MAARNG Natick_E1.00_Elec Site Plan_2015_As-Built.pdf
PDF 427 KB Posted
- Attached to
- MIL1901E-EC1 MIL-Natick-Solar PV-Design/Build
- Solicitation number
- BD-19-1019-DCP08-ENR01-29482
- Issued by
- Middlesex County, Massachusetts
About this file
This document appears to be an as-built electrical site plan for the Massachusetts Army National Guard (MAARNG) facility in Natick, Massachusetts. The related state and local contract opportunity, MIL1901E-EC1, is for a design-build project to construct a 205kW solar PV canopy and electric vehicle charging stations at the Natick site. The project may also include battery storage and rooftop solar as alternative energy conservation measures. The contract opportunity does not provide specific details on pricing terms, set asides, incumbents, funding requirements, or amounts.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .