01 35 13 03 44 Technical_Supplement_to_the_Design_Guide_for_FSH_02-14-2013.doc

DOC document 80 KB Posted

Attached to
Repair Structural Components, Bldg 1374
Solicitation number
JBSF_15-0006
Issued by

About this file

Appendices - Attachment 2 FA3047-15-R-0078

View the file

Other files

File Type Posted
QUESTIONS_AND_ANSWERS_-_FA304715R0078.pdf PDF
Attach 2 - Contractor HAZMAT Usage Report_Mar2015.docx DOCX document
Rad permit company request letter template.pdf PDF
01 35 13 30 Special Project Proceedures - GIS rev6.pdf PDF
01 33 16_Design_After_Award.docx DOCX document
As-Builts.pdf PDF
01 52 13.00 Temporary Facilities and Controls.doc DOC document
01 35 29 Occupational Safety and Health.doc DOC document
01 45 00.10 20 Contractor Quality Control.doc DOC document
Application for Installation Access Credential 12 .pdf PDF
01 74 19.00 Construction Waste Management.doc DOC document
Army Installation Design Guide.pdf PDF
Installation Access Credential —
01 31 00 44 Project Meetings.doc DOC document
AFI 31-113 Installation Access Control.pdf PDF
DIGGING PERMIT 4Jan12.pdf PDF
01 35 30 Safety Health and Emergency Response.doc DOC document
01 35 13.01 44 Special Project Procedures for JBSA-FSH CB 08 April 2014.pdf PDF
request to use radioactive material.pdf PDF
FSH Historical Bldg Maintenance and Repair Plan.pdf PDF
01 35 35 Environmental Protection Oct30.doc DOC document
01 78 23- OPERATION AND MAINTENANCE DATA.doc DOC document
01 72 00.00 44 Alterations to Existing Facilities.doc DOC document
CEPT Work Request Form Editable.pdf PDF
01 00 00 00 General Requirements.doc DOC document
01 33 00 Submittal Procedures.doc DOC document
01 78 36.00 Warranty of Construction.doc DOC document
502CES ACM LBP spec requirements.pdf PDF
01 35 13 10 00 Special Project Proceedures - Survey Revision5.pdf PDF
01 71 23.16 Cutting and Patching.doc DOC document
JBSA_FSH_NDA_Use Authorization.pdf PDF
01 35 13.20 00 Special Project Proceedures - CAD rev6.pdf PDF
01 32 01 00 10 Project Schedule.doc DOC document
01 78 00 Closeout Submittals.doc DOC document
01 56 00.00 44 Dust Control.doc DOC document
01 77 00.00 20 Contract Closeout.doc DOC document
Attch4-MATSUB.xlsx XLSX spreadsheet
Attch1-SOW_JBSF150006.pdf PDF
Attch3Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
Cover_Page-Attch2.docx DOCX document
FA304715R0078.pdf PDF
Wage_Determinations_TX150016_TX150280.pdf PDF
Attch5-AETC47.pdf PDF
11_-_Draft_DD_Form_1354_H_3_16_42_Doors.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

April 21, 2015

Section 01 35 13.03 44

Technical Supplement to the Design Guide for Fort Sam Houston

TABLE OF CONTENTS

Division 2

1. Section 31 23 00.00 20 (02111) Excavation and Fill

2. Section 02 41 00 (02050) Demolition

3. Sections 02 81 00 (02051, 02080, 02091)- General Hazardous Material Disposal procedures

4. Section 02222 Excavation, Trenching, and Backfilling for Utilities Systems

5. Section 31 00 00 (02225) Earthwork

6. Section 02660 Water Lines

7. Section 33 50 00.00 40 (02685) Gas Distribution System

8. Section 33 40 01 (02720) Storm Drainage System

9. Section 33 30 00.00 40 (02730) Sanitary Sewers

10. Section 02752 – Television Inspection of Sewers

11. Section 32 92 23 (02922) Turfing / Sodding Division 3

1. Section 03 11 13.00 10 (03100) Structural Concrete Formwork Division 4

1. Section 04 20 00 (4200) Masonry Division 5

1. Section 05 05 23.00 10 (05055) Welding, Structural

2. Section 05 12 00 (05120) Structural Steel Technical Supplement to the Design Guide for Fort Sam Houston

DIVISION 2 –

Earthwork See File 7-ConstructionMinMtsReqTestFreq Construction Minimum Materials Requirements and Testing Frequencies

Excavation and Fill

1. All borrow or spoil operations shall be off Government controlled property at the responsibility and expense of the Contractor. Fill will be placed in (1) one foot lifts and compacted with a minimum of two passes of a soil compactor to achieve a minimum of 85% compaction. The Contractor shall test for compaction as directed by the Contracting Officer’s Representative. Minimum testing is anticipated pending satisfactory performance. Clean fill is any material classified as a satisfactory material but cannot contain roots and other organic matter. Concrete and asphalt rubble void of reinforcing steel, and rocks and stones no larger than (4) four inches in diameter. Clean fill shall not contain more than 100 parts per million (PPM) of total petroleum hydrocarbons (TPH) and not more than 10 PPM of the sum of benzene, toluene, ethyl benzene, and xylene (BTEX).

Section 02050 Demolition - Any hand receipted items shall always be salvaged and turned over to the Defense Reutilization and Marketing Office (DRMO), located in Building 4195.

Sections 02051, 02080, 02091- General Hazardous Material Disposal procedures:

Standard procedures are as follows: Environmental Office will sign manifests for all material disposed off post. Materials of different types cannot be mixed in the same container. While in use for collection at demo sites, waste containers must be properly marked, and closed and secured at all times when sites are not manned. It is suggested that no storage for over a week be allowed. The Contractor shall pay all landfill and disposal fees. The Contractor will pay asbestos removal charges to state. A survey will always be required for rehab or any projects involving building demo. Usually a building survey is done (upon start of a project) by the Fort Worth District team, 502ND CES in-house forces, or an AE team. The survey and its results should be discussed with Environmental Management Office project manager during the concept design conference and all succeeding conferences, to ensure a clear scope of work and a clear understanding as to how all wastes are removed and disposed of. Disposal sites for clean debris (including uncontaminated concrete, soil, masonry and rubble) may be designated by 502nd CES on large projects such as barracks rebuild. On any project with large amounts of waste soil, contact 502nd CES for a disposal site. Building alteration specs and especially Division 2 specs such as Section 02051 should be carefully edited.

The following specific items are addressed:

1. Asbestos Containing Material (ACM)

a. All ACM waste being disposed of will be the Contractor’s responsibility, 502nd CES Environmental will sign manifests as has been standard procedure. In total demolition of buildings, mastic and floor tile (non-friable) must be disposed of properly by the Contractor.

b. All notifications of asbestos removal to the state shall be signed by Chief, 502nd CES Environmental Compliance Office.

2. All lead-based paint waste being disposed off post is the Contractor’s responsibility.

3. CPS Energy will check electrical equipment for polychlorinated biphenyls (PCB’s) on an as needed basis. Any equipment, including light ballasts, found to contain PCB’s will be disposed of by the 502nd CES Environmental Office, Bldg. 4196. If ballasts are unmarked, they will have to be considered PCB contaminated and also turned over to the 502nd CES Environmental Office.

4. Light bulbs containing mercury (including most fluorescent) will be disposed of by the Contractor. Every effort must be made to keep from breaking - packing boxes are available which will help. The same will apply to thermostats containing mercury.

5. Regulated refrigerants in old refrigerators, compressors, etc. will be purged in accordance with state regulations and the refrigerant turned in to 502nd CES Supply. Pre-arrangement for delivery of the refrigerant is required. Contact 502nd CES Environmental Compliance Office for instructions.

6. If the presence of any unusual items such as tritium powered exit lights, cesium element smoke detectors, etc. is confirmed, contact 502nd CES Environmental Compliance Office for instructions.

502nd CES Environmental Compliance Office POC – Chief David Walker, phone (210) 221- 4967.

Section 02222 Excavation, Trenching, and Backfilling for Utilities Systems

1. A tracer wire and warning marking tape shall be installed with all water, force main, and gas utilities service and distribution lines. Tracer wire shall be #10 direct burial solid copper. Tracer wires shall be installed below pipe and bedding, so wire is not disturbed during repairs. The tracer wire shall be continuous between valves, handholds, and manholes. The tracer wire shall surface at each manhole, handhold, and valve box. A coil of at least one foot of wire shall be left in each manhole, and valve box. The tracer wire shall be tested and proved continuous prior to final inspection with 502nd CES. Warning marking tape shall be color coded, installed 12" below grade, no foil or conductive backing. Comply with Encl. 4 for typical detail.

2. Grade 5 and Grade 6 crushed rock backfill may be used for backfill provided this material is installed in no more than 1 foot lifts and compacted with a vibrating plate. All backfill around manholes and valves shall be cohesive type. The cohesive material will allow any leakage of defective valves or joints to surface so they can be identified for repair.

Section 02225 Earthwork

1. Do not allow stockpiling of any material or parking vehicles or equipment within tree drip lines. Provide for temporary fencing along outside perimeter of drip line, not 5’-0" from trunk.

Section 02660 Water Lines Water Meter Installation Requirements

A water meter will be required at each building or facility. Water meters will be equipped with electronic or radio frequency (RF) transmitters for remote monitoring. The method of remote monitoring via RF transmitters must be coordinated with the installation UMCS/EMCS system. Remote monitoring will be coordinated with the individual installation. To have all water meters reading back to a central location would be expensive and is not justified. The designer will consider the placing of selected or zoned water meters in the UMCS/EMCS system. The above guidance will be interpreted as meaning remote reading to a nearby location as in the case of water meters located within buildings, basements, or generally inaccessible areas. Such installations will provide remote reading capabilities to a convenient location outside the building or structure to simplify the reading of the meter.

Also see Specification 01 35 13 – SPECIAL PROJECT PROCEDURES FOR FORT SAM HOUSTON. Include FSH water metering instructions for the contractor.

Use of Reclaimed/Recycled Water

Water Purveyor: San Antonio Water Systems (SAWS) is the regulatory body governing the use of Reclaimed/Recycled Water. The recycled water definition applies to reclaimed, reuse, and non-potable water.

http://www.saws.org/Our Water/recycling/handbook/index.shtml

All facilities designed for the use of Reclaimed/Recycled Water System shall follow Texas Commission of Environmental Quality (TCEQ) rules and regulations, Chapter 210 for the Use of Reclaimed Water, and Chapter 290 Rules and Regulations for Public Water Systems.

Additionally all facilities requiring the user of Reclaimed/Recycled Water will follow all rules and regulations set forth by the Water Purveyor (SAWS) as described in the San Antonio Water Systems Recycled Water User Handbook, and San Antonio Water Systems Cross Connection Control and Backflow Protection Program. To obtain current SAWS Backflow documents go to http://www.saws.org/business center/specs/

SAWS Reclaimed Water POC: Pablo Martinez 233-3673.

Section 02685 Gas Distribution System

1. Provide a gas pressure regulator and meter detail. All buildings served, except family housing units, shall be metered. The meter shall have a valved bypass so if the meter is removed for servicing, the building can still be supplied with gas. Provide three quarter inch plugged taps on each side of the pressure regulator so the pressure regulator can be checked for proper operation.

2. Provide Poly valves in lieu of metal for underground gas valves.

3. CPS Energy will make the determination whether or not the distribution pressure gas service is sufficient to serve the proposed project. CPS Energy will indicate the location where the distribution pressure gas will be tapped.

4. A tracer wire and marking tape shall be installed with all gas service and distribution lines. Tracer wire shall be #10 insulated solid copper. Tracer wires shall be installed below pipe and bedding, so wire is not disturbed furring repairs. The tracer wire shall be continuous between valves, handholds and manholes. The tracer wire shall surface at each manhole, handhold, and valve box. A coil of at least one foot of wire shall be left in each handhold and valve box. Tracer wire shall come up at regulator 18 inches and wrap around riser for access. The tracer wire shall be tested and proved continuous prior to final inspection with CPS Energy. Warning marking tape shall be color coded, installed 12" below grade, foil backing is not necessary.

5. Provide anodeless riser to regulator.

6. Lines to regulators shall be not less than one inch.

7. Use PE rather than ferrous metal underground when feasible, to avoid requirement for cathodic protection. PE valves are available up to 8 inches – try to limit gas valves to 8 inch. Ensure valve boxes are at least 6 inches or larger to provide access for wrench.

8. Comply with Specification 01 35 13 – SPECIAL PROJECT PROCEDURES FOR FORT SAM HOUSTON. Include permanent site natural gas and CPS Energy requirements.

CPS Energy Gas POC: Mr. Daniel Davila (210)353-5845 drdavila@cpsenergy.com.

Section 02720 Storm Drainage System

The minimum size culvert pipe under roads and entrances shall be 24 inches in diameter. 502nd CES has determined that the smaller diameters are too difficult to clean when silted up.

Section 02730 Sanitary Sewers

1. Minimize the use of sewer lift stations. If lift stations are required, provide a packaged unit assembled of coated metals that do not easily corrode. Provide an audible and visible alarm in case of a malfunction. In remote areas an FM signal shall be sent to 502nd CES - coordinate with existing electronic systems. Make sure that the location of the lift station is accessible for 502nd CES service trucks. If the location is remote and away from the main roads, provide a gravel surfaced road to the lift station.

2. If a drop manhole is needed, detail same on the bid documents. Use a drop manhole if the elevation change is more than 18 inches (per standard criteria).

3. Provide exact coordinates to an accuracy of six inches and invert elevation to an accuracy of one tenth foot for the sewer connection to the building. Provide this information on both the plumbing and civil drawings so the plumber and utility contractors are forced to talk to each other.

4. Use SDR-26 PVC pipe for sewer piping. Use PVC rather than ferrous metal underground, to avoid requirement for cathodic protection. Waiver required

5. Minimum size sewer main is 8 inches. Variance of 6” sewer will be allowed if existing sewer pipe tie-in line is 6”.

6. Minimum 6 inch sewer connection to buildings so the maintenance personnel can jet rather than rod a plugged sewer line.

7. Provide two way cleanouts every 150 feet along a sewer branch connection from a building.

8. Provide two way cleanouts at the sewer building connection.

9. Provide a manhole at every change of direction of the sewer line and every 400 feet.

10. A tracer wire is not required with a sewer pipe system.

11. All sewer lines under buildings shall be PVC, SDR-26 in lieu of cast iron.

12. Master Planner Sanitary Sewer POC: Mr. Robert “Bobby” Mengden (210) 233-3679 rmengden@saws.org.

Section 02752 – Television Inspection of Sewers– See file 1 1-Television Sewer SECTION02752

PART 1 – GENERAL

1.01 Scope of Work - This section shall apply to all internal building mains and to the public sewer system and covers the internal inspection of all sewers by a closed circuit television camera to observe the conditions in the sewer lines. The Sewer Inspection Contractor shall furnish all necessary material, labor, equipment, and services required for the internal inspection of 100% of the sewer lines, including but not limited to, all recording and playback equipment, material, and supplies. Inspections shall be performed in the presence of the Contracting Officer or his representative.

1.02 General - The Contractor shall determine by internal inspection the location, and condition within each sewer section. All the infiltration and/or inflow sources, structural defects, service connections, abnormal conditions, and other pertinent observations shall be recorded.

1.03 All inspections shall be witnessed by the Contracting Officer or his representative and be performed one manhole section at a time.

1.03 EQUIPMENT

1.01 The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be suitable to allow a clear picture for the entire periphery of the pipe. The camera shall be of a 360 degree radial view design capable of operating in 100 percent humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing a minimum 700 line resolution video picture. Picture quality and definition shall be to the satisfaction of the Contracting Officers Representative and if unsatisfactory, shall be redone at the Contractor’s expense.

1.02 All videotapes shall be new in VHS format.

PART 2 – PRODUCTS (NOT USED) PART 3 – EXECUTION

3.01 PROCEDURE

1. The camera shall be moved through the line in either direction at a uniform rate stopping when necessary to insure proper documentation of the sewer’s condition but in no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interface with proper documentation of the sewer conditions shall be used to move through the sewer line. If, during the inspection, operation of the television camera will not pass through the entire section, the Contractor shall re-setup his equipment in a manner so that the inspection can be performed from the opposite manhole, or clean out.

2. Movement of the television camera shall be temporarily halted at each visible point of interest (service line, defects, etc.) so that the radial view camera may better examine each object.

3.02 Recording of Field Observations

1. Television Inspection Logs - Information obtained shall be recorded on internal inspection logs with a format furnished or approved by the Contracting Officer’s Representative. The following information shall be recorded for each reach inspected:

Location and length of reach

Pipe size and material

Location and descriptions of service connections Locations and descriptions of defects

Items video taped and/or photographed.

2. Photographs - Instant developing, 35mm or other standard size photographs of the television monitor or problem areas shall be taken by the Contractor upon the request of the Contracting Officer’s Representative to document unusual, questionable, or severe conditions found during the course of the work.

3. Video Tape Recording - The purpose of tape recording shall be to supply a visual and audio record of the problem areas of the lines that may be replayed both daily and at future presentations by the Government. All video tape recordings shall be made at standard speed (SP) for maximum clarity. Slow motion or stop motion play back features shall be supplied at the option of the Contractor. All video tapes and logs are considered property of the Government and shall be submitted prior to release of retainage. The Contractor shall be responsible for all the repairs necessary.

4. The Contracting Officer’s Representative to insure acceptability of work and record keeping procedures of the Contractor shall witness all television inspection.

Section 02922 Turfing / Sodding General: Include the following provisions See file 8-TurfingDBmin.

1. Establishment of Turf: This job will use organic horticultural practices. It is very important that all planting beds be well prepared and contain high levels of organic material such as peat moss, processed rotted bark, compost and lava sand and taxes green sand at the rate of 40-60 lbs per 100 sqft for drainage.

Top Soil

Within 5 days after receipt by the contractor of Notice to Proceed the contracting officer shall be notified of the off-site sources from which topsoil is available and all topsoil shall be approved by the contracting officer before stripping operation are begun. Topsoil shall be natural fertile friable soil having a textural classification of silt or clay loam and stripped from surface 4-to 6- inch layer of soil.

2. Landscaping: The planting season for trees, shrubs, and vines shall be from 1 January to 15 March; planting shall be accomplished during the first planting season or portion thereof but not less then 15 days following substantial completion of the building construction. Actual planting shall be performed during the specified period only when weather and soil conditions are suitable and in accordance with locally accepted practice as approved by the contracting officer. Deviation from the planting dates will be permitted only when approved in writing by the contracting officer, if planting must be done outside of the planting season the contractor shall notify the contracting officer and shall submit for approval, a schedule for special care and maintenance. And not less then 45 calendar days. Re-fertilizing shall commence not earlier then 5 weeks after commencement of maintenance and shall be completed not later then 3 days after commencement. No payment will be made for establishment of planting until all requirements for planting are adequately performed and accepted as determined by the contracting officer.

3. Site Stabilization - Establish permanent stabilization by turfing. Storm water control structures shall not be removed until establishment of permanent stabilization and approval of the COR. Final stabilization is established at the disturbed site when all soil disturbing activities at the site have been completed and a uniform perennial vegetative cover with a density of 70% of the native background vegetative cover for the area has been established on all unpaved areas and areas not covered by permanent structures, or other stabilization measures (such as riprap, gabions, or geotextile)

4. The turfing work shall be accomplished only when satisfactory results can be expected during PLANTING SEASON periods indicated. When conditions such as drought, excessive moisture, high winds, or other factors prevail to such an extent that satisfactory results are not likely to be obtained, the Contracting Officer may, at his own discretion, stop any phase of the work. The work shall be resumed only when, in the opinion of the Contracting Officer, the desired results are likely to be obtained. All turfing operations shall be conducted across the slope. Establishment of turf shall be accomplished on all unpaved, graded, and disturbed areas that are the result of the Contractor's operations and as specified herein.

5. MAINTENANCE OF TURFING WORK. The Contractor shall maintain all planted areas during the planting period and for an additional period of not less than 120 calendar days following the final acceptance of an acceptable stand of turf, but no earlier than 120 calendar days following the completion of PLANTING SEASON and/or replanting operations if required.

Maintenance shall consist of watering, replanting, mowing, maintaining existing grades, and repair of erosion damage.

6. Stand

A stand shall be defined as the planted area achieving a uniform live grass coverage having a density where the total bare spots do not exceed 2 percent of the total turfed area, bare spots are not larger than 6 inches square, and the grass is of a height sufficient to be capable of being mowed as specified in the mowing requirements contained in this contract.

7. Replanting

If, after the typical period a successful germination of a potential stand of grass is not present, the area shall be reseeded prior to the end of the planting season, or within the next 7 days after the 14-day germination period if after the plant season as specified.

8. Maintenance of Grades and Repair of Erosion Damage

It shall be the responsibility of the Contractor to maintain the original grades of the planted turf areas after commencement of planting operations and during the specified maintenance period. Any damage to the finished surface from Contractor's operations shall be promptly repaired. In the event erosion occurs from either watering operations or from rainfall, such damage shall be repaired within 10 days from the date of the noted damage. Ruts, ridges, tracks, and other surface irregularities shall be corrected and replanted where required prior to acceptance.

9. Mowing Lawn Areas:

Vegetation shall be kept under control by mowing. Any time that the weed or grass growth reaches a height of 4 inches, the areas shall be mowed. Mowing shall be done with approved mowing machines in such manner that will leave a vegetation height of between 2 inches and 2 1/2 inches.

10. WATERING (LAWN AREAS)

Watering shall be done on a regular basis to maintain healthy vigorous growth of grass and to avoid decline of the established turf. Watering shall continue as necessary until final acceptance. The contracting officer also may direct the contractor to water the turf areas as he deems necessary. The contractor shall avoid damaging adjoining areas when watering. He shall also take steps to avoid excessive water from getting on the pavement, walks or entering active work areas creating muddy work conditions. Mud that is tracked onto the pavement and or walks shall be cleaned up by the contracting officer.

Division 3:

Earthwork See File 7-ConstructionMinMtsReqTestFreq Construction Minimum Materials Requirements and Testing Frequencies Section 03100 Structural Concrete Form Work

Do not detail or specify carton forms for the support of grade beams. This item had failed repeatedly at Fort Sam Houston due to the inferior quality of carton forms available in the area. Grade beam bottoms shall be formed in lieu of carton forms.

Floors shall be sloped in kitchens, toilet rooms and mechanical rooms to floor drains.

Division 4:

Section 04200 Masonry

All design criteria shall abide by the Fort Sam Houston Installation Design Guide. All exterior design must be coordinated with / approved by the Fort Sam Houston Environmental and Natural Resources Preservation Architect.

Specifications will be edited to address the following:

1. Brick Industry Association-technical note 7- Water Penetration Resistance - Design and Detailing.

2. Brick Industry Association-technical note 7A- Water Penetration Resistance – Materials.

3. Brick Industry Association, Tech Notes - 7B - Water Penetration Resistance - Construction and Workmanship.

4. Brick Industry Association, Tech Notes - 28B - Brick Veneer/Steel Stud Walls.

5. Brick Industry Association, Tech Note - 1 8A - Accommodating Expansion of Brickwork

6. Brick Industry Association, Tech Note - 21B - Brick Masonry Cavity Walls – Detailing.

7. National Concrete Masonry Association (NCMA) - 2008 Concrete Masonry Standards.

Division 5:

Section 05055 Welding, Structural

Requirements include a welding inspector to visually inspect and report all job welded joists, beams and moment connections.

Section 05120 Structural Steel

1. Detail all moment connections; do not leave this item to the steel fabricator.

2. If moment connections are required above the foundation, use bolted rather than welded connections if possible.

3. Completely detail length and size of all welds.

4. Indicate location of all A325 bolts.

5. Indicate all framed openings on the structural drawings and the framing material size and shape.

Division 6:

No information in Division 6 at this time.

Division 7:

All design criteria shall abide by the Fort Sam Houston Installation Design Guide. All exterior design must be coordinated with / approved by the Fort Sam Houston Environmental and Natural Resources Preservation Architect.

Roofing – The following minimum specifications shall apply:

1. Metal roof systems shall be a minimum 24 ga. Galvalume or other galvanized steel with a factory-applied type finish of 1.0 mil total thickness

2. Both Metal and membrane roofs shall have a 20 year "No Dollar Limit" warranty issued by a manufacturer that has been in the business a minimum of 10 years. All Metal Roofs should also have a 20 year Material (base metal) and Finish (paint) warranty from the manufacturer, along with a 2 year installation warranty from the roofing installer. It should also be required from the General Contractor to provide a 5-year "No Penal Sum Warranty" bond.

Specifications will be edited to address the following:

1. EIFS Industry Members Associate (EIMA) EIFS Standards of Design and Construction.

File details come from the government source that posted it. Updated .