About this file

This document is a Scope of Work form and related state and local contract opportunity for a design-build project to install a 205 kW solar PV canopy and electric vehicle charging stations at the Massachusetts Readiness Center. The base scope of work includes the solar canopy, EV charging station, and battery storage. The project also includes alternatives for rooftop solar and maintenance of the solar systems. The contract requires 50%, 90%, and 100% design documentation, commissioning and measurement & verification planning, and training for facility personnel. The contractor is responsible for extended warranties on major equipment. The facility will be responsible for preventative maintenance of the systems to maintain warranties and savings. The contract opportunity is for the Massachusetts DCAMM organization.

The contract opportunity does not provide details on pricing terms, set-asides, incumbents, or funding sources. The document indicates that the solar PV canopy and rooftop system are expected to have a 20+ year useful life, while the electric vehicle charging stations and battery storage are expected to have a 10+ year useful life. The contractor will be required to provide replenishable stock and replacement parts, as well as routine maintenance services for the duration of the contract.

View the file

Other files

File Type Posted
MIL1901E Natick Solar PV RFP.pdf PDF
preproposalsignin8.7.18.pdf PDF
MAARNG Natick_C-102_Lyt+Matls Pln_2015_As-Built_Mark-Up.pdf PDF
017419-DBB-rev71-Construction Waste Mgmt and Disposal~1.pdf PDF
MAARNG Natick_E1.00_Elec Site Pln_2015_As-Built_Mark-Up.pdf PDF
MAARNG Natick_E1.01_Elec Site Dets_2015_As-Built_Mark-Up.pdf PDF
018100-DBB-rev71-Commissioning~1.pdf PDF
MIL1901E-EC1_Dec. of Soil Bearing Capacity.pdf PDF
MAARNG Natick_E1.01_Elec Site Detls_2015_As-Built.pdf PDF
017418-DBB-rev71-Demolition Waste Mgmt and Disposal~1.pdf PDF
MIL1901E Eversource Elect Bills Nov 2015-July 2018.pdf PDF
MIL1901E_EC1_ Response_Form.docx DOCX document
Environmental Baseline Study Draft June.4.2010.pdf PDF
MAARNG Natick_C-106_Utility Plan_2015_As-Built.pdf PDF
MIL1901E Cover Letter.docx DOCX document
MAARNG Natick_C-105_Utility Plan_2015_As-Built_Mark-Up.pdf PDF
MIL1901E_Prevailing_Wage.pdf PDF
260001-CMR-rev71-TB Electrical Work~1.pdf PDF
site visit sign in sheet 8.9.18.pdf PDF
024100-DBB-rev71-Demolition~1.pdf PDF
MIL1901E EC1 Pricing Savings Form.xlsx XLSX spreadsheet
Natick Readiness Center Report-6.7.17.pdf PDF
MIL1901E Pre-Proposal Conference PresentanKAL.pptx PPTX presentation
MAARNG Natick_C-103_Grading+Drain Pln_2015_As-Built_Mark-Up.pdf PDF
DOC011.pdf PDF
MAARNG Natick_Struct Sects+Detls_As-Built_Mark-Up.pdf PDF
MAARNG Natick_C-101_Lyt Matls Pln_2015_As-Built_Mark-Up.pdf PDF
MAARNG Natick_E1.00_Elec Site Plan_2015_As-Built.pdf PDF
ESA Small Project Template August 2018.pdf PDF
MAARNG Natick_H2.04_HVAC Roof New Wrk Pln_2015_As-Built_Mark-Up.pdf PDF
MAARNG Natick_LS-101_Landscape+Plant Pln_2015_As-Built.pdf PDF
SDO-certified MWBE Sub-contractors~2.xlsx XLSX spreadsheet
MIL1901E_Natick_Real_Property.pdf PDF
MIL1901E Proposals Recieved.pdf PDF
MIL1901E.audit_template_savings.xlsm XLSM spreadsheet
MAARNG Natick_C-104_Grading+Drain Pln_2015_As-Built_Mark-Up.pdf PDF
Geotechnical Engineering Report 03-22-11.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reference

This Table is Inserted When Completed by PM or Designer into Attacment B-Part 1 of the RFP. Please put in best references you can. Separate by building ONLY if helpful.
Table B. ECM Referencing. Please note, this table provides a useful guide. It may not provide all references to an ECM. Please note, the Study information may be superceded by the BOD.
ECM NumberECM NameBuilding(s)Reference in StudyDrawing ReferenceSection of Specifications and/or BODNotes (as applicable)Revised Cost ($)Revised Cost ($)
11/12/2012Reason for Change in Cost EstimateAnnual Savings ($/yr)Simple Payback Period (years)Comment
Attachment B-IIAttachment B-IIIAttachment B-III
BASE Scope of Work21.01Photovoltaic CanopyMassachusetts Readiness CenterN/AN/AN/A7,0511,9713.6Recommended
22.02Electrical Vehicle Charging StationMassachusetts Readiness CenterN/AN/AN/A
718,784
Alternatives (Add and Replacement)22.01(Req. Alt.)Battery StorageMassachusetts Readiness CenterN/AN/AN/A$ 223.00$ 119.001.9Recommended
Solar PV Rooftop$ 448,685.73$ 395,147.00$ 20,098.0022.3Wireless controls (on/off for occupancy and light levels) with minimal wiring impact (for cast in place ceilings). Potential utility rebates $44,010 which would reduce payback to 16.4 years. Additional designs were considered which incorporate more low voltage wiring (19.9 years SPB w/o incentive and 7 years with incentive with a much higher material cost, as this incorporates daylight harvesting w/ dimming control). The design is ongoing to fine tune per space and wiring considerations. These numbers are for enclosed offices only, and do not incorporate common and open office areas. Costs could increase to include all areas in a total building light management system.
Recommended. Cost: $20,760, Savings: $1,790
$ 900.00$ - 0$ 2,000.000.5Recommended
Recommended. Cost: $900, Savings: $5,000
$ - 0
21.02(Req. Replacement Alt)Solar PV RooftopMassachusetts Readiness Centern/an/an/a
188,751709,025
$ 1,302,682.00$ 731,242.001.8
$ 2,605,364.00$ 1,462,484.001.8
$ 4,096,797.00$ 2,904,751.001.4
Alternatives (Add and Replacement)1.00(Req. Maint. Alt)Solar PV Canopy MaintenanceMassachusetts Readiness CenterN/AN/AN/A

2.00 (Req. Maint. Alt) Solar PV Rooftop Maintenance Massachusetts Readiness Center N/A N/A N/A

Project #xxxxxxxx

Table B-1

Project Name:MIL-Natick-Solar PV-Design Build
Project #:MIL1901E-EC1
Proposers Name:
Date:
Table B-1: Scope Summary and Level of Design Services
FILLED OUT BY DCAMMRequired Design Documentation
(As Defined in Schedule A of the ESA)FILLED OUT BY PROPOSER
ECM #NameBuilding(s)Brief DescriptionFeasiblity Study50% Design90% Design100% DesignNumber of UnitsDetails for Major Equipment (mfr, size, model #, etc.)Efficiency or Other Performance CriteriaReference in YOUR Proposal for further infoProposer/Contractor Notes
BASE Scope of Work21.01Photovoltaic CanopyMassachusetts Readiness CenterInstall a 205 kW Solar Canopy at Natick Readiness Center w/Data Acquisition SystemYesYesYesYes
22.02Electrical Vehicle Charging StationMassachusetts Readiness CenterInstall a single dual-head level II electric vehicle fast charging station which must be charge point compatible. The installation will include an additional 6 electrical leads for future charging station expansion.YesYesYesYes
Alternatives (Add and Replacement)22.02(Req. Alt)Battery StorageMassachusetts Readiness CenterBattery Storage sized based on the Solar Array output and demand of the site.YesYesYesYes
21.02(Req. Alt ReplacementSolar PV RooftopMassachusetts Readiness CenterInstall a 205 kW Rooftop Solar PV System w/Data Acquisition SystemYesYesYesYes
Maintenance Alternatives1.00(Req. Maint. Alt)Solar PV Canopy MaintenanceMassachusetts Readiness CenterBattery Storage sized based on the Solar Array output and demand of the site.
2.00 (Req. Maint. Alt)Solar PV Rooftop MaintenanceMassachusetts Readiness CenterInstall a 205 kW Rooftop Solar PV System w/Data Acquisition System

Form E Template Date: Feb 2018 Table B-1 Scope of Services &P

Table B-4b

2. Commissioning/Measurement & Verification (M&V): Once accepted, this will become part of the ESA. It will be updated and finalized during design by DCAMM's 3rd Party Commissioning Agent prior to Installation.
Table B-4b: M&V Requirements
FILLED OUT BY PROJECT MANAGER
CommissioningM&V
ECM #NameEquipment/ Component TestedGeneral Description of Modes and Functions

to Test

Testing Method:
(1)Sampling Strategy
(2)Who Executes TestSeasonal Test Req'd
(3)Equipment Performance Measurement & VerificationProposer/ Contractor Notes
21.01Photovoltaic CanopyTo be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.
22.01Electrical Vehicle Charging StationTo be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.
22.02 (Req. Alt)Battery StorageTo be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.
21.02 (Req. Add Alt)Solar PV RooftopTo be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.To be developed by DCAMM Cx Agent during design.
(1) Testing Method: Manual (M), Trend-log (T), Data-logging (D)
(2) List applicable equipment required
(3) List applicable equipment and modes required

&"-,Italic"Commonwealth of Massachusetts RFP, Project #xxxxxxx Proposer ____________________________________________ &"-,Italic"Date Submitted___________________________

Template Date: Feb. 2018 Table B-5- Commisioning/M&V_ &P

Table B-5

5. Training (Table B-6): This table outlines the Contractor’s responsibilities with respect to Training. Please confirm and/or fill out this table. If the Proposer is selected, this table will be finalized based upon the final scope of work, and once approved by the Commonwealth, will be inserted into Schedule B-6 of the ESA (Attachment E-I to this RFP). Please note: a minimum of 1 hour training is required for each ECM, including turnover of maintenance manuals, warranties, and preventative maintenance plans. Any training plan developed will be modified to match the learning curve and specific needs of the audience.
Table B-5: Training
FILLED OUT BY PROJECT MANAGERFILLED OUT BY PROPOSER
ECM #NameMinimum Training Required HoursTraining SpecificationsAdditional Training Offered by Contractor (hours)Training Provided ByBriefly Discuss TrainingProposer/Contractor Notes
21.01Photovoltaic Canopy8
22.01Electrical Vehicle Charging Station4-
22.02(Req. Alt)Battery Storage8
21.02(Req. Replacement Alt)Solar PV Rooftop8

&"-,Italic"Commonwealth of Massachusetts RFP, Project #xxxxxxxx Proposer_____________________________________ Date Submitted___________________________

Form E Template Date: Feb. 2018 Table B-6 Training &P

Table C-1

4. Contractor Warranty (Table C-1): Please fill out this table for each ECM, noting base requirements and adding or correcting any information. If the Proposer is selected, this table will be finalized based upon the final scope of work, and once approved by the Commonwealth, will be inserted into Schedule C-1 of the ESA (Attachment E-I to this RFP).
Table C-1: Extended Warranty
FILLED OUT BY PROJECT MANAGERFILLED OUT BY PROPOSER
ECM #ECM NamePiece of EquipmentExpected Useful LifeDuration, following Base 1 Year, if extendedDescription of CONTRACTOR's Extended Warranty Services Above Base ESA (Note if transfered manufacturer warranty)Reference in Your ProposalProposer/Contractor Notes
21.01Photovoltaic CanopyInverters, Panels20+
22.01Electrical Vehicle Charging StationCharging unit, Plug, cords, screen10+
22.02(Req. Alt)Battery StorageBatteries10+
21.02(Re. Replacement Alt)Solar PV RooftopInverters, Panels20+

&"-,Italic"Commonwealth of Massachusetts RFP, Project #xxxxxxx Proposer_____________________________________ &"-,Italic"Date Submitted___________________________

Template Date: Feb. 2018 Table C-1 Warranties_____________________ &P

Table C-2

4. Contractor Stock (Table C-2): Please fill out this table for each ECM, noting base requirements and adding or correcting any information. If the Proposer is selected, this table will be finalized based upon the final scope of work, and once approved by the Commonwealth, will be inserted into the ESA (Attachment E-I to this RFP).
Table C-2: Replenishable Stock and Replacement Parts
FILLED OUT BY PROJECT MANAGERFILLED OUT BY PROPOSER
ECM #NameEquipmentStock Provided (specify part and number or N/A)Proposer/Contractor Notes
21.01Photovoltaic CanopyN/A
22.01Electrical Vehicle Charging StationN/A
22.02(Req. Alt)Battery StorageN/A
Solar PV Rooftop

21.02(Req. Replacement Alt) Solar PV Rooftop N/A

&"-,Italic"Commonwealth of Massachusetts RFP, Project #xxxxxxx Proposer_____________________________________ &"-,Italic"Date Submitted___________________________

Template Date: Feb. 2018 Table C-2 Stock_________ &P

Table C-3a

3. Maintenance

a. Contractor Maintenance: Please fill out Table below. This table outlines the Contractor’s responsibilities with respect to O&M. If the Proposer is selected, this table will be finalized based upon the final scope of work, and once approved by the Commonwealth, will be inserted into Schedule C-3a of the ESA (Attachment E-I to this RFP).

Table C-3a: CONTRACTOR's Maintenance Responsibilities for ECMs in the Post-Installation phase of the project.
FILLED OUT BY PROJECT MANAGERFILLED OUT BY PROPOSER
ECM #NameDescription of CONTRACTOR Service, Maintenance, and Repiar Responsibilities (include equipment covered)Duration (following Substantial Completion) of CONTRACTOR'S Extended Maintenance ServicesMinimum Frequency of CONRACTOR Maintenance VisitsProposer accepts? (Y/N)Changes to requested scope? Please detail here:Reference in Your Proposal (e.g. Proposal, p. A-5)Primary Contact for Maintenance
N/AN/AN/AN/AN/A

Fabr

&"-,Italic"Commonwealth of Massachusetts RFP, Project #xxxxxxxxx Proposer_____________________________________ &"-,Italic"Date Submitted___________________________

Template Date: Feb. 2018 Table C-3a:Contractor Maintenance______________________ &P

Table C-3b

3. Maintenance:

a. Facility Maintenance: Please fill out Table below. This table outlines the facilities responsibilities with respect to O&M, in particular, those that are required to ensure savings and those that are required in order to maintain warranty. If the Proposer is selected, this table will be finalized based upon the final scope of work, and once approved by the Commonwealth, will be inserted into the ESA (Attachment E-I to this RFP). A final maintenance plan will be submitted prior to Substantial Completion.

Table C-3b: FACILITY Maintenance Responsibilities
FILLED OUT BY PROJECT MANAGERFILLED OUT BY PROPOSER
ECM #ECM NameDescription of FACILITY's Preventative Maintenace ResponsibilitiesMinimum Frequency of FACILITY MaintenanceReference in Your Proposal (e.g. Proposal, p. A-5)Notes/ Details
21.01Photovoltaic Canopy
22.01Electrical Vehicle Charging Station
22.02(Req Alt)Battery Storage
21.02(Req Replacement Alt)Solar PV Rooftop

&"-,Italic"Commonwealth of Massachusetts RFP, Project #xxxxxxxxx Proposer_____________________________________ &"-,Italic"Date Submitted___________________________

Template Date: Feb. 2018 Table C-3b Facility Maintenance______________________ &P