Section J. Exh A - CDRLs List by CLIN - Amendment 1.xlsx
XLSX spreadsheet 40 KB Posted
- Solicitation number
- M6700425R1301
- Issued by
-
United States Marine Corps
About this file
This file is a Contract Data Requirements List (CDRL) exhibit that identifies all deliverables required under the Marine Corps Prepositioning Program (MCPP) Logistics Services contract, organized by Contract Line Item Number (CLIN) and functional area. The MCPP contract covers maintenance management, program management, supply and fiscal operations, medical support, Navy operations, shipboard support, installation support, and communications support across multiple locations including the Philippines, Norway, Australia, and Palau.
The CDRLs are organized into 12 exhibits (A-1 through A-12) and encompass over 200 individual data requirements spanning CLIN codes X001 through X006. Key deliverables include appointment letters and delegation of authority documents (due within 5-21 business days of contract award), weekly and monthly status reports on equipment, staffing, and production (due weekly or monthly), inspection and assessment schedules (due within 21 business days), calibration inventory reports, quality control and risk management plans, maintenance schedules and production charts, financial reports including contract cost and status reports and estimates at completion, supply and inventory management reports, Navy-specific personnel rosters and maintenance cycle reports, ammunition and hazardous material tracking reports, and security-related documents such as COMSEC rosters and KMI incident reports. Many recurring reports have specific submission deadlines tied to operational milestones such as exercise dates, maintenance cycles, and fiscal year changes, with submission timeframes ranging from daily to annually depending on the requirement type.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit Listing
| DD1423 EXHIBIT LISTING | CDRL Numbers | SECTION | CLIN |
| A-1 | 2003-2021 | Maintenance Management | X001 |
| A-2 | 2027-2041 | Program Management | X001 |
| A-3 | 2003-11004 | MCPP Philippines | X001, X002, X003 |
| A-4 | 2008-7010 | MCPP Norway | X001, X002, X003 |
| A-5 | 5003-5057 | Supply and Fiscal | X005 |
| A-6 | 5058-5066 | Medical | X006 |
| A-7 | 6000-6048 | Navy | X002 |
| A-8 | 6049-6081 | Navy | X002 |
| A-9 | 6082-6089 | Navy | X003 |
| A-10 | 7001-7011 | Shipboard | X003 |
| A-11 | 10001-10052 | Installation Support | X001 |
| A-12 | 11001-11004 | Communications Support | X003 |
| A-13 | 2004-11004 | MCPP Australia & MCPP Palau | X001, X002, X003 |
ALL CDRLs
| CONTRACT DATA REQUIREMENTS LIST (CDRLs) | |||
| CLIN | CDRL NO. | Description | SOW Reference / Frequency |
| X001 | 1001 | RESERVED | |
| X001 | 1002 | RESERVED | |
| X001 | 2001 | RESERVED | |
| X001 | 2002 | RESERVED | |
| X001 | 2003 | Maintenance Management Office Manager Appointment Letter | 2.4.2.1 NLT 10 business days after contract award. Thereafter, NLT 5 business days after a change in personnel. |
| X001 | 2004 | UND Delegation of Authority Letter | 2.4.2.3 Within 10 business days of contract award. Within 10 business days of a new hire requiring authorization. NLT 10 business days after 1 January and 1 July of each year. |
| X001 | 2005 | Assessment/Inspection Schedule | 2.4.2.5 Within 21 business days of contract award, changes to the internal inspection schedule, and 5 business days after 1 July of each year. |
| X001 | 2006 | Internal Inspection Results | 2.4.2.6 Within 10 business days of completing inspection |
| X001 | 2007 | Plan of Corrective Action | 2.4.2.7 Within 21 business days after conclusion of the inspection |
| X001 | 2008 | DSI Authorization Letters | 2.4.3.5.1, 2.4.3.5.2, and 2.4.3.5.3 Within 21 business days after contract award and NLT five business days after award of each applicable TO. Shipboard DSI NLT 30 calendar days prior of start of ship MMC or 60 calendar days following government provision of detailed ship plans, whichever is later. |
| X001 | 2009 | Special Tool Allowance Letter | 2.4.3.5.5 NLT 21 business days after contract award and annually NLT 5 business days after 1 July. |
| X001 | 2010 | RESERVED | |
| X001 | 2011 | Reconciliation Schedule | 2.4.4.2 NLT 5 business days after 1 July. |
| X001 | 2012 | Weekly On-Island Equipment Status Report | 2.4.4.3 NLT COB each Tuesday. |
| X001 | 2013 | Annual Calibration Inventory Letter | 2.4.4.4 NLT 21 business days after contract award. Thereafter, NLT 30 business days after award of applicable TO. |
| X001 | 2014 | Locally Tracked Calibration Detail Report | 2.4.4.4.1 NLT 5 business days after start of each FY QTR per applicable TO. |
| X001 | 2015 | RESERVED | |
| X001 | 2016 | RESERVED | |
| X001 | 2017 | RESERVED | |
| X001 | 2018 | RESERVED | |
| X001 | 2019 | RESERVED | |
| X001 | 2020 | RESERVED | |
| X001 | 2021 | RESERVED | |
| X001 | 2022 | RESERVED | |
| X001 | 2023 | RESERVED | |
| X001 | 2024 | RESERVED | |
| X001 | 2025 | Annual LST COMM/ELEC PMCS Plan | 2.3.1.1.2.7 Within 30 days of contract award and annually by 1 October |
| X001, X003 | 2026 | MCPP-PHIL COSIS plan | 2.3.1.1.2.7 Within 30 days of contract award and annually by 1 October w/Quarterly updates |
| X001 | 2027 | Respond to NCRs/NCTs | 2.2.1.1.2 Within 1 business day. |
| X001 | 2028 | RESERVED |
| X001 | 2029 | RESERVED | |
| X001 | 2030 | Program Personnel Support Plan | 2.1.1.3 Semi-Annually |
| X001 | 2031 | Monthly Staffing Report | 2.1.1.3 Monthly |
| X001 | 2032 | Succession Plan | 2.1.1.3 Monthly |
| X001 | 2033 | Contract Cost and Status Report (CCSR) | 2.1.2.2 Monthly by the 10th working day or as requested |
| X001 | 2034 | Estimate at Completion | 2.1.2.3 Monthly by the 10th working day |
| X001 | 2035 | Program Cost Summary | 2.1.2.4 Monthly by the 15th working day |
| X001 | 2036 | Quality Risk and Performance Plan | 2.2.1.2 Draft within 30 days of award. Final with 60 days of contract award. Upon Revision |
| X001 | 2037 | Rolling Three Year Internal Audit Plan | 2.2.1.5 Annually in the 2d week of September |
| X001 | 2038 | Quality Control Plan | 2.2.1.7 60 days of Contract Award and annually by 1 Nov |
| X001 | 2039 | Baseline Production Plans/Schedules | 2.3.1.1.2.1 and 2.3.1.1.3 As directed in the PCL |
| X001 | 2040 | Project Change Control | 2.3.1.1.2.3 As required |
| X001 | 2041 | Production status Charts | 2.3.1.1.2.6 Weekly |
| X001 | 2042 | End of Ship Cost Report | 2.2.1.4 Weekly |
| X002, X003 | 4001 | Monthly Excess/Deficiency Report | 4.1.1.1 Monthly |
| X002, X003 | 4002 | MCPP-N/MCPP-PHIL Weekly Class of Supply Report | 4.1.1.1 Weekly |
| X002, X003 | 5003 | Draft TOECR (NAVMC 11355) | 4.1.1.2 As Required |
| X002, X003 | 5005 | Quarterly GA Recommended Stock Levels Report | 4.1.2 Quarterly |
| X002, X003 | 5006 | SECREP Excess and Deficiency Report | 4.1.3.1 Monthly |
| X002, X003 | 5007 | RIP Special Allowance Request | 4.1.3.2 Monthly |
| X002, X003 | 5008 | Garrison Special Tool Allowance List | 4.1.4NLT the fifth business day of July |
| X002, X003 | 5009 | NTV Priority Procurement List | 4.1.5 NLT the fifth business day of July |
| X002, X003 | 5010 | UURI / AAL Authorization Letter | 4.1.6 Annually |
| X002, X003 | 5011 | Supply / Maintenance Annual Spend Plan | 4.1.7 Annually |
| X002, X003 | 5012 | Supply / Maintenance Quarterly Spend Plan Update | 4.1.7.1 Quarterly |
| X002, X003 | 5013 | RESERVED | |
| X002, X003 | 5014 | RESERVED | |
| X002, X003 | 5015 | RESERVED | |
| X002, X003 | 5016 | GFE Procurement Request | 4.2.5.1.1 As Required |
| X002, X003 | 5017 | Sourced CBRN Equipment Discrepancy Report | 4.2.5.2.2 As Required |
| X002, X003 | 5018 | Physical Inventory Control Plan (PICP) | 4.3.1 Annually |
| X002, X003 | 5019 | IMO Load Request | 4.3.2.1 As Required |
| X002, X003 | 5020 | RO Nomination Package | 4.3.2.2 As Required |
| X002, X003 | 5021 | PICP Consumer Level Account Inventory Results Report | 4.3.2.3.1 As Required |
| X002, X003 | 5022 | PICP Intermediate Level Account Inventory Results Report | 4.3.3.1.2 As Required |
| X002, X003 | 5023 | RESERVED | |
| X002, X003 | 5024 | Consolidated Asset Listing (CAL) | 4.3.4.1 at E+5 (what is E+5?) for each ship |
| X002, X003 | 5025 | Monthly Afloat Armory Report | 4.3.4.1 Monthly |
| X002, X003 | 5026 | Exercise CAL | 4.3.4.1.1 As Required |
| X002, X003 | 5027 | COSIS Surveillance Plan | 4.3.5.3 Annually |
| X002, X003 | 5028 | Monthly COSIS Surveillance Plan Update and Status Report | 4.3.5.3.1 Monthly |
| X002, X003 | 5029 | Quarterly Shelf Life / Service Life Expiration Report | 4.3.5.4.1 Quarterly |
| X002, X003 | 5030 | Request for Disposition, MRP, or Rollback | 4.3.7.1 As Required |
| X002, X003 | 5031 | Notification of Missing, Lost, Stolen, or Damaged Government-Owned Assets | 4.3.8 As Required |
| X002, X003 | 5032 | DD Form 200 | 4.3.8.1 As Required |
| X002, X003 | 5033 | Contractor Investigation | 4.3.8.2 As Required |
| X002, X003 | 5034 | SF-91 / SF-94 | 4.3.8.3 As Required |
| X002, X003 | 5035 | Voucher Request | 4.3.9.1 As Required |
| X002, X003 | 5036 | GCSS-MC SUC vs NEIMS UIC Report | 4.3.12 Monthly |
| X002, X003 | 5037 | DD Form 2921 | 4.4.2 Daily |
| X002, X003 | 5038 | Attainment Deficiency Report | 4.4.3 & 4.4.5.7 Once per each MPS in Production Cycle |
| X002, X003 | 5039 | RESERVED | |
| X002, X003 | 5040 | Sustainment Block Status Report | 4.4.5.7 Once per each MPS in Production Cycle |
| X002, X003 | 5041 | SL-3 Deficiency Report | 4.4.6.3 |
| X002, X003 | 5042 | Armory Custodian Nomination Letter | 4.4.10.1.1. As Required |
| X002, X003 | 5043 | Armory Access Nomination Letter | 4.4.10.1.2 As Required |
| X002, X003 | 5044 | GCSS-MC vs MCPIC Discrepancy Report | 4.4.11 NLT E-1 for MPF vessels |
| X002, X003 | 5045 | T-AKE Post Exercise Consumption List | 4.7.3 As Required |
| X002, X003 | 5046 | Annual Container Inventory Discrepancy List | 4.8.2.1 Annually |
| X002, X003 | 5047 | Quarterly Container Projection Report | 4.8.6 Quarterly |
| X002, X003 | 5048 | Ammunition Container Seal Verification Report | 4.9.1.1.1 Within 1 business day of Ammo Backload. |
| X002, X003 | 5049 | MCPP-N Weekly Equipment Clearance Report | 4.9.1.2 Weekly |
| X002, X003 | 5050 | Outbound Ammunition Container Seal Verification Report | 4.9.2.2 Within 1 business day of Ammo Offload |
| X002, X003 | 5051 | Monthly TOT Balance Report | 4.9.3.1 Monthly |
| X002, X003 | 5052 | Unliquidated Orders Report | 4.10.3.3.3 Monthly |
| X002, X003 | 5053 | RESERVED | |
| X002, X003 | 5054 | RESERVED | |
| X002, X003 | 5055 | Status of Funds Report | 4.10.5.1 Weekly |
| X002, X003 | 5056 | Reimbursable Report | 4.10.5.2 Monthly |
| X002, X003 | 5057 | Contract Cost and Status Report | 4.10.1.3 Monthly |
| X002, X003 | 5058 | AMAL/ADAL Spread Load | 5.3.1 PX+30 |
| X002, X003 | 5059 | AMAL/ADAL Attainment Status Report | 5.3.1 PX+30 |
| X002, X003 | 5060 | Medical Container Data Report | 5.3.1 PX+30 |
| X002, X003 | 5061 | AMAL/ADAL Fly-in-Echelon (FIE) Report | 5.3.1 PX+30 |
| X002, X003 | 5062 | RESERVED | |
| X002, X003 | 5063 | Container Asset/Location Report | 5.3.1 PX+30 |
| X002, X003 | 5064 | Hazardous Material Report | 5.3.1 PX+30 |
| X002 | 6000 | Navy Personnel Roster | 6.1.1/Within 30 Calendar days. |
| X002 | 6001 | Navy Organizational Chart | 6.1.1/Within 30 Calendar days. |
| X002 | 6002 | Weekly Navy Status and Progress Report | 6.1.2/Weekly |
| X002 | 6003 | Missing, Lost, Stolen, Broken, Damaged or Unusable Navy Organic Government Property (OGP) Report | 6.1.3.4/Within three (3) business days via email and 15 days for full written report. |
| X002 | 6004 | Navy Responsible Individual (RI)/Custodian Reports | 6.1.3.5/Quarterly |
| X002 | 6005 | Navy GSA Vehicle Accident and Statement of Witness Report | 6.1.4.1/Within one (1) hour. |
| X002 | 6006 | Notification of Navy Leased Equipment Defects | 6.1.4.1/Within four (4) hours. |
| X002 | 6007 | Navy Training Forecast and Status Report | 6.1.5/As required IAW the SOW. |
| X002 | 6008 | Navy Staging and Storage Laydown Plan | 6.1.6/Quarterly |
| X002 | 6009 | Navy Actual Cost of Work Performed (ACWP) Report | 6.2.3/Daily |
| X002 | 6010 | Navy End of Ship MPF Maintenance Cycle (MMC) Life Cycle Cost Report | 6.2.4/NLT 60 days after each MPS Embarkation. |
| X002 | 6011 | Estimate At Completion (EAC) Report | 6.2.6/Monthly |
| X002 | 6012 | Follow on Fiscal Year Estimate at Completion (EAC) Report | 6.2.6.1/Annually |
| X002 | 6013 | Navy Invoice Report | 6.2.7/Monthly |
| X002 | 6014 | Physical Inventory Control Plan | 6.3.4.1.4/30 calendar days/Annually |
| X002 | 6015 | Shelf Life Report | 6.3.4.2/Quarterly |
| X002 | 6016 | Shelf Life/Service Life Expiration Reports | 6.3.5.3/Quarterly |
| X002 | 6017 | Navy Weekly Status Report | 6.3.13/Weekly |
| X002 | 6018 | Navy Reconciliation Log Report | 6.3.14/Bi-weekly |
| X002 | 6019 | Logistics Over-the-Shore (LOTS) Rotational Pool (RP) Program | 6.3.19/Update when rotated or revised. |
| X002 | 6020 | Navy Deficiency Report | 6.3.20/P-130 |
| X002 | 6021 | Navy DODAAC Documents Report | 6.3.22/Daily |
| X002 | 6022 | Purchasing System Material and Subcontract Report | 6.3.23/Daily |
| X002 | 6023 | Navy Unliquidated Obligations (ULO) Report | 6.3.25/Monthly |
| X002 | 6024 | Navy Ships Download Container Inventory and Container Discrepancy Report | 6.4.1.1/Within five (5) days. |
| X002 | 6025 | Container Ownership Database/Inventory Report | 6.4.1.4/Within five (5) business days. |
| X002 | 6026 | Navy Production Attainment Report | 6.4.1.5/Weekly |
| X002 | 6027 | Navy Production Assembly and Class IX Inventory Short List | 6.4.1.7/Within three (3) business days |
| X002 | 6028 | Navy Containerized Maintenance Transfer Log | 6.4.1.8/Bi-weekly |
| X002 | 6029 | Navy Container Contents Packing List | 6.4.5.2/NLT two (2) business days. |
| X002 | 6030 | Navy End of Ship (EOS) Attainment Percentage Report | 6.4.6.1/NLT five (5) business days. |
| X002 | 6031 | Navy Assemblies and Class IX Shortage Report(s) | 6.4.6.2/NLT five (5) business days. |
| X002 | 6032 | Navy INLS, MPFUB, LARC, ABLTS, and LCM-8 Class IX Attainment Shortage Report | 6.4.6.3/NLT five (5) business days. |
| X002 | 6033 | Navy End of Production Container Report | 6.4.6.4/Within five (5) business days. |
| X002 | 6034 | Navy Consolidated Memorandum Receipt (CMR) | 6.4.6.5/Quarterly |
| X002 | 6035 | Navy Calibration Report | 6.4.7/E-Day or seven (7) business days following EOS production cycle. |
| X002 | 6036 | Navy Containers Itemized Repairs/Cost Estimate | 6.4.8.10.1/Prior to being approved by NAV-P for repair. |
| X002 | 6037 | Load Bank Form | 6.5.3.2/Within five (5) business days. |
| X002 | 6038 | Navy End of Ship CESE Maintenance Report | 6.5.6/Within five (5) business days. |
| X002 | 6039 | Navy Master Schedule | 6.6.2/As required IAW the SOW. |
| X002 | 6040 | Navy Watercraft Production Schedule | 6.6.3/NLT the WDC-III for respective production period. |
| X002 | 6041 | Joint Work Definition Conferences (WDC-I, WDC-II & WDC-III) | 6.6.7/WDC-I NLT Offload +90 days, WDC-II NLT E-360 and WDC-III NLT E-345. |
| X002 | 6042 | Navy Watercraft Test, Inspection, Maintenance and Monitoring Results Records | 6.6.11/Within one (1) day of request from NAV-P. |
| X002 | 6043 | Pre-Mat/Post-MAT Form | 6.6.14, 6.6.20 & 6.6.28/Within five (5) business days. |
| X002 | 6044 | Navy Watercraft Oil Analysis Report | 6.6.17/Within five (5) business days. |
| X002 | 6045 | Navy Watercraft and ABLTS Load Test Certification(s) | 6.6.18/For all periodic and situational load test requirements. |
| X002 | 6046 | Fibrous and Wire Rope Service Life Data Sheet | 6.6.19/NLT E-Day |
| X002 | 6047 | Watercraft End of Ship Report for Deficiencies, Incomplete and Deferred Work | 6.6.20, 6.6.47 & 6.6.47.1/NLT E-3 |
| X002 | 6048 | Craft Condition Found Report (CFR) | 6.6.21.1, 6.8.1.5 & 6.8.3/As required IAW the SOW. |
| X002 | 6049 | Navy Watercraft and ABLTS Fuel Status Report | 6.6.24/NLT E-21 Day |
| X002 | 6050 | Selective Interchange Request Letter | 6.6.26/Prior to ANY change of parts. |
| X002 | 6051 | CFR, Corrosion Survey Report and INLS/MPFUB/LARC Paint Schedule and Deck Drawings | 6.6.27 & 6.6.34/As required IAW Lighterage Milestones. |
| X002 | 6052 | Navy Watercraft Checkpoints for Coating Systems Repairs | 6.6.27.1/Within two (2) business days. |
| X002 | 6053 | Navy Watercraft, LARCs and ABLTS Collateral Gear Inventory List | 6.6.28/Within five (5) business days. |
| X002 | 6054 | Navy Watercraft and ABLTS Movement Schedule | 6.6.29.1/NLT three (3) business days prior to changes in the movement schedule. |
| X002 | 6055 | Navy Watercraft and ABLTS Notice of Completion (NOC) | 6.6.31 & 6.8.1.5/NLT five (5) business days. |
| X002 | 6056 | Navy Watercraft Care-In-Stores | 6.6.44/Upon request by NAV-P. |
| X002 | 6057 | Watercraft Maintenance Status Report | 6.6.48/Weekly |
| X002 | 6058 | Navy OPTEST Form | 6.6.50/Within (5) days. |
| X002 | 6059 | Navy Watercraft Ship Set Readiness Report | 6.6.51/NLT E+3 |
| X002 | 6060 | 2K Transmittal Form | 6.7.1/As required IAW the SOW. |
| X002 | 6061 | Control System Support Monthly TR Inventory, Kitting and Delivery Status Report | 6.8.1.4/Monthly |
| X002 | 6062 | Navy Watercraft TR Control System Support (CSS) Material Cost Estimate | 6.8.1.9/Annually |
| X002 | 6063 | Control System Support (CSS) Monthly Shipping and CSS Shipping Invoices | 6.8.2/Monthly |
| X002 | 6064 | Unit Deployment Listing (UDL) End of Ship Report | 6.11.3/IAW Government published Milestones in C.1 |
| X002 | 6065 | Navy Spread Load Change | 6.11.5.2/Within (1) business day. |
| X002 | 6066 | Navy Leased Equipment Accident Report | 6.14.6/Within one (1) hour. |
| X002 | 6067 | Organic GFE Status Report for MHE, WHE, and GSE | 6.14.8/Monthly |
| X002 | 6068 | WHP Appointment Letters | 6.17.1.1, 6.17.1.2, 6.17.1.3 & 6.17.1.4/Within 30 calendar days. |
| X002 | 6069 | WHE Accident Investigation Report | 6.17.1.9/Within seven (7) calendar days. |
| X002 | 6070 | WHE Near Misses and Other Unplanned Occurrence Reports | 6.17.1.10/Within four (4) hours. |
| X002 | 6071 | Crane Metrics Report | 6.17.1.13/Monthly |
| X002 | 6072 | Critical Lift Plans | 6.17.3/Prior to conducting all critical lifts. |
| X002 | 6073 | WHP Monitoring Observation Report | 6.17.5/Monthly |
| X002 | 6074 | Corrosion Survey Report | 6.18.1.1/Within 60 calendar days. |
| X002 | 6075 | Individual and Descriptive Scope of Work | 6.18.1.2/Within 10 business days. |
| X002 | 6076 | Itemized Cost Estimate | 6.18.1.3/Within 10 business days. |
| X002 | 6077 | Statement of Work for Reoccurring Support Tasks | 6.18.2/Within 10 business days. |
| X002 | 6078 | Itemized Cost Estimate for Reoccurring Support Tasks | 6.18.2.1/Within 10 business days. |
| X002 | 6079 | Statement of Work for Government Identified Maintenance Tasks ISO Organic Lighterage | 6.18.3/Within 10 business days. |
| X002 | 6080 | Itemized Cost Estimate for Repairs to Organic Equipment | 6.18.3.1/Within 10 business days. |
| X002 | 6081 | Navy Repair Log | 6.18.4/Weekly |
| X003 | 6082 | Navy Small Arms Monthly Weapons Inventory Report | 6.3.15.1 & 6.10.4/Monthly |
| X003 | 6083 | Monthly Situation Report (SITREP) | 6.10.9.1/Monthly |
| X003 | 6084 | Semi Annual Startup (SASU) Report | 6.10.9.2/Upon SASU completion. |
| X003 | 6085 | Pre-Exercise Status Report | 6.10.9.3/As required by the Exercise Support Letter. |
| X003 | 6086 | Post Exercise Discrepancy Listing (PEDL) | 6.10.9.4/NLT 10 business days. |
| X003 | 6087 | Post Exercise Cost Estimate | 6.10.9.5/NLT 10 calendar days. |
| X003 | 6088 | Post Exercise After Action Report | 6.10.9.6/NLT 15 calendar days. |
| X003 | 6089 | 120 Day Pre-MMC Report | 6.10.9.7/NLT 120 calendar days. |
| X002, X003 | 6090 | RESERVED | |
| X002, X003 | 6091 | RESERVED | |
| X002, X003 | 6092 | RESERVED | |
| X002, X003 | 6093 | RESERVED | |
| X002, X003 | 7001 | Shipboard Situation Report | 7.4.4 and 7.8. Monthly |
| X002, X003 | 7002 | Contractor's Resource and Support Plan | 7.7.2 10 Days after RFP is issued |
| X002, X003 | 7003 | Shipboard PGP Report | 7.8.2 Monthly |
| X002, X003 | 7004 | Shipboard Staffing Report | 7.8.3 NLT COB Tuesday of each week |
| X002, X003 | 7005 | Shipboard/MCPP-PHIL Pre-Exercise Status Report | 7.8.5 Upon COTR and OPP OIC Boarding Ship or arriving at Land based storage facility |
| X002, X003 | 7006 | Shipboard/MCPP-PHIL Post Exercise Discrepancy Listing and Cost Estimate | 7.8.6 10 days after exercise/backload |
| X002, X003 | 7007 | Shipboard Post Exercise After Action Report | 7.8.8 NLT 15 calendar days after completion of an exercise or backload operation. |
| X002, X003 | 7008 | Shipboard 120-day Pre-MMC Report | 7.8.9 NLT 120 calendar days before scheduled MMC ship offload. |
| X002, X003 | 7009 | RESERVED | |
| X002, X003 | 7010 | AA&E Screening Forms | 7.13 within 30 calendar days of an employee boarding their assigned ship |
| X002, X003 | 7011 | Shipboard Semi-Annual Startup Report | 7.8.4 NLT 15 business days upon SASU completion |
| X002, X003 | 8001 | Local Element Appointment Letter | 8.1.1 As Required |
| X002, X003 | 8002 | COMSEC Personnel Access Roster | 8.1.2 As Required |
| X002, X003 | 8003 | KMI Incident Report | 8.1.3 As Required |
| X002, X003 | 8004 | EAP | 8.1.4 Annual |
| X002, X003 | 8005 | Semi-annual Inventory Results | 8.2.2 Semi-annual |
| X002, X003 | 8006 | Quarterly Inventory Results | 8.2.3 Quarterly |
| X002, X003 | 8007 | LE Change Inventory Results | 8.2.4 As Required |
| X002, X003 | 8008 | Monthly Spot Check Inventory Results | 8.2.5 Monthly |
| X002, X003 | 8009 | KMI Awareness Training Certificates | 8.4.2 Annual |
| X002, X003 | 8010 | SD 572 | 8.4.3 As Required |
| X002, X003 | 8011 | Monthly Training Certificates and Attendance Roster | 8.4.5 Monthly |
| X002, X003 | 9001 | Hazardous Container Listing | 9.3.2 As identified in the MMC POAM |
| X001 | 10001 | Key Personnel | 10.1.2.2 |
| X001 | 10002 | Permits and Licenses | 10.1.2.3.2, As required |
| X001 | 10003 | Temporary Suspension of Downtime Accumulation | 10.1.2.3.4.4, As required |
| X001 | 10004 | Excessive Repair | 10.1.2.3.4.5, As required |
| X001 | 10005 | Maintenance of Non-Tactical Vehicles and Equipment (NTVE) | 10.1.3.3, As required |
| X001 | 10006 | Maintenance (Govt-Owned) Vehicle Accident Reports | 10.1.3.3.1, As required |
| X001 | 10007 | Monthly PM/Certification and Testing Schedule | 10.1.3.3.1.2, As required |
| X001 | 10008 | Maintenance Report Responses | 10.1.3.3.1.2, As required |
| X001 | 10009 | Schedule of Testing and Certification | 10.1.3.3.1.2 , As required |
| X001 | 10010 | Load Testing Certification | 10.1.3.3.1.2 , As required |
| X001 | 10011 | Maintenance Inspection Specification and Record | 10.1.3.3.1.2, As required |
| X001 | 10012 | Maintenance of Non-Tactical Vehicles and Equipment (NTVE) | 10.1.3.3.1.3, As required |
| X001 | 10013 | Accident Prevention Plan (APP) | |
| X001 | 10014 | APP Signature Log | 10.2.1, As required |
| X001 | 10015 | Contractor Shutdown | 10.2.1., As required |
| X001 | 10016 | Confined Space Entry Plan | 10.2.1.1, As required |
| X001 | 10017 | Multi-Purpose Machines and Material Handling Equipment Plan | 10.2.1.2, As required |
| X001 | 10018 | Fall Protection and Prevention Plan | 10.2.1.3, At a minimum every 6 months or when changes in work habits. |
| X001 | 10019 | Fall Protection Inspection Report | 10.2.1.3, Annually |
| X001 | 10020 | Control of Hazardous Energy (lockout/tagout) | 10.2.1.4, As required |
| X001 | 10021 | Activity Hazard Analysis/Job Hazard Assessment/Job Safety Assessment | 10.2.2, As required |
| X001 | 10022 | Personnel List for Explosive Safety | 10.2.4.1, NLT last day of each quarter |
| X001 | 10023 | Work Request | 10.2.4.3, As required |
| X001 | 10024 | Portable fire extinguisher inventory | 10.2.8., And Annually |
| X001 | 10025 | Fire Warden Roster | 10.2.8.44, And Annually |
| X001 | 10026 | Evacuation Routes | 10.2.8.5, 10 calendar days after any changes |
| X001 | 10027 | Fire-Drill After Action Report | 10.2.8.6.1, As required |
| X001 | 10028 | Accident and Damage Reporting | 10.2.10, As required |
| X001 | 10029 | Radiation Safety Requirements | 10.2.11.1, As required |
| X001 | 10030 | Radiation Safety Requirements | 10.2.11.4, As required |
| X001 | 10031 | Radiation Safety Requirements | 10.2.11.5, As required |
| X001 | 10032 | Vehicle Licenses | 10.2.12.2, As required |
| X001 | 10033 | Mishap Report | 10.2.12.4, As required |
| X001 | 10034 | Safety Inspection and Monitoring Report | 10.2.13, As required |
| X001 | 10035 | Third Party Inspection Notification | 10.2.13.2, As required |
| X001 | 10036 | Hazard Reporting | 10.2.14.1, As required |
| X001 | 10037 | Respiratory Protection Program | 10.2.16, As required |
| X001 | 10038 | Environmental Coordinator Appointment Letter | 10.3.2, Anytime there is a change in the position |
| X001 | 10039 | Update Air Database | 10.3.3.1, Monthly |
| X001 | 10040 | Paint or Paint Related Product Request | 10.3.3.2, As required |
| X001 | 10041 | Green House Gas Inventory | 10.3.3.3, Annually |
| X001 | 10042 | Ozone Depleting Substance Inventory | 10.3.3.4, Quarterly |
| X001 | 10043 | Stormwater Inspections | 10.3.4.2.1, Monthly |
| X001 | 10044 | Hazardous Material List | 10.3.5.1, As required |
| X001 | 10045 | Exposure Control Plan | 10.3.5.2 , Within 30 calendar days of change to the plan. |
| X001 | 10046 | HAZMAT Inspection Form | 10.3.5.4, Quarterly |
| X001 | 10047 | Tank Maintenance Records | 10.3.8.2, Monthly |
| X001 | 10048 | Employee Environmental Training | 10.3.9.3, As required |
| X001 | 10049 | Green Procurement Report | 10.3.11, Monthly |
| X001 | 10050 | Manatee After Action Log | 10.3.13.3, Monthly |
| X001 | 10051 | Response and Notifications. | 10.3.18.1, As required |
| X001 | 10052 | Spill Kit Inventory | 10.3.18.3, Monthly |
| X002, X003 | 11001 | Consumable Supply Report | 11.2.2.2 / Quarterly |
| X002, X003 | 11002 | GOTS/COTS Accountability Report | 11.2.3.3 / Quarterly |
| X002, X003 | 11003 | D&F Form | 11.6.1 / As Required |
| X002, X003 | 11004 | IA Certificates | 11.7 / Annually |