Instructions
| INSTRUCTIONS FOR FILLING OUT FORMS B, C & D - ENERGY DESIGN BUILD PROJECT | | |
| GENERAL INSTRUCTIONS FOR ALL FORMS (B, C & D) | | |
| a. | Proposer is to fill in all cells highlighted green. |
| b. | Cells highlighted grey are not applicable and should not be filled in by Proposer. |
| c. | White cells are automatic calculation cells and should not be changed. Proposer shall verify numbers shown in these cells are correct . |
| d. | Yellow cells are predetermined values and should not, at any time, be changed by the Proposer. Under limited circumstances, DCAM may allow a change upon Director written approval. |
| e. | Red cells should only be used by the Proposer as directed: Line 9 may be used if Proposers are using only Lines 2-8 versus Line 1 (not both). If Proposers would like to submit sucontractors costs under Line 1, Proposers can use Line 9 only if they use the clarifications cell to explain what is included in Line 9 and not in Line 1. |
| f. | Please check all calculations and verify the values in the proposal. Please notify DCAM contact person if a cell is not calculating correctly. |
| SPECIFIC INSTRUCTIONS FOR FORM B | | |
| a. | Please fill out a Form B for each individual ECM. All pricing is to be "Open Book/Closed Book" as defined below. Please follow all instructions below. For any self-calculating parts of the forms, please verify calculations. |
| b. | For each ECM, Proposer may break down each major piece of equipment or system on another spreadsheet as back-up. Please provide reference. Back-up information should be available, but not submitted. |
| c. | Make sure to include Alternate ECMs and recommended changes, if applicable. |
| d. | Please confirm that the Summary Form B Total Contract Value tab is accurate (it computes automatically). The Total Contract Value on this tab will be used as the TCV for the ESA. Note: at the Commonwealth's sole discretion alternates and/or recommended changes will be added to the TCV. |
| | ITEM # | DESCRIPTION | INSTRUCTIONS |
| Installation Period Costs | Complete either item #1 or (items #2-8) | 1 | Subcontractor Competitive Bid Amount | Proposer may be asked to provide Bid Tab Summary as backup with at least 3 bidders ranked by cost showing company name, bid value, any clarification/amendments, etc. Enter value in this line item and skip line items 2 through 8. |
| | | or | If the work is sole sourced (not competitively bid) the Proposer/subcontractor will be required to fill out items 2 through 8. |
| | 2 | Direct Materials | Proposer to provide a break out of direct materials to a level which can be easily analyzed. This will require sufficient backup in the form of an itemized listing of direct materials, quantities, and unit prices. Unit pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM. |
| | 3 | Direct Equipment | Proposer to provide a break out of direct equipment to a level which can be easily analyzed. This will require sufficient backup in the form of an itemized listing of direct equipment, quantities, and unit prices. Unit pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM. |
| | 4 | Direct Labor | Proposer to provide a break out of direct labor to a level which can be easily analyzed. This will require sufficient backup in the form of an itemized listing of direct labor, quantities, and unit prices. Unit pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM. |
| | 5 | Direct Labor Fringe Benefits | Proposer to provide a break out of direct labor fringe benefits to a level which can be easily analyzed. This will require sufficient backup in the form of an itemized listing of direct quantities and unit prices. Unit pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM. |
| | 6 | Insurance and Taxes on Labor | Proposer to provide a break out of insurance and taxes on labor to a level which can be easily analyzed. This will require sufficient backup in the form of an itemized listing of direct quantities and unit prices. Unit pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM. |
| | 7 | P&P Bond | Proposer to provide a break out of payment and performance bonds to a level which can be easily analyzed. This will require sufficient backup in the form of an itemized listing of direct quantities. Pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM. |
| | 8 | Overhead and Profit | Overhead and Profit of Subcontractor. |
| | 9 | Proposer Direct Materials, Equipment & Labor | Proposer can put direct materials, equipment, and labor (if applicable) here. DCAM may require sufficient backup in the form of an itemized listing of direct materials, equipment, quantities and unit prices. Unit pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM. Mark-ups are assumed to be in the pricing. |
| | 10 | Proposer Engineering | Automatically calculated based on mark-up entered. |
| | 11 | Proposer GC's & Proj. Mgmnt | Automatically calculated based on mark-up entered. |
| | 12 | Proposer P&P Bonds | Automatically calculated as percentage of Item 1, Subcontractor Competitive Bid Amount. |
| | 13 | Proposer Overhead & Profit | Overhead and Profit of Proposer, applied to line 1 or 2-9. No overhead/ profit allowed on lines 9-12. |
| | 15 | Training/Commissioning | Cost of training and commissioning. Automatically calculated as percentage of Item 1, Subcontractor Competitive Bid Amount or lites 2-8. Mark-up from proposal. |
| | 16 | Maintenance During Construction | Total cost of maintenance during the installation period. Automatically calculated as percentage of Item 1, Subcontractor Competitive Bid Amount or lites 2-8. Proposer may guarantee utilities, which will result in a more competitive proposal. |
| Other Funds | | 19 | Guaranteed Rebates | Guaranteed utility rebates. |
| | 20 | Other Known Grants | DCAM will provide any other applicable grant totals. |
| | 21 | Estimated Savings | Predetermined values established by DCAM. |
| | 22 | Payback | Automatically calculated based on TCV Less Other Funds and Savings. |
| SPECIFIC INSTRUCTIONS FOR FORM C | | |
| a. | For Base Proposal Requirements: the savings for Base Proposal Requirements have already been calculated based upon the assumptions listed and the calculations found in Attachment B-III. Please follow the instructions on Form C. Form C calculates dollar savings using established rates. Please note instructions tab and verify information is presented accurately on Form C. |
| b. | If proposing an alternative or recommended change affecting savings, please see Form C – Table 2 and follow instructions. |
| SPECIFIC INSTRUCTIONS FOR FORM D | | |
| a. | Please fill out Form D entitled “Cashflow Model”. This form automatically calculates. Please verify information. This does not include alternatives or recommended changes. Proposers may add a new form that does. Please note: the project should have a minimum cash flow ratio of 1 : 1.10. Proposals with higher ratios will be evaluated more favorably. |
| b. | Please note: a Schedule of Values that breaks down cost per Schedule M of the ESA may be requested of Proposers during Q&A. |
ECM 21.01
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | | | | Design Build Contract | | |
| FACILITY/PROJECT: | Natick Readiness Center | | | | Audit Costs/Savings Form | | |
| PROPOSER: | | | | | Revised by DCAMM 4/17/2014 | | |
| ECM: | ECM 21.01: PV Solar Canopy | | | | | | |
| DATE: | | | | | | Unit Pricing Information | |
| | | | | | Contractor shall provide unit pricing per W to provide a basis for any potential contract price modifications | |
| | GUARANTEED PRICE | | | | if the final design results in a solar PV system that is above or below the anticipated 205 kW base. | |
| | COST | MARKUPS | MU % | TOTAL COST | Unit Pricing - PV Solar Canopy | Unit Pricing - Installation Cost (Material and Labor) |
| CONTRUCTION CAPITAL INVESTMENTS | | | | | | Per Watt | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
DESIGN SERVICES
| 16 | Design Costs | | | $0 |
| 17 | Overhead and profit | | | $0 |
| SUBTOTAL DESIGN SERVICES | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 18 | Estimated Rebate | | | $0 |
| 19 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 20 | Estimated Savings | $49,006 |
| 21 | Payback (years) | 0.0 |
| 22 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 23 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM 22.01
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM 22.01: EV Charging Station | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
DESIGN SERVICES
| 16 | Design Costs | | | $0 |
| 17 | Overhead and profit | | | $0 |
| SUBTOTAL DESIGN SERVICES | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | $0 |
| 20 | Payback (years) | ERROR:#DIV/0! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM C
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | $0 |
| 20 | Payback (years) | ERROR:#DIV/0! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM D
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials (M) | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | $0 |
| 20 | Payback (years) | ERROR:#DIV/0! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM E
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (LBE Grant) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | $0 |
| 20 | Payback (years) | ERROR:#DIV/0! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM F
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
| INSTALLATION PERIOD SUPPORTING INVESTMENT | | | | |
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | $0 |
| 20 | Payback (years) | ERROR:#DIV/0! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM I
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM I | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM J
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM J | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM K
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM K | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction (Base Req. Cost per RFP pg. 5) | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM L
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM L | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction (Base Req. Cost per RFP pg. 5) | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation (3 years) | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM M
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM M | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction (Base Req. Cost per RFP pg. 5) | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM N
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM N | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction (Base Req. Cost per RFP pg. 5) | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM O
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | SDE1301E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Essex County Sheriff's Department | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM O | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM P
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM P | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction (Base Req. Cost per RFP pg. 5) | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation (3 years) | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM Q
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM Q | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction (Base Req. Cost per RFP pg. 5) | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM R
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM R | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction (Base Req. Cost per RFP pg. 5) | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM S
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM S | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction (Base Req. Cost per RFP pg. 5) | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM T
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM T | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction (Base Req. Cost per RFP pg. 5) | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM U
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM U | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction (Base Req. Cost per RFP pg. 5) | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation (3 years) | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM V
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM V | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |
| 5 | Subcontractor Direct Labor Fringe Benefits | | | $0 |
| 6 | Subcontractor Insurance and Taxes on Labor | | | $0 |
| 7 | Subcontractor P&P Bond | | | $0 |
| 8 | Subcontractor Overhead & Profit | | | $0 |
| PROPOSER | | | |
| 9 | Proposer Direct Materials, Equipment & Labor | | | $0 |
| 10 | Proposer Engineering | | $0 | $0 |
| 11 | Proposer GC's & Proj. Mgmnt | | $0 | $0 |
| 12 | Proposer P&P Bonds | | $0 | $0 |
| 13 | Proposer Overhead & Profit | | $0 | $0 |
| SUBTOTAL CAPITAL INVESTMENT | | $0 | $0 | $0 |
INSTALLATION PERIOD SUPPORTING INVESTMENT
| 14 | Training/Commissioning | | $0 | $0 |
| 15 | Maint. During Construction | | $0 | $0 |
| SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT | | $0 | $0 | $0 |
POST-INSTALLATION PERIOD INVESTMENT
| 16 | Maintenance Post-Installation | | | $0 |
| SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT | | $0 | $0 | $0 |
TOTAL CONTRACT VALUE (TCV) $0 $0 $0
OTHER FUNDS
| 17 | Estimated Rebate | | | $0 |
| 18 | Other Known Grants (DCAMM to provide) | | | $0 |
| SUBTOTAL OTHER FUNDS | | $0 | $0 | $0 |
TCV LESS OTHER FUNDS $0 $0 $0
| 19 | Estimated Savings | ERROR:#REF! |
| 20 | Payback (years) | ERROR:#REF! |
| 21 | Recommended Changes? | | (Fill in Y/N) |
| | If yes, Change in Cost to Base | (Put in negative number if decreases) |
| | Revised TCV | |
| 22 | Increase in Savings? | | (Fill in Y/N) |
| | (If Yes, please submit additional information in Form C Savings Table 2) | |
| Cells to be filled in by Proposer | | |
| | Post-Installation Maintenance Breakdown By Year | |
| Cells not applicable | Year | Cost |
| | 1 | |
| Predetermined value | 2 | |
| | 3 | |
| Only fill in if DCAM approved | 4 | |
| | 5 | |
| CLEAR | Automatically calculates | | |
* Fill out only applicable fields - not all fields must be filled out
Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.
ECM W
FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD
| PROJECT NUMBER: | MIL1901E EC1 | Design Build Contract |
| FACILITY/PROJECT: | Natick Readiness Center | Audit Costs/Savings Form |
| PROPOSER: | | Revised by DCAMM 4/17/2014 |
| ECM: | ECM W | |
| DATE: | | |
| GUARANTEED PRICE | | | |
| COST | MARKUPS | MU % | TOTAL COST |
| CAPITAL INVESTMENTS | | | | |
| SUBCONTRACTOR | | | |
| 1 | Subcontractor Competitive Bid Amount | | | $0 |
| OR | | | |
| 2 | Subcontractor Direct Materials | | | $0 |
| 3 | Subcontractor Direct Equipment | | | $0 |
| 4 | Subcontractor Direct Labor | | | $0 |