MIL1901E_Natick_Real_Property.pdf

PDF 560 KB Posted

Attached to
MIL1901E-EC1 MIL-Natick-Solar PV-Design/Build
Solicitation number
BD-19-1019-DCP08-ENR01-29482
Issued by
Middlesex County, Massachusetts

About this file

This document appears to be a geographic information system (GIS) map and related details for a Massachusetts Army National Guard (MAARNG) facility located in Natick, Massachusetts. The map shows the boundaries, acreage, and various infrastructure components of the 25.9-acre site, including buildings, parking, utilities, and other site features.

The related state and local contract opportunity is for a project to design and build a 205kW solar photovoltaic (PV) canopy and electric vehicle (EV) charging stations at this MAARNG facility. The project may also include the option for battery storage and rooftop solar as additional energy conservation measures. No specific response dates, due dates, or award information is provided in the documentation.

View the file

Other files

File Type Posted
MIL1901E Natick Solar PV RFP.pdf PDF
preproposalsignin8.7.18.pdf PDF
MIL1901E Scope of Work Form_Final.xlsx XLSX spreadsheet
MAARNG Natick_C-102_Lyt+Matls Pln_2015_As-Built_Mark-Up.pdf PDF
017419-DBB-rev71-Construction Waste Mgmt and Disposal~1.pdf PDF
MAARNG Natick_E1.00_Elec Site Pln_2015_As-Built_Mark-Up.pdf PDF
MAARNG Natick_E1.01_Elec Site Dets_2015_As-Built_Mark-Up.pdf PDF
018100-DBB-rev71-Commissioning~1.pdf PDF
MIL1901E-EC1_Dec. of Soil Bearing Capacity.pdf PDF
MAARNG Natick_E1.01_Elec Site Detls_2015_As-Built.pdf PDF
017418-DBB-rev71-Demolition Waste Mgmt and Disposal~1.pdf PDF
MIL1901E Eversource Elect Bills Nov 2015-July 2018.pdf PDF
MIL1901E_EC1_ Response_Form.docx DOCX document
Environmental Baseline Study Draft June.4.2010.pdf PDF
MAARNG Natick_C-106_Utility Plan_2015_As-Built.pdf PDF
MIL1901E Cover Letter.docx DOCX document
MAARNG Natick_C-105_Utility Plan_2015_As-Built_Mark-Up.pdf PDF
MIL1901E_Prevailing_Wage.pdf PDF
260001-CMR-rev71-TB Electrical Work~1.pdf PDF
site visit sign in sheet 8.9.18.pdf PDF
024100-DBB-rev71-Demolition~1.pdf PDF
MIL1901E EC1 Pricing Savings Form.xlsx XLSX spreadsheet
Natick Readiness Center Report-6.7.17.pdf PDF
MIL1901E Pre-Proposal Conference PresentanKAL.pptx PPTX presentation
MAARNG Natick_C-103_Grading+Drain Pln_2015_As-Built_Mark-Up.pdf PDF
DOC011.pdf PDF
MAARNG Natick_Struct Sects+Detls_As-Built_Mark-Up.pdf PDF
MAARNG Natick_C-101_Lyt Matls Pln_2015_As-Built_Mark-Up.pdf PDF
MAARNG Natick_E1.00_Elec Site Plan_2015_As-Built.pdf PDF
ESA Small Project Template August 2018.pdf PDF
MAARNG Natick_H2.04_HVAC Roof New Wrk Pln_2015_As-Built_Mark-Up.pdf PDF
MAARNG Natick_LS-101_Landscape+Plant Pln_2015_As-Built.pdf PDF
SDO-certified MWBE Sub-contractors~2.xlsx XLSX spreadsheet
MIL1901E Proposals Recieved.pdf PDF
MIL1901E.audit_template_savings.xlsm XLSM spreadsheet
MAARNG Natick_C-104_Grading+Drain Pln_2015_As-Built_Mark-Up.pdf PDF
Geotechnical Engineering Report 03-22-11.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"d p

M

M M

M

M

MMM

M

M

M

M

M

MM

M

M

M

M

M

M M gg g g g g g g

NATICK - 25B95

Real Property

MASSACHUSETTS ARMY NATIONAL GUARD

JOINT FORCE HEADQUARTERS, MILFORD, MA

CONSTRUCTION AND FACILITIES MAINTENANCE OFFICE

Drawn by William A. Cooney Facilities GIS Manager Commonwealth of Massachusetts Military Division Office of the State Quatermaster

Building Improved Land Semi-Improved Land Unimproved Land Landscaping stone Vehicle Parking, Non-Organizational, Surfaced Vehicle Parking, Organizational, Surfaced Sidewalk Concrete Pad Natural Gas Overhead Electric Line Underground Electric Line p Pole Mounted Transformer "d Emergency Electric Generator

Underground Communication Line ¬ Fire Hydrant

Potable Water Line Fire Protection Water Line Sewer Main Line (Gravity) Sewer Service Lateral Line g Catch Basin Storm Drain

[ Fence [ Gate

USGS, MassGIS

Storage Building 62000 sq ft

Total MAARNG Acres

25.90 acres

Improved Land

6.04 acres

Semi-Improved Land

4.53 acres

Unimproved Land

7.11 acres

Org. Parking 12000 sq yards

Org. Parking 7200 sq yards

Last Update: 6/15/2016 7:00:57 AM

Non-Org. Parking 1000 sq yards

0 20 40 60 80 10010 Meters

0 100 200 300 40050 Feet

The information on this map is for planning purposes only.

This information is not adequate for legal boundary definition, regulatory interpretation, or parcel-level analysis.

Massachusetts 1:1500 NAD83/WGS84

Ü

Readiness Center

Sidewalk - 758 sq yards Loading Docks - (2) @ 30 yards ea.

Concrete Pads - (7) @ 80 Sq yards total Fence - 6407 feet Gates (6) @ 200 feet total Underground Electric Line - 4138 feet Overhead Electric Line - 200 feet Underground Communication Line - 430 feet Natural Gas Line - 783.1 feet Water Line - 3149 feet Sewer Line - 567.8 feet Storm Drain - 1505 feet Catch Basin - 8 Total Electrical Transformer - 1 Generator - 1 john.j.kent Polygon john.j.kent Callout Proposed location of 205kw solar canopy installation

RHarold Typewritten Text

RHarold Typewritten Text

File details come from the government source that posted it. Updated .