260001-CMR-rev71-TB Electrical Work~1.pdf
PDF 709 KB Posted
- Attached to
- MIL1901E-EC1 MIL-Natick-Solar PV-Design/Build
- Solicitation number
- BD-19-1019-DCP08-ENR01-29482
- Issued by
- Middlesex County, Massachusetts
About this file
This document is a set of standard specifications from the Division of Capital Asset Management and Maintenance (DCAMM) for the Electrical Work section of a Massachusetts state construction project. The scope of work includes the primary electric service duct bank, secondary service including transformers and panelboards, interior electrical distribution systems, lighting systems, fire alarm, security, and specialty systems such as data, communications, and audio/visual. The work must comply with all relevant state and local codes and regulations. The trade contractor is required to provide payment and performance bonds, and bids will only be accepted from pre-qualified contractors. The document also includes requirements for submittals, coordination, testing, record drawings, and guarantees/warranties.
The related state and local contract opportunity is for a design-build project to construct a 205KW solar PV canopy and EV charging stations at the MIL-Natick facility in Massachusetts. Battery storage and rooftop solar are listed as alternative energy conservation measures. The state has not provided additional details on the pricing, funding, or incumbent contractors for this opportunity.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DCAMM STANDARD SPECIFICATIONS MASS. STATE PROJECT NUMBER
REV 7.1 - CMR PROJECT NAME, LOCATION
ELECTRICAL WORK ISSUE DATE
260001 - 1
SECTION 260001
ELECTRICAL WORK
(Trade Bid Required)
Trade Contractors on this CM at Risk project are required by law to provide Payment and Performance Bonds for the full value of their Trade Contracts, and Trade Contractors must include the full cost of the required Payment and Performance Bonds in the Bid price they submit in response to this RFB.
Bids will only be accepted from Trade Contractors pre-qualified by the Awarding Authority.
TABLE OF CONTENTS
PART 1 - GENERAL
1.1 GENERAL PROVISIONS
1.2 DESCRIPTION OF WORK
1.3 SUBMITTALS
1.4 REFERENCES
1.5 REGULATORY REQUIREMENTS
1.6 SURVEYS AND MEASUREMENTS
1.7 COORDINATION
1.8 MECHANICAL AND ELECTRICAL COORDINATION
1.9 MECHANICAL AND ELECTRICAL COORDINATION DRAWINGS
1.10 INSTALLATION REQUIREMENTS
1.11 TYPICAL DETAILS
1.12 SLEEVES, INSERTS
1.13 CORING, DRILLING
1.14 ACCESSIBILITY
1.15 SUPPLEMENTARY SUPPORTING STEEL
1.16 TOOLS AND EQUIPMENT
1.17 PORTABLE AND DETACHABLE PARTS
1.18 RECORD DRAWINGS, PROJECT CLOSEOUT
1.19 GUARANTEE/WARRANTY
1.20 OPERATING, INSTRUCTION AND MAINTENANCE MANUALS
1.21 SERVICE CHARACTERISTICS
1.22 QUALITY ASSURANCE
1.23 DELIVERY, STORAGE AND HANDLING
1.24 TEMPORARY POWER AND LIGHTING
1.25 STAGING AND SCAFFOLDING
1.26 EXTRA MATERIALS
1.27 PHASING, DEMOLITION AND MAINTAINING EXISTING SERVICES
1.28 BIM MODEL
PART 2 - PRODUCTS
2.1 MANUFACTURERS
2.2 POWER SYSTEM STUDIES
2.3 RACEWAYS AND FITTINGS
2.4 CABLE TRAY
2.5 WIRING MATERIALS
ELECTRICAL WORK ISSUE DATE
260001 - 2
2.6 WIRING MATERIALS - 600V OR LESS SYSTEMS
2.7 OUTLET, JUNCTION, PULL BOXES, AND WIRING TROUGHS FOR ALL SYSTEMS ...26
2.8 WIRING DEVICES
2.9 GROUNDING REQUIREMENTS
2.10 PHASING AND COLOR CODING
2.11 SWITCHBOARD
2.12 SURGE PROTECTION DEVICES (TVSS)
2.13 ENCLOSURES FOR INDIVIDUALLY MOUNTED OVERCURRENT AND SWITCHING
DEVICES
2.14 PAD MOUNTED TRANSFORMERS
2.15 INDIVIDUALLY MOUNTED DRY TYPE THREE PHASE TRANSFORMERS
2.16 PANELBOARDS
2.17 MOLDED CASE CIRCUIT BREAKERS
2.18 CARTRIDGE FUSES
2.19 MOTOR CONTROLS
2.20 MOTOR CONTROL CENTERS
2.21 ENGINE GENERATOR SYSTEM
2.22 AUTOMATIC TRANSFER SWITCH
2.23 LIGHTING FIXTURES
2.24 LIGHTING CONTROL AND DIMMING SYSTEM
2.25 FIRE ALARM SYSTEM
2.26 INTRUSION ALARM CONDUIT SYSTEM
2.27 MASTER TIMECLOCK SYSTEM
2.28 COMMUNICATION - TELEPHONE SYSTEMS
2.29 ACCESS PANELS
2.30 EQUIPMENT GROUNDING REQUIREMENTS
2.31 EMPTY RACEWAYS AND OUTLETS SYSTEM FOR VOICE/DATA, AND VIDEO (TV)90
2.32 LIGHTNING PROTECTION SYSTEMS
2.33 MAIN SWITCHBOARD
2.34 DISTRIBUTION SWITCHES
2.35 STAND-BY EMERGENCY POWER SYSTEM
2.36 TRANSFORMERS
2.37 ARCHITECTURAL DIMMING SYSTEM
2.38 POWER MONITORING SYSTEM
2.39 BUSWAY
2.40 EXTENSION CORD REEL ASSEMBLY
2.41 EMPTY RACEWAYS AND JUNCTION BOX/OUTLETS SYSTEM FOR AUDIO/VISUAL
SYSTEM
2.42 INFLOOR DUCT SYSTEM
2.43 SEISMIC RESTRAINT STUDIES
2.44 SEISMIC RESTRAINT AND VIBRATION ISOLATION DEVICES
2.45 TYPE MI CABLE ASSEMBLY
2.46 FLOOR BOXES AND POKE-THROUGH ASSEMBLY
PART 3 - EXECUTION
3.1 BASIC REQUIREMENTS
3.2 TESTING REQUIREMENTS AND INSTRUCTIONS
3.3 BRANCH CIRCUITRY
3.4 REQUIREMENTS GOVERNING ELECTRICAL WORK IN DAMP OR WET LOCATIONS
3.5 REQUIREMENTS GOVERNING ELECTRIC WORK IN AIR HANDLING SPACES
3.6 UNDERGROUND CONDUIT BANKS
ELECTRICAL WORK ISSUE DATE
260001 - 3
3.7 IDENTIFICATION AND TAGGING
3.8 LIMITING NOISE PRODUCED BY ELECTRICAL INSTALLATION
3.9 SUPPORTS AND FASTENINGS
3.10 SPLICING AND TERMINATING WIRES AND CABLES
3.11 PULLING WIRES INTO CONDUITS AND RACEWAYS
3.12 REQUIREMENTS FOR THE INSTALLATION OF JUNCTION BOXES, OUTLET BOXES
AND PULL BOXES
3.13 LOCATING AND ROUTING OF CIRCUITRY
3.14 INSTALLING CIRCUITRY
3.15 PHYSICAL SEPARATION OF NORMAL, OPTIONAL STANDBY, AND EMERGENCY
SYSTEMS
ELECTRICAL WORK ISSUE DATE
260001 - 4
SECTION 260001
ELECTRICAL WORK
PART 1 - GENERAL
1.1 GENERAL PROVISIONS
A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS, which are hereby made a part of this Section of the Specifications.
B. Time, Manner and Requirements for Submitting Trade Bids:
1. Trade bids for work under this Section shall be for the complete work and shall be filed in a sealed envelope with the Division of Capital Asset Management and Maintenance at a time and place as stipulated in the "NOTICE TO CONTRACTORS".
The following should appear on the upper left hand corner of the envelope:
NAME OF TRADE BIDDER: (Insert name of trade bidder)
MASS. STATE PROJECT: ((Insert project number from top of page))
TRADE BID FOR SECTION: 260001 – ELECTRICAL WORK
2. Each trade bid submitted for work under this Section shall be on forms furnished by the Division of Capital Asset Management and Maintenance as required by Section 8 of Chapter 149A of the General Laws, as amended. Trade bid forms may be obtained at the office of the Division of Capital Asset Management and Maintenance, or may be obtained by written or telephone request; telephone (617) 727-4003.
3. Trade bids filed with the Division of Capital Asset Management and Maintenance shall be accompanied by BID BOND or CASH or CERTIFIED CHECK or TREASURER'S CHECK or CASHIER'S CHECK issued by a responsible bank or trust company payable to the Commonwealth of Massachusetts in the amount of five percent of the trade-bid. A trade bid accompanied by any other form of bid deposit than those specified will be rejected.
C. Trade Sub-Bid Requirements:
1. For the classes of work listed below, the Trade Contractor’s attention is directed to Massachusetts G.L. 149A Section 8(g)(6) and the Trade Contractor’s Bid Form part E. as amended, which provides in part as follows:
2. The names of all persons, firms and corporations furnishing to the undersigned labor or labor and materials for the classes or part thereof of work for which the provisions of the section of the Specifications for this sub-trade require listing in this paragraph, including the undersigned if customarily furnished by persons on his own payroll, and in the
ELECTRICAL WORK ISSUE DATE
260001 - 5 absence of a customary provision in the Specifications, the name of each class of work or part thereof and the bid price for such class of work or part thereof are:
CLASSES OF WORK REFERENCE PARAGRAPH OR SECTION
Lightning Protection Sound Systems Audiovisual Data/Telecommunications Electronic Safety And Security
D. Reference Drawings: The Work of this Trade Bid is shown on the following Contract Drawings: ((When issuing for bidding, insert list of drawings applicable to the work of this section))
1.2 DESCRIPTION OF WORK
A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following:
1. Primary electric service duct bank.
2. Secondary electric service including underground conduit bank and secondary service entrance feeders, from the utility company pad mounted transformer, building grounding electrode and main service disconnect.
3. Interior secondary distribution systems including main switchboard, dry type indoor transformers, all distribution panelboards, motor controls, motor control centers, magnetic starters, overcurrent and switching devices, panelboards, raceways, cables, wiring, junction and pull boxes, wireways, and all other components required for complete electrical distribution system.
4. Power system study.
5. All lighting systems (indoor and outdoor, normal, night, emergency and exit) including all fixtures, lamps, mounting accessories, switches, controls, outlets, wiring, raceways, and all other components and fittings required for a complete lighting system.
6. Telephone system including server, all wiring, termination blocks, outlets, handsets and telephones.
7. Grounding and bonding of all electrical systems and equipment.
8. Fire alarm system complete with all devices and wiring including municipal connections.
9. Wiring devices (switches and receptacles) complete with associated wall plates.
10. Power wiring to HVAC, plumbing and fire protection equipment.
11. Public address/clock system complete with all devices and wiring.
12. CCTV system complete with all devices and wiring.
13. Security system complete with control panel, door contacts, motion detectors, all wiring and a leased line connection.
14. Data system.
15. Testing of all electrical systems.
16. Emergency distribution system including diesel generator, automatic transfer switch, panelboards, and all other components required for a complete system.
17. Coordination between electrical and other trades.
18. Power wiring for elevators and associated equipment.
19. Connections for all kitchen equipment and classroom appliances.
ELECTRICAL WORK ISSUE DATE
260001 - 6
20. Independent sound systems (remote amplifiers).
21. Lighting control and dimming system.
22. Data communication system.
23. Cable/media and TV systems.
24. Certified seismic restraints to meet the Commonwealth of Massachusetts Building Code applicable at the time the building permit is issued
25. All other systems hereinafter specified or indicated on the Contract Drawings, complete, leaving ready an electrical system in perfect operating condition.
26. Lightning protection.
27. Core drilling for the Work of this Section.
28. Coordination drawings and record drawings and similar requirements.
29. BIM modeling as specified in this Section and in Section 013129 - BIM
COORDINATION.
30. Hoisting equipment for the Work of this Section.
31. Coordination with Construction Manager for use of staging, planking and scaffolding, interior and exterior, which is the responsibility of the Construction Manager as specified in Section 015000 - TEMPORARY FACILITIES AND CONTROLS.
32. All Work of Division 27 Sections - COMMUNICATIONS.
33. All Work of Division 28 Sections - ELECTRONIC SAFETY AND SECURITY.
B. Alternates: Not Applicable.
C. Items To Be Installed Only: Install the following items as furnished by the designated Sections:
1. Section 083323 – OVERHEAD COILING DOORS:
a. Controllers, wiring and power connections for overhead coiling doors.
2. Section 083613 - SECTIONAL DOORS:
a. Controllers, wiring and power connections for sectional overhead doors.
3. Section 115213 – PROJECTION SCREENS:
a. Controllers, wiring and power connections for electrically-operated projection screens.
4. Section 142400 – HYDRAULIC ELEVATORS:
a. Power connections for elevators.
5. Section 210001 - FIRE PROTECTION:
a. Connections to fire alarm system for water flow switches and tamper switches.
6. Section 220001 - PLUMBING:
a. Power connections for water heaters.
7. Section 230001 - HEATING, VENTILATING AND AIR CONDITIONING:
a. Power connections for DDC control panels, pumps, fans, electric unit heaters.
b. Magnetic starters.
D. Items To Be Furnished Only: Furnish the following items for installation by the designated Sections:
1. Section 033000 - CAST-IN-PLACE CONCRETE:
a. Lintels, sleeves, anchors, inserts, plates and similar items for electrical systems.
2. Section 042000 – UNIT MASONRY:
a. Elevator rail bracket inserts.
b. Access doors in masonry openings.
3. Section 092400 – PORTLAND CEMENT PLASTERING:
a. Access doors in plaster assemblies.
ELECTRICAL WORK ISSUE DATE
260001 - 7
4. Section 092116 - GYPSUM BOARD ASSEMBLIES:
a. Access doors in gypsum board assemblies.
5. Section 093000 - TILING:
a. Access doors in tile.
6. Section 095113 – ACOUSTICAL PANEL CEILINGS:
a. Access doors in acoustical tile.
7. Section 230001 - HEATING, VENTILATING AND AIR CONDITIONING:
a. Duct smoke detectors and sampling tubes.
E. Related Work: The following items are not included in this Section and will be performed under the designated Sections:
1. Section 033000 - CAST-IN-PLACE CONCRETE for interior concrete equipment pads and installation of backboxes and conduit for electrical devices and light fixtures.
2. Section 051200 - STRUCTURAL STEEL FRAMING for structural supports necessary to distribute loading from equipment to roof or floor.
3. Section 061000 - ROUGH CARPENTRY for plywood packing panels.
4. Section 078413 – PENETRATION FIRESTOPPING for coordination of floor and wall penetrations with firestopping contractor.
5. Section 087100 - DOOR HARDWARE for coordination with electrified door hardware.
6. Section 092116 – GYPSUM BOARD ASSEMBLIES for coordination with gypsum ceilings.
7. Section 095113 – ACOUSTICAL PANEL CEILINGS for coordination with acoustical ceilings.
8. Section 230001 – HEATING, VENTILATING AND AIR CONDITIONING for coordination with HVAC piping and ductwork, motors, and DDC wiring except 120 VAC power to control panel as indicated on the Drawings
9. Section 312000 – EARTH MOVING for excavation and backfilling for underground work.
F. The Electrical Sub-Contractor shall be responsible for filing all documents, payment of all fees, and securing of all inspections and approvals necessary for the electrical work.
G. The Electrical Sub-Contractor shall carry in the bid price all Utility Company and Municipal backcharges for all materials furnished and work performed by them in conjunction with this Contract and pay same to the respective agency upon demand. The Electrical Sub-Contractor shall not be entitled to additional compensation after the submittal of his bid price should he fail, for any reason, to obtain the total backcharge costs to be incurred by the local utility companies or municipal agencies.
1.3 SUBMITTALS
A. Comply with requirements specified in Section 013300 – SUBMITTAL REQUIREMENTS.
B. Shop Drawing: Submittals shall include but not be limited to:
1. Light fixtures, including exterior pole base foundations.
2. Switchboard and motor controls.
3. Panelboards.
4. Overcurrent and switching devices.
ELECTRICAL WORK ISSUE DATE
260001 - 8
5. Wiring devices and wall plates.
6. Security system with wiring diagram.
7. Fire alarm system with wiring diagram and schedule.
8. Public address/clock system with wiring diagram.
9. Telephone system with wiring diagram.
10. Indoor dry type transformers.
11. Emergency generator system, including automatic transfer switch.
12. CCTV system with wiring diagram and schedules.
13. Data communications system including wiring diagram.
14. Sound systems with wiring diagrams.
15. Cable trays.
16. Wiring and cables.
17. Conduit.
18. Boxes and fittings.
19. Safety switches.
20. Lighting control system.
21. Cable/TV Media TV system including wiring diagram.
22. Lightning protection system.
C. Hanger Pull-Out Testing Submittals and Requirements: Hangers and supports will be tested for pull-out by the Independent Testing Agency designated by the DCAMM Project Manager.
Comply with the requirements of Section 014325 – TESTING AGENCY SERVICES and the following:
1. Trade Contractor’s Documentation Prior to Testing:
a. Submit manufacturer’s name and model number for each type of hanger and support proposed for use, and technical data including type, load capacity, test reports, methods for installation, and use limitations.
b. Submit a schedule for each type of hanger and support indicating where units for testing will be installed, including substrate, and materials to be supported.
c. Submit a letter from Trade Contractor indicating supports have been installed in accordance with manufacturer’s recommendations and project requirements, and are ready for testing.
2. Independent Testing Agency’s Documentation Prior to Testing for Trade Contractor’s Information:
a. Submit the methods and type of equipment which will be used to test hangers and supports.
b. Submit loads which will be applied, and criteria for acceptance or failure of hangers and supports.
3. Quantity to Be Installed by Trade Contractor for Testing: Two of each size of each type of hanger or support.
4. Testing Results: The Independent Testing Agency will submit reports indicating test results.
a. Units which did not deform or fail during testing may remain in place.
b. Units which failed during testing shall be replaced and testing repeated until satisfactory results are obtained.
c. Cost of repeat testing will be at the expense of the Trade Contractor.
d. Contractor shall repair damaged substrates, if any.
ELECTRICAL WORK ISSUE DATE
260001 - 9
1.4 REFERENCES
A. Except where modified by a specific notation to the contrary, it shall be understood that the indication and/or description of any electrical item in the drawings or specifications for electrical work carries with it the instruction to furnish, install and connect the item as part of the electrical work, regardless of whether or not this instruction is explicitly stated.
B. It shall be understood that the specifications and drawings for electrical work are complimentary and are to be taken together for a complete interpretation of the electrical work except that indications on the drawings, which refer to an individual element of work, take precedence over the specifications where they conflict with same.
1.5 REGULATORY REQUIREMENTS
A. Comply with all applicable federal and state laws, and all local codes, by-laws and ordinances.
B. Where provisions of the Contract Documents conflict with any codes, rules or regulations, the latter shall govern. Where the contract requirements are in excess of applicable codes, rules or regulations, the contract provisions shall govern unless the Designer rules otherwise.
C. Request inspections from authorities having jurisdiction, obtain all permits and pay for all fees and inspection certificates as applicable and/or required. All permits and certificates shall be turned over to the DCAMM’s Project Manager s at the completion of the work. Copies of permits shall be given to the resident engineer prior to the start of work.
D. Unless otherwise specified or indicated, materials and workmanship and equipment performance shall conform with the latest edition of the following standards, codes, specifications, requirements and regulations:
1. State Building Code
2. State Electrical Code
3. National Fire Protection Association (NFPA)
4. Local Town Regulations and By-laws
5. Underwriter's Laboratories, Inc. (UL)
6. National Electrical Manufacturer's Association (NEMA)
7. American National Standards Institute (ANSI)
E. All electrical work shall meet or exceed any other state and local codes and/or authorities having jurisdiction including all other standards indicated herein.
1.6 SURVEYS AND MEASUREMENTS
A. Base all required measurements, both horizontal and vertical, on reference points established by the Construction Manager and be responsible for the correct laying out of the electrical work. In the event of a discrepancy between actual measurements and those indicated, notify the Construction Manager in writing, and do not proceed with the work required until written instructions have been issued by the Construction Manager.
ELECTRICAL WORK ISSUE DATE
260001 - 10
1.7 COORDINATION
A. HVAC, Plumbing, Fire Protection, and Electrical Drawings are diagrammatic. They indicate general arrangements of mechanical and electrical systems and other work. They do not show all offsets required for coordination nor do they show the exact routings and locations needed to coordinate with structure and other trades and to meet architectural requirements.
B. Work shall be performed in cooperation with other trades on the project and so scheduled as to allow speedy and efficient completion of the work.
C. Furnish to other trades advance information on locations and sizes of all frames, boxes, sleeves and openings needed for their work, and also furnish information and shop drawings necessary to permit trades affected by the work to install same properly and without delay.
D. In all spaces, prior to installation of visible material and equipment, including access panels, review Architectural Drawings for exact locations and where not definitely indicated, request information from Designer. Where the electrical work shall interfere with the work of other trades, assist in working out the space conditions to make satisfactory adjustments before installation. Without extra cost to DCAMM, make reasonable modifications to the work as required by normal structural interferences. Pay the Construction Manager for additional openings, or relocating and/or enlarging existing openings through concrete floors, walls, beams and roof required for any work which was not properly coordinated. Maintain maximum headroom at all locations. All piping, duct, conduit, and associated components to be as tight to underside of structure as possible.
E. If any electrical work has been installed before coordination with other trades so as to cause interference with the work of such trades, all necessary adjustments and corrections shall be made by the electrical trades involved without extra cost to DCAMM.
F. Where conflicts or potential conflicts exist and engineering guidance is desired, submit sketch of proposed resolution to Designer for review and approval.
G. Protect all materials and work of other trades from damage which may be caused by the electrical work, and repair all damages without extra cost to DCAMM.
1.8 MECHANICAL AND ELECTRICAL COORDINATION
A. Heating and Ventilating Subcontractor shall furnish and install various electrical items relating to the heating and ventilating equipment and control apparatus. The Electrical Subcontractor shall be required to connect power wiring to this equipment unless noted otherwise.
B. The Heating and Ventilating and Electrical Subcontractors shall coordinate their respective portions of the work, as well as the electrical characteristics of the heating and ventilating equipment.
C. All power wiring and local disconnect switches will be provided by the Electrical Subcontractor for the line voltage power. All control and interlocking wiring shall be the responsibility of the Heating and Ventilating Subcontractor.
ELECTRICAL WORK ISSUE DATE
260001 - 11
D. 120V and above power wiring sources extended and connected to heating and ventilating control panels, transformers and switches shall be the responsibility of the Electrical Subcontractor. All low voltage thermostat, zone valve and any switch wiring shall be the responsibility of the Heating and Ventilating Subcontractor.
E. Temperature control and equipment wiring shall be installed by the Heating and Ventilating Subcontractor.
F. Pipe Tracing shall be furnished and installed by the specified subcontractor. Power connections shall be by the Electrical Subcontractor.
G. The Electrical Subcontractor will provide all magnetic starters except those furnished as an integral part of packaged equipment.
1.9 MECHANICAL AND ELECTRICAL COORDINATION DRAWINGS
A. Refer to Section 013100 – PROJECT MANAGEMENT AND COORDINATION for coordination drawing requirements
1.10 INSTALLATION REQUIREMENTS
A. The arrangement of all electrical work shown on the drawings is diagrammatic only and indicates the minimum requirements of the work. Conditions at the building including actual measurements shall determine the details of the installation. All work shall be laid out and installed so as to require the least amount of cutting and patching.
B. Check the architectural plans and specifications before ordering any material and equipment.
Any discrepancies shall be brought to the attention of the Designer for his determination prior to proceeding with the work.
1.11 TYPICAL DETAILS
A. Typical details where shown on the drawings shall apply to each and every item of the project where such items are applicable. They are not repeated in full on the drawings, which in many cases are diagrammatic only, but with the intention that such details shall be incorporated in full. Any alternate method proposed for use by the Contractor shall have the prior approval of the Designer.
1.12 SLEEVES, INSERTS
A. Furnish and install all sleeves, inserts, anchor bolts and similar items to be set into masonry or concrete, as required for mechanical and electrical work. Internal diameter of sleeve shall be 2" larger than the outside diameter of the pipe or insulation covered line passing through it.
ELECTRICAL WORK ISSUE DATE
260001 - 12
1.13 CORING, DRILLING
A. Core, cut and/or drill all small holes 4.5" diameter or less in walls and floors required for the installation of sleeves and supports for the electrical work.
1.14 ACCESSIBILITY
A. Install all work such that parts requiring periodic inspection, operation, maintenance and repair are readily accessible.
B. Furnish all access panels appropriate to particular conditions, to be installed by trades having responsibility for the construction of actual walls, floors or ceilings at required locations.
1.15 SUPPLEMENTARY SUPPORTING STEEL
A. Provide all supplementary steelwork required for mounting or supporting equipment and materials.
B. Steelwork shall be firmly connected to building construction as required.
C. Steelwork shall be of sufficient strength to allow only minimum deflection in conformity with manufacturer's published requirements.
D. All supplementary steelwork shall be installed in a neat and workmanlike manner parallel to floor, wall and ceiling construction; all turns shall be made at forty-five and ninety degrees, and/or as dictated by construction and installation conditions.
E. All manufactured steel parts and fittings shall be galvanized.
1.16 TOOLS AND EQUIPMENT
A. Provide all tools and equipment required for the fabrication and installation of the mechanical and electrical equipment at the site.
1.17 PORTABLE AND DETACHABLE PARTS
A. Contractors shall retain in their possession all portable and/or detachable parts and portions of materials, devices, equipment etc. necessary for the proper operation and maintenance of the mechanical and electrical systems until final completion of the work, at which time they shall be handed over to DCAMM’s Project Manager.
1.18 RECORD DRAWINGS, PROJECT CLOSEOUT
A. Comply with requirements specified in Section 017700 – CONTRACT CLOSEOUT.
B. This trade shall submit the record set for approval by the fire and building departments in a form acceptable to the departments, when required by the jurisdiction.
ELECTRICAL WORK ISSUE DATE
260001 - 13
C. Drawings shall show record condition of details, sections, riser diagrams, control changes and corrections to schedules. Schedules shall show actual manufacturer and make and model numbers of final equipment installation.
1.19 GUARANTEE/WARRANTY
A. Guarantee Work of this Section in writing for one year following the date of Substantial Completion. The guarantee shall repair or replace defective materials, equipment, workmanship and installation that develop within this period, promptly and to Designer's satisfaction and correct damage caused in making necessary repairs and replacements under guarantee within Contract Price.
B. In addition to guarantee requirements of Division 01 and of Subparagraph A above, obtain written equipment and material warranties offered in manufacturer's published data without exclusion or limitation, in User Agency's name.
1. Upon receipt of notice from DCAMM’s Project Manager of failure of any part of the systems or equipment during the warranty period, the affected part or parts shall be replaced by this Contractor without any reimbursement.
2. At nine months into the one-year guarantee period, the contractor shall perform a 100% test of all installed equipment. Any device and/or part found to be defective shall be repaired and/or replaced at no cost to DCAMM. The Contractor shall notify the fire department one month in advance of the 100% test.
3. Replace material and equipment that require excessive service during guarantee period as defined and as directed by Designer.
4. Provide 24 hour service beginning on the date the project is accepted by DCAMM, whether or not fully occupied, and lasting until the termination of the guarantee period.
Service shall be at no cost to DCAMM. Service can be provided by this contractor or a separate service organization. Choice of service organization shall be subject to Designer and DCAMM’s Project Manager’s approval. Submit name and a phone number that will be answered on a 24-hour basis each day of the week, for the duration of the service.
5. Submit copies of equipment and material warranties to Designer before final payment.
6. At end of guarantee period, transfer manufacturers' equipment and material warranties still in force to User Agency.
7. This Paragraph shall not be interpreted to limit DCAMM's rights under applicable codes and laws and under this Contract.
8. Part 2 Paragraphs of this Specification may specify warranty requirements that exceed those of this Paragraph. Those paragraphs will govern.
9. Use of systems provided under this Section for temporary services and facilities shall not constitute Final Acceptance of work by DCAMM’s Project Manager, and shall not initiate the guarantee period.
10. Non-durable items, such as electric lamps, shall be replaced up to the date of acceptance, such that they shall have had no more than 100 hours use prior to this date.
11. Provide manufacturer's engineering and technical staff at site to analyze and rectify problems that develop during guarantee period immediately. If problems cannot be rectified immediately to DCAMM’s Project Manager's satisfaction, advise Designer in writing, describe efforts to rectify situation, and provide analysis of cause of problem.
Designer will direct course of action.
ELECTRICAL WORK ISSUE DATE
260001 - 14
1.20 OPERATING, INSTRUCTION AND MAINTENANCE MANUALS
A. Refer to SECTION 017700 - CONTRACT CLOSEOUT for submittal procedures pertaining to operating and maintenance manuals.
B. Each copy of the approved operating and maintenance manual shall contain copies of approved shop drawings, equipment literature, cuts, bulletins, details, equipment and engineering data sheets and typewritten instructions relative to the care and maintenance for the operation of the equipment, all properly indexed. Each manual shall have the following minimum contents:
1. TABLE OF CONTENTS
2. Introduction
a. Explanation of manual and its purpose and use.
b. Description of the electrical systems.
c. Safety precautions necessary for equipment.
d. Illustrations, schematics and diagrams.
e. Installation drawing.
3. Maintenance
a. Maintenance and lubricating instructions.
b. Replacement charts.
c. Trouble shooting charts for equipment components.
d. Testing instructions for each typical component.
e. Two typed sets of instructions for ordering spare parts. Each set shall include name, price, telephone number and address of where they may be obtained.
4. Manufacturer's Literature
a. The equipment for which shop drawings have been submitted and approved.
1.21 SERVICE CHARACTERISTICS
A. Primary Utility Voltage:
B. Secondary Building Voltage - High Level:
C. Secondary Building Voltage - Low Level:
D. All equipment and wiring shall be suitable for the applied voltage.
1.22 QUALITY ASSURANCE
A. The requirements of the State Building Code and local regulations establish the minimum acceptable quality of workmanship and materials, and all work shall conform thereto unless more stringent requirements are indicated or specified herein.
B. All work shall comply with the latest editions of the codes as referenced herein.
C. Follow manufacturer's directions for articles furnished, in addition to directions shown on drawings or specified herein.
ELECTRICAL WORK ISSUE DATE
260001 - 15
D. Protect all work, materials, and equipment from damage during process of work. Replace all damaged or defective work, materials and equipment without additional cost to DCAMM.
E. All equipment and materials for permanent installation shall be the products of recognized manufacturers and shall be new.
F. Equipment and materials shall:
1. Where normally subject to Underwriters Laboratory Inc. listing or labeling services, be so listed or labeled.
2. Be without blemish or defect.
3. Not be used for temporary light and power purposes.
4. Be in accordance with the latest applicable NEMA standards.
5. Be products which will meet with the acceptance of all authorities having jurisdiction over the work. Where such acceptance is contingent upon having the products examined, tested and certified by Underwriters or other recognized testing laboratory, the product shall be so examined, tested and certified.
G. Except for conduit, conduit fittings, outlet boxes, wire and cable, all items of equipment or material of one generic type shall be the product of one manufacturer throughout.
H. For items which are to be installed but not purchased as part of the electrical work, the electrical work shall include:
1. The coordination of their delivery.
2. Their unloading from delivery trucks driven into any point on the property line at grade level.
3. Their safe handling and field storage up to the time of permanent placement in the project.
4. The correction of any damage, defacement or corrosion to which they may have been subjected. Replacement if necessary shall be coordinated with Contractor who originally purchased the item.
5. Their field make up and internal wiring as may be necessary for their proper operation.
6. Their mounting in place including the purchase and installation of all dunnage, supporting members, and fastenings necessary to adapt them to architectural and structural conditions.
7. Their connection to building wiring including the purchase and installation of all termination junction boxes necessary to adapt and connect them to this wiring. Included also shall be the purchase and installation of any substitute lugs or other wiring terminations as may be necessary to adapt their terminals to the building wiring as called for and to the connection methods set forth in these specifications.
I. Items which are to be installed but not purchased as part of the electric work shall be carefully examined upon delivery to the project. Claims that any of these items have been received in such condition that their installation will require procedures beyond the reasonable scope of the electric work will be considered only if presented in writing within one week of the date of delivery to the project of the items in question. The electric work includes all procedures, regardless of how extensive, necessary to put into satisfactory operation, all items for which no claims have been submitted as outlined above.
ELECTRICAL WORK ISSUE DATE
260001 - 16
1.23 DELIVERY, STORAGE AND HANDLING
A. All materials for the work of this section shall be delivered, stored and handled so as to preclude damage of any nature. Manufactured materials shall be delivered and stored in their original containers, plainly marked with the products' and manufacturer's name. Materials in broken containers or in packages showing watermarks or other evidence of damage, shall not be used and shall be removed from the site.
1.24 TEMPORARY POWER AND LIGHTING
A. The Electrical Subcontractor shall furnish and install feeders of sufficient size from the Utility Company's power lines for the electric light and power requirements for the building while under construction and until the permanent feeders and related equipment have been installed and are in operation. Temporary lighting shall be based on a minimum of one watt per square foot covering each and every square foot of floor area in the building. Sufficient wiring, lamps, and outlets shall be installed to insure proper lighting in all rooms, space, stairwells, and corridors. Minimum sized lamp used shall be 100 watt. Where higher lighting intensities are required by Federal or State Standards of Laws or otherwise specified, the above specified wattage shall be increased to provide these increased intensities.
B. All necessary transformers, meters, cables, panelboards, switches, temporary lamp replacements and accessories required for the temporary light and power installation shall be provided by the Electrical Subcontractor.
C. The Electrical Subcontractor shall provide and maintain on each floor of the building, a feeder or feeders of sufficient capacity for the requirements of the entire floor and he shall provide a sufficient number of outlets, located at convenient points, so that extension cords of not over 50
ft. in length will reach all work requiring temporary light or power.
D. The Electrical Subcontractor shall install and maintain the wiring and accessories for the offices of the Construction Manager and DCAMM’s Project Manager as specified in the contract form.
E. All temporary electrical work shall meet the requirements of the National Electrical Code Article 305 Temporary Wiring, the Local Utility Company, and all Federal Standards and Laws.
F. All temporary wiring and accessories thereto installed by the Electrical Subcontractor shall be removed after their purposes have been served.
G. The Construction Manager will pay for the cost of electric energy consumed by himself and by all of his Subcontractors, unless otherwise indicated.
H. All lamps installed in permanent lighting fixtures and used for lighting during construction shall be replaced by the Electrical Subcontractor just prior to date of Use and Occupancy or Final Acceptance.
I. Provide all temporary lighting and power required above during the normal working hours of the project or a total of ten (10) hours per normal working day; Saturdays, Sundays and legal holidays are excluded. The ten hours per day shall include manning the temporary power and lighting 2 hour before and 2 hour after a normal eight (8) hour working day. In addition to the above, provide and maintain, to the satisfaction of the local authorities having jurisdiction, all
ELECTRICAL WORK ISSUE DATE
260001 - 17 temporary lighting and power that may be required for safety purposes. The Electrical Subcontractor will be compensated by the Construction Manager for any additional standby time, materials or equipment required by the Construction Manager or other Subcontractors beyond the normal working hours, as defined above.
1.25 STAGING AND SCAFFOLDING
A. Refer to requirements specified hereinabove.
1.26 EXTRA MATERIALS
A. Furnish extra materials described in following product specification sections that match products installed, are packaged with protective covering for storage, and are identified with labels clearly describing contents.
1.27 PHASING, DEMOLITION AND MAINTAINING EXISTING SERVICES
A. During the execution of the work, required relocation, etc., of existing equipment and systems in the existing building areas where new work is to be installed or new connections are scheduled to be made, shall be performed by the Electrical Subcontractor, as required by job conditions and as determined by the Designer in the field, to facilitate the installation of the new system, while demolition, relocation work or new tie ins will be performed. Outages required for construction purposes shall be scheduled for the shortest practical periods of time, in coordination with the User Agency’s designated representative, for specified, mutually agreeable periods of time, after each of which the interruption shall cease and the service shall be restored. This procedure shall be repeated to suit the User Agency’s working schedule, as many times as required until all work is completed. Any outages of service shall be approved by DCAMM’s Project Manager, prior to commencing the work. No outages or shutdowns of service shall occur without the written authorization of the DCAMM’s Project Manager prior to commencing the work. Give notice of any scheduled shutdowns, a minimum of weeks in advance. User Agency shall make their best efforts to meet this request without adversely affecting the electric service to the existing building.
B. Prior to any deactivation and relocation or demolition work, consult the drawings and arrange a conference with the Designer and the DCAMM’s Project Manager in the field to inspect each of the items to be deactivated, removed or relocated. Care shall be taken to protect all equipment designated to be relocated and reused or to remain in operation and be integrated with the new systems.
C. All deactivation, relocation and temporary tie ins of electrical systems and equipment shall be provided by the Electrical Subcontractor. All demolition and removal of electrical systems and equipment designed to be demolished shall be provided by the Electrical Subcontractor. Place all demolished electrical materials except hazardous materials (PCB lighting ballasts, fluorescent lamps, etc.) As determined by the Authority having jurisdiction in Construction Managers provided dumpster. All hazardous electrical materials shall be legally disposed by the electrical subcontractor.
ELECTRICAL WORK ISSUE DATE
260001 - 18
D. DCAMM’s Project Manger reserves the right to inspect the material scheduled for removal and salvage any items he deems usable as spare parts.
E. Phasing
1. The Electrical Subcontractor shall construct the subject project in phases as directed by the Designer to suit the project progress schedule, as well as the completion date of the project.
2. For additional information related to phasing, review the General Conditions and Supplementary Conditions and the architectural drawings.
1.28 BIM MODEL
A. The Trade Contractor for the work of this Section shall provide BIM coordination services to support the Construction Manager in their BIM model production and coordination work as required for this project in Specification Section 013129 – BIM COORDINATION.
B. The Trade Contractor shall include in their scope and in the cost of their work the service of a BIM Production Modeler. The Trade Contractor shall, within seven (7) business days of being identified as the approved The Trade Contractor, provide to the Construction Manager and DCAMM Project Manager the name, qualifications and experience history of the proposed BIM Production Modeler. The BIM Production Modeler shall have the experience on projects of similar size, scope and complexity. DCAMM has the right to approve or disapprove any proposed BIM Production Modeler. If the BIM Production Modeler proposed is not approved by DCAMM, then the Trade Contractor shall identify another firm acceptable to DCAMM without any change in cost.
C. Provide a 3-Dimensional system model of the contract documents in a computer program that is based on the concept/principles of Building Information Modeling (BIM) and Virtual Design and Construction (VDC).
1. Base Model:
a. The Designer’s base 3-D architectural and structural model will be provided by the
Construction Manager in AutoCAD Architecture (*.dwf) the base model is to be used as the background for all system models.
b. The base model point of origin (x, y, z) will be determined by the CM VDC.
2. System Model:
a. Use the same origin (x, y, z) and orientation as the base model.
b. Elevate system model so that when merged with the base model the system model is at the correct height above the finish floor elevation.
c. Model to be broken into layers, for example: floor by floor, phase by phase, and as applicable.
d. Use color and/or textures per standards to be provided by the CM VDC.
e. Provide system models in native application (*.dwg) formats.
f. System model must be a solid surface model (not wire frame), when viewed in
NavisWorks.
g. System models must accurately represent all elements in the Contract Documents and at the same level of detail and precision required for shop drawings. Remove any “scratch” work including backgrounds of other models before providing system model to the Construction Manager.
ELECTRICAL WORK ISSUE DATE
260001 - 19
h. Prepare the system models using software that allow 2-D drawing sheets to be extracted from the model so that production of these sheets do not require a special or duplicated CAD effort. The system models and any drawings produced from the coordination process will be treated as shop drawings and are to be used for coordination purposes only. All Trade Contractors are still responsible to verify that their systems are being installed per the contract documents, RFIs, changes, and as applicable.
i. Grant DCAMM (the Owner) a perpetual, fully paid license to use the models produced by this agreement. This shall be done without acknowledgement of the Modeler and in any manner deemed desirable by DCAMM in connection with its business.
j. The CADD files, AutoCAD architecture files, TIF files, shop drawings, RFIs, as-built drawings, and as applicable. (collectively “Project Information”), provided to the Trade Contractor are the Property of DCAMM (the Owner). The Trade Contractor agrees it will keep all project information in strict confidence and will not use it on any other project or for any other reason. The Trade Contractor further agrees it will not disseminate the project Information to anyone except with a need to know, and will return all project Information to DCAMM when services requiring the Project Information are complete.
D. Coordination Process Steps:
1. Step 1: Trade Contractor to identify conflicts between their system model and the base model and resolve with the Construction Manager and design team prior to MEP coordination meeting.
2. Step 2: Trade Contractor to identify any required penetrations in architectural and structural elements for their work prior to MEP coordination meeting.
3. Step 3: Trade Contractor to provide system model to the Construction Manager. The Construction Manager will integrate system model with base model in NavisWorks to create a “coordination model”
4. Step 4: Trade Contractor and the Construction Manager to meet, review, and resolve clashes/conflicts within the coordination model.
5. Step 5: Trade Contractor make changes to their system model per resolutions from MEP coordination meeting.
6. Step 6: Repeat steps 3 through 5 until all clashes/conflicts have been resolved in the coordination model.
E. Equipment Models: All equipment specified and intended to be used for installation shall be represented in the coordination model as a fully functional 3D component with the following characteristics:
1. Create models in a software application (Autodesk, Revit, Bentley MicroStation, SolidWorks, and as applicable) capable of embedding all information specific to that equipment which would typically be available in the required shop drawings and submittals.
2. Construct the models to accurately identify all of the physical components including:
Length, width and height of equipment; weight of equipment; accurate location of all facility connection points; proper identification of required supports whether provided by the Trade Contractor or others; proper identification of required supports; access for maintenance and/or filter changes locations; and clearances.
ELECTRICAL WORK ISSUE DATE
260001 - 20
3. Include all clearance requirements for the equipment as outlined by the equipment manufacturer and all applicable building codes. Identify clearances on a specific layer that can be turned off for coordination purposes. Identify clearances as solid planes (“no fly zones”) which will register as clashes during the coordination effort.
4. Provide equipment model information to the Construction Manager in its native (*.dwg) format as well as IFC format (IFC format describes the behavior, relationship, and identity of a component object within a model).
F. Schedule: Time is of the essence on this project. Trade Contractor is responsible for all efforts, methods, procedures and costs required to meet or better the scheduled dates.
1. If, at any time, it is determined by the Construction Manager or DCAMM Project Manager that this Trade Contractor is not on schedule for any reason within the control or responsibility of the Trade Contractor, the Trade Contractor shall increase its manpower or work such overtime as is required to bring the work back within the Project Schedule.
Such additional efforts shall be performed at no additional cost to the Construction Manager or DCAMM (the Owner).
2. The proposed schedule includes “estimated” start dates for the construction activities. In the interest of the Project, the Construction Manager reserves the right to alter the sequencing of activities in order to accommodate the project conditions or DCAMM requirements.
3. It is understood that the Trade Contractor shall be obligated to complete its activities within the specified durations regardless of the actual start date. Trade Contractor agrees to meet or better each duration.
G. Record Information: Trade Contractor shall maintain models during construction to match the “as built” condition of their installed work
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Product specifications are written in such a manner so as to specify what materials may be used in a particular location or application and therefore do not indicate what is not acceptable or suitable for a particular location or application. As an example: non-metallic sheathed cable is not specified; therefore, it is not acceptable.
B. For purpose of establishing a standard of quality and not for purpose of limiting competition, the basis of this Specification is upon specified models and types of equipment and materials, as manufactured by specified manufacturers.
C. In all cases, standard cataloged materials and systems have been selected. Materials such as lighting fixtures specially manufactured for this particular project and not part of a manufacturers standard product line will not be acceptable. In the case of systems, the system components shall be from a single source regularly engaged in supplying such systems. A proposed system made up of a collection of various manufacturers products will be unacceptable.
ELECTRICAL WORK ISSUE DATE
260001 - 21
D. Where Specifications list manufacturer's names and/or "as approved" or "approved equal” by Designer, other manufacturers equipment will be considered if equipment meets Specification requirements and has all features of the specified items as are considered essential by Designer.
E. All materials shall be new and shall be UL listed.
2.2 POWER SYSTEM STUDIES
A. Short Circuits Studies, Protective Device Evaluation Studies, and Protective Device Coordination Studies shall be provided by this Electrical Subcontractor.