mta-bor298001_QTY_EARTHWORK_Approaches.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
MT FLAP BOR 2980(1), Sun River Bridge Replacement Federal contract opportunity
Solicitation number
69056724B000016
Issued by
Department of Transportation Federal Highway Administration

About this file

This document appears to be an Extracted Quantities Report related to a federal contract opportunity for the MT FLAP BOR 2980(1), Sun River Bridge Replacement project.

The key details are:

The project involves building a new 462-foot long precast-post-tensioned girder bridge with precast concrete deck and MSE wall approaches, located about 50 miles northwest of Augusta, MT. The work may include demolition of the existing steel truss bridge. The contract is a Sealed Bid, Firm-Fixed-Price with an estimated price range between $10-$20 million. The tentative completion date is Fall 2026. This solicitation is for full and open competition on an unrestricted basis.

View the file

Other files for this federal contract opportunity

Other files attached to MT FLAP BOR 2980(1), Sun River Bridge Replacement, newest first.
File Type Posted
Tabulation of Bids.pdf PDF
BidSum.pdf PDF
QA_11-13-2024.pdf PDF
Amendment A008.pdf PDF
QA_11-08-2024.pdf PDF
Amendment A007.pdf PDF
QA_11-07-2024.pdf PDF
Amendment A006.pdf PDF
QA_11-06-2024.pdf PDF
QA_11-05-2024 part 2.pdf PDF
QA_11-05-2024.pdf PDF
Siphon Construction Narrative.pdf PDF
Pages from D-1771-D0000 Construction Documents 1944.pdf PDF
Amendment A005.pdf PDF
QA_11-04-2024.pdf PDF
QA_11-01-2024.pdf PDF
QA_10-31-2024.pdf PDF
QA_10-24-2024.pdf PDF
Amendment A004.pdf PDF
QA_10-22-2024.pdf PDF
Amendment A003.pdf PDF
Amendment A002.pdf PDF
QA_10-18-2024.pdf PDF
Physical Data_2.zip ZIP file
Amendment A001.pdf PDF
mta-bor298001_Plans Sun River Bridge Replacement.pdf PDF
Physical Data.zip ZIP file
FY21_GPMT0311_Rtn-FC InspRpt.pdf PDF
mta-bor298001_CompiledSWPPP_Signed.pdf PDF
mta-bor298001_ALI_APPR_APPR-02.pdf PDF
mta-bor298001_PRO_APPR_APPR-02.pdf PDF
mta-bor298001_ALI_MAIN_MAIN-01.pdf PDF
mta-bor2980-1_SunRiverBridge_HaulRoadAssessment.pdf PDF
mta-bor2980-1_Combined Asbestos Report 999-5098.pdf PDF
mta-bor2980-1_SunRiverBridge_InadvertentDiscoveryPlan.pdf PDF
mta-bor298001_QTY_EARTHWORK_Mainline.xlsx XLSX spreadsheet
mta-bor298001_ALI_APPR_APPR-01.pdf PDF
mta-bor298001_SuperelevationReport.xlsx XLSX spreadsheet
mta-bor298001_SUR_ControlPoints.xlsx XLSX spreadsheet
mta-bor298001_FinalHydraulicMemo.pdf PDF
mta-bor2980-1_SunRiverBridge_SiphonInspectionReport.pdf PDF
mta-bor298001_QTY_EARTHWORK_Mainline.pdf PDF
mta-bor298001_PRO_APPR_APPR-01.pdf PDF
mta-bor298001_PRO_MAIN_MAIN-01.pdf PDF
IFB Sun River Bridge Replacement.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Extracted Quantities Report by Named Boundary

Report Created: Thursday, May 23, 2024
Time: 10:34:07 AM
Named Boundary Group:Approach Plan Quantities
Alignment Name:
Input Grid Factor:Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.
StationNamed Boundary NameMaterialCountLengthTop Sloped AreaVolume
N.A."APPR-02"
Fill:2887.157
Turf Establishment:1610.14
Foreslope:1005.613
Shoulder Layer 1:504.127251.235
Cut:696.31
Pavement Layer 1:3029.3091464.378
DNC:
Exist Topsoil:3877.5681917.839
Volumes_Cut:1018.175610.707
Volumes_Fill:6157.89916796.205
Edge of Pavt Exist:508.3988254
Volumes_Topsoil Stripping Limits:699.7154728
Baseline - Approach:170.0634435
Centerline 1:292.5183836
Centerline:292.5183836
Prop Clearing:318.603367
DNC:1081.5111476
Ditch:160.1100622
Edge of Widen 1:360.1306033
Edge of Widen:370.7231806
Edge of Pavt 1:303.4533755
Edge of Shld 1:318.8570936
Edge of Shld:251.5872884
Centerline Exist:292.5183836
Cut:89.9481299
Fill:225.5703155
Approach road match line:88.323905
Baseline:
AUX_10:
N.A."APPR-01"
Cut:1690.244
Fill:2353.633
Turf Establishment:2747.506
Foreslope:1099.553
Pavement Layer 1:4291.9681997.503
DNC:
Shoulder Layer 1:662.235329.218
Exist Topsoil:8094.464004.834
Volumes_Cut:1828.332956.399
Volumes_Fill:7305.93817171.365
Edge of Pavt Exist:559.2124943
Volumes_Topsoil Stripping Limits:1025.9777444
Baseline:126.243151
AUX_10:16.2391165
Baseline - Approach:267.2252705
Centerline 1:379.5494081
Centerline:379.5494081
Prop Clearing:481.796308
DNC:1435.4358369
Ditch:447.3068795
Edge of Widen 1:483.4850303
Edge of Widen:499.7656986
Edge of Pavt 1:412.8830246
Edge of Shld 1:417.3128665
Edge of Shld:330.4301925
Centerline Exist:379.5494081
Cut:263.1467413
Fill:199.3416207
Approach road match line:84.1590269