DIGGING PERMIT 4Jan12.pdf

PDF 20 KB Posted

Attached to
Repair Structural Components, Bldg 1374 Federal contract opportunity
Solicitation number
JBSF_15-0006
Issued by
Department of the Air Force Air Education and Training Command

About this file

Appendices - Attachment 2 FA3047-15-R-0078

View the file

Other files for this federal contract opportunity

Other files attached to Repair Structural Components, Bldg 1374, newest first.
File Type Posted
QUESTIONS_AND_ANSWERS_-_FA304715R0078.pdf PDF
01 52 13.00 Temporary Facilities and Controls.doc DOC document
Army Installation Design Guide.pdf PDF
Installation Access Credential —
01 31 00 44 Project Meetings.doc DOC document
01 35 30 Safety Health and Emergency Response.doc DOC document
AFI 31-113 Installation Access Control.pdf PDF
01 33 00 Submittal Procedures.doc DOC document
01 00 00 00 General Requirements.doc DOC document
01 35 29 Occupational Safety and Health.doc DOC document
01 45 00.10 20 Contractor Quality Control.doc DOC document
request to use radioactive material.pdf PDF
01 35 13.01 44 Special Project Procedures for JBSA-FSH CB 08 April 2014.pdf PDF
01 35 35 Environmental Protection Oct30.doc DOC document
01 72 00.00 44 Alterations to Existing Facilities.doc DOC document
Attach 2 - Contractor HAZMAT Usage Report_Mar2015.docx DOCX document
Application for Installation Access Credential 12 .pdf PDF
01 74 19.00 Construction Waste Management.doc DOC document
FSH Historical Bldg Maintenance and Repair Plan.pdf PDF
01 78 23- OPERATION AND MAINTENANCE DATA.doc DOC document
CEPT Work Request Form Editable.pdf PDF
01 78 36.00 Warranty of Construction.doc DOC document
Rad permit company request letter template.pdf PDF
01 33 16_Design_After_Award.docx DOCX document
01 35 13 30 Special Project Proceedures - GIS rev6.pdf PDF
01 78 00 Closeout Submittals.doc DOC document
JBSA_FSH_NDA_Use Authorization.pdf PDF
01 77 00.00 20 Contract Closeout.doc DOC document
502CES ACM LBP spec requirements.pdf PDF
01 71 23.16 Cutting and Patching.doc DOC document
01 35 13 03 44 Technical_Supplement_to_the_Design_Guide_for_FSH_02-14-2013.doc DOC document
01 35 13.20 00 Special Project Proceedures - CAD rev6.pdf PDF
01 32 01 00 10 Project Schedule.doc DOC document
01 56 00.00 44 Dust Control.doc DOC document
01 35 13 10 00 Special Project Proceedures - Survey Revision5.pdf PDF
As-Builts.pdf PDF
Attch1-SOW_JBSF150006.pdf PDF
Attch4-MATSUB.xlsx XLSX spreadsheet
Attch3Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
11_-_Draft_DD_Form_1354_H_3_16_42_Doors.pdf PDF
Cover_Page-Attch2.docx DOCX document
FA304715R0078.pdf PDF
Wage_Determinations_TX150016_TX150280.pdf PDF
Attch5-AETC47.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIGGING PERMIT FOR FT SAM HOUSTON/CAMP BULLIS

502D Civil Engineer Squadron

CONTROL NUMBER: _______________________WORK REQUEST NUMBER: _______________________ DATE: _____________________

Note: This form is used to coordinate required work with key post activities, protect underground utilities and keep customer inconvenience to a minimum. Completed Digging Permit is valid a maximum of 30 days before excavation / construction start. Contractor is responsible for maintaining all markings and setting off-sets as required. THIS IS NOT A ROAD CLOSURE OR UTILITY OUTAGE REQUEST. Requestor is responsible for assuring that required road closures and utility outage requests are processed separately and timely. Please print clearly or type.

PROJECT TITLE/DESCRIPTION OF PROJECT:

Clearance is requested to proceed under Contract No.: ___________________________ involving excavation at the location shown on attached drawing. (Contractor shall attach 5 annotated copies of site plan (civil site and utility plans) that shows entire area to be disturbed)

Requestor:_____________________________________ Contractor/Company Name: __________________________________________________ Phone: ________________________________________ The following date and time has been scheduled by 502D Civil Engineer Squadron (502D CES) for the contractor to meet and coordinate with locate personnel, (10 working days are required for scheduling).

DATE: __________________________________________________ TIME: ___________________________________________ MEETING LOCATION: _______________________________________________________________________________________________ (Date requested by contractor MAY be adjusted by the 502D CES representative to avoid overbooking of locate personnel)

ORGANIZATION

502D Civil Engineer Squadron

LOCATE PERSONNEL PRINTED

NAME/SIGNATURE

MARKED

(CIRCLE

ONE)

DEPTH /REMARKS

Water, Sewer, & Drainage:

(210) 221-0207

YES / NO

Electrical: (210) 221-3212 YES / NO Road & Grounds:

(210) 221-3209/295-4980

YES / NO

HVAC: (210) 221-3212 YES / NO

*** CONTRACTOR IS RESPONSIBLE FOR NOTIFYING/ SCHEDULING THE FOLLOWING CLEARANCES/LOCATES*** 502D Communications Squadron 221-1418

DIG TESS ( 800)-344-8377:

CPS (Gas Lines, Electr.);

Southwestern Bell;

Time Warner Cable

YES / NO

YES / NO

YES / NO

YES / NO

San Antonio Water System (Recycled Water Line):

(210)-233-2009

YES / NO

Sprint (Lodging) (800)-669-8344

YES / NO

*CONTRACTOR SHALL ALSO CALL DEPARTMENTS LISTED BELOW BEFORE DIGGING AND OBTAIN CONCURRANCE* 502D CES, Natural Resources Management Section (Environmental, Bldg. 4196): (210) 221-4842

(1) Compliance Signature:_______________________________________________

Historical Signature:_______________________________________________

(2) 502D Fire Emergency Services Flight, Fire Dept. (210) 221-5452 Signature________________________________________________

(3) 502D Security Forces Squadron, Traffic Officer : (210) 221-0212 Signature________________________________________________

(4) 502D Air Base Wing Safety Office: (210) 221-3836 Signature:_______________________________________________ If site is located at OR near BAMC the following contacts also need to be made:

(14) Facilities Management: (210) 916-3534 Signature:_______________________________________________

(15) Provost Marshall: (210) 916-1007 Signature:_______________________________________________

(16) Safety Manager: (210) 916-1427 Signature: _______________________________________________

CONTRACTOR SHALL RETURN THIS FORM TO 502D CIVIL ENGINEER SQUADRON, FORT SAM HOUSTON (Bldg. 4196)

FOR FINAL APPROVAL UPON COMPLETION OF ALL ABOVE COORDINATION AND SIGNATURES.

Quality Assurance Representative: ________________________________________________ Phone: _________________________________ (Government Point of Contact)

FINAL APPROVAL: _________________________________________________________ DATE: _________________________________ Ch, Design Section, 502D CES, Fort Sam Houston

REVISED: 14Jan12,rgh

***INSTRUCTIONS***

1. The contractor shall fill out the permit and attach the contract utility plans, site/grading plan and any other plan sheets showing limits of excavation to scale (5 complete copies) and submit to his/her Quality Assurance Representative or credit card holder.

2. Clearance date is the date the contractor will meet locate personnel at the site to witness locating of known utility lines and obtain signatures.

a. Allow up to 10 working days to schedule 502D Civil Engineer Squadron, Ft Sam Houston personnel and for review of existing utility plans.

b. Clearances will be accomplished on MONDAY THROUGH FRIDAY at either 0900 or 1300 Hours in most cases.

3. Contractor is responsible for notifying the following agencies on Fort Sam Houston as noted on front of permit, see location below:

a. 502D Civil Engineer Squadron, Natural Resources Management Section (Environmental) in Bldg. 4196, See form for phone number/contact information.

b. 502d Security Forces Squadron, Traffic Officer, Fort Sam Houston in Bldg. 2244/Call the phone number on the front of the permit to ensure the appropriate person is going to be in the office before you go.

c. 502D Air Base Wing Safety Office in Bldg. 4196, Call the phone number on the front of the permit to contact.

d. Brook Army Medical Center (BAMC) Facilities Management, Provost Marshall and Safety Manager for projects in the BAMC area in

Bldg. 3600. Call the phone numbers on the front of the permit for directions and to make contact.

4. Locate personnel must accomplish the following on the clearance date:

a. Known utilities must be located and marked

b. Original digging permit must be legibly annotated as follows:

(1) Name of Individual who marked/cleared permit. (Printed name and signature)

(2) Indicate if utility is present and marked.

(3) Any necessary remarks (i.e. Depth of Line or state unknown)

5. Requestor shall be accompanied by his government point of contact (Quality Assurance Representative or Contracting Officer Representative- COR) at all times during the processing of the digging permit in Bldg. 4196.

6. Quality Assurance Representative must also sign and date the permit.

7. Completed form (upon initial request) is submitted by the Quality Assurance Representative and contractor (together) for scheduling to the 502 CES Representative in Bldg 4196. Final form with signatures is returned to the same office for final approval and signature. FINAL APPROVAL is required prior to start of construction/excavation.

8. Short suspense’s will be reviewed and processed on a case by case basis.

9. Digging permits shall be initiated no more than 30 days prior to start of construction.

10. Contractor is required to set offsets and maintain all markings from completion of digging permit and during entire construction period.

File details come from the government source that posted it. Updated .