This document set provides construction documents for infrastructure upgrades at the Marion VA Medical Center in Marion, Illinois. The project includes upgrades to electrical, mechanical, technology, fire protection, and other systems across multiple buildings. Work will be performed in occupied areas, so infection control requirements and barrier types ranging from Type A to D are specified depending on the risk level of adjacent patient areas. The documents include plans, schedules, details, notes, and specifications for demolition, new construction, and renovations.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOD-1
BLDG 37
MOD-4BLDG 13
BLDG 1
BLDG 42BLDG 2 BLDG 16
BLDG 15
BLDG 14
BLDG 43
BLDG 81
BLDG 8
BLDG 38
BLDG 82
BLDG 83
BLDG 44BLDG 7
MOD-3
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
SETH ANDREW CAVIN - ARCHITECT #AR12100034 EXP. 11/30/2024
JAMES ROSS MYLES - PROFESSIONAL ENGINEER #062.071715 EXP. 11/30/2023
CIVIL/ STRUCTURAL ENGINEER
OATES ASSOCIATES
100 LANTER COURT, SUITE 1
COLLINSVILLE, IL 62234
(618) 345-2200
MECH / ELEC / PLUMB ENGINEER
SPUR DESIGN
2519 MADISON AVE. STE 100
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
DATA/COMM CONSULTANT
ASPEN ENGINEERING & CONTRACTING
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 86301
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
EHRM INFRASTRUCTURE
UPGRADESCOMMISSIONING AGENT
ES2
13401 N. SANTA FE AVE.
OKLAHOMA, OK 73114
(405) 528-4500
/1
/2
:2 :2
A
M
COVER SHEET
NR 001 204BKM
FINAL BID DOCUMENTS
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
VA PROJECT NUMBER: 657A5-21-700
4/20/2023
657A5-21-700
MARION VA MEDICAL CENTER
2401 WEST MAIN ST. | MARION, IL
62959
MARION VA MEDICAL CENTER
2401 WEST MAIN ST. | MARION, IL 62959
FINAL BID DOCUMENTS
GI000
SPUR #: 2114
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
156 E-505 ELECTRICAL DETAILS
157 E-601 ELECTRICAL ONE-LINE DIAGRAMS - BLDG 14, 15, 16, 44
158 E-602 ELECTRICAL ONE-LINE DIAGRAMS - BLDG 38
159 E-603 ELECTRICAL ONE-LINE DIAGRAMS - BLDG 37
160 E-604 ELECTRICAL ONE-LINE DIAGRAMS - BLDG 13, 42, MOD-4
161 E-605 ELECTRICAL ONE-LINE DIAGRAMS - BLDG 8, 42, 81, 81, MOD-3
162 E-606 ELECTRICAL ONE-LINE DIAGRAMS - BLDG 83, MOD-1
163 E-607 ELECTRICAL PANELBOARD SCHEDULES - BLDG 14, 15, 16, 37, 44
164 E-608 ELECTRICAL PANELBOARD SCHEDULES - BLDG 13, 38, 42, MOD-4
165 E-609 ELECTRICAL PANELBOARD SCHEDULES - BLDG 8, 43, 81, 82, 83,
MOD-1, MOD-3
166 E-610 ELECTRICAL PANELBOARD SCHEDULES
167 E-611 ELECTRICAL PANELBOARD SCHEDULES
[09] TECHNOLOGY
167 T-000 TECHNOLOGY SYMBOLS & ABBREVIATIONS
168 T-100 TECHNOLOGY PLANS - BLDG 8
169 T-101 TECHNOLOGY PLANS - BLDG 13
170 T-102 TECHNOLOGY PLANS - BLDG 14
171 T-103 TECHNOLOGY PLANS - BLDG 15, 16
172 T-104 TECHNOLOGY PLANS - BLDG 37
173 T-105 TECHNOLOGY PLANS - BLDG 38
174 T-106 TECHNOLOGY PLANS - BLDG 38
175 T-107 TECHNOLOGY PLANS - BLDG 38
176 T-108 TECHNOLOGY PLANS - BLDG 38
177 T-109 TECHNOLOGY PLANS - BLDG 38
178 T-110 TECHNOLOGY PLANS - BLDG 42
179 T-111 TECHNOLOGY PLANS - BLDG 43, 44
180 T-112 TECHNOLOGY PLANS - BLDG 81, 82
181 T-113 TECHNOLOGY PLANS - BLDG 83
182 T-114 TECHNOLOGY PLANS - BLDG MOD-1, 3, 4 & BLDG 7
183 T-200 TEHNOLOGY AREA PLAN
184 T-300 ENLARGED PLANS - BLDG 8, 13, 14
185 T-301 ENLARGED PLANS - BLDG 15 & 16
186 T-302 ENLARGED PLANS - BLDG 37
187 T-303 ENLARGED PLANS - BLDG 38
188 T-304 ENLARGED PLANS - BLDG 38
189 T-305 ENLARGED PLANS - BLDG 42
190 T-306 ENLARGED PLANS - BLDG 42, 43, 81
191 T-307 ENLARGED PLANS - BLDG 82 & 83
192 T-308 ENLARGED PLANS - MOD-1, 3, 4 & BLDG 7
193 T-400 RACK ELEVATIONS - BLDG 8, 13, 14, 15, 16
194 T-401 RACK ELEVATIONS - BLDG 37, SERVER ROOM
195 T-402 RACK ELEVATIONS -BLDG 38
196 T-403 RACK ELEVATIONS - BLDG 42
197 T-404 RACK ELEVATIONS - BLDG 43, 44, 81
198 T-405 RACK ELEVATIONS - BLDG 82, 83
199 T-406 RACK ELEVATIONS - MOD1, 3, 4 & BLDG 7
200 T-500 TECHNOLOGY RISER DIAGRAMS
201 T-600 TECHNOLOGY DETAILS
202 T-601 TECHNOLOGY DETAILS
203 T-602 TECHNOLOGY DETAILS
204 T-603 TECHNOLOGY DETAILS
TOTAL SHEETS: 204
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
102 FA404 ENLARGED FIRE ALARM PLANS
103 FA405 ENLARGED FIRE ALARM PLANS
104 FA406 ENLARGED FIRE ALARM PLANS
105 FX101 OVERALL FIRE SUPPRESSION PLANS
106 FX102 OVERALL FIRE SUPPRESSION PLANS
107 FX103 OVERALL FIRE SUPPRESSION PLANS
108 FX104 OVERALL FIRE SUPPRESSION PLANS
109 FX105 OVERALL FIRE SUPPRESSION PLANS
110 FX401 ENLARGED FIRE SUPPRESSION PLANS
111 FX402 ENLARGED FIRE SUPPRESSION PLANS
112 FX403 ENLARGED FIRE SUPPRESSION PLANS
113 FX404 ENLARGED FIRE SUPPRESSION PLANS
114 FX405 ENLARGED FIRE SUPPRESSION PLANS
115 FX406 ENLARGED FIRE SUPPRESSION PLANS
116 SH001 CLEAN AGENT NOTES, DETAILS, AND PLAN
[07] MECHANICAL
118 M-000 LEGEND AND ABBREVIATIONS
119 M-101 REFERENCE PLANS - BUILDINGS 8, 13, 15, 16, & 37
120 M-102 REFERENCE PLANS - BUILDING 38
121 M-103 REFERENCE PLANS - BUILDING 42
122 M-104 REFERENCE PLAN - BUILDING 43 - GROUND FLOOR
123 M-105 REFERENCE PLANS - BUILDINGS 81 & 82
124 M-106 REFERENCE PLANS - MODULAR BUILDINGS 1, 3, & 4
125 M-401 ENLARGED FLOOR PLANS - BLDG 8, 13, 15, & 16
126 M-402 ENLARGED FLOOR PLANS - BLDG 37
127 M-403 ENLARGED FLOOR PLANS - BLDG 38
128 M-404 ENLARGED FLOOR PLANS - BLDG 42 & 43
129 M-405 ENLARGED FLOOR PLANS - BLDG 81 & 82
130 M-406 ENLARGED FLOOR PLANS - MOD 1, 3, & 4
131 M-501 MECHANICAL DETAILS
132 M-601 MECHANICAL SCHEDULES
133 M-701 MECHANICAL CONTROLS
[08] ELECTRICAL
134 E-000 ELECTRICAL LEGEND AND ABBREVIATIONS
135 E-100 ELECTRICAL SITE PLAN
136 E-101 REFERENCE PLANS - BLDG 8, 13, 14, 15, 16, 37
137 E-102 REFERENCE PLANS - BLDG 38
138 E-103 REFERENCE PLANS - BLDG 42
139 E-104 REFERENCE PLANS - BLDG 43, 44, 81, 82
140 E-105 REFERENCE PLANS - BLDG 83 & MOD-1, 3, 4
141 E-401 ENLARGED PLANS - BLDG 8, 13, 14
142 E-402 ENLARGED PLANS - BLDG 15, 16
143 E-403 ENLARGED PLANS - BLDG 37
144 E-404 ENLARGED PLANS - BLDG 37
145 E-405 ENLARGED PLANS - BLDG 38
146 E-406 ENLARGED PLANS - BLDG 38
147 E-407 ENLARGED PLANS - BLDG 42
148 E-408 ENLARGED PLANS - BLDG 43, 44, 81
149 E-409 ENLARGED PLANS - BLDG 82, 83
150 E-410 ENLARGED PLANS - MOD-1, 3
151 E-411 ENLARGED PLANS - MOD-4
152 E-501 ELECTRICAL DETAILS
153 E-502 ELECTRICAL DETAILS
154 E-503 ELECTRICAL DETAILS
155 E-504 ELECTRICAL DETAILS
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
051 CU213 FIBER PLAN & PROFILE
052 CU214 FIBER PLAN & PROFILE
053 CU215 FIBER PLAN & PROFILE
054 CU216 FIBER PLAN & PROFILE
055 CU217 FIBER PLAN & PROFILE
056 CU218 FIBER PLAN & PROFILE
057 CU300 ELECTRICAL PLAN & PROFILE
058 CU301 ELECTRICAL PLAN & PROFILE
059 CU302 ELECTRICAL PLAN & PROFILE
060 CU303 ELECTRICAL PLAN & PROFILE
061 CU400 CIVIL DETAILS
062 CU401 CIVIL DETAILS
063 CU402 CIVIL DETAILS
[04] STRUCTURAL
064 SJ001 GENERAL NOTES
065 SJ002 GENERAL NOTES
066 SJ003 TYPICAL DETAILS
067 SJ004 TYPICAL DETAILS
068 SD001 DEMOLITION PLAN - GROUND FLOOR
069 SB100 FOUNDATION / GROUND LEVEL PLAN & DETAILS
070 SF200 1ST, 2ND, 3RD, & 4TH FRAMING PLANS
071 SF201 ROOF FRAMING PLAN
072 SF300 BUILDING FRAME ELEVATION
073 SF301 STEEL DETAILS
074 SF302 STEEL DETAILS
[05] ARCHITECTURAL
075 AE101 REFERENCE PLANS - BLDG 8, 13, 14, 15, 16, 37
076 AE102 REFERENCE PLANS - BLDG 38
077 AE103 REFERENCE PLANS - BLDG 42
078 AE104 REFERENCE PLANS - BLDG 43, 81, 82
079 AE105 REFERENCE PLANS - BLDG 83, MOD-1, 3, 4
080 AE201 BUILDING ELEVATION AND SECTION
081 AE401 ENLARGED PLANS - BLDG 8, 13, 14
082 AE402 ENLARGED PLANS - BLDG 15 & 16
083 AE403 ENLARGED PLANS - BLDG 37
084 AE404 ENLARGED PLANS - BLDG 38
085 AE405 ENLARGED PLANS - BLDG 38
086 AE406 ENLARGED PLANS - BLDG 38
087 AE407 ENLARGED PLANS - BLDG 42
088 AE408 ENLARGED PLANS - BLDG 42, 43, 81
089 AE409 ENLARGED PLANS - BLDG 82 & 83
090 AE410 ENLARGED PLANS - MOD-1, 3, 4
091 AE601 DOOR SCHEDULE AND PARTITION TYPES
092 AF711 FINISH SCHEDULE
[06] FIRE PROTECTION
093 FA001 FIRE ALARM GENERAL NOTES, LEGEND, AND DIAGRAMS
094 FA101 OVERALL FIRE ALARM PLANS
095 FA102 OVERALL FIRE ALARM PLANS
096 FA103 OVERALL FIRE ALARM PLANS
097 FA104 OVERALL FIRE ALARM PLANS
098 FA105 OVERALL FIRE ALARM PLANS
099 FA401 ENLARGED FIRE ALARM PLANS
100 FA402 ENLARGED FIRE ALARM PLANS
101 FA403 ENLARGED FIRE ALARM PLANS
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[01] GENERAL
001 GI000 COVER SHEET
002 GI001 GENERAL INFORMATION
003 GI002 ICRA CONSTRUCTION DETAILS
[02] HAZARDOUS MATERIALS
004 HA000 ENVIRONMENTAL HAZARDS - GENERAL NOTES
005 HA100 ENVIRONMENTAL HAZARDS - BUILDING 1 - GROUND FLOOR
006 HA101 ENVIRONMENTAL HAZARDS - BUILDING 1 - FLOOR 1
007 HA102 ENVIRONMENTAL HAZARDS - BUILDING 1 - FLOOR 2
008 HA103 ENVIRONMENTAL HAZARDS - BUILDING 1 - FLOOR 3
009 HA801 ENVIRONMENTAL HAZARDS - BUILDING 8 - FLOOR 1
010 HA802 ENVIRONMENTAL HAZARDS - BUILDING 8 - FLOOR 2
011 HA803 ENVIRONMENTAL HAZARDS - BUILDING 8 - BASEMENT
012 HA130 ENVIRONMENTAL HAZARDS - BUILDING 13
013 HA140 ENVIRONMENTAL HAZARDS - BUILDING 14
014 HA150 ENVIRONMENTAL HAZARDS - BUILDING 15
015 HA160 ENVIRONMENTAL HAZARDS - BUILDING 16
016 HA370 ENVIRONMENTAL HAZARDS - BUILDING 37
017 HA371 ENVIRONMENTAL HAZARDS - BUILDING 37 ROOF
018 HA380 ENVIRONMENTAL HAZARDS - BUILDING 38 - GROUND FLOOR
019 HA381 ENVIRONMENTAL HAZARDS - BUILDING 38 - FLOOR 1
020 HA382 ENVIRONMENTAL HAZARDS - BUILDING 38 - FLOOR 2
021 HA383 ENVIRONMENTAL HAZARDS - BUILDING 38 - FLOOR 3
022 HA384 ENVIRONMENTAL HAZARDS - BUILDING 38 - FLOOR 4
023 HA420 ENVIRONMENTAL HAZARDS - BUILDING 42 NORTH
024 HA421 ENVIRONMENTAL HAZARDS - BUILDING 42 NORTH - 2
025 HA422 ENVIRONMENTAL HAZARDS - BUILDING 42 - GROUND FLOOR -
NORTH EAST
026 HA423 ENVIRONMENTAL HAZARDS - BUILDING 42 - GROUND FLOOR -
NORTH WEST
027 HA424 ENVIRONMENTAL HAZARDS - BUILDING 42 - GROUND FLOOR -
SOUTH WEST
028 HA425 ENVIRONMENTAL HAZARDS - BUILDING 42 -ROOF
029 HA430 ENVIRONMENTAL HAZARDS - BUILDING 43
030 HA810 ENVIRONMENTAL HAZARDS - BUILDING 81 FLOOR 1
031 HA811 ENVIRONMENTAL HAZARDS - BUILDING 81 ROOF
032 HA812 ENVIRONMENTAL HAZARDS - BUILDING 82 ROOF
[03] CIVIL
033 CU001 GENERAL NOTES, ABBREVIATIONS, SYMBOLS
034 CU002 UTILITY KEY MAP - FIBER
035 CU003 UTILITY KEY MAP - ELECTRICAL
036 CU004 STAGING PLAN
037 CU100 NETWORK TOWER STANDOFF
038 CU200 FIBER PLAN & PROFILE
039 CU201 FIBER PLAN & PROFILE
040 CU202 FIBER PLAN & PROFILE
041 CU203 FIBER PLAN & PROFILE
042 CU204 FIBER PLAN & PROFILE
043 CU205 FIBER PLAN & PROFILE
044 CU206 FIBER PLAN & PROFILE
045 CU207 FIBER PLAN & PROFILE
046 CU208 FIBER PLAN & PROFILE
047 CU209 FIBER PLAN & PROFILE
048 CU210 FIBER PLAN & PROFILE
049 CU211 FIBER PLAN & PROFILE
050 CU212 FIBER PLAN & PROFILE
DEDUCT ALTERNATES
1. BUILDING 13 - REMOVE FROM SCOPE. THIS AREA TO BE ADDRESSED BY ANOTHER
PROJECT.
2. BUILDING 15 - REMOVE FROM SCOPE. THIS AREA TO BE ADDRESSED BY ANOTHER
PROJECT.
N
AREA
PLAN
LOCATION
PLAN
N
PROJECT LOCATION
DIRECTOR, MARION VAMC:
ASSOCIATE DIRECTOR, MARION VAMC:
CHIEF OF STAFF, MARION VAMC:
CHIEF OF PRIMARY CARE, MARION VAMC:
COR, MARION VAMC:
SAFETY:
PROJECT ENGINEER:
PRIVACY OFFICER:
PATIENT SAFETY:
INFECTION PREVENTION:
MENTAL HEALTH:
VA POLICE:
WOMEN'S HEALTH COORDINATOR:
MAINTENANCE AND OPERATIONS:
LOGISTICS:
ENERGY ENGINEER:
STRATEGIC PLANNER:
ENVIRONMENTAL MANAGEMENT /INTERIOR DESIGN
OFFICE OF INFORMATION AND TECHNOLOGY:
CLINICAL SERVICES:
FOOD AND NUTRITION:
PHARMACY:
STERILE PROCESSING AND DISTRIBUTION:
BIOMEDICAL:
NURSING SERVICE:
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
DATE:__________________
CONTROLLED UNCLASSIFIED INFORMATION - CONTACT
CONTROLLED BY: DEPARTMENT OF VETERAN AFFIARS
CUI CATEGORY: PRVCY, PHYS
LIMITED DISSEMINATION CONTROL: FED CON
POC: SHAWN MOORE
SHAWN.MOORE1@VA.GOV
No. REVISION DESCRIPTION DATE
HA820
ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS
4' -0
4' -0
2' -1
0"
2' -3
1'-6"
1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT
BLOCKING FOR ALL WALL MOUNTED ACCESSORIES,
FIXTURES, AND EQUIPMENT.
2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN
COUNTERTOPS @ 36"-48" MAX ON CENTER.
3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER
FINISHED FLOOR TO THE OPERABLE PART OF THE FIXTURE.
4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL
FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR
FIXTURE TYPES USED IN THIS PROJECT.
5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,
BACKING TO BE PROVIDED AS SHIM FOR FLUSH
APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.
6"
9"
SHOWER
VA TOILET ROOM
TURNING RADIUS
DRINKING
FOUNTAIN
PAPER TOWEL
DISPENSER
SANITARY
NAPKIN
DISPENSER
4' -0
WASTE
RECEPTACLE
LAVATORY
WITH MIRROR
ON CENTER
WALL
4' -0
SOAP
DISPENSER
2' -1
0" M
A X
3' -4
17 MIN
2' -3
3' -0
1'-6"
WALL
2' -9
4' -0
2'-0"
8"
WALL
LAVATORY
WITH APRON
1' -5
1'-6"
URINAL
WALL
1'-4" - 1'-6" (WHEELCHAIR)
5'-6" 6'-0"
3'-0"
2' -9
1'-0" 3'-6" 1'-0"
4'-6"
1' -5
1' -3
M
IN
A D
A /A
B A
2' -9
WALL
WALL
4' -0
WALL HOOK
7' -0
CLOCK
WALL
FINISHED FLOOR
FIRE EXTINGUISHER
CABINET
WEIGHT > 40LBS
FIRE EXTINGUISHER
CABINET
WEIGHT < 40LBS
4' -0
4' -0
TOILET SEAT
COVER
DISPENSER
BABY
CHANGING
STATION
CLEAR FLOOR SPACE
@ WATER CLOSET
5'-6"
2'-6"
4' -0
2'-6"
4' -0
HANDRAILS AND
BUMPER GUARDS
FIXTURE MOUNTING HEIGHTS AND CLEARANCES
18" MIN
M
IN
FRONT APPROACH,
PULL SIDE
36" MIN
M
IN
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PULL SIDE
*12" MIN48
M
IN
FRONT APPROACH,
PUSH SIDE
M
IN
HINGE APPROACH,
PUSH SIDE
22" MIN 24" MIN
*4 8"
M
IN
LATCH APPROACH,
PULL SIDE
24" MIN*4
2"
M
IN
LATCH APPROACH,
PUSH SIDE
*IF BOTH CLOSER
AND LATCH ARE
PROVIDED
*54" MIN IF CLOSER
IS PROVIDED
*48" IF CLOSER IS
PROVIDED
FRONT APPROACH,
PUSH SIDE
M
IN
42" MIN
DOOR AND FIXTURE CLEARANCES
MATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS
SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2021 VA INFRASTRUCTURE STANDARD FOR TELECOMMUNICATION SPACES
• 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• 2021 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• 2021 NATIONAL FIRE CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2020 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2021 INTERNATIONAL MECHANICAL CODE
• 2020 NATIONAL ELECTRICAL CODE (NEC), NFPA 70
• 2021 INTERNATIONAL PLUMBING CODE (IPC)
• 2016 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2017 ANSI ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
• 2019 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)
• 2017 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2019 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ASHRAE 90.1 - 2019 EDITION
BUILDING LOCATION: MARION, IL
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 4A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM
AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)
ROOFS REQUIRED DESIGNED
INSULATION: R-30 c.i. R-30 METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls N/A
ATTIC AND OTHER: R-49 N/A
WALLS, ABOVE GRADE
MASS: R-9.5 c.i. N/A METAL BUILDING: R-0 + R-15.8 c.i. N/A STEEL-FRAMED: R-13 + R-7.5 c.i. R-24 WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 N/A
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i. N/A
FLOORS
MASS: R-14.6 c.i. N/A
STEEL-FRAMED: R-30 R-30
WOOD-FRAMED AND OTHER: R-30 N/A
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 for 24 in. R-15 HEATED SLABS: R-20 for 24 in. N/A
OPAQUE DOORS
SWINGING: U-0.370 N/A
NONSWINGING: U-0.310 N/A
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION, U-FACTOR
FIXED: U-0.36 N/A
OPERABLE: U-0.45 N/A
ENTRANCE DOOR: U-0.63 N/A
DEFINITIONS
c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
N
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL
CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE
ENTIRE DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY
WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY
ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES.
5. PROVIDE CONSTRUCION FENCING. GC TO PROPOSE ADDITIONAL STAGING AREAS AS
NEEDED. STAGING AREAS MUST BE RESTORED TO ORIGINAL CONDITION UPON
COMPLETION AT NO COST TO THE GOVERNMENT.
6. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
7. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND
REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
8. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED
OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE
OWNER.
9. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT
PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.
10. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
11. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE
AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,
BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL
DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE
OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION
DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND
OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND
SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL
SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE
DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO
THE GOVERNMENT.
12. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH
SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN
ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE,
EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR
INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60
CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS
DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER
MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE
THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION SCHEDULE UNLESS
REQUESTED IN WRITING AND APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED,
IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME
SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF
THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY
OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE
INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN
ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY
AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING
THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
13. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR
DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING
BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE
DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION
DOCUMENTS.
13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.
GENERAL NOTES
AREA NAME
150 SF
A101
A101
SIM
A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00" 4B
3A
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
CLEAN UTILITY
000A
150 SF
/1 A101
X0000
6"
3' -0
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
SIM
A101
SIM
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALK BOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CP/CI CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CPT CARPET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPOXY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
REFERENCE SYMBOLS IDENTIFICATION TAGS
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
**48" MIN IF BOTH CLOSER
AND LATCH PROVIDED
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
6'- 0"
5'- 6"
BARIATRIC TOILET ROOM
TURNING RADIUS
CLEAR FLOOR SPACE
@ ADA LAVATORY
CLEAR FLOOR SPACE @ ADA
DRINKING FOUNTAIN
4"
6"
6" 1'
-6
6"
7" - 9" 11" MIN
17" - 25"
M
IN
6' -0
39"- 41"
M
IN
1"
3' -6
" 5' -0
R
RAF RESILIENT ATHLETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
VC VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL FACED ACOUSTICAL TILE
VP VENEERED PLASTER
VT VINYL TILE
VV VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
SETH ANDREW CAVIN - ARCHITECT #AR12100034 EXP. 11/30/2024
JAMES ROSS MYLES - PROFESSIONAL ENGINEER #062.071715 EXP. 11/30/2023
CIVIL/ STRUCTURAL ENGINEER
OATES ASSOCIATES
100 LANTER COURT, SUITE 1
COLLINSVILLE, IL 62234
(618) 345-2200
MECH / ELEC / PLUMB ENGINEER
SPUR DESIGN
2519 MADISON AVE. STE 100
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
DATA/COMM CONSULTANT
ASPEN ENGINEERING & CONTRACTING
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 86301
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
EHRM INFRASTRUCTURE
UPGRADESCOMMISSIONING AGENT
ES2
13401 N. SANTA FE AVE.
OKLAHOMA, OK 73114
(405) 528-4500
/1
/2
:2 :2
A
M
GENERAL INFORMATION
NR 002 204BKM
FINAL BID DOCUMENTS
4/20/2023
657A5-21-700
MARION VA MEDICAL CENTER
2401 WEST MAIN ST. | MARION, IL
62959
GI001
SPUR #: 2114
No. REVISION DESCRIPTION DATE
A. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR AND THE MEDICAL CENTER.
B. ACTIVITY HAZARD RISK CLASSIFICATIONS OF CLASS I OR CLASS II SHALL REQUIRE APPROVAL BY THE FACILITY SAFETY MANAGER AND CONTRACTING OFFICER REPRESENTATIVE BEFORE BEGINNING ANY CONSTRUCTION WORK. HAZARD RISK CLASSIFICATIONS OF CLASS III OR IV SHALL REQUIRE A
PERMIT BEFORE BEGINNING ANY CONSTRUCTION WORK. INFECTION CONTROL PERMITS WILL BE
ISSUED BY THFACILITY SAFETY MANAGER AND CONTRACTING OFFICER REPRESENTATIVE.
C. INFECTION CONTROL PERMITS SHALL BE POSTED OUTSIDE THE APPROPRIATE CONSTRUCTION
AREA. MORE THAN ONE PERMIT MAY BE ISSUED, AS WORK IS LOCATED IN MULTIPLE AREAS.
D. THE REQUIRED INFECTION CONTROL PRECAUTIONS ARE AS FOLLOWS:
CLASS I:
• NOTIFY THE COR.
• EXECUTE WORK USING METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION
OPERATIONS.
• CEILING TILES: IMMEDIATELY REPLACE ANY CEILING TILES DISPLACED FOR VISUAL INSPECTION.
• UPON COMPLETION: CLEAN WORK AREA, AND NOTIFY COR.
CLASS II:
• NOTIFY THE COR.
• PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE
SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS.
• WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
• SEAL UNUSED DOORS WITH PAINTERS TAPE.
• BLOCK OFF AND SEAL AIR VENTS.
• REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
• UPON COMPLETION: WIPE WORK SURFACES WITH CLEANER/ DISINFECTANT. CONTAIN
CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
CLASS III:
DURING CONSTRUCTION WORK:
• OBTAIN PERMIT FROM THE COR.
• REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK
SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL
WORK HOURS.
• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A
DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON
INSTALLATION, MAINTAINEDWITH PERIODIC CALIBRATION AND MONITORED BY THE CONTRACTOR.
• CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
• COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
UPON COMPLETION:
• DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT THOROUGHLY
CLEANED, AND IS INSPECTED BY THE CONTRACTING OFFICER REPRESENTATIVE AND BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
• REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL
WORK HOURS.
• VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
• WET MOP AREA WITH CLEANER/DISINFECTANT.
• UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
• RETURN PERMIT TO THE COR.
CLASS IV:
DURING CONSTRUCTION WORK:
• OBTAIN PERMIT FROM THE COR.
• ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF
DUCT SYSTEM.
• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK
SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL
WORK HOURS.
• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A
DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON
INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE
CONTRACTOR.
• SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
• CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY
CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN
WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK SITE.
• ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS
MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
UPON COMPLETION:
• DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT THOROUGHLY
CLEANED, AND IS INSPECTED BY THE CONTRACTING OFFICER REPRESENTATIVE.
• REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL
WORK HOURS.
• CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
• COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
• VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
• AREA TO BE CLEANED/DISINFECTED PER VA ENVIRONMENTAL SERVICES GUIDELINES AS
COORDINATED BY THE COR.
• UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
• RETURN PERMIT TO THE COR.
GENERAL ICRA NOTES
LOW RISK
PATEINT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
• OFFICE AREAS • CARDIOLOGY
• ECHOCARDIOGRAPHY
• ENDOSCOPY
• NUCLEAR MEDICINE
• PHYSICAL THERAPY
• RADIOLOGY/MRI
• RESPIRATORY
THERAPY
• CCU
• EMERGENCY ROOM
• LABOR & DELIVERY
• LABORATORY (SPECIMEN)
• NEWBORN NURSERY
• OUTPATIENT SURGERY
• PEDIATRICS
• PHARMACY
• POST ANESTHESIA CARE
UNIT
• SURGICAL UNITS
• ANY AREA FOR
IMMUNOCOMPROMISED PATIENTS
• BURN UNIT
• CARDIAC CATH LAB
• CENTRAL STERILE SUPPLY
• INTENSIVE CARE UNITS
• MEDICAL UNIT
• NEGATIVE PRESSURE ISOLATION
ROOMS
• ONCOLOGY
• OPERATING ROOMS INCLUDING
• C-SECTION ROOMS
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
I
I
I
II
II
II
II
III/IV
II
III
III/IV
III/IV
III/IV
IV
IV
IV
IC MATRIX - CLASS OF PRECAUTIONS:
CONSTRUCTION PROJECT BY PATIENT RISK
CONSTRUCTION PROJECT TYPE
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL INDICATE
THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
INSPECTIONS AND NON-INVASTIVE ACTIVITES
MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION
TYPE A
INCLUDES BUT NOT LIMITED TO:
• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER
50 SQUARE FEET.
• PAINTING (BUT NOT SANDING).
• WALL COVERING, ELECTRICAL TRIM, MINOR PLUMBING AND ACTIVITIES WHICH
DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO
CEILINGS OTHER THAN FOR VISUAL INSPECTION
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATES MINIMAL DUSTTYPE B
INCLUDES BUT NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING.
• ACCESS TO CHASE SPACES.
• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE
CONTROLLED.
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES
DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
TYPE C
INCLUDES BUT NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING.
• REMOVAL OF FLOOR COVERINGS, CEILING TILES OR CASEWORK.
• NEW WALL CONSTRUCTION.
• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS.
• MAJOR CABLING ACTIVITIES.
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT.
MAJOR DEMOLITION AND CONSTRUCTION PROJECTSTYPE D
INCLUDES BUT NOT LIMITED TO:
• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS.
• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING
SYSTEM.
• NEW CONSTRUCTION.
INFECTION CONTROL RISK ASSESSMENT (ICRA)
3 5/8" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16" O.C.
WALL TO EXTEND TO UNDERSIDE
OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
4 7/8"
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
4 7/8"
3 5/8" 16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
CB
3 5/8" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16" O.C.
(2) LAYERS 5/8" GYPSUM BOARD
EACH SIDE. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6 1/8"
D
FIRE RESISTANT SEALANT, BOTH
SIDES
FIRE RESISTANT SEALANT, BOTH
SIDES
FIRE RESISTANT SEALANT, BOTH
SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
SMOKE RATED 2-HR RATED AND SMOKE
RATED
U.L. DESIGN NO. U404A
PLASTIC SHEET BARRIER
NON RATED
PLASTIC SHEET
BARRIER
EXISTING WALL
ASSEMBLY
EXISTING CEILING
BOTTOM SEALING RUNNER
TOP SEALING RUNNER
SUPPORT POLES,
QUANTITY PER MANUF.
RECOMMENDATIONS
AS
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
XXXXXX
XXXXXX
XXXXXX
4' -0
THIS IS A RESTRICTED AREA
AREA UNDER CONSTRUCTION
PERSONNEL ENTERING MUST HAVE: HARD HAT,
SAFETY GLASSES AND PROPER I.D.
COMING SOON!!
--DESCRIPTION ON NEWLY PROPOSED OCCUPANCY--
ICRA, ISLM, WATCH,
MISC. FORMS
PAPER CADDY
INDICATOR
(REFER TO
PLAN AND
ELEVATION)
FRAMED PICTURE
OF C.O.R. WITH
CONTACT
INFORMATION
CONSTRUCTION
SUPERVISOR
NAME AND CELL NUMBER
XXXXX
BOILER/CHILLER PLANT AFTER
HOURS CONTACT PHONE XXXXX
FIRE EMERGENCY DIAL 911
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO LOCKING
BRAKES
MOBILE CART
A D
JU
S
T A
B
LE
H E
IG
H
T
HEPA NEGATIVE AIR
UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
HEATED DETECTOR CUT-OFF
BASIS OF DESIGN: HEPA NEGATIVE AIR UNIT
INTEGRAL WITH EDGEGUARD BARRIER SYSTEM.
FIRE RATED PLYWOOD (TEMP.
REMOVE GLASS PANEL)
EXISTING WINDOW FRAME
TYPE A OR C ICRA BARRIER,
SEE PLANS FOR TYPE AND
LOCATION
TYPE B OR D ICRA BARRIER,
SEE PLANS FOR TYPE AND
LOCATION
EXISTING CEILING
EXISTING CONCRETE SLAB FLOOR OR
ROOF ASSEMBLY
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING
REPLACED MUST BE PROTECTED.
COVER WITH ROSIN PAPER/ FIRE
RATED PLYWOOD.
WHEN WORKING ABOVE CEILING WITH
BARRIERS THAT TERMINATE AT CEILING,
PROVIDE PLASTIC ENCLOSURE IN
PLENUM SPACE.
OUTSIDE OF BUILDING
WEEKLY CHANGED
HEPA FILTER
HEPA NEGATIVE
AIR UNIT
WEEKLY CHANGED
(OR MORE AS
NEEDED) PRE FILTER
FIRE RATED PLYWOOD
F
LE
X D
U C
T
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT.
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION A
O
V
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
6 MIL PLASTIC
TEMPORARY DIGITAL MANOMETER FOR NEGATIVE
PRESSURE MONITORING OUTSIDE OF ICRA BARRIER
FOR VA'S INSPECTION. INDICATOR SHALL BE AT -0.01
OR GREATER (VERIFY DAILY). IF NOT, VERIFY ALL
OPENINGS, SUCH AS DOOR CLOSED, AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
PROVIDE STICKY MAT, DRY MAT, WET MAT
(CHANGED END OF SHIFT OR MORE IF
NECESSARYTO MAINTAIN CLEANLINESS)
PROVIDE WIPES AND SPRAY FOR WET MAT
POST ICRA ILSM FIRE
INSPECTION SHEETS
CONTAINER VISIBLE TO
PUBLIC
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND THE DIFFUSERS)
E
DOOR OPENING
VENT TO OUTSIDE ROUTE
TO BE APPROVED BY COR.
FIRE PULL STATION WITH AUDIO/
VISUAL
ILSM SIGNAGE
ICRA BARRIER, SEE PLANS FOR TYPE AND LOCATION
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
SETH ANDREW CAVIN - ARCHITECT #AR12100034 EXP. 11/30/2024
JAMES ROSS MYLES - PROFESSIONAL ENGINEER #062.071715 EXP. 11/30/2023
CIVIL/ STRUCTURAL ENGINEER
OATES ASSOCIATES
100 LANTER COURT, SUITE 1
COLLINSVILLE, IL 62234
(618) 345-2200
MECH / ELEC / PLUMB ENGINEER
SPUR DESIGN
2519 MADISON AVE. STE 100
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
DATA/COMM CONSULTANT
ASPEN ENGINEERING & CONTRACTING
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 86301
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
EHRM INFRASTRUCTURE
UPGRADESCOMMISSIONING AGENT
ES2
13401 N. SANTA FE AVE.
OKLAHOMA, OK 73114
(405) 528-4500
/1
/2
:2 :3
A
M
ICRA CONSTRUCTION DETAILS
NR 003 204BKM
FINAL BID DOCUMENTS
4/20/2023
657A5-21-700
MARION VA MEDICAL CENTER
2401 WEST MAIN ST. | MARION, IL
62959
GI002
SPUR #: 2114
3/4" = 1'-0"
ICRA BARRIER WALL TYPES5
3/8" = 1'-0"
ICRA ELEVATION4
3/8" = 1'-0"
ICRA MOBILE CONTAINMENT CART23/8" = 1'-0"
SECTION AT ICRA CONSTRUCTION PLAN3 1/2" = 1'-0"
GENERAL ICRA CONSTRUCTION PLAN LAYOUT1
No. REVISION DESCRIPTION DATE
| Sheets |
| GI000 - COVER SHEET |
| GI001 - GENERAL INFORMATION |
| GI002 - ICRA CONSTRUCTION DETAILS |