLIES/SERVICES | EST QTY | UNIT | UNIT PRICE/COST | EXTENDED PRICE/COST |
TH-57 BASE
| 0001 | Fixed Maintenance for NAS Whiting Field | FFP | ||||
| 0001AA | OPTION Fixed Maintenance 78 Aircraft Daily | 11 | MO | $ | $ | |
| 0001AB | OPTION Fixed Maintenance 83 Aircraft Daily | 11 | MO | $ | $ | |
| 0001AC | OPTION Fixed Maintenance 88 Aircraft Daily | 11 | MO | $ | $ | |
| 0001AD | OPTION Fixed Maintenance 93 Aircraft Daily | 11 | MO | $ | $ | |
| 0001AE | OPTION Fixed Maintenance 96 Aircraft Daily | 11 | MO | $ | $ |
0002 Satellite Site Support for NAS Patuxent River 11 MO $ $ FFP
0003 Additional One Aircraft for One Day 6 EA $ $ FFP
0004 Scheduled Depot - Aircraft Condition Inspection (ACI) 22 EA $ $ FFP
| 0005 | Unscheduled Depot | FFP | ||||
| 0005AA | Engine Overhaul due to Metal Contamination | 6 | EA | $ | $ | |
| 0005AB | Replace Cabin Roof | 2 | EA | $ | $ | |
| 0005AC | Replace Forward Lower Shell | 1 | EA | $ | $ | |
| 0005AD | Replace Aft Lower Shell | 1 | EA | $ | $ | |
| 0005AE | Replace Cabin Roof and Forward Lower Shell | 1 | EA | $ | $ | |
| 0005AF | Replace Cabin Roof and Aft Lower Shell | 2 | EA | $ | $ | |
| 0005AG | Replace Forward and Aft Lower Shell | 4 | EA | $ | $ | |
| 0005AH | Replace Cabin Roof and Forward and Aft Lower Shell | 1 | EA | $ | $ | |
| 0005AJ | Replace Cabin Roof in conjunction with ACI | 5 | EA | $ | $ | |
| 0005AK | Replace Forward Lower Shell in conjunction with ACI | 12 | EA | $ | $ | |
| 0005AL | Replace Aft Lower Shell in conjunction with ACI | 2 | EA | $ | $ | |
| 0005AM | Replace Cabin Roof and Forward Lower Shell in conjunction with ACI | 4 | EA | $ | $ | |
| 0005AN | Replace Cabin Roof and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005AP | Replace Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005AQ | Replace Cabin Roof and Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ |
0006 Flight Hour Generated Maintenance 71,500 FH $ $ FFP
| 0007 | On-Site Conditional Maintenance | LH | ||||
| 0007AA | Airframe On-Site Conditional Maintenance | 7,000 | LH | $ | $ | |
| 0007AB | Engines On-Site Conditional Maintenance | 5,800 | LH | $ | $ |
| 0008 | Depot Conditional Maintenance | LH | ||||
| 0008AA | Airframe Depot Conditional Maintenance (Airframe Repair) | 50,000 | LH | $ | $ | |
| 0008AB | Engines Depot Conditional Maintenance (Engine Repair) | 15,000 | LH | $ | $ |
0009 Off-Site Emergency Repair Services (Contractor) 2,400 LH $ $ LH
0010 Engineering and Technical Services 800 LH $ $ LH
0011 Modifications - Development 2,000 LH $ $ LH
| 0012 | Material and Subcontractor Labor | $ 24,000,000.00 | Cost Re | |||
| 0012AA | Material and Subcontractor Labor (Flight Operations) | 1 | LOT | TBD | TBD | |
| 0012AB | Material and Subcontractor Labor (ACI) | 1 | LOT | TBD | TBD | |
| 0012AC | Material and Subcontractor Labor In-Service Repairs (ISR) | 1 | LOT | TBD | TBD | |
| 0012AD | Material and Subcontractor Labor (Engine Repair) | 1 | LOT | TBD | TBD | |
| 0012AE | Material and Subcontractor Labor (PRL) | 1 | LOT | TBD | TBD | |
| 0012AF | Material and Subcontractor Labor (Special Rework) | 1 | LOT | TBD | TBD | |
| 0012AG | Material and Subcontractor Labor (Patuxent River) | 1 | LOT | TBD | TBD | |
| 0012AH | Material and Subcontractor Labor (Modification - Development) | 1 | LOT | TBD | TBD | |
| 0012AJ | Material and Subcontractor Labor (Modification - Production) | 1 | LOT | TBD | TBD |
0013 Off-Site Emergency Repair Services (Subcontractor) 1 LOT $ 100,000.00 $ 100,000.00 Cost Re
0014 Travel and Per Diem 1 LOT $ 13,000.00 $ 13,000.00 Cost Re
0015 Technical Data IAW Exhibit A 1 LOT $ NSP $ NSP NSP
| 0016 | Performance Measurement Framework Incentive | FFP | ||||
| 0016AA | Performance Measurement Framework Incentive - First Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AB | Performance Measurement Framework Incentive - Second Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AC | Performance Measurement Framework Incentive - Third Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AD | Performance Measurement Framework Incentive - Fourth Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 |
0017 Modifications - Production 2,000 LH $ - 0 $ - 0 LH
| 0018 | Weekend/Holiday Flight Operations Per Day | FFP | ||||
| 0018AA | Weekend/Holiday Flight Operations - 50 Aircraft | 25 | EA | $ | $ | |
| 0018AB | Weekend/Holiday Flight Operations - 93 Aircraft | 40 | EA | $ | $ |
0019 Transition Phase In 1 MO $ $ FFP
Page &P
Option 1
| SECTION L ATTACHMENT 4 | |||||
| SECTION B "SUPPLIES OR SERVICES AND PRICES/COST | |||||
| ITEM | SUPPLIES/SERVICES | QTY | UNIT | UNIT PRICE/COST | EXTENDED PRICE/COST |
TH-57 OPTION PERIOD 01
| 0101 | Fixed Maintenance for NAS Whiting Field | FFP | ||||
| 0101AA | OPTION Fixed Maintenance 78 Aircraft Daily | 12 | MO | $ | $ | |
| 0101AB | OPTION Fixed Maintenance 83 Aircraft Daily | 12 | MO | $ | $ | |
| 0101AC | OPTION Fixed Maintenance 88 Aircraft Daily | 12 | MO | $ | $ | |
| 0101AD | OPTION Fixed Maintenance 93 Aircraft Daily | 12 | MO | $ | $ | |
| 0101AE | OPTION Fixed Maintenance 96 Aircraft Daily | 12 | MO | $ | $ |
0102 Satellite Site Support for NAS Patuxent River 12 MO $ $ FFP
0103 Additional One Aircraft for One Day 6 EA $ $ FFP
0104 Scheduled Depot - Aircraft Condition Inspection (ACI) 24 EA $ $ FFP
| 0105 | Unscheduled Depot | FFP | ||||
| 0105AA | Engine Overhaul due to Metal Contamination | 6 | EA | $ | $ | |
| 0105AB | Replace Cabin Roof | 2 | EA | $ | $ | |
| 0105AC | Replace Forward Lower Shell | 1 | EA | $ | $ | |
| 0105AD | Replace Aft Lower Shell | 1 | EA | $ | $ | |
| 0105AE | Replace Cabin Roof and Forward Lower Shell | 1 | EA | $ | $ | |
| 0105AF | Replace Cabin Roof and Aft Lower Shell | 2 | EA | $ | $ | |
| 0105AG | Replace Forward and Aft Lower Shell | 4 | EA | $ | $ | |
| 0105AH | Replace Cabin Roof and Forward and Aft Lower Shell | 1 | EA | $ | $ | |
| 0105AJ | Replace Cabin Roof in conjunction with ACI | 5 | EA | $ | $ | |
| 0105AK | Replace Forward Lower Shell in conjunction with ACI | 12 | EA | $ | $ | |
| 0105AL | Replace Aft Lower Shell in conjunction with ACI | 2 | EA | $ | $ | |
| 0105AM | Replace Cabin Roof and Forward Lower Shell in conjunction with ACI | 4 | EA | $ | $ | |
| 0105AN | Replace Cabin Roof and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105AP | Replace Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105AQ | Replace Cabin Roof and Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ |
0106 Flight Hour Generated Maintenance 78,000 FH $ $ FFP
| 0107 | On-Site Conditional Maintenance | LH | ||||
| 0107AA | Airframe On-Site Conditional Maintenance | 7,000 | LH | $ | $ | |
| 0107AB | Engines On-Site Conditional Maintenance | 5,800 | LH | $ | $ |
| 0108 | Depot Conditional Maintenance | LH | ||||
| 0108AA | Airframe Depot Conditional Maintenance (Airframe Repair) | 50,000 | LH | $ | $ | |
| 0108AB | Engines Depot Conditional Maintenance (Engine Repair) | 15,000 | LH | $ | $ |
0109 Off-Site Emergency Repair Services (Contractor) 2,400 LH $ $ LH
0110 Engineering and Technical Services 800 LH $ $ LH
0111 Modifications - Development 2,000 LH $ $ LH
| 0112 | Material and Subcontractor Labor | $ 24,720,000.00 | Cost Re | |||
| 0112AA | Material and Subcontractor Labor (Flight Operations) | 1 | LOT | TBD | TBD | |
| 0112AB | Material and Subcontractor Labor (ACI) | 1 | LOT | TBD | TBD | |
| 0112AC | Material and Subcontractor Labor In-Service Repairs (ISR) | 1 | LOT | TBD | TBD | |
| 0112AD | Material and Subcontractor Labor (Engine Repair) | 1 | LOT | TBD | TBD | |
| 0112AE | Material and Subcontractor Labor (PRL) | 1 | LOT | TBD | TBD | |
| 0112AF | Material and Subcontractor Labor (Special Rework) | 1 | LOT | TBD | TBD | |
| 0112AG | Material and Subcontractor Labor (Patuxent River) | 1 | LOT | TBD | TBD | |
| 0112AH | Material and Subcontractor Labor (Modification - Development) | 1 | LOT | TBD | TBD | |
| 0112AJ | Material and Subcontractor Labor (Modification - Production) | 1 | LOT | TBD | TBD |
0113 Off-Site Emergency Repair Services (Subcontractor) 1 LOT $ 103,000.00 $ 103,000.00 Cost Re
0114 Travel and Per Diem 1 LOT $ 13,390.00 $ 13,390.00 Cost Re
0115 Technical Data IAW Exhibit A 1 LOT $ NSP $ NSP NSP
| 0116 | Performance Measurement Framework Incentive | FFP | ||||
| 0016AA | Performance Measurement Framework Incentive - First Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AB | Performance Measurement Framework Incentive - Second Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AC | Performance Measurement Framework Incentive - Third Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AD | Performance Measurement Framework Incentive - Fourth Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 |
0117 Modifications - Production 2,000 LH $ - 0 $ - 0 LH
| 0118 | Weekend/Holiday Flight Operations Per Day | FFP | ||||
| 0118AA | Weekend/Holiday Flight Operations - 50 Aircraft | 25 | EA | $ | $ | |
| 0118AB | Weekend/Holiday Flight Operations - 93 Aircraft | 40 | EA | $ | $ |
FFP
OPTION 1 Page &P
Option 2
| SECTION L ATTACHMENT 4 | |||||
| SECTION B "SUPPLIES OR SERVICES AND PRICES/COST | |||||
| ITEM | SUPPLIES/SERVICES | QTY | UNIT | UNIT PRICE/COST | EXTENDED PRICE/COST |
TH-57 OPTION PERIOD 02
| 0201 | Fixed Maintenance for NAS Whiting Field | FFP | ||||
| 0201AA | OPTION Fixed Maintenance 78 Aircraft Daily | 12 | MO | $ | $ | |
| 0201AB | OPTION Fixed Maintenance 83 Aircraft Daily | 12 | MO | $ | $ | |
| 0201AC | OPTION Fixed Maintenance 88 Aircraft Daily | 12 | MO | $ | $ | |
| 0201AD | OPTION Fixed Maintenance 93 Aircraft Daily | 12 | MO | $ | $ | |
| 0201AE | OPTION Fixed Maintenance 96 Aircraft Daily | 12 | MO | $ | $ |
0202 Satellite Site Support for NAS Patuxent River 12 MO $ $ FFP
0203 Additional One Aircraft for One Day 6 EA $ $ FFP
0204 Scheduled Depot - Aircraft Condition Inspection (ACI) 24 EA $ $ FFP
| 0205 | Unscheduled Depot | FFP | ||||
| 0205AA | Engine Overhaul due to Metal Contamination | 6 | EA | $ | $ | |
| 0205AB | Replace Cabin Roof | 2 | EA | $ | $ | |
| 0205AC | Replace Forward Lower Shell | 1 | EA | $ | $ | |
| 0205AD | Replace Aft Lower Shell | 1 | EA | $ | $ | |
| 0205AE | Replace Cabin Roof and Forward Lower Shell | 1 | EA | $ | $ | |
| 0205AF | Replace Cabin Roof and Aft Lower Shell | 2 | EA | $ | $ | |
| 0205AG | Replace Forward and Aft Lower Shell | 4 | EA | $ | $ | |
| 0205AH | Replace Cabin Roof and Forward and Aft Lower Shell | 1 | EA | $ | $ | |
| 0205AJ | Replace Cabin Roof in conjunction with ACI | 5 | EA | $ | $ | |
| 0205AK | Replace Forward Lower Shell in conjunction with ACI | 12 | EA | $ | $ | |
| 0205AL | Replace Aft Lower Shell in conjunction with ACI | 2 | EA | $ | $ | |
| 0205AM | Replace Cabin Roof and Forward Lower Shell in conjunction with ACI | 4 | EA | $ | $ | |
| 0205AN | Replace Cabin Roof and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0205AP | Replace Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0205AQ | Replace Cabin Roof and Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ |
0206 Flight Hour Generated Maintenance 78,000 FH $ $ FFP
| 0207 | On-Site Conditional Maintenance | LH | ||||
| 0207AA | Airframe On-Site Conditional Maintenance | 7,000 | LH | $ | $ | |
| 0207AB | Engines On-Site Conditional Maintenance | 5,800 | LH | $ | $ |
| 0208 | Depot Conditional Maintenance | LH | ||||
| 0208AA | Airframe Depot Conditional Maintenance (Airframe Repair) | 50,000 | LH | $ | $ | |
| 0208AB | Engines Depot Conditional Maintenance (Engine Repair) | 15,000 | LH | $ | $ |
0209 Off-Site Emergency Repair Services (Contractor) 2,400 LH $ $ LH
0210 Engineering and Technical Services 800 LH $ $ LH
0211 Modifications - Development 2,000 LH $ $ LH
| 0212 | Material and Subcontractor Labor | $ 25,461,600.00 | Cost Re | |||
| 0212AA | Material and Subcontractor Labor (Flight Operations) | 1 | LOT | TBD | TBD | |
| 0212AB | Material and Subcontractor Labor (ACI) | 1 | LOT | TBD | TBD | |
| 0212AC | Material and Subcontractor Labor In-Service Repairs (ISR) | 1 | LOT | TBD | TBD | |
| 0212AD | Material and Subcontractor Labor (Engine Repair) | 1 | LOT | TBD | TBD | |
| 0212AE | Material and Subcontractor Labor (PRL) | 1 | LOT | TBD | TBD | |
| 0212AF | Material and Subcontractor Labor (Special Rework) | 1 | LOT | TBD | TBD | |
| 0212AG | Material and Subcontractor Labor (Patuxent River) | 1 | LOT | TBD | TBD | |
| 0212AH | Material and Subcontractor Labor (Modification - Development) | 1 | LOT | TBD | TBD | |
| 0212AJ | Material and Subcontractor Labor (Modification - Production) | 1 | LOT | TBD | TBD |
0213 Off-Site Emergency Repair Services (Subcontractor) 1 LOT $ 106,090.00 $ 106,090.00 Cost Re
0214 Travel and Per Diem 1 LOT $ 13,792.00 $ 13,792.00 Cost Re
0215 Technical Data IAW Exhibit A 1 LOT $ NSP $ NSP NSP
| 0216 | Performance Measurement Framework Incentive | FFP | ||||
| 0016AA | Performance Measurement Framework Incentive - First Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AB | Performance Measurement Framework Incentive - Second Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AC | Performance Measurement Framework Incentive - Third Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AD | Performance Measurement Framework Incentive - Fourth Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 |
0217 Modifications - Production 2,000 LH $ - 0 $ - 0 LH
| 0218 | Weekend/Holiday Flight Operations Per Day | FFP | ||||
| 0218AA | Weekend/Holiday Flight Operations - 50 Aircraft | 25 | EA | $ | $ | |
| 0218AB | Weekend/Holiday Flight Operations - 93 Aircraft | 40 | EA | $ | $ |
OPTION 2 Page &P
Option 3
| SECTION L ATTACHMENT 4 | |||||
| SECTION B "SUPPLIES OR SERVICES AND PRICES/COST | |||||
| ITEM | SUPPLIES/SERVICES | QTY | UNIT | UNIT PRICE/COST | EXTENDED PRICE/COST |
TH-57 OPTION PERIOD 03
| 0301 | Fixed Maintenance for NAS Whiting Field | FFP | ||||
| 0301AA | OPTION Fixed Maintenance 78 Aircraft Daily | 12 | MO | $ | $ | |
| 0301AB | OPTION Fixed Maintenance 83 Aircraft Daily | 12 | MO | $ | $ | |
| 0301AC | OPTION Fixed Maintenance 88 Aircraft Daily | 12 | MO | $ | $ | |
| 0301AD | OPTION Fixed Maintenance 93 Aircraft Daily | 12 | MO | $ | $ | |
| 0301AE | OPTION Fixed Maintenance 96 Aircraft Daily | 12 | MO | $ | $ |
0302 Satellite Site Support for NAS Patuxent River 12 MO $ $ FFP
0303 Additional One Aircraft for One Day 6 EA $ $ FFP
0304 Scheduled Depot - Aircraft Condition Inspection (ACI) 24 EA $ $ FFP
| 0305 | Unscheduled Depot | FFP | ||||
| 0305AA | Engine Overhaul due to Metal Contamination | 6 | EA | $ | $ | |
| 0305AB | Replace Cabin Roof | 2 | EA | $ | $ | |
| 0305AC | Replace Forward Lower Shell | 1 | EA | $ | $ | |
| 0305AD | Replace Aft Lower Shell | 1 | EA | $ | $ | |
| 0305AE | Replace Cabin Roof and Forward Lower Shell | 1 | EA | $ | $ | |
| 0305AF | Replace Cabin Roof and Aft Lower Shell | 2 | EA | $ | $ | |
| 0305AG | Replace Forward and Aft Lower Shell | 4 | EA | $ | $ | |
| 0305AH | Replace Cabin Roof and Forward and Aft Lower Shell | 1 | EA | $ | $ | |
| 0305AJ | Replace Cabin Roof in conjunction with ACI | 5 | EA | $ | $ | |
| 0305AK | Replace Forward Lower Shell in conjunction with ACI | 12 | EA | $ | $ | |
| 0305AL | Replace Aft Lower Shell in conjunction with ACI | 2 | EA | $ | $ | |
| 0305AM | Replace Cabin Roof and Forward Lower Shell in conjunction with ACI | 4 | EA | $ | $ | |
| 0305AN | Replace Cabin Roof and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0305AP | Replace Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0305AQ | Replace Cabin Roof and Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ |
0306 Flight Hour Generated Maintenance 78,000 FH $ $ FFP
| 0307 | On-Site Conditional Maintenance | LH | ||||
| 0307AA | Airframe On-Site Conditional Maintenance | 7,000 | LH | $ | $ | |
| 0307AB | Engines On-Site Conditional Maintenance | 5,800 | LH | $ | $ |
| 0308 | Depot Conditional Maintenance | LH | ||||
| 0308AA | Airframe Depot Conditional Maintenance (Airframe Repair) | 50,000 | LH | $ | $ | |
| 0308AB | Engines Depot Conditional Maintenance (Engine Repair) | 15,000 | LH | $ | $ |
0309 Off-Site Emergency Repair Services (Contractor) 2,400 LH $ $ LH
0310 Engineering and Technical Services 800 LH $ $ LH
0311 Modifications - Development 2,000 LH $ $ LH
| 0312 | Material and Subcontractor Labor | $ 26,225,447.00 | Cost Re | |||
| 0312AA | Material and Subcontractor Labor (Flight Operations) | 1 | LOT | TBD | TBD | |
| 0312AB | Material and Subcontractor Labor (ACI) | 1 | LOT | TBD | TBD | |
| 0312AC | Material and Subcontractor Labor In-Service Repairs (ISR) | 1 | LOT | TBD | TBD | |
| 0312AD | Material and Subcontractor Labor (Engine Repair) | 1 | LOT | TBD | TBD | |
| 0312AE | Material and Subcontractor Labor (PRL) | 1 | LOT | TBD | TBD | |
| 0312AF | Material and Subcontractor Labor (Special Rework) | 1 | LOT | TBD | TBD | |
| 0312AG | Material and Subcontractor Labor (Patuxent River) | 1 | LOT | TBD | TBD | |
| 0312AH | Material and Subcontractor Labor (Modification - Development) | 1 | LOT | TBD | TBD | |
| 0312AJ | Material and Subcontractor Labor (Modification - Production) | 1 | LOT | TBD | TBD |
0313 Off-Site Emergency Repair Services (Subcontractor) 1 LOT $ 109,272.00 $ 109,272.00 Cost Re
0314 Travel and Per Diem 1 LOT $ 14,206.00 $ 14,206.00 Cost Re
0315 Technical Data IAW Exhibit A 1 LOT $ NSP $ NSP NSP
| 0316 | Performance Measurement Framework Incentive | FFP | ||||
| 0016AA | Performance Measurement Framework Incentive - First Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AB | Performance Measurement Framework Incentive - Second Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AC | Performance Measurement Framework Incentive - Third Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AD | Performance Measurement Framework Incentive - Fourth Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 |
0317 Modifications - Production 2,000 LH $ - 0 $ - 0 LH
| 0318 | Weekend/Holiday Flight Operations Per Day | FFP | ||||
| 0318AA | Weekend/Holiday Flight Operations - 50 Aircraft | 25 | EA | $ | $ | |
| 0318AB | Weekend/Holiday Flight Operations - 93 Aircraft | 40 | EA | $ | $ |
OPTION 3 Page &P
Option 4
| SECTION L ATTACHMENT 4 | |||||
| SECTION B "SUPPLIES OR SERVICES AND PRICES/COST | |||||
| ITEM | SUPPLIES/SERVICES | QTY | UNIT | UNIT PRICE/COST | EXTENDED PRICE/COST |
TH-57 OPTION PERIOD 04
| 0401 | Fixed Maintenance for NAS Whiting Field | FFP | ||||
| 0401AA | OPTION Fixed Maintenance 78 Aircraft Daily | 12 | MO | $ | $ | |
| 0401AB | OPTION Fixed Maintenance 83 Aircraft Daily | 12 | MO | $ | $ | |
| 0401AC | OPTION Fixed Maintenance 88 Aircraft Daily | 12 | MO | $ | $ | |
| 0401AD | OPTION Fixed Maintenance 93 Aircraft Daily | 12 | MO | $ | $ | |
| 0401AE | OPTION Fixed Maintenance 96 Aircraft Daily | 12 | MO | $ | $ |
0402 Satellite Site Support for NAS Patuxent River 12 MO $ $ FFP
0403 Additional One Aircraft for One Day 6 EA $ $ FFP
0404 Scheduled Depot - Aircraft Condition Inspection (ACI) 24 EA $ $ FFP
| 0405 | Unscheduled Depot | FFP | ||||
| 0405AA | Engine Overhaul due to Metal Contamination | 6 | EA | $ | $ | |
| 0405AB | Replace Cabin Roof | 2 | EA | $ | $ | |
| 0405AC | Replace Forward Lower Shell | 1 | EA | $ | $ | |
| 0405AD | Replace Aft Lower Shell | 1 | EA | $ | $ | |
| 0405AE | Replace Cabin Roof and Forward Lower Shell | 1 | EA | $ | $ | |
| 0405AF | Replace Cabin Roof and Aft Lower Shell | 2 | EA | $ | $ | |
| 0405AG | Replace Forward and Aft Lower Shell | 4 | EA | $ | $ | |
| 0405AH | Replace Cabin Roof and Forward and Aft Lower Shell | 1 | EA | $ | $ | |
| 0405AJ | Replace Cabin Roof in conjunction with ACI | 5 | EA | $ | $ | |
| 0405AK | Replace Forward Lower Shell in conjunction with ACI | 12 | EA | $ | $ | |
| 0405AL | Replace Aft Lower Shell in conjunction with ACI | 2 | EA | $ | $ | |
| 0405AM | Replace Cabin Roof and Forward Lower Shell in conjunction with ACI | 4 | EA | $ | $ | |
| 0405AN | Replace Cabin Roof and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0405AP | Replace Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0405AQ | Replace Cabin Roof and Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ |
0406 Flight Hour Generated Maintenance 78,000 FH $ $ FFP
| 0407 | On-Site Conditional Maintenance | LH | ||||
| 0407AA | Airframe On-Site Conditional Maintenance | 7,000 | LH | $ | $ | |
| 0407AB | Engines On-Site Conditional Maintenance | 5,800 | LH | $ | $ |
| 0408 | Depot Conditional Maintenance | LH | ||||
| 0408AA | Airframe Depot Conditional Maintenance (Airframe Repair) | 50,000 | LH | $ | $ | |
| 0408AB | Engines Depot Conditional Maintenance (Engine Repair) | 15,000 | LH | $ | $ |
0409 Off-Site Emergency Repair Services (Contractor) 2,400 LH $ $ LH
0410 Engineering and Technical Services 800 LH $ $ LH
0411 Modifications - Development 2,000 LH $ $ LH
| 0412 | Material and Subcontractor Labor | $ 27,012,212.00 | Cost Re | |||
| 0412AA | Material and Subcontractor Labor (Flight Operations) | 1 | LOT | TBD | TBD | |
| 0412AB | Material and Subcontractor Labor (ACI) | 1 | LOT | TBD | TBD | |
| 0412AC | Material and Subcontractor Labor In-Service Repairs (ISR) | 1 | LOT | TBD | TBD | |
| 0412AD | Material and Subcontractor Labor (Engine Repair) | 1 | LOT | TBD | TBD | |
| 0412AE | Material and Subcontractor Labor (PRL) | 1 | LOT | TBD | TBD | |
| 0412AF | Material and Subcontractor Labor (Special Rework) | 1 | LOT | TBD | TBD | |
| 0412AG | Material and Subcontractor Labor (Patuxent River) | 1 | LOT | TBD | TBD | |
| 0412AH | Material and Subcontractor Labor (Modification - Development) | 1 | LOT | TBD | TBD | |
| 0412AJ | Material and Subcontractor Labor (Modification - Production) | 1 | LOT | TBD | TBD |
0413 Off-Site Emergency Repair Services (Subcontractor) 1 LOT $ 112,551.00 $ 112,551.00 Cost Re
0414 Travel and Per Diem 1 LOT $ 14,632.00 $ 14,632.00 Cost Re
0415 Technical Data IAW Exhibit A 1 LOT $ NSP $ NSP NSP
| 0416 | Performance Measurement Framework Incentive | FFP | ||||
| 0016AA | Performance Measurement Framework Incentive - First Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AB | Performance Measurement Framework Incentive - Second Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AC | Performance Measurement Framework Incentive - Third Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 | |
| 0016AD | Performance Measurement Framework Incentive - Fourth Quarter | 1 | LOT | $ 750,000.00 | $ 750,000.00 |
0417 Modifications - Production 2,000 LH $ - 0 $ - 0 LH
| 0418 | Weekend/Holiday Flight Operations Per Day | FFP | ||||
| 0418AA | Weekend/Holiday Flight Operations - 50 Aircraft | 25 | EA | $ | $ | |
| 0418AB | Weekend/Holiday Flight Operations - 93 Aircraft | 40 | EA | $ | $ |
OPTION 4 Page &P
File details come from the government source that posted it. Updated .