Amendment A002.pdf

PDF 1 MB Posted

Attached to
MT FLAP BOR 2980(1), Sun River Bridge Replacement Federal contract opportunity
Solicitation number
69056724B000016
Issued by
Department of Transportation Federal Highway Administration

About this file

This document is an Amendment (A002) to a federal solicitation for the MT FLAP BOR 2980(1), Sun River Bridge Replacement project.

The amendment revises Plan sheet #D.5 to add a construction limit overview. The solicitation is for a new bridge construction project about 200 feet downstream of the existing bridge, with new approach embankments and MSE wall approaches. The work includes building a 3-span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck, and abutments supported on spread footings and piles within an MSE wall fill. There is also an option to demolish the existing steel truss bridge upon completion of the new structure. The solicitation is offered for full and open competition, with an estimated price range between $10 million to $20 million and a tentative completion date of Fall 2026. The contracting agency is the Department of Transportation Federal Highway Administration.

View the file

Other files for this federal contract opportunity

Other files attached to MT FLAP BOR 2980(1), Sun River Bridge Replacement, newest first.
File Type Posted
Tabulation of Bids.pdf PDF
BidSum.pdf PDF
QA_11-13-2024.pdf PDF
Amendment A008.pdf PDF
QA_11-08-2024.pdf PDF
Amendment A007.pdf PDF
QA_11-07-2024.pdf PDF
Amendment A006.pdf PDF
QA_11-06-2024.pdf PDF
QA_11-05-2024 part 2.pdf PDF
QA_11-05-2024.pdf PDF
Pages from D-1771-D0000 Construction Documents 1944.pdf PDF
Siphon Construction Narrative.pdf PDF
Amendment A005.pdf PDF
QA_11-04-2024.pdf PDF
QA_11-01-2024.pdf PDF
QA_10-31-2024.pdf PDF
QA_10-24-2024.pdf PDF
Amendment A004.pdf PDF
QA_10-22-2024.pdf PDF
Amendment A003.pdf PDF
QA_10-18-2024.pdf PDF
Physical Data_2.zip ZIP file
Amendment A001.pdf PDF
mta-bor298001_Plans Sun River Bridge Replacement.pdf PDF
Physical Data.zip ZIP file
FY21_GPMT0311_Rtn-FC InspRpt.pdf PDF
mta-bor298001_CompiledSWPPP_Signed.pdf PDF
mta-bor298001_ALI_APPR_APPR-02.pdf PDF
mta-bor298001_PRO_APPR_APPR-02.pdf PDF
mta-bor298001_ALI_MAIN_MAIN-01.pdf PDF
mta-bor2980-1_SunRiverBridge_HaulRoadAssessment.pdf PDF
mta-bor2980-1_Combined Asbestos Report 999-5098.pdf PDF
mta-bor2980-1_SunRiverBridge_InadvertentDiscoveryPlan.pdf PDF
mta-bor298001_QTY_EARTHWORK_Mainline.xlsx XLSX spreadsheet
mta-bor298001_FinalHydraulicMemo.pdf PDF
mta-bor2980-1_SunRiverBridge_SiphonInspectionReport.pdf PDF
mta-bor298001_QTY_EARTHWORK_Mainline.pdf PDF
mta-bor298001_PRO_APPR_APPR-01.pdf PDF
mta-bor298001_PRO_MAIN_MAIN-01.pdf PDF
mta-bor298001_QTY_EARTHWORK_Approaches.xlsx XLSX spreadsheet
IFB Sun River Bridge Replacement.pdf PDF
mta-bor298001_ALI_APPR_APPR-01.pdf PDF
mta-bor298001_SuperelevationReport.xlsx XLSX spreadsheet
mta-bor298001_SUR_ControlPoints.xlsx XLSX spreadsheet
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 10/21/2024 N/A MT FLAP BOR 2980(1)

Sun River Bridge Replacement

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056724B000016

9B. DATED (SEE ITEM 11)

10/15/2024

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

MT FLAP BOR 2980(1), Sun River Bridge Replacement Amendment A002 is issued to revise the following:

PLANS

Plan sheet #D.5 Adds construction limit overview.

ENCLOSURES: Plan sheet D.5

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

+ B C

G P S

B M

G P S

G P S

G P S e = 0.050

'38.70L =

'19.38T =

'300.00R =

(RT)07°23'30"Δ =

1+74.67PI

e = 0.054 '194.91L = '102.71T = '250.00R =

(RT)44°40'11"Δ =

9+55.20PI

10+ 47.39

PT

N41°34'47" E N48°58'18"E

.2

P C

.0

T

.4

C

.4

P

O B 1 2 3 4 5 6 7 8 9

West Approach: 2+99.1354 (B)

Mid-West: 4+39.1357 (B)

Mid-East: 6+14.1360 (B)

East Approach: 7+54.1363 (B)

B r id g e

B T

G B r id g e B

B r id g e

B T

G B r id g e B

N

81740.3118E=

43526.7219N=

1+02.68"MAIN 01"

BEGIN CONSTRUCTION

81725.5703E= 43510.1064N=

0+80.47"MAIN 01"

BEGIN PROJECT

11.00' LT

+54.14

8.00' LT

+79.84

11.00' RT

+54.14

8.00' RT

+79.84

8.00' LT

+55.08

.7

L T

.3

.0

L T

.3

.2

' R

T

.4

.0

' R

T

.4

.0

L T

.0

.0

' R

T

.0

.0

' R

T

.0

0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00

4,440 4,440

4,450 4,450

4,460 4,460

4,470 4,470

.0

.7

HLSD = INF'

K = 67

75' VC4

,4 .0

HLSD = 270'

K = 54

250' VC

-0.83%

+0.29%

-2.38%

.0

.0

.0

.5

SSD = 447'

K = 32

85' VC

B C

West Approach: 2+99.1354 (B)

Mid-West: 4+39.1357 (B)

Mid-East: 6+14.1360 (B)

East Approach: 7+54.1363 (B)

Bridge (BTG Bridge - B)

Bridge (BTG Bridge - B)

Slope stake limit

Slope stake limit

Line to be constructed

"MAIN 01"

Existing ground

Profile grade

Special ditch bottom

2+95.50 Begin Sun River Bridge

7+57.76 End Sun River Bridge

See Section H for details.

7+42.14 to 8+29.83 LT

"WALL 03" MSE wall

See Section H for details.

7+42.14 to 8+04.82 RT

"WALL 04" MSE wall

Construction limit (typ.)

Construction limit

S u n R iv e r

Fence (wildlife-friendly)

Fence (wildlife-friendly)

Install gate, metal, 16 feet

CONNECTION DETAIL

(406) 564-5677 Scott Steyee Fairfield, MT 59436 310 1st Avenue South Sun River Electric Co-Op

(406) 590-2591 Scott Kocan Fairfield, MT 59436 406 2nd Avenue South/P.O. Box 429 3 Rivers Communications

UTILITY OWNER CONTACT(S)*

Road Sun Canyon

.6

Section See Typical

Existing EOP

Pishkun Road

"APPR 01"

"APPR 02"

LT & RT

Class B Wood Posts

Type 4, Guardrail System MGS, .6

LT & RT

(Weathering Steel) Structure Transition Railing, MGS System

.7

LT & RT

(Weathering Steel) Type MGS Tangent

Terminal Section, .1

.1

Guardrail System MGS, Type 4, Class B Wood Posts RT

.7

LT & RT

(Weathering Steel)

Structure Transition Railing, MGS System

.3

.2

Guardrail System MGS, Type 4, Class B Wood Posts LT

.1

Terminal Section, Type MGS Tangent (Weathering Steel) LT 8

.8

Terminal Section, Type MGS Tangent (Weathering Steel) RT

.3

.2

National Forest Service Lands

Bureau of Land Management Lands

50'R

R

See Section H for details.

3+03.15 RT

"WALL 02" MSE wall

See Section H for details.

3+03.15 LT

"WALL 01" MSE wall move prior to construction.

Sun River Electric Co-Op to Overhead power pole

* Preserve and protect existing utilities

Klick & Robinson, LLC

Canal

Pishkun edge of water2 Q

N

Construction limit (typ.)

CONSTRUCTION LIMIT OVERVIEW

Sun River

Existing bridge

Proposed bridge

20' (typ.)

20' (typ.)

20' (typ.)

20' (typ.)

limit (typ.)

Construction

Line to be constructed

"MAIN 01"

1 Revised by Amendment A001 road (typ.)

Existing edge of a rc h p ip e c u lv e rt q u iv a le n t In s ta ll

PISHKUN ROAD

Pishk un R oad

:3

A

M

O c to b e r

P is h k u n R d

P la n

S h e t]

R

P A

-H L

N -0

\S h a re d

\h ig h w a y s \F

H W

A \2 m ta

-b o r2

-1

S u n R iv e rB ri d g e

\D G

N \P la n a n d P ro fi le

\m ta

-b o r2 p ln p p

.d g n

PROJECT

NUMBER

SHEET

D.4

MT FLAP BOR 2980(1)

File details come from the government source that posted it. Updated .