2017-0502.10 Building 13 Geotech Report.pdf
PDF 4 MB Posted
- Attached to
- 36C77623B0047 - Y1DA--657A5-21-700 EHRM Infrastructure Upgrades Construction Marion, IL VAMC
- Solicitation number
- 36C77623B0047_1
About this file
This document provides details regarding a federal solicitation for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is seeking offers for infrastructure upgrades at the Marion VA Medical Center in Marion, Illinois under solicitation number 36C77623B0047_1. Offerors should provide construction to upgrade the EHRM systems at the facility. The period of performance and award dates are not specified. Pricing terms and any set-asides or incumbent contractors are not identified. The solicitation provides an opportunity for construction contractors to upgrade critical systems that support veterans healthcare at the Marion VA Medical Center location.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCI ENGINEERING, INC.
650 Pierce Boulevard
O’Fallon, Illinois 62269 618-624-6969 www.sciengineering.com
Geotechnical Report
MARION VAMC BUILDING 13 – SEISMIC DEFICIENCIES
MARION, ILLINOIS
OCTOBER 2020
THE DEPARTMENT OF VETERAN AFFAIRS – OFFICE OF CONSTRUCTION AND
FACILITIES MANAGEMENT
Owner
ROMANYK CONSULTING CORP.
Architect
SCI No. 2017-0502.10
DR
AF
T
EARTH • SCIENCE • SOLUTIONS
GEOTECHNICAL
ENVIRONMENTAL
NATURAL RESOURCES
CULTURAL RESOURCES
CONSTRUCTION SERVICES
650 Pierce Boulevard, O’Fallon, Illinois 62269 ■ 618-624-6969 www.sciengineering.com
October 22, 2020
Ms. Rebecca C. Olson, AIA, ACHA, NCARB, LEED AP Romanyk Consulting Corporation 3308 Preston Road Suite 350-164 Plano, Texas 75093
RE: Geotechnical Report Marion VAMC Building 13 - Seismic Deficiencies Marion, Illinois SCI No. 2017-0502.10
Dear Ms. Olson:
Attached is our Geotechnical Report dated October 2020. It should be read in its entirety, and our recommendations applied to the design and construction of the project. Selected excerpts from the report are highlighted below:
• For the evaluation of the existing buildings, we recommend using a maximum net allowable bearing pressure of 2,700 pounds per square foot (psf) for continuous wall footings with a nominal width of 2 feet and 2,500 psf for isolated column footings with a nominal width of 2.5 feet, under static loading conditions. A one-third increase in the net allowable bearing pressures may be used for transient loadings, such as earthquake.
• Site Class C should be used for foundation design, with seismic design parameters for the site as follows: Fa = 1.04, Fv = 1.49, SDS = 0.63 and SD1 = 0.31. The Seismic Design Category (SDC) for the site is D.
We appreciate the opportunity to be of service and look forward to working with you during the construction phase of the project. SCI should participate in a meeting prior to clearing/grading of the site. Such meetings are valuable in reviewing and clarifying project requirements and responsibilities.
DR
Ms. Rebecca C. Olson, AIA, ACHA, NCARB, LEED AP 2 October 22, 2020 Romanyk Consulting Corporation SCI No. 2017-0502.10
If you have any questions or comments, please do not hesitate to contact me.
Respectfully, Prakash Paudel, E.I.
Staff Engineer
Thomas J. Casey, P.E.
Chief Geotechnical Engineer
PP/TJC/tlw
Enclosure
Geotechnical Report
\\scieng\shared\StCharles\shared\1soils\1NEW\PROJECT FILES\2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T004- Marion, IL VAMC\GS\Report\2017-0502.10 GS Report - Marion VAMC Seismic.docx
DR
October 2020 SCI No. 2017-0502.10
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 SITE AND PROJECT DESCRIPTION
3.0 SUBSURFACE CONDITIONS
3.1 Existing Fill and Native Soil Profile
3.2 Bedrock Profile
3.3 Groundwater
4.0 GEOTECHNICAL/GEOLOGICAL RISKS AND DESIGN RECOMMENDATIONS
4.1 Subsurface Mining Activity
4.2 Seismic Considerations
4.2.1 Seismic Setting
4.2.2 Design Earthquake
4.2.3 International Building Code Site Classification
4.2.4 Liquefaction Potential Analysis
4.3 Shallow Foundations
5.0 LIMITATIONS
TABLES
Table 3.1 – Penetration Refusal Summary Table 4.1 – Seismic Design Parameters
FIGURES
Figure 1 – Vicinity and Topographic Map Figure 2 – Aerial Photograph Figure 3 – Site Plan Figure 4 – ISGS Mine Map
APPENDICES
Appendix A – CPT Legend and Nomenclature, CPT Logs, and CDP Boring Logs Appendix B – Corrosion Potential Test Results Appendix C – Foundation Design Calculations
DR
October 2020 SCI No. 2017-0502.10
Geotechnical Report
MARION VAMC BUILDING 13 – SEISMIC DEFICIENCIES
MARION, ILLINOIS
1.0 INTRODUCTION
At the request of Mr. Andrew M. Romanyk of Romanyk Consulting Corporation (RCC), SCI Engineering, Inc. (SCI) conducted a geotechnical exploration for the proposed corrections.
The purpose of our exploration was to characterize and evaluate the subsurface conditions, provide recommendations for the allowable bearing pressures, and address the seismic and geotechnical/geological aspects of the project. Our services were provided in general accordance with the Task Order dated
September 16, 2020 and authorized by Romanyk Consulting Corporation.
2.0 SITE AND PROJECT DESCRIPTION
SCI understands that corrections to seismic deficiencies are planned for Building 13 at the
Marion VA Medical Center. The existing structure is located at 2401 West Main Street in Marion, Illinois.
The location of the site is shown on the Vicinity and Topographic Map, Figure 1 and the existing site conditions are shown on the Aerial Photograph, Figure 2. For evaluating the existing foundations, a plan sheet entitled Attendants Quarters BLDG. No. 13, Sheet 13-2R, dated September 4, 1940 was provided.
Based on the plan provided, we understand that the existing foundations bear at elevations ranging from
453 to 454.5 and range from 2 feet wide for the continuous wall footings to 2.5 feet square for the interior columns.
Previously, SCI performed a limited geotechnical analysis in the past for Building 42 which is nearby
Building 13 at the Marion VA Medical Center. Additionally, SCI was provided a report titled
“Geotechnical Exploration Report of VAMC Marion IL Mental Health,” dated June 2011 by others. Apart from these referenced reports, we have not reviewed, nor are we aware of, any previous studies on this specific site, by SCI or others, that would affect the preparation of this report.
3.0 SUBSURFACE CONDITIONS
Four CPTu soundings, designated as C-1 through C-4 were advanced on site in September 2020.
The approximate sounding locations are shown on the Aerial Photograph, Figure 2 and Site Plan, Figure 3. The CPTu soundings were pushed to refusal, which varied from 4 to 23.8 feet below the existing ground surface. Additionally, direct push samples were advanced to a depth of 4 feet adjacent to each sounding location, with the exception of C-4. The sounding locations were staked in the field by SCI personnel using an Arrow 100 GNSS GPS unit with submeter accuracy. Ground surface elevations at the
DR
SCI Engineering, Inc. Marion VAMC Building 13 - Seismic Deficiencies
October 2020 Page 2 of 6 sounding locations were estimated from available LIDAR data for the site. Detailed information regarding the nature and thickness of the soils encountered are shown on the CPT Sounding Logs and Direct Push
Boring Logs contained in Appendix A.
3.1 Existing Fill and Native Soil Profile
Existing lean clay fill with trace fine to coarse sand and gravel was encountered at C-3 and extended to the termination of the direct push sample at a depth of 4 feet. We anticipate the existing fill was placed during construction of the existing structures and subsequent development of the facility. Beneath the surficial fill soils, the native soils generally consisted of soft to stiff lean clay (CL in accordance with the Unified Soil
Classification System and ASTM D 2488) and fat clay (CH) with some percentage of silt and trace amount of fine to coarse sand and gravel, which extended to the termination of the soundings. Moisture contents recorded in the upper 4 feet ranged from 22 to 27 percent. In addition, sulphate, chloride, pH, and resistivity tests were also performed on the extracted samples. The results of these tests are shown on the Direct Push
Boring Logs in Appendix A and corrosion potential test results included in Appendix B.
3.2 Bedrock Profile
Documented geology, including the Bedrock Geologic Map of the Marion Quadrangle, Illinois, indicates that bedrock at the site consists of the Carbondale Formation including five coal members: Herrin, Springfield, Houchin Creek, Colchester, and Davis. The entire formation consists of interbedded weathered/unweathered sandstone, limestone, and shale with banded bituminous coal and pyrite partings and laminae.
Penetration refusal was encountered in all four soundings at depths of 20 to 23.8 feet (approximately elevations 437 to 456 feet) as shown in Table 3.1. As an exception, the probe at C-4 was refused at a depth of approximately 4 feet indicating a very stiff material near the surface, which is likely debris from present site development. Penetration refusal is a designation applied to any material that cannot be further penetrated by the probe and is indicative of a very hard or very dense material, usually boulders or bedrock.
In addition to the soundings performed for this project, our previous experience at the site indicates bedrock is generally encountered at depths ranging from 22 to 33 feet, which is in line with the data collected for this exploration.
October 2020 Page 3 of 6
Table 3.1 - Penetration Refusal Summary
Sounding Approximate Ground Surface Elevation (ft) Depth to Auger Refusal (ft) Approximate Auger Refusal
Elevation (ft)
C-1 461.00 23.62 437.38
C-2 460.00 23.79 436.21
C-3 462.00 20.18 441.82
C-4 460.00 4.13 455.87
3.3 Groundwater
The sounding logs indicate the possibility of groundwater at depths ranging from 7 to 11 feet at the site.
Review of previous boring information indicates groundwater table depths ranging from 5 to 19.5 feet depending on the length of time between completing the boring and taking the groundwater table elevation.
The groundwater level depends on seasonal and climatic variations and may be present at different depths in the future. In addition, without extended periods of observation, accurate groundwater level measurements may not be possible, particularly in low permeability soils. This is further reinforced by the wide range of groundwater elevations measured over time.
4.0 GEOTECHNICAL/GEOLOGICAL RISKS AND DESIGN RECOMMENDATIONS
4.1 Subsurface Mining Activity
Based on the Illinois State Geologic Survey (ISGS) Williamson Directory of Coal Mines, dated
September 2019, the site is not undermined, however it is close to the buffer region of an underground coal mine which is approximately half-a-mile south-east of the project site. While the risk of settlement related to mine subsidence is possible, we believe the risk is relatively low based on the distance from the nearest mapped subsurface mine. The site location in relation to the nearest mapped mine is presented on
Figure 4, ISGS Mine Map.
4.2 Seismic Considerations
4.2.1 Seismic Setting
According to the Williamson County, Illinois Multi-Hazard Mitigation Plan 2015, the Williamson county is situated in a region susceptible to earthquakes. New Madrid Seismic Zone and the Wabash Valley Fault
System are known to be the most significant sources of seismic activity in Illinois. The epicenters of seven small earthquakes (M 2.2-M 3.4) have been recorded in Williamson County. The probability of occurrence of large earthquakes is estimated to be low in Williamson County, however, moderate earthquakes (≤ M 6) are probable. The USGS estimates that the probability of M 5.5 earthquake occurring in Marion, IL within
October 2020 Page 4 of 6 next 500 years falls in between 30 percent to 40 percent. The White Ash Fault Zone running north-south is the nearest fault zone which is approximately 2 miles away from the project site. However, the seismogenic potential of this fault is unknown, and the geologic mechanism relevant to smaller events is not fully understood.
4.2.2 Design Earthquake
According to International Building Code (IBC 2015), structures such as those proposed for this project are required to be designed to a design earthquake with a 2 percent Probability of Exceedance (PE) over a
50-year exposure period (i.e. a 2,475-year design earthquake). The design earthquake has a Moment
Magnitude (Mw) of 7.7 and a Site Modified Peak Ground Acceleration (PGA) of 0.51g, as determined from data provided by the IBC 2015 and the United States Geological Survey (USGS) National Seismic Hazard
Mapping Project.
4.2.3 International Building Code Site Classification
Based on procedures outlined in the IBC 2015 and the anticipated depth to bedrock, the site can be classified as Site Class C for foundation design. This is based predominately on the calculated weighted average shear wave velocity of 1,250 feet per second (fps) that was estimated for the site. A minimum shear wave velocity of 1,200 fps is required for a Site Class C. The shear wave velocity analysis was performed for the previous study for Building 42 that is referenced in Section 2. Based on the evaluation, a Site Class C may be used for foundation design. The seismic design parameters for the site are presented in Table 4.1 for risk categories I through IV.
Table 4.2 - Seismic Design Parameters
Item Value
Site Class C
PGA 0.51
Fpga 1.00
Fa 1.04
Fv 1.49
PGAM 0.51
Design Spectral Acceleration at 0.2 sec. (SDS) 0.63
Design Spectral Acceleration at 1.0 sec.(SD1) 0.31
Seismic Design Criteria D
October 2020 Page 5 of 6
4.2.4 Liquefaction Potential Analysis
The liquefaction potential analysis for the site was conducted using data from the field exploration and laboratory test results and the techniques outlined in the National Center for Earthquake Engineering
(NCEER) Technical Report NCEER-97-0022.
Based on our analyses, the majority of the soils have sufficient strength and/or a plasticity index that make the threat of liquefaction minimal during the design earthquake. While the amount of the seismically-induced settlement is dependent on the magnitude and distance from the seismic event, we estimate that the settlements from the design earthquake will be negligible, so liquefaction mitigation techniques are not required.
4.3 Shallow Foundations
For the evaluation of the existing building, we recommend using a maximum net allowable bearing pressure of 2,700 pounds per square foot (psf) for continuous wall footings with a nominal width of 2 feet and
2,500 psf for isolated column footings with a nominal width of 2.5 feet, under static loading conditions.
A one-third increase in the net allowable bearing pressures may be used for transient loadings, such as wind and earthquake. For evaluating future improvements that may require additional foundation elements, this maximum allowable bearing pressure can also be used. For footings of larger sizes, SCI should be contacted to evaluate appropriate allowable bearing pressures. The foundation design calculations are included in
Appendix C.
5.0 LIMITATIONS
The recommendations provided herein are for the exclusive use of Romanyk Consulting Corporation and the Department of Veteran Affairs. It is imperative that SCI be contacted by any third-party interests to evaluate the applicability of this report relative to use by anyone other than Romanyk and the VA.
Our recommendations are specific only to the project described, and are not meant to supersede more stringent requirements of local ordinances. They are based on subsurface information obtained at four specific testing locations within the project area; and our understanding of the project as presented in
Section 2.0, “Site and Project Description”; and geotechnical engineering practice consistent with the standard of care. No other warranty is expressed or implied. SCI should be contacted if conditions encountered are not consistent with those described.
October 2020 Page 6 of 6
This report was performed for evaluating the seismic stability of the existing structures and should not be used to evaluate new construction beyond the specific references presented within this report. Should new construction development occur beyond the limited defined instances here, a separate comprehensive geotechnical investigation should be performed.
VICINITY AND TOPOGRAPHIC MAP
DATE JOB NUMBER DRAWN BY
CHECKED BY
MARION VAMC - SEISMIC DEFICIENCIES
MARION, ILLINOIS
PROJECT NAME GENERAL NOTES/LEGEND
FIGURE
10/2020 2017-0502.10 T004
RCV
TJC
USGS TOPOGRAPHIC MAP
MARION, ILLINOIS QUADRANGLE
DATED 1996
10' CONTOURS
STREET MAP
HTTP://GOTO.ARCGISONLINE.COM/MAPS/WORLD_STREET_MAP
SITE
SITE
NOT TO SCALE
0 1,000 2,000 ft
1"=2,000'SCALE
DR
AERIAL PHOTOGRAPH
DATE JOB NUMBER DRAWN BY
CHECKED BY
MARION VAMC - SEISMIC DEFICIENCIES
MARION, ILLINOIS
PROJECT NAME GENERAL NOTES/LEGEND
FIGURE
10/2020 2017-0502.10 T004
RCV
TJC
!U !U
!U !U
C-1 C-2
C-3 C-4
AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH, DATED 02/2020.
DIMENSIONS AND LOCATIONS ARE APPROXIMATE; ACTUAL MAY VARY.
DRAWING SHALL NOT BE USED OUTSIDE THE CONTEXT OF THE REPORT FOR
WHICH IT WAS GENERATED.
0 12.5 25 ft
1"=25'SCALE
!U APPROXIMATE CPT SOUNDING LOCATIONS
DR
S
IT
E P L A N
G E N E R A L N O T E S/
LE
G E N D
DATE
JOB NUMBER
CHECKED BY
DRAWN BY
FIGURE
M A R
IO
N V A M C S E
IS
M
IC
D E F
IC
IE
N C
IE
S
M A R
IO
N , I L L
IN
O
IS
P R O
JE
C T N
A M E
10/2020
2017-0502.10 T004
RCV
TJC
P L A N D A T E D /1 1/ B Y R O M A N Y K C O N S U
LT
IN
G
D
IM
E N S
IO
N S A N D L O C A T
IO
N S A R E A P P R O X
IM
A T E ; A
C T U A L M
A Y V A R Y D R A W
IN
G S H A L L
N O T B E U S E D O U T S
ID
E T H E C O N T E X T O F T H E R E P O R T F O R W
H
IC
H I T W
A S G E N E R A T E D
!U !U
!U !U
C-1 C-2
C-3
C-4
0 7.5 15 ft
1"=15'SCALE
!U
A P P R O X
IM
A T E C P T S O U N D
IN
G L O C A T
IO
N S
DR
ISGS MINE MAP
DATE JOB NUMBER DRAWN BY
CHECKED BY
MARION VAMC - SEISMIC DEFICIENCIES
MARION, ILLINOIS
PROJECT NAME GENERAL NOTES/LEGEND
FIGURE
10/2020 2017-0502.10 T004
LFC
TJC
*8 T*8 T
8"é
8"é
8"é
8"é
8"é
: 8"é: 8"é
: 8"é : 8"é: 8"é : 8"é : 8"é: 8"é
: 8"é : 8"é
: 8"é
: 8"é
: 8"é
: 8"é
: 8"é
: 8"é
Ç9
Ç9
Ç9
Ç9 Ç9
Ç9 Ç9
Ç9
3187 941 SOUTHERN JEWEL COAL COMPANY
SOUTHERN JEWEL MINE
4018, 1935-1939
4533, QUALITY COAL COMPANY
QUALITY MINE4533, 1933-1941
J.W.INGRAM
INGRAM MINE
4040, 1905-1090
970, 970, WENZEL BROTHERS COAL COMPANY
WENZEL MINE
970, 1964-1965
SCOTTSBORO COAL COMPANY
SCOTTSBORO MINE
4442, 1928-1929
970, 970, AERIAL PHOTOGRAPH OBTAINED FROM ARCGIS ONLINE, WORLD IMAGERY.
MINE LOCATION INFORMATION OBTAINED FROM:
HTTP://WWW.ISGS.UIUC.EDU
ILLINOIS STATE GEOLOGICAL SURVEY DISCLAIMS THAT LOCATIONS OF SOME
FEATURES ON THE MINE MAP MAY BE OFFSET BY 500 OR MORE FEET DUE TO
ERRORS IN THE ORIGINAL SOURCE MAPS, THE COMPILATION PROCESS,
DIGITIZING, OR A COMBINATION OF THESE FACTORS. DIMENSIONS AND
LOCATIONS ARE APPROXIMATE; ACTUAL MAY VARY. DRAWING SHALL NOT BE
USED OUTSIDE THE CONTEXT OF THE REPORT FOR WHICH IT WAS GENERATED.
SITE
0 1,000 2,000 ft
1"=2,000'SCALE
DR
APPENDIX A
O’Fallon, Illinois 62269 618-624-6969 www.sciengineering.com
SCI Engineering, Inc 1 | P a g e 4/4/2017
USE and UNDERSTANDING of CPTu Logs
The CPTu logs show the corrected Tip Resistance (qt), Friction (fs), Porewater Pressure (U2), SPT N60 correlation (N60), and the Soil Behavior interpretation results. The corrected cone tip resistance (qt) is measured as the maximum force over the projected area of the cone tip. It is a point stress related to the bearing capacity of the soil. The measured uncorrected tip value (qc) must be corrected for porewater pressure effects (Lunne et al, 1997), especially in clays and silts where porewater pressures typically vary greatly from hydrostatic. The sleeve friction (fs) is used as a measure of soil type and can be expressed by friction ratio (RF) which is used in the soil behavior classification. The u2 position element is required for the measurement of penetration porewater pressures and the correction of tip resistance. Calculations of qt, RF, and the SPT N60 calculation are discussed below.
The estimated stratigraphic profiles included in the CPTu logs are based on relationships between qt, fs, and U2 as shown graphically in the figure below.
Non-normalized CPT Soil Behavior Type (SBT) chart
* Heavily overconsolidated or cemented
Pa = atmospheric pressure = 100 kPa = 1 tsf
Derived Values from CPT Corrected cone resistance: qt = qc + u2(1-a) Friction ratio: Rf = (fs/qt) x 100%
Equivalent SPT N60, (blows/ft) Lunne et al. (1997)
= 8.5 X
Where Ic = ((3.47 – log Qt1)2 + (log RF + 1.22)2)0.5 And Qtn = ((qt - svo)/pa) x (pa/(s'vo)n, and recalculate Ic, then iterate for n:
Iterate until the change in n, ∆n < 0.01
Z
Soil Behavior Type 1 Sensitive, fine grained 2 Organic soils - clay 3 Clay – silty clay to clay 4 Silt mixtures – clayey silt to silty clay 5 Sand mixtures – silty sand to sandy silt 6 Sands – clean sand to silty sand 7 Gravelly sand to dense sand 8 Very stiff sand to clayey sand* 9 Very stiff fine grained* DR
Project: VAMC - Marion, IL: 2017-0502.10 T104
SCI Engineering, Inc.
130 Point West Blvd, St. Charles, MO, 63301 Geotechnical Engineers www.sciengineering.com
Total depth: 23.62 ft, Date: 9/24/2020
Surface Elevation: 461.00 ftMarion, IL
CPT: C-1
Location:
Cone resistance qt
Tip resistance (tsf) 100806040200
D e p th ft
2 4
Cone resistance qt Sleeve friction
Friction (tsf) 21.510.50
D e p th ft
2 4
Sleeve friction Pore pressure u
Pressure (psi) 3020100-10
D e p th ft
2 4
Pore pressure u SPT N60
N60 (blows/ft) 302520151050
D e p th ft
2 4
SPT N60 Soil Behaviour Type
SBT (Robertson, 2010) 181614121086420
D e p th ft
2 4
Soil Behaviour Type
Silty sand & sandy silt Clay & silty clay
Clay
Clay & silty clay
Silty sand & sandy silt
Sand & silty sand Silty sand & sandy silt
Clay
Clay & silty clay
Clay
Clay & silty clay
Clay
Clay
Clay & silty clay
Clay
Clay & silty clay
Clay
Clay & silty clay
Clay
Clay & silty clay
Silty sand & sandy silt
CPeT-IT v.2.1.1.8 - CPTU data presentation & interpretation software - Report created on: 10/20/2020, 5:50:28 PM 1 Project file: N:\StCharles\shared\1soils\1NEW\PROJECT FILES\2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T004- Marion, IL VAMC\GS\CPT\CPT data\CPTall.cpt
DR
130 Point West Blvd, St. Charles, MO, 63301 Geotechnical Engineers www.sciengineering.com
Total depth: 23.79 ft, Date: 9/24/2020
Surface Elevation: 460.00 ftMarion, IL
CPT: C-2
Location:
Cone resistance qt
Tip resistance (tsf) 100806040200
D e p th ft
2 4
Cone resistance qt Sleeve friction
Friction (tsf) 21.510.50
D e p th ft
2 4
Sleeve friction Pore pressure u
Pressure (psi) 3020100-10
D e p th ft
2 4
Pore pressure u SPT N60
N60 (blows/ft) 302520151050
D e p th ft
2 4
SPT N60 Soil Behaviour Type
SBT (Robertson, 2010) 181614121086420
D e p th ft
2 4
Soil Behaviour Type
Clay
Clay & silty clay
Clay
Clay & silty clay
Clay Silty sand & sandy silt Sand & silty sand Silty sand & sandy silt
Silty sand & sandy silt Clay & silty clay
Clay
Clay & silty clay
Clay
Clay & silty clay
Clay
Clay & silty clay
Sand & silty sand
CPeT-IT v.2.1.1.8 - CPTU data presentation & interpretation software - Report created on: 10/20/2020, 5:50:28 PM 2 Project file: N:\StCharles\shared\1soils\1NEW\PROJECT FILES\2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T004- Marion, IL VAMC\GS\CPT\CPT data\CPTall.cpt
DR
130 Point West Blvd, St. Charles, MO, 63301 Geotechnical Engineers www.sciengineering.com
Total depth: 20.18 ft, Date: 9/24/2020
Surface Elevation: 462.00 ftMarion, IL
CPT: C-3
Location:
Cone resistance qt
Tip resistance (tsf) 100806040200
D e p th ft
2 4
Cone resistance qt Sleeve friction
Friction (tsf) 21.510.50
D e p th ft
2 4
Sleeve friction Pore pressure u
Pressure (psi) 3020100-10
D e p th ft
2 4
Pore pressure u SPT N60
N60 (blows/ft) 302520151050
D e p th ft
2 4
SPT N60 Soil Behaviour Type
SBT (Robertson, 2010) 181614121086420
D e p th ft
2 4
Soil Behaviour Type
Clay & silty clay
Clay
Clay & silty clay
Clay & silty clay
Clay Clay & silty clay
Clay & silty clay
Clay
Clay & silty clay
Clay & silty clay
Clay
Clay & silty clay
Silty sand & sandy silt
CPeT-IT v.2.1.1.8 - CPTU data presentation & interpretation software - Report created on: 10/20/2020, 5:50:29 PM 3 Project file: N:\StCharles\shared\1soils\1NEW\PROJECT FILES\2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T004- Marion, IL VAMC\GS\CPT\CPT data\CPTall.cpt
DR
130 Point West Blvd, St. Charles, MO, 63301 Geotechnical Engineers www.sciengineering.com
Total depth: 4.13 ft, Date: 9/24/2020
Surface Elevation: 460.00 ftMarion, IL
CPT: C-4
Location:
Cone resistance qt
Tip resistance (tsf) 100806040200
D e p th ft
2 4
Cone resistance qt Sleeve friction
Friction (tsf) 21.510.50
D e p th ft
2 4
Sleeve friction Pore pressure u
Pressure (psi) 3020100-10
D e p th ft
2 4
Pore pressure u SPT N60
N60 (blows/ft) 302520151050
D e p th ft
2 4
SPT N60 Soil Behaviour Type
SBT (Robertson, 2010) 181614121086420
D e p th ft
2 4
Soil Behaviour Type
Sand & silty sand
Silty sand & sandy silt
Clay & silty clay
Silty sand & sandy silt
CPeT-IT v.2.1.1.8 - CPTU data presentation & interpretation software - Report created on: 10/20/2020, 5:50:29 PM 4 Project file: N:\StCharles\shared\1soils\1NEW\PROJECT FILES\2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T004- Marion, IL VAMC\GS\CPT\CPT data\CPTall.cpt
DR
O’Fallon, Illinois 62269 618-624-6969 www.sciengineering.com
BORING LOG LEGEND AND NOMENCLATURE
Depth is in feet below ground surface. Elevation is in feet mean sea level, site datum, or as otherwise noted.
Sample Type SS Split-spoon sample, disturbed, obtained by driving a 2-inch-O.D. split-spoon sampler (ASTM D 1586).
NX Diamond core bit, nominal 2-inch-diameter rock sample (ASTM D 2113).
ST Thin-walled (Shelby) tube sample, relatively undisturbed, obtained by pushing a 3-inch-diameter, tube (ASTM D 1587).
CS Continuous sample tube system, relatively undisturbed, obtained by split-barrel sampler in conjunction with auger advancement.
SV Shear vane, field test to determine strength of cohesive soil by pushing or driving a 2-inch-diameter vane, and then shearing by torquing soil in existing and remolded states (ASTM D 2573).
BS Bag sample, disturbed, obtained from cuttings.
Recovery is expressed as a ratio of the length recovered to the total length pushed, driven, cored.
Blows Numbers indicate blows per 6 inches of split-spoon sampler penetration when driven with a 140-pound hammer falling freely 30 inches. The number of total blows obtained for the second and third 6- inch increments is the N value (Standard Penetration Test or SPT) in blows per foot (ASTM D 1586). Practical refusal is considered to be 50 or more blows without achieving 6 inches of penetration, and is expressed as a ratio of 50 to actual penetration, e.g., 50/2 (50 blows for 2 inches).
For analysis, the N value is used when obtained by a cathead and rope system. When obtained by an automatic hammer, the N value may be increased by a factor of 1.3.
Vane Shear Strength is expressed as the peak strength (existing state) / the residual strength (remolded state).
Description indicates soil constituents and other classification characteristics (ASTM D 2488) and the Unified Soil Classification (ASTM D 2487). Secondary soil constituents (expressed as a percentage) are described as follows:
Trace <5 Few 5-15 With >15-30
Stratigraphic Breaks may be observed or interpreted, and are indicated by a dashed line. Transition between described materials may be gradual.
Laboratory Test Results
- Natural moisture content (ASTM D 2216) in percent.
- Dry density in pounds per cubic foot (pcf).
- Hand penetrometer value of apparently intact cohesive sample in kips per square foot (ksf).
- Unconfined compressive strength (ASTM D 2166) in kips per square foot (ksf).
- Liquid and Plastic Limits (ASTM D 4318) in percent.
RQD (Rock Quality Designation) is the ratio between the total length of core segments 4 inches or more in length and the total length of core drilled. RQD (expressed as a percentage) indicates insitu rock quality as follows:
Excellent 90 to 100 Good 75 to 90 Fair 50 to 75 Poor 25 to 50 Very Poor 0 to 25
DR
1) Low recovery.
2) Chloride = 212 mg/Kg-dry. Sulfate < 524 mg/Kg-dry. pH = 7.66. Resistivity = 4000 ohm/cm.
2 22
2.0
1.0
2.0
1.0
LEAN CLAY (CL): Brown, trace gray
Boring terminated at 4 feet.
DP
of 1
B
LO
W S
(p er in
REMARKS:
D E
P T
H ft
NONE OBSERVED WHILE DRILLING
T Y
P E
DRILLER SCI Engineering, Inc.
P
LA
S T
IC
IT
Y
IN
D E
X
BORING LOG
LI
Q
U
ID
L
IM
IT
ft WHILE DRILLING ft DAYS AFTER DRILLING
DESCRIPTION
(UNIFIED SOIL CLASSIFICATION)
WATER LEVEL:
LABORATORY TEST RESULTS
ft
ELEVATION 461±
HAMMER N/A PROJECT NO.2017-0502.10 Task 004
SHEET 1
G R
A P
H
IC
SAMPLE
BORING NUMBER C-1
H A
N D
P E
N E
T R
O M
E T
E R
(k sf
U N
C O
N F
IN
E
D C
O M
P R
E S
S
IV
E S
T R
E N
G T
H ks f)
HRS AFTER DRILLING
S E
E R
E M
A R
K N
O
N U
M B
E R
X
PROJECT Marion VAMC Building 13 Seismic Deficiencies
LOCATION Marion, IL
E L
E V
A T
IO
N ft
EQUIPMENT Vertek S4 CPT w/DirectSampler
D R
Y D
E N
S
IT
Y (p cf
R E
C O
V E
R Y
(in /in
M O
IS
T
U R
E C
O N
T E
N T
DATE DRILLED 09/23/2020
DR
2) Chloride < 235 mg/Kg-dry. Sulfate < 589 mg/Kg-dry. pH = 7.98. Resistivity = 3400 ohm/cm.
3.5
2.0
3.5
2.0
LEAN CLAY (CL): Brown, trace gray, trace fine to medium sand
FAT CLAY (CH): Brown and gray, trace fine to coarse sand
Boring terminated at 4 feet.
DP
of 1
B
LO
W S
(p er in
REMARKS:
D E
P T
H ft
NONE OBSERVED WHILE DRILLING
T Y
P E
DRILLER SCI Engineering, Inc.
P
LA
S T
IC
IT
Y
IN
D E
X
BORING LOG
LI
Q
U
ID
L
IM
IT
ft WHILE DRILLING ft DAYS AFTER DRILLING
DESCRIPTION
(UNIFIED SOIL CLASSIFICATION)
WATER LEVEL:
LABORATORY TEST RESULTS
ft
ELEVATION 460±
HAMMER N/A PROJECT NO.2017-0502.10 Task 004
SHEET 1
G R
A P
H
IC
SAMPLE
BORING NUMBER C-2
H A
N D
P E
N E
T R
O M
E T
E R
(k sf
U N
C O
N F
IN
E
D C
O M
P R
E S
S
IV
E S
T R
E N
G T
H ks f)
HRS AFTER DRILLING
S E
E R
E M
A R
K N
O
N U
M B
E R
X
PROJECT Marion VAMC Building 13 Seismic Deficiencies
LOCATION Marion, IL
E L
E V
A T
IO
N ft
EQUIPMENT Vertek S4 CPT w/DirectSampler
D R
Y D
E N
S
IT
Y (p cf
R E
C O
V E
R Y
(in /in
M O
IS
T
U R
E C
O N
T E
N T
DATE DRILLED 09/23/2020
DR
22 2.52.5
FILL: Brown and gray, lean clay, trace fine to coarse sand and gravel
Boring terminated at 4 feet.
DP
of 1
B
LO
W S
(p er in
REMARKS:
D E
P T
H ft
NONE OBSERVED WHILE DRILLING
T Y
P E
DRILLER SCI Engineering, Inc.
P
LA
S T
IC
IT
Y
IN
D E
X
BORING LOG
LI
Q
U
ID
L
IM
IT
ft WHILE DRILLING ft DAYS AFTER DRILLING
DESCRIPTION
(UNIFIED SOIL CLASSIFICATION)
WATER LEVEL:
LABORATORY TEST RESULTS
ft
ELEVATION 462±
HAMMER N/A PROJECT NO.2017-0502.10 Task 004
SHEET 1
G R
A P
H
IC
SAMPLE
BORING NUMBER C-3
H A
N D
P E
N E
T R
O M
E T
E R
(k sf
U N
C O
N F
IN
E
D C
O M
P R
E S
S
IV
E S
T R
E N
G T
H ks f)
HRS AFTER DRILLING
S E
E R
E M
A R
K N
O
N U
M B
E R
X
PROJECT Marion VAMC Building 13 Seismic Deficiencies
LOCATION Marion, IL
E L
E V
A T
IO
N ft
EQUIPMENT Vertek S4 CPT w/DirectSampler
D R
Y D
E N
S
IT
Y (p cf
R E
C O
V E
R Y
(in /in
M O
IS
T
U R
E C
O N
T E
N T
DATE DRILLED 09/23/2020
DR
APPENDIX B
Appendix B ‐ Corrosion Potential Testing Marion VAMC Building 13 Seismic Deficiencies
Sample Depth Resistivity feet Test 1 Test 2 Ohms‐cm
C‐1 1 ‐ 2 7.56 7.56 4000
C‐2 2 ‐ 3 7.93 8.02 3400
Laboratory Testing Results
Sounding/Boring pH
DR
ht tp:/ / w w w.teklabinc.com/
October 01, 2020
WorkOrder: 20091941VAMC-Marion, IL 2017-0502.10 T004RE:
Dear Amy Smith:
TEKLAB, INC received 2 samples on 9/30/2020 2:10:00 PM for the analysis presented in the following report.
Samples are analyzed on an as received basis unless otherwise requested and documented. The sample results contained in this report relate only to the requested analytes of interest as directed on the chain of custody. NELAP accredited fields of testing are indicated by the letters NELAP under the Certification column. Unless otherwise documented within this report, Teklab Inc. analyzes samples utilizing the most current methods in compliance with 40CFR.
All tests are performed in the Collinsville, IL laboratory unless otherwise noted in the Case Narrative.
All quality control criteria applicable to the test methods employed for this project have been satisfactorily met and are in accordance with NELAP except where noted. The following report shall not be reproduced, except in full, without the written approval of Teklab, Inc.
If you have any questions regarding these tests results, please feel free to call.
Sincerely, O'Fallon, IL 62269
(618) 558-0150
(618) 624-7099
TEL:
FAX:
Amy Smith SCI Engineering, Inc.
Emily Pohlman Project Manager (618)344-1004 ex 44 epohlman@teklabinc.com
DR
This reporting package includes the following:
Report Contents
Client Project: VAMC-Marion, IL 2017-0502.10 T004
Client: SCI Engineering, Inc.
Report Date: 01-Oct-2020
Work Order: 20091941 ht tp:/ / ww w .teklabinc.com/
Cover Letter 1
Report Contents 2
Definitions 3
Case Narrative 4
Accreditations 5
Laboratory Results 6
Receiving Check List 8
Chain of Custody Appended
DR
____TeklabHdrP
Definitions
Client Project: VAMC-Marion, IL 2017-0502.10 T004
Client: SCI Engineering, Inc.
Report Date: 01-Oct-2020
Work Order: 20091941 ht tp:/ / ww w .teklabinc.com/
Abbr Definition
* Analytes on report marked with an asterisk are not NELAP accredited
CCV Continuing calibration verification is a check of a standard to determine the state of calibration of an instrument between recalibration.
CRQL A Client Requested Quantitation Limit is a reporting limit that varies according to customer request. The CRQL may not be less than the MDL.
DF Dilution factor is the dilution performed during analysis only and does not take into account any dilutions made during sample preparation. The reported result is final and includes all dilution factors.
DNI Did not ignite
DUP Laboratory duplicate is a replicate aliquot prepared under the same laboratory conditions and independently analyzed to obtain a measure of precision.
ICV Initial calibration verification is a check of a standard to determine the state of calibration of an instrument before sample analysis is initiated.
IDPH IL Dept. of Public Health
LCS Laboratory control sample is a sample matrix, free from the analytes of interest,spiked with verified known amounts of analytes and analyzed exactly like a sample to establish intra-laboratory or analyst specific precision and bias or to assess the performance of all or a portion of the measurement system.
LCSD Laboratory control sample duplicate is a replicate laboratory control sample that is prepared and analyzed in order to determine the precision of the approved test method. The acceptable recovery range is listed in the QC Package (provided upon request).
MBLK Method blank is a sample of a matrix similar to the batch of associated sample (when available) that is free from the analytes of interest and is processed simultaneously with and under the same conditions as samples through all steps of the analytical procedures, and in which no target analytes or interferences should present at concentrations that impact the analytical results for sample analyses.
MDL "The method detection limit is defined as the minimum measured concentration of a substance that can be reported with 99% confidence that the measured concentration is distinguishable from method blank results."
MS Matrix spike is an aliquot of matrix fortified (spiked) with known quantities of specific analytes that is subjected to the entire analytical procedures in order to determine the effect of the matrix on an approved test method’s recovery system. The acceptable recovery range is listed in the QC Package (provided upon request).
MSD Matrix spike duplicate means a replicate matrix spike that is prepared and analyzed in order to determine the precision of the approved test method.
The acceptable recovery range is listed in the QC Package (provided upon request).
MW Molecular weight
ND Not Detected at the Reporting Limit
NELAP NELAP Accredited
PQL Practical quantitation limit means the lowest level that can be reliably achieved within specified limits of precision and accuracy during routine laboratory operation conditions.
RL The reporting limit the lowest level that the data is displayed in the final report. The reporting limit may vary according to customer request or sample dilution. The reporting limit may not be less than the MDL.
RPD Relative percent difference is a calculated difference between two recoveries (ie. MS/MSD). The acceptable recovery limit is listed in the QC Package (provided upon request).
SPK The spike is a known mass of target analyte added to a blank sample or sub-sample; used to determine recovery deficiency or for other quality control purposes.
Surr Surrogates are compounds which are similar to the analytes of interest in chemical composition and behavior in the analytical process, but which are not normally found in environmental samples.
TIC Tentatively identified compound: Analytes tentatively identified in the sample by using a library search. Only results not in the calibration standard will be reported as tentatively identified compounds. Results for tentatively identified compounds that are not present in the calibration standard, but are assigned a specific chemical name based upon the library search, are calculated using total peak areas from reconstructed ion chromatograms and a response factor of one. The nearest Internal Standard is used for the calculation. The results of any TICs must be considered estimated, and are flagged with a "T". If the estimated result is above the calibration range it is flagged "ET"
TNTC Too numerous to count ( > 200 CFU )
Qualifiers # - Unknown hydrocarbon B - Analyte detected in associated Method Blank
C - RL shown is a Client Requested Quantitation Limit E - Value above quantitation range
H - Holding times exceeded I - Associated internal standard was outside method criteria
J - Analyte detected below quantitation limits M - Manual Integration used to determine area response
ND - Not Detected at the Reporting Limit R - RPD outside accepted recovery limits
S - Spike Recovery outside recovery limits T - TIC(Tentatively identified compound)
X - Value exceeds Maximum Contaminant Level
DR
Case Narrative
Client Project: VAMC-Marion, IL 2017-0502.10 T004
Client: SCI Engineering, Inc.
Report Date: 01-Oct-2020
Work Order: 20091941 ht tp:/ / ww w .teklabinc.com/
Cooler Receipt Temp: 27.38 °C
Locations
___________________________________Collinsville
5445 Horseshoe Lake Road
Collinsville, IL 62234-7425
(618) 344-1004
(618) 344-1005 jhriley@teklabinc.com
___________________________________Springfield
3920 Pintail Dr
Springfield, IL 62711-9415
(217) 698-1004
(217) 698-1005
KKlostermann@teklabinc.com
___________________________________Kansas City
8421 Nieman Road
Lenexa, KS 66214
(913) 541-1998
(913) 541-1998 jhriley@teklabinc.com
___________________________________Collinsville Air
5445 Horseshoe Lake Road
Collinsville, IL 62234-7425
(618) 344-1004
(618) 344-1005
EHurley@teklabinc.com
___________________________________Chicago
1319 Butterfield Rd.
Downers Grove, IL 60515
(630) 324-6855 arenner@teklabinc.com
DR
____TeklabHdrP
Accreditations
Client Project: VAMC-Marion, IL 2017-0502.10 T004
Client: SCI Engineering, Inc.
Report Date: 01-Oct-2020
Work Order: 20091941 ht tp:/ / ww w .teklabinc.com/
NELAPState Cert # Exp Date LabDept
Illinois 100226 1/31/2021 CollinsvilleNELAPIEPA
Kansas E-10374 4/30/2021 CollinsvilleNELAPKDHE
Louisiana 05002 6/30/2021 CollinsvilleNELAPLDEQ
Louisiana 05003 6/30/2021 CollinsvilleNELAPLDEQ
Oklahoma 9978 8/31/2021 CollinsvilleNELAPODEQ
Arkansas 88-0966 3/14/2021 CollinsvilleADEQ
Illinois 17584 5/31/2021 CollinsvilleIDPH
Kentucky 0073 1/31/2021 CollinsvilleUST
Missouri 00930 5/31/2021 CollinsvilleMDNR
Missouri 930 1/31/2022 CollinsvilleMDNR
Page 5 of 8ht tp:/ / ww w.tek labinc.com/
DR
TeklabHdrP
Laboratory Results
Client Project: VAMC-Marion, IL 2017-0502.10 T004
Client: SCI Engineering, Inc.
Report Date: 01-Oct-2020
Work Order: 20091941 ht tp:/ / ww w .teklabinc.com/
Analyses Result Units Date AnalyzedRL DFCertification Qual
Collection Date: 09/23/2020 0:00
Lab ID: 20091941-001 Client Sample ID: C1 DP1 1-2ft Matrix: SOLID
Batch
EPA SW846 3550C, 5035A, ASTM D2974
Percent Moisture 09/30/2020 16:560.1 % 119.7* R282237
STANDARD METHODS 4500-CL E (TOTAL) 1997
Chloride 10/01/2020 11:57210 mg/Kg-dry 5212NELAP 169690
SW-846 9036 (TOTAL)
Sulfate 10/01/2020 11:57524 mg/Kg-dry 5< 524NELAP 169691
Elevated reporting limit due to sample composition.
DR
TeklabHdrP
Laboratory Results
Client Project: VAMC-Marion, IL 2017-0502.10 T004
Client: SCI Engineering, Inc.
Report Date: 01-Oct-2020
Work Order: 20091941 ht tp:/ / ww w .teklabinc.com/
Analyses Result Units Date AnalyzedRL DFCertification Qual
Collection Date: 09/23/2020 0:00
Lab ID: 20091941-002 Client Sample ID: C2 DP1 2-3ft Matrix: SOLID
Batch
EPA SW846 3550C, 5035A, ASTM D2974
Percent Moisture 09/30/2020 16:560.1 % 117.1* R282237
STANDARD METHODS 4500-CL E (TOTAL) 1997
Chloride 10/01/2020 12:13235 mg/Kg-dry 5< 235NELAP 169690
Elevated reporting limit due to sample composition.
SW-846 9036 (TOTAL)
Sulfate S 10/01/2020 12:13589 mg/Kg-dry 5< 589NELAP 169691
Matrix spike did not recover within control limits. Result is verified by re-analysis.
Elevated reporting limit due to sample composition.
DR
Receiving Check List
Client Project: VAMC-Marion, IL 2017-0502.10 T004
Client: SCI Engineering, Inc.
Report Date: 01-Oct-2020
Work Order: 20091941 ht tp:/ / w ww .teklabinc.com/
Received By: KMTCarrier: Employee
Completed by: Reviewed by:
On:
30-Sep-2020 On:
30-Sep-2020
Shipping container/cooler in good condition? Yes No Not Present
Chain of custody present? Yes No
Chain of custody signed when relinquished and received? Yes No
Chain of custody agrees with sample labels? Yes No
Samples in proper container/bottle? Yes No
Sample containers intact? Yes No
Sufficient sample volume for indicated test? Yes No
All samples received within holding time? Yes No
Container/Temp Blank temperature in compliance? Yes No
Temp °C
When thermal preservation is required, samples are compliant with a temperature between 0.1°C - 6.0°C, or when samples are received on ice the same day as collected.
The samples were out of temperature compliance upon receipt. Per client consent, proceed with analyses. - adilallo - 9/30/2020 3:37:12 PM
Water – at least one vial per sample has zero headspace? Yes No No VOA vials
Water - pH acceptable upon receipt? Yes No NA
Type of thermal preservation? None Ice Blue Ice Dry Ice
Chain of custody 1 Extra pages included 0
Reported field parameters measured: Field Lab NA
Water - TOX containers have zero headspace? No TOX containersYes No
NPDES/CWA TCN interferences checked/treated in the field? Yes No NA
Amber M. Dilallo Elizabeth A. Hurley
DR
APPENDIX C
130 Point West Blvd, St. Charles, MO, 63301 Geotechnical Engineers www.sciengineering.com
Total depth: 23.62 ft, Date: 9/24/2020
Surface Elevation: 461.00 ftMarion, IL
CPT: C-1
Location:
Bearing Capacity Plot
Footing Width (ft)
32.92 .82 .72 .62 .52 .42 .32 .22 .12
U lt im a te
B e a ri n g C a p a ci ty ts f)
4 .5
4 .45
4.4
4 .35
4.3
4 .25
4.2
4 .15
4.1
4 .05
3.95
3.9
3 .85
3.8
3 .75
Bearing Capacity Plot
Bearing Capacity calculation is perfromed based on the formula:
soiltkult qqRQ where:
Rk: Bearing capacity factor qt: Average corrected cone resistance over calculation depth qsoil: Pressure applied by soil above footing
No B (ft)
Start Depth
(ft)
End Depth (ft)
Ave. qt
(tsf) Soil Press.
(tsf) Ult. bearing cap. (tsf) Rk
:: Tabular results ::
1 2.00 6.50 9.50 19.23 0.39 4.240.20
2 2.50 6.50 10.25 18.47 0.39 4.080.20
3 3.00 6.50 11.00 19.75 0.39 4.340.20
CPeT-IT v.2.1.1.8 - CPTU data presentation & interpretation software - Report created on: 10/22/2020, 11:13:45 AM 1 Project file: N:\StCharles\shared\1soils\1NEW\PROJECT FILES\2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T004- Marion, IL VAMC\GS\CPT\CPT data\CPTall.cpt
DR
AF
T jmiller2 Rectangle jmiller2 Rectangle jmiller2 Oval jmiller2 Oval
130 Point West Blvd, St. Charles, MO, 63301 Geotechnical Engineers www.sciengineering.com
Total depth: 23.62 ft, Date: 9/24/2020
Surface Elevation: 461.00 ftMarion, IL
CPT: C-1
Location:
Cone resistance qt
Tip resistance (tsf) 100806040200
D e p th ft
2 4
Cone resistance qt Constrained Modulus
M(CPT) (tsf) 1 ,012812612412212
D e p th ft
2 4
Constrained Modulus Cumulative settlement
Settlement (in)
10.80.60 .40 .20
D e p th ft
2 4
End of Primary Ov erall
Cumulative settlement
Settlements calculation according to theory of elasticity*
Calculation properties
Footing type: Rectangular Footing width: 2.50 (ft) L/B: 1.0 Footing pressure: 2.00 (tsf) Embedment depth: 6.50 (ft) Footing is rigid: Yes Remove excavation load: No Apply 20% rule: Yes Calculate secondary settlements: Yes Time period for primary consolidation: 6 months Time period for second. settlements: 60 months
* Primary settlements calculation is performed according to the following formula:
)log(S tzCa
* Secondary (creep) settlements calculation is performed according to the following formula:
z
CPT
v
CPeT-IT v.2.1.1.8 - CPTU data presentation & interpretation software - Report created on: 10/22/2020, 11:10:15 AM 1 Project file: N:\StCharles\shared\1soils\1NEW\PROJECT FILES\2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T004- Marion, IL VAMC\GS\CPT\CPT data\CPTall.cpt
DR
130 Point West Blvd, St. Charles, MO, 63301 Geotechnical Engineers www.sciengineering.com
Total depth: 23.79 ft, Date: 9/24/2020
Surface Elevation: 460.00 ftMarion, IL
CPT: C-2
Location:
Bearing Capacity Plot
Footing Width (ft)
32.92 .82 .72 .62 .52 .42 .32 .22 .12
U lt im a te
B e a ri n g C a p a ci ty ts f)
4 .25
3.75
3.5
3 .25
2.75
Bearing Capacity Plot
Bearing Capacity calculation is perfromed based on the formula:
soiltkult qqRQ where:
Rk: Bearing capacity factor qt: Average corrected cone resistance over calculation depth qsoil: Pressure applied by soil above footing
No B (ft)
Start Depth
(ft)
End Depth (ft)
Ave. qt
(tsf) Soil Press.
(tsf) Ult. bearing cap. (tsf) Rk
:: Tabular results ::
1 2.00 5.50 8.50 18.65 0.33 4.060.20
2 2.50 5.50 9.25 15.48 0.33 3.430.20
3 3.00 5.50 10.00 13.74 0.33 3.080.20
CPeT-IT v.2.1.1.8 - CPTU data presentation & interpretation software - Report created on: 10/22/2020, 11:16:10 AM 1 Project file: N:\StCharles\shared\1soils\1NEW\PROJECT FILES\2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T004- Marion, IL VAMC\GS\CPT\CPT data\CPTall.cpt
DR
AF
T jmiller2 Rectangle jmiller2 Rectangle jmiller2 Oval
130 Point West Blvd, St. Charles, MO, 63301 Geotechnical Engineers www.sciengineering.com
Total depth: 23.79 ft, Date: 9/24/2020
Surface Elevation: 460.00 ftMarion, IL
CPT: C-2
Location:
Cone resistance qt
Tip resistance (tsf) 100806040200
D e p th ft
2 4
Cone resistance qt Constrained Modulus
M(CPT) (tsf) 1 ,9291,429929429
D e p th ft
2 4
Constrained Modulus Cumulative settlement
Settlement (in) 0.60.40.20
D e p th ft
2 4
End of Primary Ov erall
Cumulative settlement
Settlements calculation according to theory of elasticity*
Calculation properties
Footing type: Rectangular Footing width: 2.50 (ft) L/B: 1.0 Footing pressure: 2.00 (tsf) Embedment depth: 5.50 (ft) Footing is rigid: Yes Remove excavation load: No Apply 20% rule: Yes Calculate secondary settlements: Yes Time period for primary consolidation: 6 months Time period for second. settlements: 60 months
* Primary settlements calculation is performed according to the following formula:
)log(S tzCa
* Secondary (creep) settlements calculation is performed according to the following formula:
z
CPeT-IT v.2.1.1.8 - CPTU data presentation & interpretation software - Report created on: 10/22/2020, 11:07:59 AM 1 Project file: N:\StCharles\shared\1soils\1NEW\PROJECT FILES\2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T004- Marion, IL VAMC\GS\CPT\CPT data\CPTall.cpt
DR
130 Point West Blvd, St. Charles, MO, 63301 Geotechnical Engineers www.sciengineering.com
Total depth: 20.18 ft, Date: 9/24/2020
Surface Elevation: 462.00 ftMarion, IL
CPT: C-3
Location:
Bearing Capacity Plot
Footing Width (ft)
U lt im a te
B e a ri n g C a p a ci ty ts f)
4 .25
3.75
Bearing Capacity Plot
Bearing Capacity calculation is perfromed based on the formula:
soiltkult qqRQ where:
Rk: Bearing capacity factor qt: Average corrected cone resistance over calculation depth qsoil: Pressure applied by soil above footing
No B (ft)
Start Depth
(ft)
End Depth (ft)
Ave. qt
(tsf) Soil Press.
(tsf) Ult. bearing cap. (tsf) Rk
:: Tabular results ::
1 2.00 7.50 10.50 17.85 0.45 4.020.20
2 2.50 7.50 11.25 17.88 0.45 4.030.20
3 3.00 7.50 12.00 17.32 0.45 3.910.20
4 3.50 7.50 12.75 17.22 0.45 3.890.20
CPeT-IT v.2.1.1.8 - CPTU data presentation & interpretation software - Report created on: 10/22/2020, 11:18:21 AM 1 Project file: N:\StCharles\shared\1soils\1NEW\PROJECT FILES\2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T004- Marion, IL VAMC\GS\CPT\CPT data\CPTall.cpt
DR
AF
T jmiller2 Rectangle jmiller2 Rectangle jmiller2 Oval
130 Point West Blvd, St. Charles, MO, 63301 Geotechnical Engineers www.sciengineering.com
Total depth: 20.18 ft, Date: 9/24/2020
Surface Elevation: 462.00 ftMarion, IL
CPT: C-3
Location:
Cone resistance qt
Tip resistance (tsf) 100806040200
D e p th ft
2 4
Cone resistance qt Constrained Modulus
M(CPT) (tsf) 67457447437427417474
D e p th ft
2 4
Constrained Modulus Cumulative settlement
Settlement (in)
10.80.60 .40 .20
D e p th ft
2 4
End of Primary Ov erall
Cumulative settlement
Settlements calculation according to theory of elasticity*
Calculation properties
Footing type: Rectangular Footing width: 2.50 (ft) L/B: 1.0 Footing pressure: 2.00 (tsf) Embedment depth: 7.50 (ft) Footing is rigid: Yes Remove excavation load: No Apply 20% rule: Yes Calculate secondary settlements: Yes Time period for primary consolidation: 6 months Time period for second. settlements: 60 months
* Primary settlements calculation is performed according to the following formula:
)log(S tzCa
* Secondary (creep) settlements calculation is performed according to the following formula:
z
CPeT-IT v.2.1.1.8 - CPTU data presentation & interpretation software - Report created on: 10/22/2020, 11:11:14 AM 1 Project file: N:\StCharles\shared\1soils\1NEW\PROJECT FILES\2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T004- Marion, IL VAMC\GS\CPT\CPT data\CPTall.cpt
DR
| Appendix B - Corrosion Potential Testing.pdf |
| Analytic_Test_Results_20091941 |
| Appendix C - Foundation Design Calculations.pdf |
| Settlement C1 |
| Settlement C2 |
| Settlement C3 |