FY21_GPMT0311_Rtn-FC InspRpt.pdf
PDF 19 MB Posted
- Attached to
- MT FLAP BOR 2980(1), Sun River Bridge Replacement Federal contract opportunity
- Solicitation number
- 69056724B000016
About this file
This document is a federal solicitation for the MT FLAP BOR 2980(1), Sun River Bridge Replacement project. The work consists of building a new 462-foot long, 3-span precast-post-tensioned concrete girder bridge with gravel approaches and concrete surface. The project also includes demolition of the existing steel truss bridge. The estimated price range is between $10 million to $20 million, and the project is expected to be completed by Fall 2026. This is a sealed bid, firm-fixed-price contract offered for full and open competition on an unrestricted basis. The solicitation is issued by the Department of Transportation Federal Highway Administration, a civilian agency.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bridge Name: Sun River Bridge
NBI Structure#: MTA-SR-001
Table of Contents
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Structure Information .................................................................................................................................................................................................... I
Inspection Information
Bridge Description
Structure Data and Properties
Report Approval
Location Map
General Site Information
Bridge Elevation - Upstream Face (Looking Downstream)
Bridge Elevation - Downstream Face (Looking Upstream)
Critical Findings
Critical Finding Plan of Action
Structural Evaluation Summary (SES)- Non-Fracture Critical Members
Table I: Gap Measurement Between Top Plate of Roller Bearing and Concrete Abutment ................................................................................. I I
Table 2: Non-Fracture Critical Superstructure Deficiencies .................................................................................................................................... I I
Fracture Critical Inspection Summary
Table 3: Fracture Critical Member Deficiencies
Inspection Report UPDATES Summary
Additional Inspection Notes and Deficiencies
Condition Ratings Defined
Deck Condition
Superstructure Condition
Substructure Condition
Channel and Channel Protection Condition
Culvert Condition
Scour Critical Bridges
Traffic Safety Rating Codes
Waterway Adequacy
Approach Roadway Condition
Approach Roadway Alignment
Structure Load Rating
Structure Inventory & Appraisal (I of 2)
Structure Inventory & Appraisal (2 of 2) .............. .'
Photographs
Inspection Date: 9/28/2021 Responsible Office: Montana Area Office
Condition Ratings Defined Condition Rating Codes for Items 58-62 _ _ � Not Al!�licable _ __j 3 T
T erious Condition - Loss of section, deterioration, spalling, or
__2_ Excellent Condition
• sc?ur have serio�sly affe�ted primaD'. structural components .. Local
8 Very Good Condition_ Isolated I failures are possible. Fatigue cracks m steel, or shear cracks m minor problems. 1 concrete may be present. ·- - Good Condition - Some minor problems.
Satisfactory Condition - Structural elements show some minor deterioration. ·-- - --
Fair Condition - All primary structural elements are sound, but may have minor section loss, cracking, spalling, or scour.
Poor Condition - Advanced section loss, deterioration, spalling, or s�our.
! 1;
I i
Critical Condition - Advanced deterioration of primary structural elements. Fatigue cracks in steel, or shear cracks in concrete may be present, or scour may have removed substructure support. Unless closely monitored, it may be necessary to close the bridge until corrective action is taken. - "Imminent" Failure Condition - Major deterioration or section loss present in critical structural components, or obvious vertical or horizontal movement affecting structure stability. Bridge is closed to traffic, but corrective action may return structure to light service.
Failed Condition - Out of service; beyond corrective action.
Condition Rating Code E uivalents for Sub-Com onents i
G = Good 7-9 F = Fair 5-6 P = Poor 0-4 . N = Not A Rlicable I UNK = Unknown
- l58 Deck Condition 4 - Poor - ·-·- ·-·--· -� �·-·- - -- -
1. Deck
2. Expa1_!:sioE_Loi_��s
3. W eari_!!g �urfa�e
1 4. .!3-i.9ei1bi_!i.!Y_ _
5. Curbs, Sidewalks, and Median
6. Parapets and/or Railing 7 .:_ Drains and Drainage
8. Utilities
9. Deflection and/or Vibration
10. Other
_ _ P_--< Notes (with Sub-Component Number):
N 5 8 .1: The deck slab consists of pre-cast concrete panels that are l· .. ; in good condition but are not mechanically attached to the bridge.
N 58.4 & 58.9: The pre-cast concrete panels experience movement --+-P---< when vehicles travel across these panels.
N 58.6: The bridge guardrail is the top chord of the truss system.
N -P ---, This condition is not desirable to have a compression member of
+---N ---, the primary system subject to vehicle impact.
[59 - 7 &Ip-;r-;tructure Co!_lditi� � _ -=-=-� _- Poor _
1. �e�i1!:_g Devices } !' Notes (with Sub-Component Number):
2. Girders or Beams N - 59.1: See Note 4. in the Structural Evaluation Summary (SES) -
3. Arches or Slabs N Non-Fracture Critical Members.
4. Floorbeams and Stringers F 59.4 & 59.9: Floor beams/stringers are unbraced the full length.
5. Trusses F 59.5: Overall, truss members are in satisfactory condition with
6. Dia hragms and B�ac�ng F . minor structural deterioration due to light corrosion. Some
7. Pai1_!:t _ P members are bent likely from impact damage during a flood in
8. Connections or Welds F 1964.
9. Deflection and/or Vibration P - -·-
10. Alignment
11. Other
F N
59.6: Some diaphragms and bracing members are bent.
59. 7: The paint is essentially non-existent.
59. 8: Connections are in satisfactory condition with light corrosion on most. The connection of L3A has more severe corrosion. Some connections have missing or loose rivets/bolts.
59. 10: Slight horizontal distortion in some locations.
Inspection Date: 9/28/2021 Responsible Office: Montana Area Office
60 1 Substructure Condition Abutments - - -- --
T
3 - Serious
I
I. Breastwalls or Columns ______ J Notes (with Sub-Component Number):
F _ 60.x: See Note 7. in the Structural Evaluation Summary (SES) - N ] Non-Fracture Critical Members. 2. Piles ---- ---- -- -
3.
4.
5.
Caps and/or Bearing���!_ll Backwalls and/or Bulkheads Foundations -·- -----
6. Wingwalls
7. Weep Holes
8. Expansion Joints
9. Erosion and/or Scour
10. Settlement or Deflection JL_§lope Stability or Protection
12. Other Piers -
13. Walls and/or Columns
14. Piles --- - ·
15. Caps and/or Bearing Seats
16. Foundations
17. Erosion and/or Scour -···
18. Settlement or Deflection
19. Other - ----· -p ---· ··---- · 1 p
G ·- F N N F G
N
N ·- Notes (with Sub-Component Number):
F 60.13 & 60.15: See Note 7. in the Structural Evaluation N Summary (SES) - Non-Fracture Critical Members.·-·- F G
G G
N
[ 61 1 Channel and Channel Protection Condition 1 8 - Very Good I-·· - ---- • ·-- -----· - --- -·· I. �ignment _2._ • Notes (with Sub-Component Number):
2. Erosion and/or scour G l· Channel Prot�c�!Ol! -� ]
4. :±1 ate�ay Obstructio�_s _ _ _ __ G
G _ l5. Adequacy of Opening
16. Streambed Comp_osition _____ --+--_G_
7. Other N j
62- , -Culvert c-;-�dition -- l N·- N� App1icabl;-
1. Barrel(s) _ ___ [ �- --J Notes (with Sub-Component Number): ------
2. Footings ____ _ _ __
• N
3. Headwalls N
--�---<4. Wingwalls __ !
N _
5. Debris andioc Silt i N
6. Erosion and/or Scour N
7. Settlement and/or Deflection .... _ �--�
8. Alignment • N
9. Adequacy of Cover
] N
__ 10. Para1zets and/or Railing N
11. Roadway Surface -=-1- N
12. Other N
I
I
I
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Scour Critical Brid es Every bridge should have a scour evaluation report on-file that documents the code for Item 113 - Scour Critical Brid�� _Every routine ins ection should verify that th� Item _J U co�� is still valid.
Item Current Valid? 1
Notes Rating (Yes/No)
113-Scour An Underwater Inspection Report took place in October of 1 2018. A scour screening report was generated and finalized by
Michael Sixta on 08/05/2020. Critical Bridges 2 Yes
Traffic Safety Rating Codes 0 - Does not meet standards or a safety feature is �!}ired, and none is �rovided _ - --
_lli!!! - ---
36A -Bridge Railing 36B -Transitions 36C -Approach Guardrail 36D -�pproach 9uardrail Ends
Waterway Ade uacy
Rating
1 - Meets currently ' N - Not applicable or a safety _ �plicable standards_ J _ feature is not requireg _
Poor system due to it being part of the truss structure.
Substantial improvements should occur.
Substantial improvements should occur.
J Does no! exist_._
See Coding Quide for a description of each rating code Hem Rating_ � 71-W_?te__J'.'way Adequacy _ 9
I l 222 Appr�;ch_�oadway Condition _ _ ---=-�{--Poo!
- 1
I. A proach Slab �_J Notes (with Sub-Component Number):
2. Relief Joints __________ __N __ 222.3: The left abutment approach has wood decking that is
3. Surfacin _! J deteriorating and has failed in some small, localized areas.
4. Erosion ----·- �- J 222.4 & 222.5: Substantial loss of subgrade material below the
5. Settlement � _J concrete jersey barriers at the left (north) approach has been noted
6. Signs ! 4 in the past and continues to deteriorate in stability.
7• Other . 222.6: See outstanding recommendations in the Recommendations and Estimated Costs table.
I Approach Roadway Alignment 8 No speed reduction required when approaching structure --- 6 Minor speed reduction requir�<! when approaching structure 3 -�ubstantial speed reductio� r�quired when app�achin��ctur_e _
* Interpolate between defined values when necessary
Item
� Rating� Notes_ 72 -Approach Roadway , 3Alignment
Sharp curves at both approaches.
r -i Structure Load Rating
Load Rating Details Design Loading Level:
Date of Load Rating Calculation:
Load Rating Method:
� Does Structure Require Load Posting?
Load Rating Controlling Member:
Load Rating Notes/Summary
Load Posting/Rating Evaluation Yes/No/NA
Is Load Posting Properly Installed ( when Yes required)?
Does this structure require a revised load No rating?
Load Posting/Rating Evaluation
Unknown 2/13/2018
ASR
Yes
Inspection Date: 9/28/2021 Responsible Office: Montana Area Office
I Load Rated By: I Tim Lannen, P.E., S.E.
Moment in longitudinal stringers.
Notes !
Design Rating Inventory Rating Factor (RF) Operating RF
HS-20 0.13 0.20 --- - - - ---.
HL-93
Legal Rating Inventory Rating Factor (RF) ______ Operating RF - �-=7 Type 3 --- -- Type 3S2 Type 3-3
Notional Rating Load (NRL)
SU4 - -----·
SUS -- -
SU6 --
SU7 --·-·
EV2
EV3
Required Load Posting
0.20 0.22
- --- r- -
0.29 ---- ;- -··
0.32 --·-· - - - ---- - - -- ----·· -· - ---- --- --··---�
0.30 .. ______
0.18 - - 0.18 0.17 0.20
0.43 - ---- -- -
0.26 0.26- 0.26 0.33
- _____ J ----1
I I ·--
I
Posting I MBE Year and MUTCD Sign I Notes I I Magnitude governing Equation Type I '
I Operating Rating Factors are below 1.0, !
5, 8 and 10 Tons I 2011 MBE equation R12-5 I therefore per Montana Department of
I 6B.4.1-1 I Transportation, the bridge should be posted _j__ __ -- 1 at Inventory Level.
NBI Structure #: MT A-SR-00 I
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Structure Inventory & Appraisal (1 of 2)
Bridge Name: SUN RIVER BRIDGE
NBI Number: MTA-SR-001
Last Inspection Date:
RBI Number:
09/2021
GPMT0311
Type 1 Bridge Structure Inventory & Appraisal
STROCTO'RE IDENTIFICATION
205 - USBR Region:
201 - Area Office:
202 - Structure Name, B - Structure Number:
20 - Toll: 3
5 - Missouri Baain
KB/ART-Montana Area Office
SUN RIVER BRlDGB
MTA-SR-001
21 - Maintained By, 2 5 - Other Local Agency
Primary Operating Entity: Greenfields Irrigation District
22 - owner, 69 - BOR
26 - Punctional Claeeification, 9 - Rural Local Road
27 - Tear Built, 1916
106 - Year Recon■tructedt 0000
37 - Historical Significance: 2 - Eligible for NRHP
100 - STRAHNET Highway, 0 - The inventory route is not a
STRABNBT route
102 - DirectiOI1 of Traffic: 3 - one lane bridge for 2-way traffic
104 - NBS Route t O - :Inventory route is not on the National Highway Syatan (NHS)
1 - State Coda: MT
2 - Highway Agency District, 00
3 - County Code , 4 - Place Code:
Lewis and Clark County
5 - Inventory Rout• at1 b1 6 Cl 8 d: 00000
6A - Peaturea :Interaecteda Sun River
68 - Critical Pacility fil.dicators
7 - Facility Carried: PismrnN ROAD
9 - Location, 19 miles NW of Augusta
10 - Rte. Min Verticle Clearance, 99.99000000
11 - �ilometer (Mile) Point: 0
12 - Baae Highway Network: 0
13 - LRS Inventory Route, Subrouter
112 - NBIS Bridge Length: Tea
., 0
110 Designated National Net, O - The inventory route is not part of the national network for trucks
STROCTIJRB DESCRIPTION AND DBClt TYPE
43A - �d of Material/Design, 3 - Steel 44A Approach span Naterial/Design, 3 - Steel
43B - Type of Deaign/Conatructiont 10 - Truss Thru 44B - Approach Span Deeign/Conatruction, 2 - Stringer/Multi beu, or Girder
45 - Number of Spana in Main unit, 2
46 - Number of Approach Spana, l
48 - Length of Naximum Span 1 110
49 - Bridge Length: H9.67
90 - Inapection Date1 09/2021
91 - Designated Inspection Frequency: 24
232 - Team Leaders
233 - Reviewers
234 - Approvert
Gary Graaael
Jacob Noland
Gary Grassel
107 - Deck Structure Type: 2 - Concrete Pr.cast Panela
108A - Type of Wearing Surface, 0 - Nona (no additional concrete thickness or wearing surface is included in the bridge deck)
108B - Type of Membrane, O - None
1oec - Deck Protection, o - None
INSPECTION DATES
92A - Practure Crititcal Inspections Y24
93A - Fracture Critical Date: 09/2021
92B - underwater Inspection, Y60
93B underwater Inapection Date: 10/2018
92C Other Special I:nspection1 N
93C - Other Special :Inspection Date 1
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Structure Inventory & Appraisal (2 of 2)
LOAD RATING AND POSTINGS
65 - J:nventory Rating Method: 2 - Allowable Stress (AB) in Tons
63 - Operating Rating Method, 2 - Allowable Stress (AB) in
Tons
64 - Operating Rating: 7
66 - J:nventory Rating:
31 - Design Load:
41 - Structure Status s
70 - Bridge Posting, C - Other
P - Posted for load
0 - > 39.9, below
GEOMETRY TRAFFIC AND NAVIGATIONAL DATA
16 - Latitude, 17 - Longitude , 19 - Detour Length, <l7.61946200
-112. 69202000
2BA - Lanes on Structure, l Lane
2BB - Lanes under Structure, O Lanes
42A - Type of Service on Bridge: 1 - Highway
42B - Type of Service 'Under Bridge, 5 - Waterway
ADT: 30
30 Ytiar of ADTa 2015
114 - Future ADT, 33
Year of Puture ADT, 2041
Average Daily Truck Traffics
103 - Temporary Structure Designations
32 Approach Roadway Width, 13.5ft.
47 Total Horizontal Clearance, 13 .33ft.
51 Bridge Roadway Width, 13ft.
52 - Deck Width, out-to-out 13.33ft.
33 Bridge Median, O - No Median
34 - Skew, O
35 - Structure Plareds O -Width of structure does not vary
50A Left Curb/ Sidewalk Width, Oft.
SOB - Right Curb/ Sidewalk Width: Oft.
53 - Vert Clearance over Roadway, 99.99ft.
54A - Reference Peature (Vertical), N
54B - Minimum Vertical 'Ullderclearance, ft.
SSA - Reference Feature (Lateral) t N
55B - Min Right Lateral. Underclearance, 56 - Min Left Lateral 'Underclearance, 101 - Paral.lel Structures N - No parallel structure exists.
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COSTS
58 - Decks 4 - Poor
59 - Superstructures 4 - Poor
60 - Substructure, 3 Serious
61 - Channel/ Channel Protection, e - Very Good
62 CUlverts, N - NA
�22 - Approaches, 4 - Poor
36 - Bridge a. Railings, b. Transitions, c. Approach Guardrail, d. Approach Guardrail Bnds a, O - Not Acceptable bi O - Not Acceptable cs O - Not Acceptable ds O - Not Acceptable
72 - Approach Road-y Alignment, 3
230 - RemarksResponsible Load Raters Tim Lannen
71 - Waterway Adequacy, 9 - Bridge deck and roadway approaches above flood water elevations (high water).
Chance of overtopping is remote.
113 - Scour Critical Bridgesi 2 - Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. Immediate action is required to provide scour coUDtermeaaurea.
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photographs
Photo 1: Bridge Elevation_ Looking Upstream
Downstream face of the bridge from the right abutment. (Photos taken by Gary Grasse!, Anellise Deters, and Jacob
Noland on September 28, 2021)
Photo 2: Bridge Elevation_ Looking Downstream
Upstream face of the bridge from the right abutment.
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photographs
Photo 3: Left Abutment Approach_ Looking (SW)
Missing object marker on the downstream left approach, see recommendation 2017-2-C.
Photo 4: Right Abutment Approach_ Looking (NE) li('t1 D:--.t llll!_ll
NBI Structure #: MT A-SR-00 I
Photographs
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
FLOW
Photo 5: Left Abutment Elevation Underside of Bridge Deck_ Far Side
FLOW
Photo 6: Right Abutment Elevation Underside of Bridge Deck_ Far Side
Photographs
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photo 7: Waterway/Channel_ Looking Upstream
Photo 8: Waterway/Channel_ Looking Downstream
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photographs
Photo 9: Bridge Deck Driving Surface Looking Toward Right Abutment _ Far Side
Photo 10: Abrupt Transition on Left Abutment Approach
There is approximately a 3" vertical lip on the left abutment approach transition. There is also a horizontal gap between the approach to the concrete transition that is approximately 3" horizontally (change from 2 1/8" in 2019). See Photo 10 from the 2019 Bridge Inspection Report.
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photographs
Photo 11: Upstream Edge of Left Abutment Approach
Hole in approach timber, see recommendation 2017-2-D. The hole is not in the driving lane, therefore is not an immediate concern. Similar to Photo 1 1 from the 2019 Bridge Inspection Report. Left photo is from below deck.
RAB
Photo 12: Upstream Right Abutment Roller Bearing - Interior
Looking at the interior side of the right abutment upstream roller bearing. The interior anchor rod has sheared off at top of plate, and the rollers are covered in debris, preventing movement of the rollers. The right roller is off the bearing plate. Similar to Photo 12 from the 2019 Bridge Inspection Report.
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photographs
Photo 13: Upstream Right Abutment Roller Bearing
Drainage should be rerouted away from the right abutment bearings to prevent further debris deposits, see recommendation 2020-2-A. Similar to Photo 13 from the 2019 Bridge Inspection Report.
Photo 14: Downstream Right Abutment Roller Bearing
Interior face of the right abutment roller bearing. The interior anchor rod has sheared off (see arrow pointing to the failed anchor rod), and the rollers are covered in debris, preventing movement of the rollers. The roller is also located off the bearing plate on the side nearest to the backwall. Similar to Photo 14 from the 2019 Bridge Inspection.
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photographs
Photo 15: Approach Pier 1 on Downstream Face of Left Approach Side
Deteriorated pier. Note exposed reinforcing steel in several locations. Appears to be in the same condition as the previous inspection. This should be replaced as soon as possible. Similar to Photo 9 in the 2019 Bridge Inspection.
Photo 16: Left Approach Foundation Wall (P2)
Steel stringers bear load on the Pier 2 wall with no positive connection to the concrete wall. Similar to Photo 16 in the
2019 Bridge Inspection. Note the holes in the wood deck.
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photographs
Photo 17: Downstream Face of Right Abutment Erosion
Erosion adjacent to the right abutment approach. (See Photo 17 in 2019 report)
Photo 18: Diagonal Crack on the Upstream Right Abutment Wingwall
The arrow indicates the crack and location where adjacent photo with crack gauge was taken.
Photographs
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photo 19: Downstream Face of the Left Abutment
The riprap placed behind P2 is adding a substantial lateral load to P2 and P 1, that could lead to failure of the left abutment approach span, see recommendation 2017-2-B. Notice the jersey barriers leaning on the guardrail system on the bridge deck. Similar to Photo 30 in the 2019 Bridge Inspection.
I
Photo 20: Downstream Right Abutment Wingwall
Crack along the wingwall. The green arrow indicates the crack and location where adjacent photo with crack gauge was taken.
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photographs
Photo 21: Downstream Edge of Left Approach
Hole in the approach roadway at downstream approach railing. Concrete jersey approach railing has continued to drastically settle. See Photo 3 as well.
Photo 22: Left Approach
The timber decking has failed in a portion of the approach decking. The hole is approximately 21" long. See Photo 16 for a photo from underneath the deck.
Photographs
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photo 23: Pier 3 Looking Slightly Upstream
Poor consolidation and concrete deterioration. This is a typical condition of original concrete construction.
--\IJ [)--.( L1(15-
Photo 24: Upstream Pier 3 Bearing
Cracking in the concrete.
Photographs
Right Approach
ONE
LANE
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photo 25: Right and Left Approach Signs
The left approach is missing the speed limit, one lane bridge, and curve sign.
Photo 26: Downstream Right Bearing
The blue arrow indicates the measurement taken in Table 1: Gap Measurement Between Top Plate of Roller Bearing and
Concrete Abutment. The measurement shown is from 2019. The red line indicates the approximate location that has been marked with a permanent marker.
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photographs
Web member below joint USA
Photo 27: Common Diagonal Web Member at Concrete Deck Panel
Concrete deck panels have pushed up against superstructure web members. Flexure and structure vibration is causing steel members to cut into concrete decking. Panels shall be moved away from superstructure members.
Photo 28: Upstream Node UlA
Several locations that previously had rivets missing from connector holes had ¾" diameter A325 bolted connections installed where accessible.
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photographs
Photo 29: Defect #10 _ Upstream Node L2B Looking Toward LIB
Significant out of plane distortion likely from debris impacting the bottom chord during the I 964 flood.
Photo 30: Defect #4 Member L4B to USB
Primary truss web member L4B-U5B that shows significant deformation in the upstream directiqm. This member is considered to be a tension member, however, when debris impacted the bottom chord during the I 964 flood this likely induced compression forces into the member and thus distorted the member out of plane.
Inspection Date: 9/28/2021
Responsible Office: Montana Area Office
Photographs
.,'\ I (,IJ I �-
:aa:,.,-...., ___ -.,,,u.s_ .... -.. - ;.,.-. ----·,.,_
Photo 31: Defect #1 _ Upstream Node L6B
Note the missing rivet in diagonal web member connection. Hole is not present in gusset plate to permit installation. The second missing rivet mentioned in Table 3 is in the far gusset plate with the blue arrow.
Photo 32: Node L7A Common Condition at a Few Locations
Occasional locations have a bolt installed in the place of a rivet. This likely occurred during the erection process to initially connect members prior to the rivet process.