01 56 00.00 44 Dust Control.doc

DOC document 62 KB Posted

Attached to
Repair Structural Components, Bldg 1374 Federal contract opportunity
Solicitation number
JBSF_15-0006
Issued by
Department of the Air Force Air Education and Training Command

About this file

Appendices - Attachment 2 FA3047-15-R-0078

View the file

Other files for this federal contract opportunity

Other files attached to Repair Structural Components, Bldg 1374, newest first.
File Type Posted
QUESTIONS_AND_ANSWERS_-_FA304715R0078.pdf PDF
Application for Installation Access Credential 12 .pdf PDF
01 74 19.00 Construction Waste Management.doc DOC document
FSH Historical Bldg Maintenance and Repair Plan.pdf PDF
01 78 23- OPERATION AND MAINTENANCE DATA.doc DOC document
CEPT Work Request Form Editable.pdf PDF
01 78 36.00 Warranty of Construction.doc DOC document
Rad permit company request letter template.pdf PDF
01 33 16_Design_After_Award.docx DOCX document
01 35 13 30 Special Project Proceedures - GIS rev6.pdf PDF
01 78 00 Closeout Submittals.doc DOC document
JBSA_FSH_NDA_Use Authorization.pdf PDF
01 77 00.00 20 Contract Closeout.doc DOC document
502CES ACM LBP spec requirements.pdf PDF
01 71 23.16 Cutting and Patching.doc DOC document
01 35 13 03 44 Technical_Supplement_to_the_Design_Guide_for_FSH_02-14-2013.doc DOC document
01 35 13.20 00 Special Project Proceedures - CAD rev6.pdf PDF
01 32 01 00 10 Project Schedule.doc DOC document
01 35 13 10 00 Special Project Proceedures - Survey Revision5.pdf PDF
As-Builts.pdf PDF
01 35 29 Occupational Safety and Health.doc DOC document
01 45 00.10 20 Contractor Quality Control.doc DOC document
request to use radioactive material.pdf PDF
01 35 13.01 44 Special Project Procedures for JBSA-FSH CB 08 April 2014.pdf PDF
01 35 35 Environmental Protection Oct30.doc DOC document
01 72 00.00 44 Alterations to Existing Facilities.doc DOC document
Attach 2 - Contractor HAZMAT Usage Report_Mar2015.docx DOCX document
01 52 13.00 Temporary Facilities and Controls.doc DOC document
Army Installation Design Guide.pdf PDF
Installation Access Credential —
01 31 00 44 Project Meetings.doc DOC document
01 35 30 Safety Health and Emergency Response.doc DOC document
AFI 31-113 Installation Access Control.pdf PDF
DIGGING PERMIT 4Jan12.pdf PDF
01 33 00 Submittal Procedures.doc DOC document
01 00 00 00 General Requirements.doc DOC document
Cover_Page-Attch2.docx DOCX document
FA304715R0078.pdf PDF
Wage_Determinations_TX150016_TX150280.pdf PDF
Attch5-AETC47.pdf PDF
Attch1-SOW_JBSF150006.pdf PDF
Attch4-MATSUB.xlsx XLSX spreadsheet
Attch3Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
11_-_Draft_DD_Form_1354_H_3_16_42_Doors.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JBSF150006

SECTION 01 56 00.00 44

DUST CONTROL

PART 1

GENERAL

1.1 Description of Work

The work covered by this section consists of furnishing all labor, materials and equipment and performing all work required for the control and prevention of fugitive dust during and as the result of construction operations under this contract except for those measures set forth in other Technical Provisions of these specifications. For the purpose of this specification, fugitive dust entails the generation of solid particles by the forces of wind or machinery acting upon exposed materials. Provisions of this specification shall prevent fugitive dust from adversely affecting human health or welfare; unfavorably altering ecological balances of importance to human life; affecting other species of importance to man; or degrading the utility of the environment for aesthetic and recreational purposes. Dust Control is a requirement in the EPA and state pollutant discharge elimination system or permit for discharging storm water during construction.

1.2 References

The publications listed below form a part of this section to the extent referenced. The publications are referenced in the text by basic designation only.

U.S. ARMY CROPS OF ENGINEERS (USACE)

EM 385-1-1

(2008) Safety and Health Requirements Manual

1.3 Submittals

Government approval is required for submittals with a “GA” designation; submittals not having a “GA” designation are for information only. When used, a designation following the “GA” designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 - SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Dust Control; GA.

Products and Procedures; GA Prior to commencement of the work, the Contractor shall submit in writing a proposal to the Contracting Officer for implementing the provisions of this section for fugitive dust control. The Contractor shall address by submittal the plans to prevent and control fugitive dust through specific mitigation and preventative measures, including Material Safety Data Sheet or (MSDS) for soil binder to be used. The effectiveness of the dust control program shall be periodically checked and reviewed. Revisions to the dust control plan shall be submitted to the Contracting Officer as changes are necessary during the duration of this contract.

SD-02 Shop Drawings Recordkeeping;

Maintain and furnish records in accordance with PART 1.7 RECORDKEEPING.

1.4 Implementation Meeting

Prior to commencement of the work the Contractor shall meet with representatives of the Contracting Officer to develop mutual understandings relative to compliance with these provisions and administration of the dust control program in accordance with Section 01 31 00 44 - PROJECT MEETINGS.

1.5 Applicable Regulations

In order to prevent and to provide control of pollution arising from the construction activities of the Contractor and his subcontractors in the performance of this contract, all applicable Federal, State, and local laws and regulations concerning environmental pollution control and abatement, and all applicable provisions of the USACE EM 385-1-1 as well as the specific requirements stated in this section and elsewhere in the contract specifications. Compliance with the provisions of this section by subcontractors will be the responsibility of the Contractor.

1.6 Notification of Non-Compliance

The Contracting Officer will notify the Contractor in writing of any observed non-compliance with the foregoing provisions. The Contractor shall, after receipt of such notice, immediately take corrective action. Such notice, when delivered to the Contractor or his authorized representative at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor unless it was later determined that the Contractor was in compliance.

1.7 Recordkeeping

The Contractor shall, at a minimum, maintain records indicating dust control measures taken. Information provided shall be sufficient to answer any questions regarding control methods utilized, products used, application rates, inspections performed. Additional information to be recorded, but not limited to reporting, includes treated area, operator, date and time of treatment, meteorological conditions and inspection and monitoring reports. Records shall be submitted every 30 days to the Contracting Officer.

PART 2

PRODUCTS

2.1 Products and Procedures

Products and procedures used in controlling particulates and dust shall be In accordance with the Contractor's Environmental Protection Plan and the dust control plan required by this Section. Material Safety Data Sheet of soil binders for dust control shall be pre-approved. Soil binders containing carcinogenic substances (e.g. acrylamides) are prohibited.

PART 3

EXECUTION

3.1 Dust Control

3.1.1 Control techniques for fugitive dust sources shall involve watering. For arid region and dusty work area, dust control shall include water application with soil binders that is environmental sustainable and non-toxic. The methods utilized shall be cost effective, water conservation, and appropriate for the size and scope of the fugitive dust source. Methods and controls shall not have adverse effects on plant and animal life, ecosystem, and facility air intakes, or contaminate the treated material.

3.1.2 Methods shall be repeated at such intervals as to keep all parts of the disturbed area treated at all times, and the Contractor shall have sufficient competent equipment on the job to accomplish control techniques. Products shall provide a method to reduce dust-related environmental concerns and aid in complying with applicable regulations. Products shall not in any form produce any adverse environmental effects through their use and shall provide an effective, clean, safe control of airborne dust and protection against soil erosion.

3.1.2.1 Preventative Techniques

The reduction of source extent, the incorporation of process modifications, or adjusted work practices, which reduce the amount of dust-generation, are preventative techniques for the control of fugitive dust emissions. These techniques could include, for example, the elimination of mud and dirt carry-out onto paved roads at construction sites.

3.1.2.2 Mitigation Techniques

Mitigation measures entail the periodic removal of dust-producing material. Examples of mitigation control measures include clean-up of spillage on paved or unpaved travel surfaces and clean-up of material spillage at transfer points.

3.2 Materials Handling

The Contractor shall take the following minimum precautions to limit fugitive dust emissions from material handling and transportation to achieve control of dust emissions to the extent practicable:

3.2.1 Stockpiles

The Contractor shall apply water with approved soil binder. Other alternatives shall include laydown top soil with organic matters that are removed from the disturbed area or placing a compounded fiber erosion control blanket to cover material stockpiles and other surfaces which can create airborne dust. BMP perimeter controls around the stockpile shall be placed at least 10 feet away from the toe of stockpiled material.

3.2.2 Transportation

At a minimum, complete covering, maintaining a minimum 12 inch free-board space, and moistening of materials hauled from the construction site is required. The open truck bed creates airborne particulate matter is prohibited. Additional application of water with approved soil binder shall be required if additional controls are considered necessary by the Contracting Officer.

3.2.3 Off-Site Tracking

Dust control shall be performed as the work proceeds to minimize vehicle off-site tracking of sediment and generation of dust. If necessary, temporary paved roadway shall be made to keep vehicles from tracking soils from the construction site. Gravel construction access roadway shall be at least 80 feet long and 30 feet wide for construction site five acres and larger. The access roadway gravel blanket shall be 6-inch minimum in depth with gravel size of 3-inch minimum. The gravel blanket is overlaying on two layers of 6-mil thick geo-textile fabric or a single layer of 10-mil thickness.

Dust generation shall be controlled by water sprinkling. For water conservation, water could be applied with approved soil binder.

3.3 Construction and Demolition

The Contractor shall control dust resulting from demolition and construction activities. No person may cause, suffer, allow, or permit a structure, road, street, alley, or parking area to be constructed, altered, repaired, or demolished, or land to be cleared without taking minimum precautions to achieve control of dust emissions.

3.3.1 Demolition

The amount of dust resulting from demolition shall be controlled to prevent the spread of dust to occupied portions of the construction site and to avoid creation of a nuisance in the surrounding area. The use of water, oil or chemical treatment for control of dust in the demolition of structures, in construction operations, in work performed on a road, parking area, or in the clearing of land is required.

3.3.2 Sandblasting

Adequate methods and enclosure of work areas and debris to prevent airborne particulate matter during sandblasting of structures that contain paint or other similar operations shall be utilized.

3.4 Access Roads and Parking Lots

No person may cause, suffer, allow, or permit any public, industrial, commercial, or private road, street, or alley to be used without taking precautions to achieve control of dust emissions.

In addition to mitigation and control techniques, the removal of soil or other materials shall be periodically performed by mechanical sweepers or their equivalent. The Contractor shall also spot clean dirty roadways and parking lots. These activities shall be performed as deemed necessary. Sand applied for the specific purpose of snow or ice control shall be removed as soon as such control is no longer necessary.

3.4.1 Access Roads

The use of temporary asphalt or uniform gravel covers (as described above for control of Off-Site Tracking) with wheel wash is an acceptable method of dust control for roads leading to and from the area of construction activity.

3.4.2 Parking Lots

Parking surfaces with more than five parking spaces shall be paved. Temporary parking area(s) to be used 30 calendar days or more for the Contractor's equipment or personal vehicles shall be paved with temporary asphalt. Temporary lots used for less than one month may use uniform gravel, if required by Corps Area Office Contracting Officer (AOCO), applying water with approved soil binder may be necessary.

3.5 Control Structures

Activities performed under this Contract shall conform with the specifications described herein along with other technical specifications, particularly Sections 01 35 35 - ENVIRONMENTAL PROTECTION and 01 57 24.00 44 - STORM WATER POLLUTION PREVENTION PLAN.

3.5.1 If the Contractor proposes to construct temporary structures, he shall submit the proposal for approval at least ten (10) days prior to the scheduled start of such temporary work. Modification of the Contractor's plans shall be made only with the written approval of the Contracting Officer (CO).

3.6 Maintenance

3.6.1 During the life of this contract, the Contractor shall maintain all facilities constructed for pollution control under this Contract as long as the operations creating the particular pollutant are being carried out or until the material concerned has become stabilized to the extent that pollution is no longer being created. Re-application of water by sprinkling or approved soil binder with water shall be required when the disturbed areas are not stabilized.

3.6.2 During the construction period the Contractor shall conduct frequent training courses for his maintenance personnel. The curricula shall include methods of dust control, familiarity with pollution standards, and care of controls and measures to prevent and correct fugitive dust pollution.

3.6.3 The Contractor shall furnish daily services for the temporary control measures at the project site and perform any required maintenance as deemed necessary by and to the satisfaction of the CO during the entire life of the Contract. Services shall be performed at such a time and in such a manner to least interfere with the operations.

3.6.4 The Contractor's designated Site Inspector shall inspect all pollution prevention measures in accordance with Sections 01 57 24.00 44 - STORM WATER POLLUTION PREVENTION PLAN and 01 57 25.00 44 - SWPP PLAN INSPECTION AND MAINTENANCE REPORT or at the Contracting Officer's request. Application of soil binder with water is an acceptable temporary stabilization protocol when approved by CO.

---END OF SECTION 01 56 00.00 44---

SECTION 01 56 00.00 44 DUST CONTROL