About this file
This document is an Environmental Baseline Study (EBS) prepared for the Massachusetts Army National Guard (MAARNG) for a 29-acre property located at 143 Speen Street in Natick, Massachusetts. The EBS was conducted to assess the environmental condition of the property, which has been used for storage by the MAARNG. The report includes a description of the property, its historical use, a review of regulatory records, site reconnaissance findings, and conclusions. Based on the information gathered, the EBS finds the environmental condition of the property to be Category 1, indicating no release or disposal of hazardous substances or petroleum products has occurred, including migration from adjacent properties.
The related state and local contract opportunity is for a design-build project to construct a 205kW solar PV canopy and electric vehicle charging stations at the Natick site. The project may also include battery storage and rooftop solar as alternative energy conservation measures. The contract is being issued by the Commonwealth of Massachusetts and the project is located in Natick, Massachusetts.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Environmental Baseline Study 143 Speen Street Natick, Massachusetts, 01760
Prepared for:
MAARNG
50 Maple Street Milford, MA, 01757-3604
Project No. 03-213721.00 June 4,2010
Prepared by:
Environmental Compliance Services, Inc. (ECS) 997 Millbury Street, Unit G Worcester, MA 01607 tel 508.756.0151 fax 508.757.7063 www.ecsconsult.com
TABLE OF CONTENTS
1.0 INTRODUCTION................•.......•
1.1 Location and Property Identification 2
1.2 References 2
1.3 Brief Description of Methodology 3
2.0 PROPERTY DESCRIPTION..........................................................•.......................•
2.1 Property Description 3
2.2 Surrounding Land Use : 3
2.3 Surface Water, Topography, Geology, Hydrogeology, Sensitive Environments and
Natural/Cultural Resources ........•
3.0 PAST AND CURRENT OPERATIONS 4
3.1 Land Use History from Interview Information and Documentation 4
3.2 Analysis of Federal and State Regulatory Records Search Results 5
3.3 Analysis of Aerial Photographs 5
3.4 Analysis of Historical Records Search to Include Chain of Title for Property 5
3.5 Hazardous Materials Use, Handling and Storage 6
3.6 Hazardous Waste Generation, Handling and Storage 6
3.7 Petroleum Products Use, Handling, and Storage 6
3.8 Other Environmental Contamination 6
4.0 SITE RECONNAISSANCE ..............•...............•...........................•.........................•...........•.. 6
4.1 Results of Site Reconnaissance 6
5.0 RESPONSE ACTIONS .......................................................................................•
5.1 Description and Status of Ongoing Response Actions or Regulatory Orders 7
5.2 Description and Documentation of Closed Response Actions 7
6.0 FINDINGS AT ADJACENT PROPERTIES ...............•.............................••..•
6.1 Analysis of Federal and State Regulatory Records Search Results 7
6.2 Historical Activities and Current Use Information 7
7.0 CONCLUSIONS 7
7.1 Environmental Condition of Property 7
7.2 Known or Suspected Areas with Transfer Restrictions 7
FIGURES:
Figure 1 Figure 2
APPENDICES:
Appendix A AppendixB AppendixC AppendixD AppendixE AppendixF AppendixG
Site Location Map Site Plan
Photographs Current Tax Assessor's Records Scope of Service Previous Reports Environmental Data Resol'l:rces Report Aerial Photographs Natick Fire Department Records f·"", R·.·:£lIltJ;ewOnlyor .)1>",", v!!..
EXECUTIVE SUMMARY
Purpose
The Environmental Baseline Study (EBS) has been developed to comply with the Army National Guard EBS Standard Operating Procedures as best fit based upon obtainable information. The assessment has been performed for the purpose of assessing the environmental conditions currently at the above Site.
Summary
Environmental Compliance Services, Inc., (ECS) conducted an EBS of a 29 acre property at 143 Speen Street in Natick, Massachusetts. ECS performed a Site reconnaissance that consisted of visual observations of the Site and an interview with the Site user. ECS also reviewed historical documents in order to properly characterize the environmental liability of the Site.
Conclusions
Based on the information gathered during this EBS, ECS fmds the Environmental Condition of the Property to by Category 1, which is defmed as area where no release or disposal of hazardous substances or petroleum products has occurred (including migration of these substances from adjacent properties).
[1]
DRP~lCTCOPY For Review Only
1.0 INTRODUCTION
1.1 Location and Property Identification
The Site is located at 143 Speen Street in Natick, Massachusetts. Attached to this report is Figure 1, and Figure 2, which are a Site location map, and a Site Plan, respectively. Photographs are provided in Appendix A. A copy of the current Tax Assessor's office property card is provided in Appendix B.
PROJECT SUMMARY TABLE
Site Name: Massachusetts Army National Guard Site Address: 143 Speen Street (parcel ill 41-00000084) City: I Natick County: Middlesex I State: I Massachusetts Tax Map designation: NA Property Area: 28.96 acres Building Footprint: Unlisted Year Built: Unlisted Renovations: Unlisted Number of Stories: One Basement: No Land Use: Storage Last Sale Date NA Property Owner Commonwealth ofMassachusetts Site Occupants Massachusetts National Guard
Heating Source: Location: Heating Fuel: Storage:
None NA NA NA
Fuel Storage: NA Floor Drains: Yes Site Utilities:
Municipal Sewer Yes On-Site Septic System No Municipal Water No On-Drinking Water Well No
ECS Personnel: Aaron Kaczowka AccompaniedlEscorted By: Mr. Steve Raymond and Mr. Keith Driscoll Inspection DatefTime: April 22, 2010
1.2 References
1. USGS Framingham Quadrangle, 7.5-minute series
2. 1995 Aerial Photograph
(http://terraserver-usa.com/default.aspx)
3. The EDRRadius Map Report; dated May 19,2010.
4. Underground Storage Tank Closure Report, Massachusetts Arruy National Guard, dated
January 2008
5. Level I Environmental Site Assessment, Commonwealth of Massachusetts Division of
Capital Planning and Operations, dated April 1994
[2]
1.3 Brief Description of Methodology
This report was prepared for Massachusetts Anny National Guard to comply with the requirements of an Environmental Baseline Study in accordance with the project Scope of Services. ECS perfonned a records review of the Site, interviews with the user and municipal officials, and a Site reconnaissance to characterize the environmental liability of the Site. The project's Scope of Services is attached as AppendixC.
2.0 PROPERTY DESCRIPTION
2.1 Property Description
The Site consists of one parcel of land, totaling approximately 29 acres of land. The center of the Site is improved by a one story storage building. Access to the Site is provided from the west via Speen Street.
The Natick Town Park abuts the Site to the north. The Albany Railroad abuts the Site to the south and Lake Cochituate is located to the east.
Exterior portions of the Site include an asphalt paved parking area. The perimeter of the property is surrounded by a chain link fence capped with barbed wire. A storage building is located on the north portion of the property. Six rooms are located in the storage building, all of which had floor drains present in them. Papers, sand bags, fire hydrants, a humidity controller, and various vehicles were present in the storage building.
2.2 Snrrounding Land Use
General observations of adjoining properties were perfonned in conjunction with ECS' site inspection on April 22, 2010. The following uses were identified on adjoining properties.
DIRECTION DESCRIPTION
North Natick Park South Albanv Railroad East Lake Cochituate West Speen Street across which were resdential dwellings
2.3 Surface Water, Topography, Geology, Hydrogeology, Sensitive Environments and Natural/Cultural Resources
I GEOLOGY AND HYDROLOGY SUMMARY I
Elevation: Approximately 165 feet above mean sea level (based on EDR report) Site Slope: Generally flat with a downward slope to the east Regional Surface Drainage Patterns Northeasterly Estimated Depth to Groundwater: Approximately 15-20 feet below grade (based on the elevation ofLake Cochituate) Estimated Groundwater Flow Northeasterly (based on topography and location of nearest Direction: surface water body)
[3]
> 'U'..... ):'"-,J }~'i:~d' . . . _. -'. j for Review Only State GW Criteria/Standards: GW-I/GW-2/GW-3 Sensitive Environmental Receptors: Lake Cochituate abuts the Site to the east.
Flood Plain Designation: Zone X: Area of moderate flood hazard, usually the area between the limits of the 100-vear and 500-year floods.
Flood Plain Map: 25017C0536E Flood Plain Map Date: June 4, 2010 Bedrock: Dedham Granodiorite formation - ancestral glacial lake deposits composed ofmostly pebble and sand-sized material.
Bedrock Outcroppings None observed
3.0 PAST AND CURRENT OPERATIONS
3.1 Land Use History from Interview Information and Documentation
ECS was accompanied by Steven Raymond (caretaker ofproperty) during the Site inspection on April 22, 2010. Mr. Raymond informed ECS that the Site was mostly used for storage purposes. He also indicated the no vehicle maintenance building was performed at the Site and that no surface spills had occured.
ECS also obtained two reports. One ofthe reports was for the northern portion of the property entitled:
Level I Environmental Site Assessment, Commonwealth of Massachusetts Division of Capital Planning and Operations, dated April 1994
A copy of the report is included as Appendix D. The findings of the report are summarized below:
• Since constmcted in the mid 1960's, the Site has been utilized as a base for highway maintenance crews for the Massachusetts Highway Department.
• No evidence of spills or illegal dumping were observed during a Site reconnaissance.
• A Recognized Environmental Condition does exist at the National Guard Depot (the Site). The facility has had at least three underground storage tanks for fuel oil and gasoline, which have been either removed or closed in place.
The later report was entitled:
Underground Storage Tank Closure Report, Massachusetts Army National Guard, dated January
A copy of the report is included as Appendix D. The [mdings of the report are summarized below:
• A 5,000 gallon heating oil underground storage tank was removed from the property.
• No evidence of any release was indicated by physical observations or the laboratory analysis or soil samples collected from the sidewalls and base of the excavation.
The previous reports both depicted two buildings, which are no longer present at the Site. ECS interviewed Mr. Keith Driscoll (NEPA/MEPA Coordinator for MAARNG) about the former buildings located at the property. Mr. Driscoll's responded that one ofthe three original buildings was demolished the facility was occupied by the U.S. Procurement and Fiscal Office (USPF & 0) of the Massachusetts Army National Guard. The primary function of the USPF&O was administrative and storage space. The
[4] for Review Only, rear ofthe building contained a large open area that was used as a warehouse that served as a distribution center for supplies for the armories and associated military units across the state.
The second of the three original buildings constructed at the site was occupied by the U.S. Procurement and Fiscal Office (USPF & 0) ofthe Massachusetts Army National Guard. The primary function ofthe building was administrative and storage space.
3.2 Analysis of Federal and State Regulatory Records Search Results
ECS obtained an environmental database search report from Environmental Data Resources Inc. (EDR).
The search distances are consistent with those specified in EBS SOP guidelines. Databases searched and search distances are provided in Appendix E.
The Site is listed on the Manifest Database as a having disposed of one drum of sodium hydroxide and one tanker truck (329 galllons) of waste gasoline, but the report does not indicate that a release of either substance occurred at the Site or that any environmental impact would be likely due to the generation of thyse materials. .
Records pertaining to nearby listed properties of concern based on proximity to the subject site are summarized below.
Environmental Recognized
Location Database Listing Proximity to Site Condition
Environmental Condition
135 W. Central Located south Generation of small
Street - Classic RCRA Generator across the Albany quantities ofwaste
No Auto Sales Railroad oil and halogenated solvents
Based upon distance, area topography, and/or facility status of the remaining identified locations within the EDR report, none of the above spills are likely to represent an REC with respect to the subject site.
Three records were identified at "non-geocoded" locations on the Speen Street which directly adjoins the site to the west. Based on the nature and status of the records, they are not expected to impact soil and groundwater on Site. Several additional "non-geocoded" records were also identified. Although the exact locations of these incidents could not be confirmed, none appear to pertain to the site, adjoining properties, or locations where releases would reasonable be expected to impact the site.
3.3 Analysis of Aerial Photographs
ECS examined an aerial photograph obtained from http://terraserver.microsoft.com for the year 1995.
The photograph depicts the two former buildings at the property. The rest of the Site and surrounding area appears to be developed to its current extent in the photograph reviewed. Copies of the aerials photographs are provided as Appendix F.
3.4 Analysis of Historical Records Search to Include Chain of Title for Property
The Chain of Title could not be obtained during the Natick Municipal File Review. According to the 1994 Levell Site Assessment, Sanborn Maps were available for the area for the years 1926, 1948, and
[5]
COPY.
For ReviewOmy.:
1968, however the maps only cover to properties further south. No coverage was available for the actual Site.
3.5 Hazardous Materials Use, Handling and Storage
No hazardous materials are used, handled, or stored at the Site.
3.6 Hazardous Waste Generation, Handling and Storage
No hazardous waste is generated from activities that occur at the Site with the exception of the materials discussed in Section 3.2.
3.7 Petroleum Products Use, Handling, and Storage
ECS reviewed several Natick Fire Department records pertaining to petroleum USTs removed from the Site and any other enviromnental conditions that may be present at the Site. A summary of the records is listed below:
• FP-290 (512/1986) - Notification of 15,000 gallon UST that was used to store gasoline.
• FP-292 (6/31/1990) - Application for permit to remove the 15,000 gallon UST.
• FP-29l (8/10/1990) - Receipt of disposal of 15,000 gallon UST.
• FP-292 (9/71/2007) ~ Application for permit to remove the 5,000 gallon heating oil UST.
ECS made a request to the Fire Department for a copy of the FP 291 for the heating fuel UST, however these records were not provided. Copies of the Fire Department's records are provided as Appendix G.
3.8 Other Environmental Contamination
No other enviromnental contamination, including unexploded munitions, was observed during the Site reconnaIssance.
4.0 SITE RECONNAISSANCE
4.1 Results of Site Reconnaissance
Aaron Kaczowka ofECS inspected the site on April 22, 2010. Mr. Kaczowka was accompanied by Mr.
Steven Raymond and Mr. Keith Driscoll during the Site inspection. A summary of site reconnaissance findings is presented below.
Except for a driveway, parking lot, a ten foot high fence and storage building the Site is undeveloped land. Two gates proved access to the Site from the west from Speen Street. No evidence of illegal dumping was observed at the Site. There is a slight northeast downward slope on the northeast boundary.
Interior portions of the storage building mainly consists of storage space. The storage building is divided into six rooms. The rooms contain cars, fire extinguishers, parole records, National Guard Humvees, trailers, and sand bags, which were left by FEMA. Three floor drains were observed in the southwest room of the building. The floor drains were observed to have a dry, black, brittle substance with no odor
[6]
F it"!;, ..
''''or KeVlew to it. The floor drains did have a 4" pipe inside of them, which appeared to discharge from the roof. No unexploded munitions were observed in the armory or at any other location at the property. A dehumidifier is located in the room located to the central south section of the building. Photographs of the Site are included in Appendix A. No drywells or holding tanks were observed during the Site reconnaissance.
5.0 RESPONSE ACTIONS
5.1 Description and Status of Ongoing Response Actions or Regulatory Orders
There are no ongoing response actions or regulatory orders at the Site.
5.2 Description and Documentation of Closed Response Acti~ns
There are no records of response actions that have been closed out at the Site.
6.0 FINDINGS AT ADJACENT PROPERTIES
6.1 Analysis of Federal and State Regulatory Records Search Results
Please see Section 3.2.
6.2 Historical Activities and Current Use Information
According to historical reports for the property, the current and former buildings were constructed in the mid 1960's and, the Site had initially been utilized as a base for highway maintenance crews for the Massachusetts Highway Department. Three USTs had been present at the Site. According to the Health Departments records, two 5,000 gallon fuel oil USTs had been located near the southemwall of the former main building located in the center of the property. One of these USTs was removed in 1988 and the other was closed in place due to sturctural intergrity concerns of the existing building. The closed in place UST was removed in 2007. According to the Natick Fire Department's records a 15,000 gallon steel UST was removed from the property in 1986.
7.0 CONCLUSIONS
7.1 Environmental Condition of Property
Based on the information gathered during this EBS, ECS finds the Environmental Condition of the Property to by Category I, which is defined as area where no release or disposal of hazardous substances or petroleum products has occurred (including migration ofthese substances from adjacent properties).
7.2 Known or Suspected Areas with Transfer Restrictions
No known or suspected areas with transfer restrictions were identified during this EBS.
[7]
FIGURES
Mass Army National Guard Property 143 Speen Street Natick, MA 01760 Figure 1: SITE LOCUS
Environmental Compliance SelVices, Inc.
997 Millbury Street, Unit G Worcester, MA 01607 Phone 508.756.0151 Fax 508.757.7063 www.ecsconsult.com
Map Datum: NAD 27 Contour Intel'l3l: 3 Meters
Map Edited: 1987 o 112 1 Mile
Base Map: U.S. Geological Survey; Quadrangle Location: Framingham, MA
LatlLon: 42' 16' 52" NORTH, 71' 22' 37" WEST - UTM Coordinates: 19304014 EAST /4683734 NORTH
Generated By: Rich Walas j • ,., f
~ t ~ i Hi j ~l!
~ , I ;{
• ID
.l! " I .
!"l
.. I , ~. 'i 1i g, § ,. '" i ~
IIi > • 0 l~~ ~ ~ ~ :i
'07.
~l j C! ~ a ~~-u
: I j&+> ~
I:
iii ~'lii~~
~~ i i • a
~ :B~§ jl
~ ~t~~
• il I J ~• ~ a: ~ ~ "
/ I
; E
~ // L I
I
• / I I
I e /' Ic /8
I
~ / I
I
I I
I ! I
I
I
I e I I
I I
I
/ I I
/ I
I I
/ I I
I
I
IL-_
l
I
I
I
I
I ~
I \
I L----
I
I i
I
I \ ~ I
I
I
I
I \
I I
I
I
I
I
I I I
I ,----J lr .l.3~.LSN33dS l /
'r-
APPENDIX A
PHOTOGRAPHS
APPENDIXB
CURRENT TAX ASSESSOR'S RECORDS
Commercial Detail
Town of Natick Commercial Property Record Card Preliminary
Page 1 of3
Fiscal Year 2010
PARCEL: 41-00000084 STATE_CLASS: 910
LOCATION: 149 SPEEN ST NEIGHBORHOOD: 202
ASSESSMENT: $6,831,397
ZONING: RSC:,
httn'//wwwn"tid'TIl"or"/"""",,o/r;OM,",n?ic1=41-000000R4&PPN 2=5154~
OWNER_NAME_1: COMMONWEALTH
OWNER_NAME_2: ARMORY COMMR~
OWNER_NAME_3:
MAILING ADDRESS: 149 SPEEN ST
MAILING CITY: NATICK, MA01760
DEED_BOOK: LC242
DEED PAGE: 00073
DEED_DATE: 19330523
TOTAL_ACRES: 28.96
5124/2010
Commercial Detail
Town of Natick Commercial Property Record Card
Page 2 of3
Fiscal Year 2009
INCOME APPROACH
MARKET DATA
POTENTlAL_GROSS_INCOME: $0
VACANCY: 0.00%
EFFECTlVE_GROSS_INCOME: $0
TOTAL_EXPENSES: $0
NET_OPERATING_INCOME: $0
CAP RATE: 0.00
INCOME VALUE: $0
BUILDING AREA:O
httn·//wwwnBt;"kmHor"/H"ess/r;OM.Hsn?i<1=41-000000R4&PPN 2='i1 'i41
'i/?4/?010
APPENDIXC
SCOPE OF SERVICES
0: -•• J,-, ~I=' en _ <:» <->-0 c"
__T":
"T.
1"'"1 .--:i
"-'..J...
I::nlllronrne!'ltB[ Ilil!l:iellnf! 5:tooy 500 PI! of .5eNices
The M""""ch<,...tts Army Nown,,1 GuariJ is r~'l,,~SllnB a propoAAl fJ:w Ifill j»)m~l<l<lo'1 .;>foll l:n~iron..<:nliIIIl"scIino St...dy JE~ ofthe u~l~d S~e$Il;O\'(Re~e~ 1l"Oi>'!'''''' ""'ate",,~ I>4(l
Plan I. ~~., Stree l, W(}rte~ler, Ml1~5.r.h'''f.[1!i. Th. <;<tIp' "Ith" EII5 "",,,rs,, S acre p"rcell~clutllll!l Z b~ndlr'lg:i {a ,3 Jta Vmamtmame go r.lgll 41 nd ~ ;htury iIl!I1II1l1mi~4I!IlI~I)' ~uik1i~l. The -5[l;e .a 1,.;1 includes parkl~E ar@~:!jI, IdelliallG, a landsC<lpe.:l and semHmllroved ore<! <I nd 5k>rlll WOlfer "IEment. I'."
~~ched Ifl:lpJ.
Thp. F,BS will b. """"loped l~ rom ply w'r!h t~e Army Haliunal Gua,d EBS $\ondardO~tdl'~~ Pmr@dur<!s ~SOP) Pll'll07 ln~1 ~dedl .5 b~tffl b<il:selJ upon olttiljn~l>I./a"ai lab'" informallon. The =i!:SSI'Il ~I'll will bi performed fonlle purp D5 ~ Qfasse:;5ins ll-.e e ~~ironnlentll <;1)o!1d itjQn~ l;I.l....ntlyat tile abDV<> .ii:<!_
The EBS w~1 iirlJd~ IlrodlllgS ~nd _ [lu!;1on~ ~:IS~d on .. ~Dn·ln~a&l~c&!l~ 1II&1t, :l1J well as dlscu:llllDn !If
_"~ifi""nte""imnm..ntal mati:ers cbse....ed _nd·fi"al r"."",,,,.ndatiO[I!i. A d;lL:lba!:Ei _[c~ Pilck~ wnto """ilablo hi .rorie.1 "'I'~ rt...ill b~ ind\Jdcld I nd !.~I"""I>d for 1h.. Eas. Il'\'1ta.$lue o••u"."u.fllc~ ilTl!£!sfi~i1tkJn.1form~.iitlcfckcdllicn~oar.::h~ ;'1nd qtlL:lnttl:::Jtlvoe ;n~!);.r)'mMt!:=<rl rnclnn.l ::'~~t1~J If!.ad-
. b.sed pa'n!, and pm', w~1 not: b<: ind.~""", pr.lrl "rlh" EU5. Th" L.>b;'Uu"" Ih" JulbwiflB, Th ~ mntr.>rt<lr will roDli U<l a ne<l>T<is "",""",icrthe ",I>j~ctsite :and 5UrTlRlnr!j'B ""dil./ti in eom-pllano:l wilh the EBS SOP. Thi 5 wi II in cI udc ASJM d ..tronK: dot" LeYiclv .nrnush [noi ",nmel'll.L IJ.U:I n.",,,r=
(EDR) thatwillfulfili tl",.",ooo,,' ell~iru""'''''LDh."u[d""u"... fur II,. FtooJ",.1 .,RJ ~l.l", p1r,-:;i cal . Betting ,.:,.n:e, an" hi<tcril:i3l use rel !&rdll.....hl!:rn a~a lIa~). 11'Ie oortlraclDr will 00 Bd'llet peuonnel rnterul,ws with lh&assl~~nee of the MAAR.ttG 800 re\1e'N preYlou. EaS repa rto and Dthe:r wallable "",,,r.5 at 1o",,, ""'II a,,,,,,I[ '" lu<;allir~oJ",partll'l8nl ~ml boaltb deP'irtffient rl!p~n~ TII~ COnlriidDI will al50 pruYide • ,..,oold"telli~W al tho!! Mil. DI!!P~m1l!nt of ErwlroM1!I'll~1 PlCI~IDf'IMrthe- respected are9 10 ••vi'''' a...ailable ;~cardsior ttlas1t~ and ~c1J.r~nt pl'Op~l1r~s.
Tb P. corn I<Ictcr win inelnde ob""",atH:m [J f..11 ~urte nf,,;lo 8cli.iLE~ and iIlSpectloll of iiI@' 6 ocr~ subJ~
.site. This will include ab2"",tion m.Il cu,-;ent Si1i! ad:i\'1I:I.~ ~nd ir>sp!'!dl<llldth!! ~ruClures.Tbn fuJlowlng is alJlie! summ_ry of '<;..0,. to be "b,.,lVod wh••,,,.p ~li,.lJI. 000'<'<1 Uf'I'>O th.. I'RS S[)P:
• Cvld",·,O!! af<p111 •
• [)r.jJ in=:i iIJIf :iUnlp::i
• Sa",,,, of h_ln,g:
• W~r ~u=, lrt!llment 300 stoia ge
• ~~Ilv;mtsor pipe5
• U,",-"'I\Sf',
• ~1,cl;rl!'011 trlIn""rme's.
.. Ci:lld, Bi:lslm:i" li!t!::uon:!l 01 rjjb
E' ,m l _ 1 en
"'"C"
C··.l i."( :-
·x:. ,
• Iiaz.r<i",,~ Wll:lte.b<l~ ~re~ <>f dJ'~D.,,1
• t'l'ideraofPCIf""JlCM Or'LaP
Th~ c"ntrnr.tmmlJst fl1CClj>Ofab. "ne [11 diry!{J compl~t., the site InspeCliQn .and y,jll ~"ume" repre5ul;ali'le nom thE! MAAFtNG \11111 bl<!~vall~llle to provide sit~ s~ ~& me infolllmilticn duri~g the illterui.elll preCE!SS and i1C~ tc the ~n.U±ILre.:s.
The m"t,-",d",wDl "p~ilL~ IhI! _1.1n8 ~tt8 pilin wltl1 tilE ill;;ci~e i~fofll1;rtio.il as l>lJtlin~lIlhIl<Jltl'll Mth'"
E85 mp. This~ will fndltd@ In ~ollaboml(ln wIl~ l:I1e MAMltlG in !"liningaren*),mf1 a" En~;rnnrnerAalClasslflcat:lon llf Prop~rl~ [.COP) &8~{>1'i (1-1)<15 cUlliMd in till;! Ell, SOP.
TasH. D,ilttand Rno' R~l'ort an""d "PO" It.., 000..:, 1l:I,b, II,,, ,o"l(..cLD..wl~ d~1f~I"p'~ draft EBS report fD' MAAAhJG revic",_ Rq:",rt oontenL, wi II ill (IUI1@ (b~sd upon the mp Ap pBlldiK ~I:
• Pasta nd eUlTe~t <;IlIer.Jtio.-.;
• SnE! i"E![;IJnl3ili5Si:l m;1t
III ~p.!,: pDTI~e3C1nJn5-
• Findint:" ,1;: o"joocnt prop~rti .,
• l:oncl~slcns
B.""d "p". tI>E! MAARNG rom ""'''''', tho:: <••tflOol.or 'llith ~ e'ie[<;>P a ~,,~I "l'PQn that wi II in [I "de datilbwE! ,.,.,,£1, ""'ults, ~811a1 pnolJ.l~rap~5 jwl"':l"e ~'l.allilble), ~Ite phOJot:<JGIilf>h', oegLJlinr"JI
-do t umental[Qfl (wh",e auallab!@) ,,~6 ot~~ rele;i~nt d!l1ll•.
If ~OLJ flffi'e ~~~ mntlBrqueotion.', pllea"" "mlt:ad Kei!:h J. 0""'011, MAAR.rIG EWP [\118t"11111l1'1r at l5 OS) 2;10 -6511.
File details come from the government source that posted it. Updated .