Limitations on Subcontracting - Construction.docx

DOCX document 17 KB Posted

Attached to
36C77623B0047 - Y1DA--657A5-21-700 EHRM Infrastructure Upgrades Construction Marion, IL VAMC
Solicitation number
36C77623B0047_1
Issued by

About this file

This document is a certification template for compliance with limitations on subcontracting for construction contracts. It relates to solicitation number 36C77623B0047 for infrastructure upgrades construction at the Marion, Illinois VA Medical Center. The certification requires the contractor to agree that no more than 85% of the amount paid by the government will be paid to non-certified small business subcontractors. It outlines penalties for lack of good faith compliance and requires contractors to provide documentation demonstrating compliance with subcontracting limitations upon request.

View the file

Other files

File Type Posted
Wage Determination - Williamson County - 9.8.23.pdf PDF
36C77623B0047 0009.docx DOCX document
36C77623B0047 Amendment 0008.docx DOCX document
ae601 door schedule and partition types.pdf PDF
3837_001.pdf PDF
M-105 REFERENCE PLANS - BUILDINGS 81 and 82.pdf PDF
04 20 00 UnitMasonry.pdf PDF
657a5-21-700 ehrm marion il addendum-03.pdf PDF
03 30 00 Cast-in-Place Concrete.pdf PDF
36C77623B0047 Amendment 0007.docx DOCX document
ae408 enlarged plans - bldg 42 43 81.pdf PDF
1 Technical Questions Tracking Spreadsheet - Marion Infra Constr - 8-24-23 Final.pdf PDF
Wage rates - Williamson - 8.14.23.pdf PDF
B 38 Drawing Package_Part5.pdf PDF
Building 14 Boiler Plant Geotechnical Report.pdf PDF
B 38 Drawing Package_Part4.pdf PDF
2. B 37 Marion VA Field Print Model (2 of 2) (1).pdf PDF
2. B 37 Marion VA Field Print Model (2 of 2) (5).pdf PDF
2. B 37 Marion VA Field Print Model (2 of 2) (3).pdf PDF
2017-0502.10 Building 13 Geotech Report.pdf PDF
2. B 37 Marion VA Field Print Model (2 of 2) (2).pdf PDF
36C77623B0047 Amendment 0006.docx DOCX document
B 38 Drawing Package_Part3.pdf PDF
15225023 VA Project 657A5-21-700 EHRM Marion Geotechnical Report.pdf PDF
B 38 Drawing Package_Part1.pdf PDF
B 38 Drawing Package_Part6.pdf PDF
2. B 37 Marion VA Field Print Model (2 of 2) (4).pdf PDF
B 38 Drawing Package_Part2.pdf PDF
Wage Determination - Williamson 8.4.pdf PDF
36C77623B0047 0005.pdf PDF
Attachment 1 - Missing Specs.zip ZIP file
36C77623B0047 0004.pdf PDF
36C77623B0047 0003.pdf PDF
Construction Wage Rates - Williamson County - 7-28-23.pdf PDF
Site Visit Sign-In Sheet - Marion Infra 7-31-23.pdf PDF
Attachment 1 - Electrical Plans 657A5-21-700.zip ZIP file
36C77623B0047 Amendment 0002.pdf PDF
Attachment 1 - 36C77623B0047_1.pdf PDF
36C77623B0047 Amendment 0001.docx DOCX document
ARCHITECTURAL.pdf PDF
STRUCTURAL.pdf PDF
Civil Drawings CU301-CIVIL DETAILS.pdf PDF
HAZARDOUS MATERIALS.pdf PDF
Civil Drawings CU211-CU213.pdf PDF
36C77623B0047_1.docx DOCX document
Civil Drawings CU207-CU210.pdf PDF
GENERAL.pdf PDF
Civil Drawings CU217-CU300.pdf PDF
Civil Drawings CU-214-CU216.pdf PDF
Brand Name Justification - Marion EHRM Infra Redacted.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VAAR 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction (JAN 2023)(DEVIATION)

(a) Pursuant to 38 U.S.C. 8127(k)(2), the offeror certifies that—

(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:

(ii) [X] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.

(3) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:

(i) Referral to the VA Suspension and Debarment Committee;

(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and

(iii) Prosecution for violating section U.S.C. 1001.

(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.

(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.

(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.

Certification:

I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].

Printed Name of Signee: ___________________________________

Printed Title of Signee: ____________________________________

Signature: ____________________________

Date: ____________

Company Name and Address:

File details come from the government source that posted it. Updated .