This document is a Horizontal Alignment Review Report for the "APPR-01" alignment of the MT FLAP BOR 2980(1), Sun River Bridge Replacement project. The report provides detailed technical information about the horizontal alignment, including station locations, tangents, curves, radii, and other geometric elements.

The related federal contract opportunity is for the MT FLAP BOR 2980(1), Sun River Bridge Replacement project. The work consists of building a new 462-foot long, 3-span precast-post-tensioned girder bridge with precast concrete deck, along with new embankment and MSE wall approaches. The project is located 50 miles northwest of Augusta, MT and has a tentative completion date of Fall 2026. The contract type is Sealed Bid, Firm-Fixed-Price, with an estimated price range between $10 million to $20 million. The solicitation is offered for full and open competition on an unrestricted basis.

View the file

Other files for this federal contract opportunity

Other files attached to MT FLAP BOR 2980(1), Sun River Bridge Replacement, newest first.
File Type Posted
Tabulation of Bids.pdf PDF
BidSum.pdf PDF
QA_11-13-2024.pdf PDF
Amendment A008.pdf PDF
QA_11-08-2024.pdf PDF
Amendment A007.pdf PDF
QA_11-07-2024.pdf PDF
Amendment A006.pdf PDF
QA_11-06-2024.pdf PDF
QA_11-05-2024 part 2.pdf PDF
QA_11-05-2024.pdf PDF
Siphon Construction Narrative.pdf PDF
Pages from D-1771-D0000 Construction Documents 1944.pdf PDF
Amendment A005.pdf PDF
QA_11-04-2024.pdf PDF
QA_11-01-2024.pdf PDF
QA_10-31-2024.pdf PDF
QA_10-24-2024.pdf PDF
Amendment A004.pdf PDF
QA_10-22-2024.pdf PDF
Amendment A003.pdf PDF
Amendment A002.pdf PDF
QA_10-18-2024.pdf PDF
Physical Data_2.zip ZIP file
Amendment A001.pdf PDF
mta-bor2980-1_SunRiverBridge_HaulRoadAssessment.pdf PDF
mta-bor2980-1_Combined Asbestos Report 999-5098.pdf PDF
mta-bor2980-1_SunRiverBridge_InadvertentDiscoveryPlan.pdf PDF
mta-bor298001_QTY_EARTHWORK_Mainline.xlsx XLSX spreadsheet
mta-bor298001_SuperelevationReport.xlsx XLSX spreadsheet
mta-bor298001_SUR_ControlPoints.xlsx XLSX spreadsheet
mta-bor298001_Plans Sun River Bridge Replacement.pdf PDF
Physical Data.zip ZIP file
FY21_GPMT0311_Rtn-FC InspRpt.pdf PDF
mta-bor298001_CompiledSWPPP_Signed.pdf PDF
mta-bor298001_ALI_APPR_APPR-02.pdf PDF
mta-bor298001_PRO_APPR_APPR-02.pdf PDF
mta-bor298001_ALI_MAIN_MAIN-01.pdf PDF
mta-bor298001_FinalHydraulicMemo.pdf PDF
mta-bor2980-1_SunRiverBridge_SiphonInspectionReport.pdf PDF
mta-bor298001_QTY_EARTHWORK_Mainline.pdf PDF
mta-bor298001_PRO_APPR_APPR-01.pdf PDF
mta-bor298001_PRO_MAIN_MAIN-01.pdf PDF
mta-bor298001_QTY_EARTHWORK_Approaches.xlsx XLSX spreadsheet
IFB Sun River Bridge Replacement.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Horizontal Alignment Review Report Report Created: Thursday, August 8, 2024

Time: 9:13:33 AM

Project: Design IntlFt Description:

File Name: \\RPA-HLN-04\Shared\highways\FHWA\23500008_mta-bor2980-1_SunRiverBridge\DGN\mta-bor298001_cvc01 - Option_2.dgn

Last Revised: 8/8/2024 09:12:41

Note: All units in this report are in feet unless specified otherwise.

Alignment Name: "APPR-01" Alignment Description:

Alignment Style: Alignment\Baseline - Approach Station Northing Easting

Element: Linear

START ( "MAIN-

01" ) 999+88.84 44066.0800 82363.5695

PC ( PC ) 1000+37.27 44106.4318 82336.7823

Tangential Direction: N33.578°W

Tangential Length: 48.434

Element: Circular

PC ( PC ) 1000+37.27 44106.4318 82336.7823

HPI ( HPI ) 1000+76.74 44139.3108 82314.9557

CC ( CC ) 44073.2475 82286.7942

PT ( PT ) 1001+07.09 44132.2905 82276.1208

Radius: 60.000 Delta: 66.669° Left

Degree of Curvature (Arc): 95.493° Length: 69.816

Tangent: 39.464 Chord: 65.943

Middle Ordinate: 9.871 External: 11.815

Back Tangent Direction: N33.578°W Back Radial Direction: N56.422°E

Chord Direction: N66.912°W Ahead Radial Direction: N10.247°W

Ahead Tangent Direction: S79.753°W

Element: Linear

PT ( PT ) 1001+07.09 44132.2905 82276.1208

PC ( PC ) 1001+59.80 44122.9127 82224.2447

Page 1 of 2Horizontal Alignment Review Report

8/8/2024

Tangential Direction: S79.753°W Tangential Length: 52.717

Element: Circular

PC ( PC ) 1001+59.80 44122.9127 82224.2447

HPI ( HPI ) 1001+92.94 44117.0182 82191.6378

CC ( CC ) 44181.9557 82213.5713

PT ( PT ) 1002+20.35 44141.4767 82169.2830

Radius: 60.000 Delta: 57.820° Right

Degree of Curvature (Arc): 95.493° Length: 60.549

Tangent: 33.135 Chord: 58.012

Middle Ordinate: 7.477 External: 8.542

Back Tangent Direction: S79.753°W Back Radial Direction: N10.247°W

Chord Direction: N71.337°W Ahead Radial Direction: N47.573°E

Ahead Tangent Direction: N42.427°W

Element: Linear

PT ( PT ) 1002+20.35 44141.4767 82169.2830

END ( END ) 1002+48.27 44162.0812 82150.4507

Tangential Direction: N42.427°W

Tangential Length: 27.914

Page 2 of 2Horizontal Alignment Review Report