mta-bor298001_QTY_EARTHWORK_Approaches.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- MT FLAP BOR 2980(1), Sun River Bridge Replacement Federal contract opportunity
- Solicitation number
- 69056724B000016
About this file
This document appears to be an Extracted Quantities Report related to a federal contract opportunity for the MT FLAP BOR 2980(1), Sun River Bridge Replacement project.
The key details are:
The project involves building a new 462-foot long precast-post-tensioned girder bridge with precast concrete deck and MSE wall approaches, located about 50 miles northwest of Augusta, MT. The work may include demolition of the existing steel truss bridge. The contract is a Sealed Bid, Firm-Fixed-Price with an estimated price range between $10-$20 million. The tentative completion date is Fall 2026. This solicitation is for full and open competition on an unrestricted basis.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Extracted Quantities Report by Named Boundary
| Report Created: Thursday, May 23, 2024 | ||
| Time: 10:34:07 AM | ||
| Named Boundary Group: | Approach Plan Quantities | |
| Alignment Name: | ||
| Input Grid Factor: | Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise. |
| Station | Named Boundary Name | Material | Count | Length | Top Sloped Area | Volume |
| N.A. | "APPR-02" | |||||
| Fill: | 2887.157 | |||||
| Turf Establishment: | 1610.14 | |||||
| Foreslope: | 1005.613 | |||||
| Shoulder Layer 1: | 504.127 | 251.235 | ||||
| Cut: | 696.31 | |||||
| Pavement Layer 1: | 3029.309 | 1464.378 | ||||
| DNC: | ||||||
| Exist Topsoil: | 3877.568 | 1917.839 | ||||
| Volumes_Cut: | 1018.175 | 610.707 | ||||
| Volumes_Fill: | 6157.899 | 16796.205 | ||||
| Edge of Pavt Exist: | 508.3988254 | |||||
| Volumes_Topsoil Stripping Limits: | 699.7154728 | |||||
| Baseline - Approach: | 170.0634435 | |||||
| Centerline 1: | 292.5183836 | |||||
| Centerline: | 292.5183836 | |||||
| Prop Clearing: | 318.603367 | |||||
| DNC: | 1081.5111476 | |||||
| Ditch: | 160.1100622 | |||||
| Edge of Widen 1: | 360.1306033 | |||||
| Edge of Widen: | 370.7231806 | |||||
| Edge of Pavt 1: | 303.4533755 | |||||
| Edge of Shld 1: | 318.8570936 | |||||
| Edge of Shld: | 251.5872884 | |||||
| Centerline Exist: | 292.5183836 | |||||
| Cut: | 89.9481299 | |||||
| Fill: | 225.5703155 | |||||
| Approach road match line: | 88.323905 | |||||
| Baseline: | ||||||
| AUX_10: | ||||||
| N.A. | "APPR-01" | |||||
| Cut: | 1690.244 | |||||
| Fill: | 2353.633 | |||||
| Turf Establishment: | 2747.506 | |||||
| Foreslope: | 1099.553 | |||||
| Pavement Layer 1: | 4291.968 | 1997.503 | ||||
| DNC: | ||||||
| Shoulder Layer 1: | 662.235 | 329.218 | ||||
| Exist Topsoil: | 8094.46 | 4004.834 | ||||
| Volumes_Cut: | 1828.332 | 956.399 | ||||
| Volumes_Fill: | 7305.938 | 17171.365 | ||||
| Edge of Pavt Exist: | 559.2124943 | |||||
| Volumes_Topsoil Stripping Limits: | 1025.9777444 | |||||
| Baseline: | 126.243151 | |||||
| AUX_10: | 16.2391165 | |||||
| Baseline - Approach: | 267.2252705 | |||||
| Centerline 1: | 379.5494081 | |||||
| Centerline: | 379.5494081 | |||||
| Prop Clearing: | 481.796308 | |||||
| DNC: | 1435.4358369 | |||||
| Ditch: | 447.3068795 | |||||
| Edge of Widen 1: | 483.4850303 | |||||
| Edge of Widen: | 499.7656986 | |||||
| Edge of Pavt 1: | 412.8830246 | |||||
| Edge of Shld 1: | 417.3128665 | |||||
| Edge of Shld: | 330.4301925 | |||||
| Centerline Exist: | 379.5494081 | |||||
| Cut: | 263.1467413 | |||||
| Fill: | 199.3416207 | |||||
| Approach road match line: | 84.1590269 |
File details come from the government source that posted it. Updated .