mta-bor298001_PRO_MAIN_MAIN-01.pdf

PDF 94 KB Posted

Attached to
MT FLAP BOR 2980(1), Sun River Bridge Replacement Federal contract opportunity
Solicitation number
69056724B000016
Issued by
Department of Transportation Federal Highway Administration

About this file

This document is a Vertical Alignment Review Report for the project "MT FLAP BOR 2980(1), Sun River Bridge Replacement." The report details the horizontal and vertical alignments for the new bridge construction, including station elevations, tangent grades, curve lengths, and middle ordinates.

The related federal contract opportunity is for the construction of a new 462-foot long precast-post-tensioned girder bridge with concrete deck, located approximately 50 miles northwest of Augusta, Montana. The project also includes approach work on embankments and MSE walls, with final surfacing of gravel for the approaches and concrete on the bridge. The work may include an option to demolish the existing steel truss bridge upon completion of the new structure. The contract is a sealed bid, firm-fixed-price procurement with an estimated price range between $10 million and $20 million. The tentative completion date is Fall 2026.

View the file

Other files for this federal contract opportunity

Other files attached to MT FLAP BOR 2980(1), Sun River Bridge Replacement, newest first.
File Type Posted
Tabulation of Bids.pdf PDF
BidSum.pdf PDF
QA_11-13-2024.pdf PDF
Amendment A008.pdf PDF
QA_11-08-2024.pdf PDF
Amendment A007.pdf PDF
QA_11-07-2024.pdf PDF
Amendment A006.pdf PDF
QA_11-06-2024.pdf PDF
QA_11-05-2024 part 2.pdf PDF
QA_11-05-2024.pdf PDF
Siphon Construction Narrative.pdf PDF
Pages from D-1771-D0000 Construction Documents 1944.pdf PDF
Amendment A005.pdf PDF
QA_11-04-2024.pdf PDF
QA_11-01-2024.pdf PDF
QA_10-31-2024.pdf PDF
QA_10-24-2024.pdf PDF
Amendment A004.pdf PDF
QA_10-22-2024.pdf PDF
Amendment A003.pdf PDF
Amendment A002.pdf PDF
QA_10-18-2024.pdf PDF
Physical Data_2.zip ZIP file
Amendment A001.pdf PDF
mta-bor298001_ALI_APPR_APPR-01.pdf PDF
mta-bor298001_SuperelevationReport.xlsx XLSX spreadsheet
mta-bor298001_SUR_ControlPoints.xlsx XLSX spreadsheet
mta-bor298001_Plans Sun River Bridge Replacement.pdf PDF
Physical Data.zip ZIP file
FY21_GPMT0311_Rtn-FC InspRpt.pdf PDF
mta-bor298001_CompiledSWPPP_Signed.pdf PDF
mta-bor298001_ALI_APPR_APPR-02.pdf PDF
mta-bor298001_PRO_APPR_APPR-02.pdf PDF
mta-bor298001_ALI_MAIN_MAIN-01.pdf PDF
mta-bor298001_FinalHydraulicMemo.pdf PDF
mta-bor2980-1_SunRiverBridge_SiphonInspectionReport.pdf PDF
mta-bor298001_QTY_EARTHWORK_Mainline.pdf PDF
mta-bor298001_PRO_APPR_APPR-01.pdf PDF
mta-bor298001_QTY_EARTHWORK_Approaches.xlsx XLSX spreadsheet
IFB Sun River Bridge Replacement.pdf PDF
mta-bor2980-1_SunRiverBridge_HaulRoadAssessment.pdf PDF
mta-bor2980-1_Combined Asbestos Report 999-5098.pdf PDF
mta-bor2980-1_SunRiverBridge_InadvertentDiscoveryPlan.pdf PDF
mta-bor298001_QTY_EARTHWORK_Mainline.xlsx XLSX spreadsheet
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vertical Alignment Review Report Report Created: Thursday, August 8, 2024

Time: 9:05:31 AM

Project: Design IntlFt Description:

File Name: \\RPA-HLN-04\Shared\highways\FHWA\23500008_mta-bor2980-1_SunRiverBridge\DGN\mta-bor298001_ali01.dgn

Last Revised: 8/8/2024 09:05:03

Note: All units in this report are in feet unless specified otherwise.

Horizontal Alignment: "MAIN-01" Horizontal Description:

Horizontal Style: Alignment\Baseline

Vertical Alignment: "MAIN-01 PRO" Vertical Description:

Vertical Style: Alignment\Baseline Station Elevation

Element: Linear

START 0+91.39 4467.1434

VPC 1+07.50 4467.0101

Tangent Grade: -0.008 Tangent Length: 16.112

Element: Symmetrical Parabola

VPC 1+07.50 4467.0101

VPI 1+45.00 4466.7000

VPT 1+82.50 4466.8071

VLP 1+63.24 4466.7796

Length: 75.000 Entrance Grade: -0.008

Exit Grade: 0.003 r = 100 * (g2 - g1) / L: 1.484

K = l / (g2 - g1): 67.403 Middle Ordinate: 0.104

Element: Linear

VPT 1+82.50 4466.8071

VPC 2+07.50 4466.8786

Tangent Grade: 0.003 Tangent Length: 25.000

Element: Symmetrical Parabola

Page 1 of 3Vertical Alignment Review Report

8/8/2024

Horizontal Alignment: "MAIN-01" Horizontal Description:

Horizontal Style: Alignment\Baseline

VPC 2+07.50 4466.8786

VPI 2+50.00 4467.0000

VPT 2+92.50 4465.9865

VHP 2+16.59 4466.8916

Length: 85.000 Entrance Grade: 0.003

Exit Grade: -0.024 r = 100 * (g2 - g1) / L: -3.142

K = l / (g2 - g1): 31.831 Middle Ordinate: -0.284

Element: Linear

VPT 2+92.50 4465.9865

VPC 7+75.00 4454.4808

Tangent Grade: -0.024 Tangent Length: 482.500

Element: Symmetrical Parabola

VPC 7+75.00 4454.4808

VPI 9+00.00 4451.5000

VPT 10+25.00 4454.3276

VLP 9+03.30 4452.9511

Length: 250.000 Entrance Grade: -0.024

Exit Grade: 0.023 r = 100 * (g2 - g1) / L: 1.859

K = l / (g2 - g1): 53.802 Middle Ordinate: 1.452

Element: Linear

VPT 10+25.00 4454.3276

VPC 15+50.00 4466.2034

Tangent Grade: 0.023 Tangent Length: 525.000

Element: Symmetrical Parabola

VPC 15+50.00 4466.2034

VPI 16+25.00 4467.9000

VPT 17+00.00 4467.3667

VHP 16+64.12 4467.4942

Length: 150.000 Entrance Grade: 0.023

Exit Grade: -0.007 r = 100 * (g2 - g1) / L: -1.982

Page 2 of 3Vertical Alignment Review Report

Horizontal Alignment: "MAIN-01" Horizontal Description:

Horizontal Style: Alignment\Baseline K = l / (g2 - g1): 50.451

Middle Ordinate: -0.557

Element: Linear

VPT 17+00.00 4467.3667

VPC 18+00.00 4466.6556

Tangent Grade: -0.007 Tangent Length: 100.000

Element: Symmetrical Parabola

VPC 18+00.00 4466.6556

VPI 18+50.00 4466.3000

VPT 19+00.00 4466.3833

VLP 18+81.02 4466.3675

Length: 100.000 Entrance Grade: -0.007

Exit Grade: 0.002 r = 100 * (g2 - g1) / L: 0.878

K = l / (g2 - g1): 113.929 Middle Ordinate: 0.110

Element: Linear

VPT 19+00.00 4466.3833

END 20+41.61 4466.6193

Tangent Grade: 0.002 Tangent Length: 141.606

Page 3 of 3Vertical Alignment Review Report

File details come from the government source that posted it. Updated .