01 74 19.00 Construction Waste Management.doc

DOC document 93 KB Posted

Attached to
Repair Structural Components, Bldg 1374 Federal contract opportunity
Solicitation number
JBSF_15-0006
Issued by
Department of the Air Force Air Education and Training Command

About this file

Appendices - Attachment 2 FA3047-15-R-0078

View the file

Other files for this federal contract opportunity

Other files attached to Repair Structural Components, Bldg 1374, newest first.
File Type Posted
QUESTIONS_AND_ANSWERS_-_FA304715R0078.pdf PDF
Application for Installation Access Credential 12 .pdf PDF
FSH Historical Bldg Maintenance and Repair Plan.pdf PDF
01 78 23- OPERATION AND MAINTENANCE DATA.doc DOC document
CEPT Work Request Form Editable.pdf PDF
01 78 36.00 Warranty of Construction.doc DOC document
Rad permit company request letter template.pdf PDF
01 33 16_Design_After_Award.docx DOCX document
01 35 13 30 Special Project Proceedures - GIS rev6.pdf PDF
01 35 29 Occupational Safety and Health.doc DOC document
01 45 00.10 20 Contractor Quality Control.doc DOC document
request to use radioactive material.pdf PDF
01 35 13.01 44 Special Project Procedures for JBSA-FSH CB 08 April 2014.pdf PDF
01 35 35 Environmental Protection Oct30.doc DOC document
01 72 00.00 44 Alterations to Existing Facilities.doc DOC document
Attach 2 - Contractor HAZMAT Usage Report_Mar2015.docx DOCX document
01 78 00 Closeout Submittals.doc DOC document
JBSA_FSH_NDA_Use Authorization.pdf PDF
01 77 00.00 20 Contract Closeout.doc DOC document
502CES ACM LBP spec requirements.pdf PDF
01 71 23.16 Cutting and Patching.doc DOC document
01 35 13 03 44 Technical_Supplement_to_the_Design_Guide_for_FSH_02-14-2013.doc DOC document
01 35 13.20 00 Special Project Proceedures - CAD rev6.pdf PDF
01 32 01 00 10 Project Schedule.doc DOC document
01 56 00.00 44 Dust Control.doc DOC document
01 35 13 10 00 Special Project Proceedures - Survey Revision5.pdf PDF
As-Builts.pdf PDF
01 52 13.00 Temporary Facilities and Controls.doc DOC document
Army Installation Design Guide.pdf PDF
Installation Access Credential —
01 31 00 44 Project Meetings.doc DOC document
01 35 30 Safety Health and Emergency Response.doc DOC document
AFI 31-113 Installation Access Control.pdf PDF
DIGGING PERMIT 4Jan12.pdf PDF
01 33 00 Submittal Procedures.doc DOC document
01 00 00 00 General Requirements.doc DOC document
Cover_Page-Attch2.docx DOCX document
FA304715R0078.pdf PDF
Wage_Determinations_TX150016_TX150280.pdf PDF
Attch5-AETC47.pdf PDF
Attch1-SOW_JBSF150006.pdf PDF
Attch4-MATSUB.xlsx XLSX spreadsheet
Attch3Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
11_-_Draft_DD_Form_1354_H_3_16_42_Doors.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JBSF150006

SECTION 01 74 19 00

CONSTRUCTION WASTE MANAGEMENT

PART 1

GENERAL

1.1 Summary

This Section includes administrative and procedural requirements for the following:

a. Salvaging nonhazardous demolition and construction waste.

b. Recycling nonhazardous demolition and construction waste.

c. Disposing of nonhazardous demolition and construction waste.

1.2 Definitions

1.2.1 Construction Waste

Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.

1.2.2 Demolition Waste

Building and site improvement materials resulting from demolition or selective demolition operations.

1.2.3 Disposal

Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction.

1.2.4 Recycle

Recovery of demolition or construction waste for subsequent processing in preparation for reuse.

1.2.5 Salvage

Recovery of demolition or construction waste and subsequent sale or reuse in another facility.

1.2.6 Salvage and Reuse

Recovery of demolition or construction waste and subsequent incorporation into the Work.

1.3 Performance Goals OR Requirements, as directed

1.3.1 General

Develop waste management plan that results in end-of-Project rates for salvage/recycling of 50 OR 75, as directed, percent by weight of total waste generated by the Work.

1.3.2 Salvage/Recycle Goals OR Requirements, as directed: Owner's goal is to salvage and recycle as much nonhazardous demolition and construction waste as possible including the following materials:

a. Demolition Waste:

1) Asphaltic concrete paving.

2) Concrete.

3) Concrete reinforcing steel.

4) Brick.

5) Concrete masonry units.

6) Wood studs.

7) Wood joists.

8) Plywood and oriented strand board.

9) Wood paneling.

10) Wood trim.

11) Structural and miscellaneous steel.

12) Rough hardware.

13) Roofing.

14) Insulation.

15) Doors and frames.

16) Door hardware.

17) Windows.

18) Glazing.

19) Metal studs.

20) Gypsum board.

21) Acoustical tile and panels.

22) Carpet.

23) Carpet pad.

24) Demountable partitions.

25) Equipment.

26) Cabinets.

27) Plumbing fixtures.

28) Piping.

29) Supports and hangers.

30) Valves.

31) Sprinklers.

32) Mechanical equipment.

33) Refrigerants.

34) Electrical conduit.

35) Copper wiring.

36) Lighting fixtures.

37) Lamps.

38) Ballasts.

39) Electrical devices.

40) Switchgear and panelboards.

41) Transformers.

b. Construction Waste:

1) Site-clearing waste.

2) Masonry and CMU.

3) Lumber.

4) Wood sheet materials.

5) Wood trim.

6) Metals.

7) Roofing.

8) Insulation.

9) Carpet and pad.

10) Gypsum board.

11) Piping.

12) Electrical conduit.

13) Packaging: Regardless of salvage/recycle goal indicated above, salvage or recycle 100 percent of the following uncontaminated packaging materials:

a) Paper.

b) Cardboard.

c) Boxes.

d) Plastic sheet and film.

e) Polystyrene packaging.

f) Wood crates.

g) Plastic pails.

1.4 Submittals

1.4.1 Waste Management Plan

Submit 3 copies of plan within 7 days of date for the Notice of Award, as directed.

1.4.2 Waste Reduction Progress Reports

Concurrent with each Application for Payment, submit three copies of report. Include separate reports for demolition and construction waste. Include the following information:

a. Material category.

b. Generation point of waste.

c. Total quantity of waste in tons.

d. Quantity of waste salvaged, both estimated and actual in tons.

e. Quantity of waste recycled, both estimated and actual in tons.

f. Total quantity of waste recovered (salvaged plus recycled) in tons.

g. Total quantity of waste recovered (salvaged plus recycled) as a percentage of total waste.

1.4.2 Waste Reduction Calculations

Before request for Substantial Completion, submit three copies of calculated end-of-Project rates for salvage, recycling, and disposal as a percentage of total waste generated by the Work.

1.4.3 Records of Donations

Indicate receipt and acceptance of salvageable waste donated to individuals and organizations. Indicate whether organization is tax exempt.

1.4.4 Records of Sales

Indicate receipt and acceptance of salvageable waste sold to individuals and organizations. Indicate whether organization is tax exempt.

1.4.5 Recycling and Processing Facility Records

Indicate receipt and acceptance of recyclable waste by recycling and processing facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.

1.4.6 Landfill and Incinerator Disposal Records

Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.

1.4.7 Qualification Data: For Waste Management Coordinator and refrigerant recovery technician.

1.4.8 Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.

1.5 Quality Assurance

1.5.2 Refrigerant Recovery Technician Qualifications

Certified by EPA-approved certification program.

1.5.3 Regulatory Requirements

Comply with hauling and disposal regulations of authorities having jurisdiction.

1.5.4 Waste Management Conference

Conduct conference at Project site. Review methods and procedures related to waste management including, but not limited to, the following:

a. Review and discuss waste management plan including responsibilities of Waste Management Coordinator.

b. Review requirements for documenting quantities of each type of waste and its disposition.

c. Review and finalize procedures for materials separation and verify availability of containers and bins needed to avoid delays.

d. Review procedures for periodic waste collection and transportation to recycling and disposal facilities.

e. Review waste management requirements for each trade.

1.6 Waste Management Plan

1.6.1 General

Develop plan consisting of waste identification, waste reduction work plan, and cost/revenue analysis. Include separate sections in plan for demolition and construction waste if Project requires selective demolition or building demolition. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan.

1.6.2 Waste Identification

Indicate anticipated types and quantities of demolition, site-clearing, and construction waste generated by the Work. Include estimated quantities and assumptions for estimates.

1.6.3 Waste Reduction Work Plan

List each type of waste and whether it will be salvaged, recycled, or disposed of in landfill or incinerator. Include points of waste generation, total quantity of each type of waste, quantity for each means of recovery, and handling and transportation procedures.

a. Salvaged Materials for Reuse: For materials that will be salvaged and reused in this Project, describe methods for preparing salvaged materials before incorporation into the Work.

b. Salvaged Materials for Sale: For materials that will be sold to individuals and organizations, include list of their names, addresses, and telephone numbers.

c. Salvaged Materials for Donation: For materials that will be donated to individuals and organizations, include list of their names, addresses, and telephone numbers.

d. Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept. Include names, addresses, and telephone numbers.

e. Disposed Materials: Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and incinerator facility.

f. Handling and Transportation Procedures: Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location on Project site where materials separation will be located.

1.6.4 Cost/Revenue Analysis

Indicate total cost of waste disposal as if there was no waste management plan and net additional cost or net savings resulting from implementing waste management plan. Include the following:

a. Total quantity of waste.

b. Estimated cost of disposal (cost per unit). Include hauling and tipping fees and cost of collection containers for each type of waste.

c. Total cost of disposal (with no waste management).

d. Revenue from salvaged materials.

e. Revenue from recycled materials.

f. Savings in hauling and tipping fees by donating materials.

g. Savings in hauling and tipping fees that are avoided.

h. Handling and transportation costs. Include cost of collection containers for each type of waste.

i. Net additional cost or net savings from waste management plan.

PART 2

PRODUCTS- NOT USED

PART 3

EXECUTION

3.1 Plan Implementation

3.1.1 General

Implement waste management plan as approved by the Contracting Officer. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.

Comply with Division 01 Section "Temporary Facilities And Controls" for operation, termination, and removal requirements.

3.1.2 Waste Management Coordinator

Engage a waste management coordinator to be responsible for implementing, monitoring, and reporting status of waste management work plan. Coordinator shall be present at Project site full time for duration of Project.

3.1.3 Training

Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work occurring at Project site.

Distribute waste management plan to everyone concerned within three days of submittal return.

Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal.

3.1.4 Site Access and Temporary Controls

Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

Designate and label specific areas on Project site necessary for separating materials that are to be salvaged, recycled, reused, donated, and sold.

Comply with Division 01 Section "Temporary Facilities And Controls" for controlling dust and dirt, environmental protection, and noise control.

3.2 Salvaging Demolition Waste

3.2.1 Salvaged Items for Reuse in the Work:

a. Clean salvaged items.

b. Pack or crate items after cleaning. Identify contents of containers.

c. Store items in a secure area until installation.

d. Protect items from damage during transport and storage.

e. Install salvaged items to comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make items functional for use indicated.

3.2.2 Salvaged Items for Sale and Donation: Not permitted, as directed, on Project site.

3.2.3 Salvaged Items for Owner's Use:

a. Clean salvaged items.

b. Pack or crate items after cleaning. Identify contents of containers.

c. Store items in a secure area until delivery to Owner.

d. Transport items to Owner's storage area on-site OR off-site OR designated by Owner, as directed.

e. Protect items from damage during transport and storage.

3.2.4 Doors and Hardware

Brace open end of door frames. Except for removing door closers, leave door hardware attached to doors.

3.3 Recycling Demolition And Construction Waste, General

3.3.1 General

Recycle paper and beverage containers used by on-site workers.

3.3.2 Recycling Receivers and Processors

Refer to the Contracting Officer for available recycling receivers and processors.

3.3.3 Recycling Incentives

Revenues, savings, rebates, tax credits, and other incentives received for recycling waste materials shall accrue to Owner, as directed.

3.3.4 Procedures

Separate recyclable waste from other waste materials, trash, and debris. Separate recyclable waste by type at Project site to the maximum extent practical.

a. Provide appropriately marked containers or bins for controlling recyclable waste until they are removed from Project site. Include list of acceptable and unacceptable materials at each container and bin.

1) Inspect containers and bins for contamination and remove contaminated materials if found.

b. Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.

c. Stockpile materials away from construction area. Do not store within drip line of remaining trees.

d. Store components off the ground and protect from the weather.

e. Remove recyclable waste off Owner's property and transport to recycling receiver or processor.

3.4 Recycling Demolition Waste

3.4.1 Asphaltic Concrete Paving

Grind asphalt to maximum 1-1/2-inch (38-mm) OR 4-inch (100-mm), as directed, size.

Crush asphaltic concrete paving and screen to comply with requirements in Division 31 Section "Earth Moving" for use as general fill.

3.4.2 Asphaltic Concrete Paving

Break up and transport paving to asphalt-recycling facility.

3.4.3 Concrete

Remove reinforcement and other metals from concrete and sort with other metals.

Pulverize concrete to maximum 1-1/2-inch (38-mm) OR 4-inch (100-mm), as directed, size.

Crush concrete and screen to comply with requirements in Division 31 Section "Earth Moving" for use as satisfactory soil for fill or subbase.

3.4.4 Masonry

Remove metal reinforcement, anchors, and ties from masonry and sort with other metals.

Pulverize masonry to maximum 3/4-inch (19-mm) OR 1-inch (25-mm) OR 1-1/2-inch (38- mm) OR 4-inch (100-mm), as directed, size.

Crush masonry and screen to comply with requirements in Division 31 Section "Earth Moving" for use as general fill OR satisfactory soil for fill or subbase, as directed.

Crush masonry and screen to comply with requirements in Division 32 Section "Plants" for use as mineral mulch.

Clean and stack undamaged, whole masonry units on wood pallets.

3.4.5 Wood Materials

Sort and stack members according to size, type, and length. Separate lumber, engineered wood products, panel products, and treated wood materials.

3.4.6 Metals: Separate metals by type.

3.4.6.1 Structural Steel

Stack members according to size, type of member, and length.

3.4.6.2 Remove and dispose of bolts, nuts, washers, and other rough hardware.

3.4.7 Asphalt Shingle Roofing

Separate organic and glass-fiber asphalt shingles and felts. Remove and dispose of nails, staples, and accessories.

3.4.8 Gypsum Board

Stack large clean pieces on wood pallets and store in a dry location. Remove edge trim and sort with other metals. Remove and dispose of fasteners.

3.4.9 Acoustical Ceiling Panels and Tile

Stack large clean pieces on wood pallets and store in a dry location.

Separate suspension system, trim, and other metals from panels and tile and sort with other metals.

3.4.10 Carpet and Pad

Roll large pieces tightly after removing debris, trash, adhesive, and tack strips.

Store clean, dry carpet and pad in a closed container or trailer provided by Carpet Reclamation Agency or carpet recycler.

3.4.11 Equipment

Drain tanks, piping, and fixtures. Seal openings with caps or plugs. Protect equipment from exposure to weather.

3.4.12 Plumbing Fixtures

Separate by type and size.

3.4.13 Piping

Reduce piping to straight lengths and store by type and size. Separate supports, hangers, valves, sprinklers, and other components by type and size.

3.4.14 Lighting Fixtures

Separate lamps by type and protect from breakage.

3.4.15 Electrical Devices

Separate switches, receptacles, switchgear, transformers, meters, panelboards, circuit breakers, and other devices by type.

3.4.16 Conduit

Reduce conduit to straight lengths and store by type and size.

3.5 Recycling Construction Waste

3.5.1 Packaging:

3.5.1.1 Cardboard and Boxes

Break down packaging into flat sheets. Bundle and store in a dry location.

3.5.1.2 Polystyrene Packaging

Separate and bag materials.

3.5.1.3 Pallets

As much as possible, require deliveries using pallets to remove pallets from Project site. For pallets that remain on-site, break down pallets into component wood pieces and comply with requirements for recycling wood.

3.5.1.4 Crates

Break down crates into component wood pieces and comply with requirements for recycling wood.

3.5.2 Site-Clearing Wastes

Chip brush, branches, and trees on-site OR at landfill facility, as directed.

Comply with requirements in Division 32 Section "Plants" for use of chipped organic waste as organic mulch.

3.5.3 Wood Materials:

3.5.3.1 Clean Cut-Offs of Lumber

Grind or chip into small pieces.

3.5.3.2 Clean Sawdust

Bag sawdust that does not contain painted or treated wood.

Comply with requirements in Division 32 Section "Plants" for use of clean sawdust as organic mulch.

3.5.4 Gypsum Board

Stack large clean pieces on wood pallets and store in a dry location.

3.5.4.1 Clean Gypsum Board

Grind scraps of clean gypsum board using small mobile chipper or hammer mill. Screen out paper after grinding.

Comply with requirements in Division 32 Section "Plants" for use of clean ground gypsum board as inorganic soil amendment.

3.6 Disposal Of Waste

3.6.1 General

Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.

Except as otherwise specified, do not allow waste materials that are to be disposed of accumulate on-site.

Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

3.6.2 Burning

Do not burn waste materials.

3.6.3 Disposal

Transport waste materials off Owner's property and legally dispose of them.

---END OF SECTION 01 74 19 00---

SECTION 01 74 19.00 CONSTRUCTION WASTE MANAGEMENT