mta-bor298001_ALI_APPR_APPR-02.pdf

PDF 92 KB Posted

Attached to
MT FLAP BOR 2980(1), Sun River Bridge Replacement Federal contract opportunity
Solicitation number
69056724B000016
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains a Horizontal Alignment Review Report for the "APPR-02" alignment on the MT FLAP BOR 2980(1), Sun River Bridge Replacement project. The report provides detailed technical information on the horizontal alignment, including the station, coordinates, tangential direction and length, circular elements with radius and delta, and other geometric attributes.

The related federal contract opportunity is for the MT FLAP BOR 2980(1), Sun River Bridge Replacement project. The work involves building a new 462-foot long, 3-span precast-post-tensioned girder bridge with concrete deck, along with new embankment and MSE wall approaches, approximately 200 feet downstream of the existing steel truss bridge. The project is located 50 miles northwest of Augusta, MT and has a tentative completion date of Fall 2026. The contract will be a Sealed Bid, Firm-Fixed-Price with an estimated price range between $10 million to $20 million.

View the file

Other files for this federal contract opportunity

Other files attached to MT FLAP BOR 2980(1), Sun River Bridge Replacement, newest first.
File Type Posted
Tabulation of Bids.pdf PDF
BidSum.pdf PDF
QA_11-13-2024.pdf PDF
Amendment A008.pdf PDF
QA_11-08-2024.pdf PDF
Amendment A007.pdf PDF
QA_11-07-2024.pdf PDF
Amendment A006.pdf PDF
QA_11-06-2024.pdf PDF
QA_11-05-2024 part 2.pdf PDF
QA_11-05-2024.pdf PDF
Siphon Construction Narrative.pdf PDF
Pages from D-1771-D0000 Construction Documents 1944.pdf PDF
Amendment A005.pdf PDF
QA_11-04-2024.pdf PDF
QA_11-01-2024.pdf PDF
QA_10-31-2024.pdf PDF
QA_10-24-2024.pdf PDF
Amendment A004.pdf PDF
QA_10-22-2024.pdf PDF
Amendment A003.pdf PDF
Amendment A002.pdf PDF
QA_10-18-2024.pdf PDF
Physical Data_2.zip ZIP file
Amendment A001.pdf PDF
mta-bor298001_Plans Sun River Bridge Replacement.pdf PDF
Physical Data.zip ZIP file
FY21_GPMT0311_Rtn-FC InspRpt.pdf PDF
mta-bor298001_CompiledSWPPP_Signed.pdf PDF
mta-bor298001_PRO_APPR_APPR-02.pdf PDF
mta-bor298001_ALI_MAIN_MAIN-01.pdf PDF
mta-bor298001_ALI_APPR_APPR-01.pdf PDF
mta-bor298001_SuperelevationReport.xlsx XLSX spreadsheet
mta-bor298001_SUR_ControlPoints.xlsx XLSX spreadsheet
mta-bor298001_FinalHydraulicMemo.pdf PDF
mta-bor2980-1_SunRiverBridge_SiphonInspectionReport.pdf PDF
mta-bor298001_QTY_EARTHWORK_Mainline.pdf PDF
mta-bor298001_PRO_APPR_APPR-01.pdf PDF
mta-bor298001_PRO_MAIN_MAIN-01.pdf PDF
mta-bor298001_QTY_EARTHWORK_Approaches.xlsx XLSX spreadsheet
IFB Sun River Bridge Replacement.pdf PDF
mta-bor2980-1_SunRiverBridge_HaulRoadAssessment.pdf PDF
mta-bor2980-1_Combined Asbestos Report 999-5098.pdf PDF
mta-bor2980-1_SunRiverBridge_InadvertentDiscoveryPlan.pdf PDF
mta-bor298001_QTY_EARTHWORK_Mainline.xlsx XLSX spreadsheet
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Horizontal Alignment Review Report Report Created: Thursday, August 8, 2024

Time: 9:21:17 AM

Project: Design IntlFt Description:

File Name: \\RPA-HLN-04\Shared\highways\FHWA\23500008_mta-bor2980-1_SunRiverBridge\DGN\mta-bor298001_cvc01 - Option_2.dgn

Last Revised: 8/8/2024 09:20:55

Note: All units in this report are in feet unless specified otherwise.

Alignment Name: "APPR-02" Alignment Description:

Alignment Style: Alignment\Baseline - Approach Station Northing Easting

Element: Linear

START ( "MAIN-

01" ) 1999+88.82 44066.0800 82363.5695

PC ( PC ) 2000+24.65 44036.2268 82383.3874

Tangential Direction: S33.578°E

Tangential Length: 35.832

Element: Circular

PC ( PC ) 2000+24.65 44036.2268 82383.3874

HPI ( HPI ) 2000+50.22 44014.9243 82397.5290

CC ( CC ) 44091.5340 82466.7008

PT ( PT ) 2000+74.72 44003.0242 82420.1602

Radius: 100.000 Delta: 28.686° Left

Degree of Curvature (Arc): 57.296° Length: 50.066

Tangent: 25.569 Chord: 49.544

Middle Ordinate: 3.117 External: 3.217

Back Tangent Direction: S33.578°E Back Radial Direction: S56.422°W

Chord Direction: S47.921°E Ahead Radial Direction: S27.736°W

Ahead Tangent Direction: S62.264°E

Element: Linear

PT ( PT ) 2000+74.72 44003.0242 82420.1602

PC ( PC ) 2000+99.64 43991.4267 82442.2162

Page 1 of 2Horizontal Alignment Review Report

8/8/2024

Tangential Direction: S62.264°E Tangential Length: 24.919

Element: Circular

PC ( PC ) 2000+99.64 43991.4267 82442.2162

HPI ( HPI ) 2001+31.34 43976.6740 82470.2724

CC ( CC ) 43902.9169 82395.6756

PT ( PT ) 2001+61.03 43948.4526 82484.7065

Radius: 100.000 Delta: 35.176° Right

Degree of Curvature (Arc): 57.296° Length: 61.393

Tangent: 31.698 Chord: 60.433

Middle Ordinate: 4.675 External: 4.904

Back Tangent Direction: S62.264°E Back Radial Direction: S27.736°W

Chord Direction: S44.676°E Ahead Radial Direction: S62.912°W

Ahead Tangent Direction: S27.088°E

Element: Linear

PT ( PT ) 2001+61.03 43948.4526 82484.7065

END ( END ) 2001+85.64 43926.5459 82495.9109

Tangential Direction: S27.088°E

Tangential Length: 24.606

Page 2 of 2Horizontal Alignment Review Report