Amendment A007.pdf
PDF 769 KB Posted
- Attached to
- MT FLAP BOR 2980(1), Sun River Bridge Replacement Federal contract opportunity
- Solicitation number
- 69056724B000016
About this file
This document is an Amendment (A007) to Solicitation 69056724B000016 for the "MT FLAP BOR 2980(1), Sun River Bridge Replacement" project. The project involves building a new 462-foot long precast-post-tensioned girder bridge and approach work approximately 200 feet downstream of the existing bridge. Key revisions in this amendment include an updated bid opening date of 11/20/2024, changes to the disposal of materials requirements, and additional details on the pre-demolition asbestos inspection for the existing bridge. The overall project is located 50 miles northwest of Augusta, MT, has an estimated value between $10-20 million, and a tentative completion date of Fall 2026. The contract will be awarded through a sealed bid, firm-fixed-price procurement on an unrestricted, full and open competition basis.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A007 11/08/2024 N/A MT FLAP BOR 2980(1)
Sun River Bridge Replacement
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X 69056724B000016
9B. DATED (SEE ITEM 11)
10/15/2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A D OTHER (Specify type of modification and authority)
N/A E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MT FLAP BOR 2980(1), Sun River Bridge Replacement
See Page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A007, dated 11/08/24 Project No. MT FLAP BOR 2980(1) Solicitation No. 6905672B000016 Project Name Sun River Bridge Replacement
REVISIONS ARE AS FOLLOWS:
SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change)
Page A-3, Block 13A. Revises bid opening date from 11/13/2024 to 11/20/24, 1400pm Pacific time.
SPECIAL CONTRACT REQUIREMENTS
Page F-3 Subsection 203.05 Disposing of Material, Revises 4th paragraph on page F-3.
PLANS
Plan sheet #M.20
ENCLOSURES
Pages:
F-3
Plan Sheets:
M.20
Page(s) not included due to Pen and Ink change(s):
A-3 through A-3
New bid opening date: 11/20/2024
F-3 DIVISION 200
Special Contract Requirements Project: MT FLAP BOR 2980(1), Sun River Bridge Replacement
(8) 40 CFR 50.6 - EPA National Primary and Secondary Ambient Air Quality Standards for Particulate Matter;
(9) 40 CFR 50.12 - EPA National Primary and Secondary Ambient Air Quality Standards for Lead; and
(10) 40 CFR Parts 260-268 - Resource Conservation and Recovery Act (RCRA).
At least 28 days before beginning work at the Sprague Creek Lift Station, submit a written plan for acceptance that details the measures to be used for protecting the environment, public, adjacent property, and workers. Include in the plan the following:
(11) Manufacturer’s material safety data sheets and product data sheets for any cleaning and painting products;
(12) A detailed containment plan for removed material, cleaning products, and paint debris.
Include details of attachment to the structure;
(13) A detailed disposal plan for removed material, cleaning products, and paint debris;
(14) Specific safety measures to protect workers from site hazards including falls and fumes;
(15) Emergency spill procedures; and
(16) A competent person responsible for ensuring that all necessary health, safety, and containment measures are enacted and maintained.
After acceptance, perform work according to the plan. If the measures fail to perform as intended, immediately stop work and take corrective action. Collect and properly dispose of all material including wastewater that is used in preparing, cleaning, or painting material with lead content.
The existing Sun River Bridge has had a Pre-Demolition Asbestos Inspection performed per EPA requirements. The inspection reports did not detect any asbestos materials and are posted in FAR Clause 52.236-4 physical data.
Revised by Amendment A007
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
AUGUST 2024 As Shown
STATE PROJECT
NUMBER
SHEET
FLAP BOR 2980(1)MT
SUN RIVER BRIDGE
MONTANA
LEWIS AND CLARK COUNTY AND TETON COUNTY
D. McIntierB. Schlachter S. McDonald
BRIDGE DRAWING
(1 of 6)
BULB TEE GIRDER, 74-INCH DETAILS
PRECAST, PRESTRESSED CONCRETE
RG3296-T
O R
D m ta b o r b r g p ln
.d g n
S u n R iv e r B r id g e R e p la c e
:3
P
M
N o v e m b e r
No Scale
POST-TENSIONING NOTES
POST-TENSIONING TABLE
SPAN GIRDER
GIRDER CLOSURE
STRENGTH (KSI)
COMPRESSIVE
MIN. CONC.
STRANDS
OF
NUMBER
(KIPS)
PRESTRESSING LOAD
JACKING
SEATING
AFTER LOSS (KSI)
PRESTRESS
TOTAL
TEMPORARY STRANDS
STRANDS
NUMBER OF
FORCE (KIPS)
JACKING
DUCT SPLICE DETAIL
No Scale
STRAND LOCATION DETAIL
No Scale
SPAN�STRAND PATTERN AT
POST-TENSIONING
No Scale
* MEASURED BEFORE POST-TENSIONING
SHOWING POST-TENSIONING CABLE PATHS
PRECAST LONGITUDINAL HALF-SECTION
No Scale
CLOSURE DETAIL
TENDON IN SAG CURVE
SEGMENT
PRECAST END
PRECAST MID-SEGMENT
This sheet See "CLOSURE DETAIL"
Span�Symm. about
(typ.)diaphragms splaying at end 2" Clr. except for
� Ducts
D u c ts
¾ profile on post-tensioning Dimension shown strands C.G. of
M
IN
� Ducts shrink sleeve 4" Heat segments precast End of
3" 3"1'-6"
2'-0"
Closure
2-G8 #6
Typ.
2-G5 #5
6-G4 #5
Splice, Typ.
1'-6" Min. Lap
Spa. @4" = 1'-8" (2)#3G10 (2)#5G8, #5G9, 2" 2"
See Duct Splice Detail
1 A-C 10 18 61 2702 2464 12.1 6 264
2 A-C 10 18 61 2702 2464 12.1 6 264
3 A-C 10 18 61 2702 2464 12.1 6 264 elastic shortening creep and shrinkage of concrete.
strands shown in the post-tensioning table due to steel relaxation, The design is based on the estimated prestress loss of post-tensioning4.
contractor in the shop plans and include them in the transfer force calculations k = 0.0002/ft. Specify the actual anchor set and jacking force used by the a curvature friction coefficient, µ = 0.20 and a wobble friction coefficient, The design is based on 0.6"ø low relaxation strands with an anchor set of 3#8,3.
steel in the duct.
duct is at least 2.5 times the net area of the prestressing inside diameter of the Use a maximum nominal duct diameter of 4 inches. The minimum area using the 2.
place concrete at the closure at the time of post-tensioning Post-tensioning table shows the minimum compressive strength of the cast-in-1.
� Brg.
� Pier 2
� Closure
227'-6"
150'-0" 77'-6"*
10'-0"
84'-0" 42'-0" 61'-3"
1'-0"
2post-tensioning strands
C.G. of total between control points Parabolic curve
M.20
If the optional girder splice is used, stress all tendons from the east end of the bridge.7.
Stress all tendons from one end.6.
is eccentric from the centerline of bridge.
tendons in a way so that, at no time, more than 1/6 of the total prestressing force adjacent webs to an equal force prior to stressing that web any further. Stress the
b. When one half of the total prestressing force in any web is stressed, stress the and in such a way that it is placed symmetrically about the centline of the bridge.
a.distribute the prestressing force with an approximately equal amount in each web calculations. Criteria for the stressing sequence are as follows:
losses due to tendion vertical and horizontal curvature in the elongation Include all Submit the stressing sequence and elongation calculations for approval.5.
75'-0" � Optional Closure
See "CLOSURE DETAIL" this sheet Optional closure at span 3 only 1'-0"
Blockout�
"2
#5G5
Middle segmentEnd segment
#5G4
#5G3
(2)#6G1
7 Revised by Amendment A007
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A007 |
File details come from the government source that posted it. Updated .