01 35 13 10 00 Special Project Proceedures - Survey Revision5.pdf

PDF 2 MB Posted

Attached to
Repair Structural Components, Bldg 1374 Federal contract opportunity
Solicitation number
JBSF_15-0006
Issued by
Department of the Air Force Air Education and Training Command

About this file

Appendices - Attachment 2 FA3047-15-R-0078

View the file

Other files for this federal contract opportunity

Other files attached to Repair Structural Components, Bldg 1374, newest first.
File Type Posted
QUESTIONS_AND_ANSWERS_-_FA304715R0078.pdf PDF
01 35 29 Occupational Safety and Health.doc DOC document
01 45 00.10 20 Contractor Quality Control.doc DOC document
request to use radioactive material.pdf PDF
01 35 13.01 44 Special Project Procedures for JBSA-FSH CB 08 April 2014.pdf PDF
01 35 35 Environmental Protection Oct30.doc DOC document
01 72 00.00 44 Alterations to Existing Facilities.doc DOC document
Attach 2 - Contractor HAZMAT Usage Report_Mar2015.docx DOCX document
Application for Installation Access Credential 12 .pdf PDF
01 74 19.00 Construction Waste Management.doc DOC document
FSH Historical Bldg Maintenance and Repair Plan.pdf PDF
01 78 23- OPERATION AND MAINTENANCE DATA.doc DOC document
CEPT Work Request Form Editable.pdf PDF
01 78 36.00 Warranty of Construction.doc DOC document
Rad permit company request letter template.pdf PDF
01 33 16_Design_After_Award.docx DOCX document
01 35 13 30 Special Project Proceedures - GIS rev6.pdf PDF
01 52 13.00 Temporary Facilities and Controls.doc DOC document
Army Installation Design Guide.pdf PDF
Installation Access Credential —
01 31 00 44 Project Meetings.doc DOC document
01 35 30 Safety Health and Emergency Response.doc DOC document
AFI 31-113 Installation Access Control.pdf PDF
DIGGING PERMIT 4Jan12.pdf PDF
01 33 00 Submittal Procedures.doc DOC document
01 00 00 00 General Requirements.doc DOC document
01 78 00 Closeout Submittals.doc DOC document
JBSA_FSH_NDA_Use Authorization.pdf PDF
01 77 00.00 20 Contract Closeout.doc DOC document
502CES ACM LBP spec requirements.pdf PDF
01 71 23.16 Cutting and Patching.doc DOC document
01 35 13 03 44 Technical_Supplement_to_the_Design_Guide_for_FSH_02-14-2013.doc DOC document
01 35 13.20 00 Special Project Proceedures - CAD rev6.pdf PDF
01 32 01 00 10 Project Schedule.doc DOC document
01 56 00.00 44 Dust Control.doc DOC document
As-Builts.pdf PDF
Cover_Page-Attch2.docx DOCX document
FA304715R0078.pdf PDF
Wage_Determinations_TX150016_TX150280.pdf PDF
Attch5-AETC47.pdf PDF
Attch1-SOW_JBSF150006.pdf PDF
Attch4-MATSUB.xlsx XLSX spreadsheet
Attch3Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
11_-_Draft_DD_Form_1354_H_3_16_42_Doors.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 35 13.10 00

SPECIAL PROJECT PROCEDURES – SURVEYING

JOINT BASE SAN ANTONIO, TX

01 35 13.10 00 - 1 27 FEB 2014, rev5

PART 1: GENERAL: This Section covers the project requirements unique to Joint Base San

Antonio, Texas. These unique requirements relate to Surveying.

1.1 REFERENCES: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

1.1.1 U.S. ARMY REGULATIONS (AR) (NOT USED)

1.1.2 UNITED STATES ARMY CORPS OF ENGINEERS ENGINEERING MANUALS

(EM)

a. EM 1110-1-1002 Survey Markers and Monumentation, http://140.194.76.129/publications/eng-manuals

b. EM1110-1-1005 Engineering and Design: Control and Topographic Mapping, (http://140.194.76.129/publications/eng-manuals)

1.1.3 JOINT BASE SAN ANTONIO (JBSA) PUBLICATIONS

a. JBSA Installation Design Guide, July 2006, (http://www.samhouston.army.mil/dpw/) obtain pending updates by email to usaf.jbsa.502-abw.mbx.502-ces-cad-manager@mail.mil.

b. San Antonio Unified Development Code http://library.municode.com/index.aspx?clientId=14228&stateId=43&stateName=Te xas

c. Tri-Service A/E/C CAD Standards, https://cadbim.usace.army.mil/CAD Manhole

Entry Request Form, obtained from Network Enterprise Center, Transmission

Branch, ph: 808-8888, poc: Mr Joseph P. Saladin.

1.1.4 ATTACHMENTS AND APPENDICIES

a. Appendix A – Meta Data Sample

b. Appendix B – Monument Construction

c. Attachment A – Control Monument Form

1.2 SUBMITTALS: The following shall be submitted in accordance with applicable

SUBMITTAL PROCEDURES:

a. Survey Work Plan

b. GIS FILES in ESRI file format. email usaf.jbsa.502-abw.mbx.502-ces-cad-manager@mail.mil for current version meeting requirements of Section 01 35 13.30 00

c. All FINAL and all INTERIM review plans shall include CAD files, in AutoCAD drawing format, per Section 01 35 13.20 00.

http://140.194.76.129/publications/eng-manuals http://140.194.76.129/publications/eng-manuals file:///C:/Users/don.n.morgan/AppData/Roaming/Microsoft/Word/(http:/www.samhouston.army.mil/dpw/) mailto:usaf.jbsa.502-abw.mbx.502-ces-cad-manager@mail.mil mailto:usaf.jbsa.502-abw.mbx.502-ces-cad-manager@mail.mil http://library.municode.com/index.aspx?clientId=14228&stateId=43&stateName=Texas http://library.municode.com/index.aspx?clientId=14228&stateId=43&stateName=Texas https://cadbim.usace.army.mil/CAD mailto:usaf.jbsa.502-abw.mbx.502-ces-cad-manager@mail.mil

01 35 13.10 00 - 2 27 FEB 2014, rev5

d. Metadata as required by Executive Order 12096, containing as a minimum the metadata elements defined in the Content Standard for Digital Geospatial Metadata

(CSDGM). A sample of the type and desired format is shown in Appendix A –

Metadata Sample.

e. Verification in writing of survey completion (submitted prior to preconstruction meeting).

PART 2 PRODUCTS: (Not Applicable)

PART 3: EXECUTION:

3.1 TOPOGRAPHIC, PLANIMETRIC, AND UTILITY SURVEYS

3.1.1 The contractor shall accomplish the survey in accordance with the following United

States Army Corps of Engineers Engineering Manuals (EM). These EMs may be accessed at http://140.194.76.129/publications/eng-manuals. In case of conflict between the specifications, the scope of work, and the referenced EMs, the scope of work shall have precedence.

a. EM 1110-1-1002 Survey Markers and Monumentation

b. EM 1110-1-1005 Engineering and Design: Control and Topographic Mapping

3.1.2 The contractor shall coordinate and conduct a kick-off meeting prior to the initiation of the field survey. The purpose of the meeting is to ensure a mutual understanding among the contractor and the Government Agents of the survey requirements, deliverables, and submittals. At a minimum, the participants from the contractor shall include the Survey

Manager and Survey Chief one of which a Registered Professional Land Surveyor

(RPLS).

3.1.3 Using control points provided by the government and as set as needed by the contractor, the contractor shall layout horizontal and vertical control in the survey area.

JBSA uses a localized scale factor for all survey work at all JBSA installation locations.

Email usaf.jbsa.502-abw.mbx.502-ces-cad-manager@mail.mil for the current scale factor, coordinate of record, and procedures.

3.1.3.1 The Contractor shall establish additional temporary semi-permanent control points (rebar w/cap) set in inter visible pairs, as needed with a minimum of one pair in locations that will remain usable for construction layout. The contractor shall record data in field books, including setups, backsights, measure ups, shot numbers, and shot descriptions.

3.1.3.2 If required, the Contractor shall establish additional permanent control in accordance with Appendix B – Monument Construction, essentially a ‘type

G” monument as described in EM1110-1-1002 – for 3 rd order work.

http://140.194.76.129/publications/eng-manuals

01 35 13.10 00 - 3 27 FEB 2014, rev5

3.1.3.3 All control points set, temporary, semi-permanent, or permanent shall have a completed Monument Control Sheet and will be required upon final submission.

(form attached )

3.1.4 The contractor shall acquire field topographic points to be used for 1-inch equals 30-feet scale mapping with a 1-foot contour interval. Density of field elevations shall show all breaks in grade, changes in terrain, and physical features. The contractor shall provide a topographic survey in the form of a three-dimensional AutoCAD 2010/2011

.dwg file named ******-V-SP.dwg. The file shall contain breaklines and a triangulated irregular network (TIN) composed of topologically correct nodes, edges, and triangles at their correct elevations and any other data required to create an accurate digital terrain model. Spot elevations in the file shall be placed as a block with attributes, with the insertion point being the location of the shot, the block shall be provided by the government. The contractor shall record data in field books including setups, backsights, measure ups, shot numbers, shot descriptions or other data as necessary to fully record the data, conditions, adjustments, methods, etc of the survey.

3.1.5 The contractor shall survey all improvements and generate planimetric data, including but not limited to: surface type for roads (paved and unpaved), parking lots (paved and unpaved), curbs, sidewalks, trails (paved or unpaved), bridges (including deck and low chord elevations), buildings and other structures, fences, handrails, retaining walls, headwalls, catch basins, utilities, manholes, utility poles, signs and all other man made physical features. For buildings or structures, provide the type of structure, number of stories or floors, and building number. The contractor shall acquire planimetric information to be used for 1-inch equals 30-feet scale mapping. Planimetric features shall be placed at zero elevation.

3.1.6 The contractor shall survey all utilities as described in the following sections. All field tied utilities shall be placed into the ******-V-SP.dwg AutoCAD file, on the appropriate layer for that entity. All horizontal and vertical control established for ties shall be shown as a symbol with annotation. All symbols utilized shall conform to

A/E/C CADD Standard Release 5.0 and shall be identified on the drawings. All line styles, layer names, symbols, and template files shall be obtained from the government by email request to usaf.jbsa.502-abw.mbx.502-ces-cad-manager@mail.mil.

3.1.6.1 Water - Locate all valves, standpipes, regulators, etc. Locate all fire hydrants.

Provide size of pipe and distance above ground. Provide elevations at the top of valve cover and the elevation of the valve, and top of all other feature elements.

3.1.6.2 Sanitary Sewer - Locate all manholes and provide top of rim elevation along with an invert elevation of all pipes connected to the manhole; identify type, size, and direction of each pipe extending from the manhole. Locate all clean-outs. For sanitary sewer lines that extend outside the primary survey area, locate the next manholes along the line, upstream and downstream, and provide the top of rim elevation and invert of pipes extending from the manhole.

01 35 13.10 00 - 4 27 FEB 2014, rev5

3.1.6.3 Storm Drainage - Locate manholes and all other storm drainage structures such as culverts, headwalls, catch basins, and clean-outs. Provide top of manhole, catch basin elevation, or other structure, along with an invert elevation of all pipes connected to a manhole or catch basin and bottom elevation; identify type, size, and direction of each pipe extending from the manhole. Provide type, size, and invert elevation for all culverts. For storm drain lines that extend outside the primary survey area, locate the next storm drain structure along the line, upstream and downstream, and provide the top of structure elevation and invert of pipes extending from the structure.

3.1.6.4 Electrical and Communications Equipment - Specific data to be collected includes; pole height, type of pole, class of wood poles (if applicable), number of cross arms, direction, type (electrical or communication) and number of wires; low wire elevation at each pole; number and type of lights on poles, and quantity and rating for pole mounted transformers. In addition, collect data on manholes, manhole sizes, pullboxes, handholes, and top and bottom elevations.

Collect the number and location of ducts entering manholes, pullboxes, and handholes, and provide their invert elevations. Indicate location of the ducts exiting the structure within the survey limits. Provide number of cables in each duct and indicate size and type of cable. The contractor must request access prior to opening and communications manholes at least 1 week in advance by processing a Manhole Entry Request Form, obtained from Network Enterprise

Center, Transmission Branch, ph: 808-8888, poc: Mr Joseph P. Saladin

3.1.6.5 Gas - Locate all valves, meters, and gas line markers. Provide elevations at the top of valve cover and the elevation of the valve, and top of all other features elements.

3.1.6.6 The contractor shall take digital photographs of all electrical and communications equipment including poles, manholes, and transformers.

Photographs of the manholes shall show the interior of the manhole, showing the ducts and lines that extend from the manhole. The contractor shall take photographs of any downstream and upstream culvert including headwalls. The contractor shall take photographs looking downstream and upstream from the culvert headwalls. Photographs shall be keyed to collected data and key information placed in the drawing, to show general location and direction of shot.

3.1.6.7 Utilities that cannot be field tied shall be illustrated in electronic file format utilizing the following descending order of accuracy: As-Built, GIS, or Base

Map and shall reside in separate model files, or, alternatively, a layer suffix may be used, xxxx-A (As-Built), xxxx-G (GIS), xxxx-M (other map) and reside in a single model file.

3.1.7 JBSA uses a localized scale factor for all survey work. Contact usaf.jbsa.502-abw.mbx.502-ces-cad-manager@mail.mil a copy of the Geodetic Control Network

01 35 13.10 00 - 5 27 FEB 2014, rev5

Adjustment Factor Report if you want a copy. In general, all survey work shall meet the following Technical Requirements:

a. Horizontal Control: Texas State Plane (Grid), South Central Zone (4204), NAD

83; shall comply with Corps of Engineers 3rd Order, Class I standards.

b. Vertical Control: NAVD 88; will comply with Corps of Engineers 3rd Order

c. Measurements: All measurements will be collected using an electronic data collector; all elevations will be measured at hundredths-of-feet (0.00)

d. The Combined Scale Factor, for all non boundary survey work on the base, that shall be used is 0.99983000 (nearest 100,000 th ) with the inverse being 1.00017, with Mon 6 being the coordinate of record (N13714201.155, E 2146430.189, Elev 726.32)

1) To convert from Grid to Surface Multiply Grid coordinate by 1.00017.

2) To convert from Surface to Grid, Multiply Surface coordinate by .99983000

e. Unit of Measure: U.S. Survey Feet

f. Map scale: 1-inch equals 30-feet

g. Contour interval: 1-foot

h. Metadata: Federal Geodetic Data Committee (FGDC) standards. The following link contains information and tools for metadata: http://www.fgdc.gov/metadata

i. CADD Standard: AutoCAD (current release); A/E/C Release 5.0 standards compliant, as modified by sect ion 3.3 of this specification.

j. CADD files shall be produced in Texas State Plane (Surface) and/or Texas State

Plane (GRID)

3.1.8 The government will furnish the following material:

a. Location map of area to be surveyed

b. Network Control Points and procedures

c. Block library

d. Template Files

e. Utility maps – not in coordinate system and may be paper, scanned, or CAD files.

f. Control Monument form

3.2 DELIVERABLE FORMAT AND MEDIA

http://www.fgdc.gov/metadata

01 35 13.10 00 - 6 27 FEB 2014, rev5

3.2.1 The draft and final survey data shall be submitted either on a DVD or CD and a transmittal letter shall accompany each submittal.

3.2.2 Complete Survey Submittal Package

3.2.2.1 AutoCAD files will include metadata, control points, topographic, planimetric, and data. The files shall follow the Layer name, and Linetype, of the template files. Lineweights and colors may be adjusted as desired to produce the desired print. Attribute information (text) for each utility shall be placed in the graphics file. All work shall conform to Section 01 35 13.20 00.

3.2.2.2 Completed Control Monument Form for all control points SET.

3.2.2.3 Raw Data and Computations – The contractor shall furnish the government computer output of unadjusted bearings, azimuths, distances, and coordinates of all traverse points. The error of closure, both azimuth and positions, shall be shown. The final data will be adjusted by the compass method and display the adjusted bearings, distances, and coordinates of all points surveyed. The contractor shall provide a final list of coordinates for all points. All level lines shall be reduced and adjusted in accordance with accepted procedures and practices. All computations shall be arranged in a sequential and understandable order with notes when appropriate so a review can be made with minimum reconstruction.

3.2.2.4 Field Books - Field books shall be neat, legible, and sequential. Each field book shall have an index; the index shall also display the serial number and type of instruments used. The field books will also display the names of crew members and date at the beginning of each day. All print and sketches shall be dark enough to produce legible photocopies. There is to be a maximum of one (1) horizontal setup per page. Field books shall also be scanned into a .pdf file.

3.2.2.5 Digital Photos – Digital photographs shall be clearly marked and identified by point shot. The numbers of the photographs must match the shot number in the

AutoCAD file and the shot number in the field book.

3.2.2.6 Signed Statement of Services – A statement will be signed and dated by the

Survey Chief, Quality Control Manager, Survey Manager, and Company

Principal attesting that the survey was completed in accordance with requirements.

3.2.2.7 Transmittal Letter - A transmittal letter will accompany each submittal.

3.2.2.8 All items listed in Complete Submittal Package plus a letter describing how comments were addressed and/or corrected.

END OF SECTION

Joint Base San Antonio Vehicle Parking and Roads FGDC, Biological Metadata

Hide Definitions

Description | Spatial | Data Quality | Data Source | Metadata

Description Citation

Information used to reference the data.

Title: Joint Base San Antonio-Fort Sam Houston (JBSA-FSH) Vehicle Parking and Roads Originators: Your Company Name Here Publication place: San Antonio, Texas Publication date: 20081108 Data type: CAD data

Description

A characterization of the data, including its intended use and limitations.

Abstract: This data set represents the results of a topographic,planimetric, and utility survey of two seperate site that total approximately 71 acres at JBSA-FSH in San Antonio, Texas. The most northern area is a strip about 260 feet wide that overlaps and follows Dickman Rd. from about 215 feet north of Austin Rd. to about 150 feet west of N. New Braunfels Ave. The second area, to the southeast is overlapping Scott Rd., at varing widths from Taylor Rd to Hood St. The objective is to generate a one-foot contour map to support a 1" = 30' mapping scale showing all grade breaks, planimetric and visible utility information and to establish secondary control points around the project.

Purpose: The purpose of this data set is to provide for engineering design.

Point Of Contact

Contact information for the individual or organization that is knowledgeable about the data.

Person: Data Owner or Representative Organization: US Army Corps of Engineers Fax: (817) 886-6498 Telecommunications Device or Teletypewriter (TDD/TTY) phone: (817) 886-1862 Address type: mailing and physical

Address: P.O. Box 17300 Address: 819 Taylor St. Room 3B05 City: Fort Worth State or Province: TX Postal code: 76102-0300 County: USA

Data Type

How the data are represented, formatted and maintained by the data producing organization.

Data type: CAD data

Time Period of Data

Time period(s) for which the data corresponds to the currentness reference.

Beginning date: 20080818 Ending date: 20081112 Currentness reference: observed

12/22/2011 don.n.morgan Text Box

APPENDIX - A

Status

The state of and maintenance information for the data.

Data status: Complete Update frequency: None planned

Key Words

Words or phrases that summarize certain aspects of the data.

Theme:

Keywords: imageryBaseMapsEarthCover,010 Keyword thesaurus: ISO 19155 Topic Category

Theme:

Keywords: topographic, planimetric, and visible utility survey Keyword thesaurus: None

Place:

Keywords: JBSA-FSH Keyword thesaurus: None

Place:

Keywords: Bexar County Keyword thesaurus: None

Place:

Keywords: Texas Keyword thesaurus: None

Data Access Constraints

Restrictions and legal prerequisites for accessing or using the data after access is granted.

Access constraints: None Use constraints: None

Spatial Reference Information Horizontal Coordinate System

Reference system from which linear or angular quantities are measured and assigned to the position that a point occupies.

Coordinate System Details

Grid coordinate system

Grid coordinate system name: State Plane Coordinate System 1983 State Plane Coordinate System:

SPCS xone identifier: 4204 Lambert Conformal Conic:

Standard parallel: 30.28333 Standard parallel: 28.38333 Longitude of central meridian: 99.00000 Latitude of projection origin: 27.83333 False easting: 19684999.000 False northing: 13123333.333

Planar Coordinate Information

12/22/2011 don.n.morgan

Planar coordinate encoding method: distance and bearing Distance and bearing representation:

Distance resolution: 0.01 Bearing resolution: 0.01 Bearing units: Degrees, minutes, and decimal seconds Bearing reference direction: North Bearing reference meridian: Geodetic

Planar distance units: survey feet

Geodetic model

Horizontal datum name: North American Datum of 1983 Ellipsoid name: Geodetic Reference System 80 Semi-major axis: 6500000 Denominator of flattening ratio: 298.25722210088

Vertical Coordinate System

Reference system from which vertical distances (altitudes or depths) are measured.

Altitude system definition:

Altitude datum name: North American Vertical Datum of 1988 Altitude resolution: 0.01 Altitude distance units: feet Altitude encoding method: Explicit elevation coordinate included with horizontal coordinates

Spatial Domain

The geographic areal domain of the data that describes the western, eastern, northern, and southern geographic limits of data coverage.

Bounding Coordinates

Description of geographic extent: JBSA-FSH, San Antonio, Texas

In Unprojected coordinates (geographic)

Data Quality and Accuracy Information General

Information about the fidelity of relationships, data quality and accuracy tests, omissions, selection criteria, generalization, and definitions used to derive the data.

Logical consistency report: Processed digital conventional data collection using AutoCAD Civil 3D Land Desktop 2008 with multiple checks to established control. Conventional digital leveling data processed using StarLev version 1.27, a least squares adjustment program. The GPS/RTK data was processed using Trimble Geomatics Office version 1.63 after making redundant observations at different satellite constelations.

Attribute Accuracy

Boundary Coordinate West -98.46144 (latitude)

East -98.44701 (latitude)

North 29.46322 (longitude)

South 29.44397 (longitude)

12/22/2011 don.n.morgan

Accuracy of the identification of data entities, features and assignment of attribute values.

Attribute accuracy report: Conventional field survey data entries and line connectivity verified against field notes and sketches. GPS/RTK data verified using checks to existing JBSA-FSH GPS Control Network and making redundant observations on new established project control points. Vertical positions verified using digital leveling from multiple control network monuments.

Positional Accuracy

Accuracy of the positional aspects of the data.

Horizontal accuracy report: Project control complies with Corps of Engineers standards for Third Order Class I as outlined in EM 1110-1-1005, Table 6-1.

Data Source and Process Information Methodology

Information about individual steps of field and/or biological laboratory work.

Methodology information

Method 1

Methodology Type: Lab Methodology Description: GPS/RTK calibration created using existing JBSA-FSH GPS Control Network.

Method 2

Methodology Type: Field Methodology Description: Using GPS/RTK calibration, ties were made to existing control monuments and verified for accuracy, ties were then made to new secondary control points needed for conventional topographic work.

Method 3

Methodology Type: Lab Methodology Description: GPS/RTK observations were processed and derivations checked with tolerances set at 0.05 of a foot horizontally and 0.08 of a foot vertically.

Method 4

Methodology Type: Field Methodology Description: Conventional digital leveling from existing JBSA-FSH control monuments previously established for JBSA-FSH base utility survey to new secondary control points set for the conventional data collection.

Method 5

Methodology Type: Lab Methodology Description: Digital levels processed, leveled elevations versus GPS/RTK elevations on average varied no more than 0.06 of a foot.

Method 6

Methodology Type: Field Methodology Description: Conventional topographical survey data collected tying planimetric and visible utility information.

Method 7

Methodology Type: Lab Methodology Description: Conventional survey data processed and checked against field notes, sketches, and existing control.

12/22/2011 don.n.morgan

Process Steps

Information about events, parameters, tolerances and techniques applied to construct or derive the data.

Process step information

Process Step 1

Process description: No process steps have been described for this data set Process date: Unknown

Metadata Reference Metadata Date

Dates associated with creating, updating and reviewing the metadata.

Last updated: 20081119

Metadata Point of Contact

Contact information for the individual or organization responsible for the metadata information.

Organization: Your Company DATA here Fax: xxx-xxx-xxxx Telecommunications Device or Teletypewriter (TDD/TTY) phone: xxx-xxx-xxxx Address type: physical

Address: XXXXX Some Street City: Some City State or Province: Your State Postal code: Your Zip County: USA

Metadata Standards

Description of the metadata standard used to document the data and reference to any additional extended profiles to the standard used by the metadata producer.

Standard name: FGDC Biological Data Profile of the Content Standard for Digital Geospatial Metadata Standard version: FGDC-STD-001.1-1999

FGDC Plus Metadata Stylesheet

Stylesheet: FGDC Plus Stylesheet File name: FGDC Plus.xsl Version: 2.0 Description: This metadata is displayed using the FGDC Plus Stylesheet, which is an XSL template that can be used with ArcGIS software to display metadata. It displays metadata elements defined in the Content Standard for Digital Geospatial Metadata (CSDGM) - aka FGDC Standard, the ESRI Profile of CSDGM, the Biological Data Profile of CSDGM, and the Shoreline Data Profile of CSDGM. CSDGM is the US Federal Metadata standard. The Federal Geographic Data Committee originally adopted the CSDGM in 1994 and revised it in 1998. According to Executive Order 12096 all Federal agencies are ordered to use this standard to document geospatial data created as of January, 1995. The standard is often referred to as the FGDC Metadata Standard and has been implemented beyond the federal level with State and local governments adopting the metadata standard as well. The Biological Data Profile broadens the application of the CSDGM so that it is more easily applied to biological data that are not explicitly geographic (laboratory results, field notes, specimen collections, research reports) but can be associated with a geographic location. Includes taxonomical vocabulary. The Shoreline Data Profile addresses variability in

12/22/2011 don.n.morgan the definition and mapping of shorelines by providing a standardized set of terms and data elements required to support metadata for shoreline and coastal data sets. The FGDC Plus Stylesheet includes the Dublin Core Metadata Element Set. It supports W3C DOM compatible browsers such as IE7, IE6, Netscape 7, and Mozilla Firefox. It is in the public domain and may be freely used, modified, and redistributed. It is provided "AS-IS" without warranty or technical support.

Instructions: On the top of the page, click on the title of the dataset to toggle opening and closing of all metadata content sections or click section links listed horizontally below the title to open individual sections. Click on a section name (e.g. Description) to open and close section content. Within a section, click on a item name (Status, Key Words, etc.) to open and close individual content items. By default, the Citation information within the Description section is always open for display.

Download: FGDC Plus Stylesheet is available from the ArcScripts downloads at www.esri.com.

Federal Geographic Data Committee

12/22/2011 don.n.morgan

Appendix B

JOINT BASE SAN ANTONIO

CONTROL MONUMENT CONSTRUCTION

NOTE: The instructions are based on Berntsen brand Sectional Rod monuments with sleeve, access cover, and Aluminum Cap for illustrative needs only. Any other comparable system may be used upon submission and approval. The product can be seen at http://www.berntsen.com/.

Equipment needed: Items needed, but not limited to, are Inclinometer, measuring tape, lathe, marker, flagging, clip board with monument sheet, pencil with template, shooter shovel, post hole diggers, digging bar, access cover, hammer and stamping set, Berntsen rods with plenty of points, 16 lb. sledge hammer or gasoline drive impact hammer, safety glasses, two pairs of vice grip pliers, “Lock Tight Liquid” or lock washers, generator, grinder with cutting wheels and grinding wheels, drill with datum point shaping tool, punch, 12” form tube cut to approx. 24” high, 24” length of 6” Sched 40 PVC, wheel barrow and spade shovel, a small amount of pea gravel, “Ready Mix Concrete”, sand, and a trowel for finishing concrete.

1.) Location: Select a location for this monument by looking for a clear area, preferably close to the ROW, with no obstructions, no overhanging trees or billboards towering over the proposal point, no underground utilities in the area, no nearby microwave towers, and not too close to traffic. The location of the point must be suitable for occupation by a base or a rover. If this monument is to be paired with an azimuth mark, the pair must have line of sight at a distance according to job scope. Any obstruction must comply with the project manager’s scope of inclination.

2.) Starting to set the rod: Dig grade to depth of approximately 2’-3” with bell at bottom, see drawing SK-01. Assemble your first rod per manufacturer direction, w/point on one end and the insert on the other before driving. Be sure to tighten all the pairs after you squeeze Lock Tight on all the threads of the bolts or lock washers with the two vice grip pliers, depending on what the project manager wants. (Do not put Lock Tight on the threads of the insert.). Drive rod to approximately 4 tenths of a foot above the ground, remove the insert and screw another rod to the rod in the ground and tighten once again. You must retighten the insert at the top of the rod several times to ensure the rods are not loosening as you are striking. The person holding the setting tool will be able to feel when to stop striking and remove the setting tool and tighten the rod. When you tighten the rod it is a good idea to tighten as much as possible to ensure the joints in the ground are tight also. Keep repeating until you reach Refusal (Definition of Refusal: Refusal is reached when the rod has not moved a tenth of a foot with your last ten strikes, or 1 foot after 1 min of continuous operation with the impact hammer.)..Cut rod to approx 3-4 inches below grade, grind smooth top.

3.) Preparing for concrete: Install 12” form tube at top of bell, bottom of hole, with no more that 1” above grade. The access cover must be stamped with the point name before it is set in PVC. Set stamped cover in PVC, glue in place, let dry thoroughly. Drive 2 #4 deformed Rebar anchors in bottom of hole, ensure 4” into in-situ earth. Fill bottom of hole with approximately 3” sand. Ensure approximately 2” of Rebar extends above sand bed. Drill holes for 60D nails in PVC below access cover collar and install 60D nails. Place PVC over rod into sand. The sides of the hole must be belled outward and down from the bottom of the form tube to the estimated depth and shape as shown in SK01.

4.) Place concrete: Place Ready Mix into a wheelbarrow, using the spade shovel stir water in thoroughly to make a paste.

Backfill around PVC with mixed concrete, fill PVC with Sand and Top with 3” pea gravel to approximately 3” below top of Rod. Trowel concrete smooth. The access cover must be above ground but not more than one inch but must be below ground. The concrete must be smoothed with a trowel.

5.) Finish up: Stamp Rod Cap with required information and install on end of rod. Cap should be approximately centered between access cover and top of gravel. When monument is complete be sure not to leave site without removing all debris and trash. The site should be left as it was found with the exception of the new monument.

SKETCH: See attached

M

A X

FORM TUBE OR

NATURAL FORM

SECTIONAL ROD

CONCRETE,

BELL AT BOTTOM

ACCESS

COVER & CAP

12"

GRADE

D E

P T

H

T

O

P

O I N

T

O F

R

E F

U S

A L

3' MIN DISTANCE TO

VERTICAL OBSTRUCTION

PEA GRAVEL

" x 8" REBAR, DEFORMED

SAND

IN-SITU EARTH

60 "D" NAILS

6" SCHD 40

PVC

P

R

O

J

E

CT

N

A

M

E

A

N

D

I

F

O R

M

A

T

I

O

N

S

U

R

V

Y

MO

U

M

E

N

T

T

D I S

T

U

R

B

C

S

S

U

R

V

E

Y

S

T

B

S

T

A

T

I O

I

DATE:

F S

N

Sheet of

F I L

E

N

A M

E

D W

N

B

Y

D E

S I G

N E

D

B

Y

R E

L E

A S

B

C K

D

B

Y

P R

O J E

U M

B E

R

C O

N T

R A

U M

B E

R

D R

A W

I N

G

C

O D

E

D A

T

WORK ORDER REF:

Scale: N.T.S.

TYPE 'G' MONUMENT

A

Scale: N.T.S

ACCESS COVER

B

Scale: N.T.S

ROD CAP

C

SK-01

G E

N E

R A

L

C

O N

S T

R U

C T

I O

N

C

O N

C E

P T

T Y

P

G

M

O N

U M

E N

T

JBSF12XXXXX

S U

R V

N

T R

O L

J O

I N

T

B

A S

E

S

A

A

T

O N

I O

M o r g a n

D

M o r g a n

D

R e l e a s e w i t h

S p e c s

J a n r e v

J a n

F�

Monument

�heet
�����

��������� JBSF TYMX JBSC CYRB Station Name:

MPLS DAXG VGJT JBSG KELL

MBPB MPYJ

JBSA ������� �����

���� � XXXXXX ������ #$�

����&�
�'���&� �
���&�,��)������-����
��
�����,���
�����

,��0 ����� ��� �+* 1+' �22 ���3� ����2���� ����)����

�����������������
,��0����
�� ����
��������
����������
�&������������

�2���� ����)��

#� 4���) *�����2����

Monument Control Sheet ���� 5

��������� JBSF TYMX JBSC CYRB Station Name:

MPLS DAXG VGJT JBSG KELL

MBPB MPYJ

�JBSA ������� ����

������� �0���)

�)����6�������*����
�)���56������������������
Check Box8: Off
Check Box9: Off
Fort Sam Houston Project Number: XXXXXXXX
Station Name: XX-XY
Established By: XXXXX
Survey Quality: xx Order
DATE ESTABLISHED: XXXXX
Intervisible Stations: XXXXX
HORZ SURVEY METHOD: XXX
VERT METHOD: XXXX
HORZ DATUM: XXXX
VERT ADJUSTMENT: XXXXX
VERT DATUM: XXXX
HORZ ADJUSTMENT: XXXX
PROJECTION: XXXXX
GEOID MODEL: XXXX
Mark Logo: XXXX
NGS PID If applic: XXX
Stamping: XXXX
Northing: XXX
Condition: XXX
Easting: XXX
Marker: XX
Elevation: XXXX
Stability: XXX
Scale Factor: XXXX
Latitude: XXXX
Elevation Factor: XXXX
Longitude: XXXX
Combined Factor: XXXX
Ellipsoid Height: A
Convergence: A
To Reach Description: XXXX
Notes: XXXX

File details come from the government source that posted it. Updated .