RFP Attachment 4 Schedule of Material Submittals

View the file

Other files for this federal contract opportunity

Other files attached to Repair Structural Components, Bldg 1374, newest first.
File Type Posted
QUESTIONS_AND_ANSWERS_-_FA304715R0078.pdf PDF
01 52 13.00 Temporary Facilities and Controls.doc DOC document
Army Installation Design Guide.pdf PDF
Installation Access Credential —
01 31 00 44 Project Meetings.doc DOC document
01 35 30 Safety Health and Emergency Response.doc DOC document
AFI 31-113 Installation Access Control.pdf PDF
DIGGING PERMIT 4Jan12.pdf PDF
01 33 00 Submittal Procedures.doc DOC document
01 00 00 00 General Requirements.doc DOC document
Application for Installation Access Credential 12 .pdf PDF
01 74 19.00 Construction Waste Management.doc DOC document
FSH Historical Bldg Maintenance and Repair Plan.pdf PDF
01 78 23- OPERATION AND MAINTENANCE DATA.doc DOC document
CEPT Work Request Form Editable.pdf PDF
01 78 36.00 Warranty of Construction.doc DOC document
Rad permit company request letter template.pdf PDF
01 33 16_Design_After_Award.docx DOCX document
01 35 13 30 Special Project Proceedures - GIS rev6.pdf PDF
01 78 00 Closeout Submittals.doc DOC document
JBSA_FSH_NDA_Use Authorization.pdf PDF
01 77 00.00 20 Contract Closeout.doc DOC document
502CES ACM LBP spec requirements.pdf PDF
01 71 23.16 Cutting and Patching.doc DOC document
01 35 13 03 44 Technical_Supplement_to_the_Design_Guide_for_FSH_02-14-2013.doc DOC document
01 35 13.20 00 Special Project Proceedures - CAD rev6.pdf PDF
01 32 01 00 10 Project Schedule.doc DOC document
01 56 00.00 44 Dust Control.doc DOC document
01 35 13 10 00 Special Project Proceedures - Survey Revision5.pdf PDF
As-Builts.pdf PDF
01 35 29 Occupational Safety and Health.doc DOC document
01 45 00.10 20 Contractor Quality Control.doc DOC document
request to use radioactive material.pdf PDF
01 35 13.01 44 Special Project Procedures for JBSA-FSH CB 08 April 2014.pdf PDF
01 35 35 Environmental Protection Oct30.doc DOC document
01 72 00.00 44 Alterations to Existing Facilities.doc DOC document
Attach 2 - Contractor HAZMAT Usage Report_Mar2015.docx DOCX document
Attch1-SOW_JBSF150006.pdf PDF
Attch3Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
11_-_Draft_DD_Form_1354_H_3_16_42_Doors.pdf PDF
Cover_Page-Attch2.docx DOCX document
FA304715R0078.pdf PDF
Wage_Determinations_TX150016_TX150280.pdf PDF
Attch5-AETC47.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF FORM 66

PROJECT NUMBER:PROJECT TITLE:SOLICITATION/CONTRACT NUMBER:
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTALCERTIFICATION OF
COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S
RECOMMENDATIONSMANUFACTURER'S
WARRANTYCATALOG DATAOPERATING
INSTRUCTIONSDOCUMENTREQUIRED SUBMISSION
DATEDATE RECEIVED IN
CONTRACTINGDATE TO CIVIL
ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE

CONTRACTOR

NOTIFIEDCONTRACTOR
RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS-

APPROVED

1Design Submittals - Hard Copies 65% (SOW Ref)3
2Design Submittals -CD/DVD 65% (SOW Ref)3
3Design Submittals - Hard Copies 95% (SOW Ref)3
4Design Submittals -CD/DVD 95% (SOW Ref)3
5Design Submittals - Hard Copies 100% (SOW Ref)3
6Design Submittals -CD/DVD 100% (SOW Ref)3
7Hazardous Material Inventory & Monthly Usage Report3
8Inventory of the chemicals that will be used and corresponding Safety Data Sheets3
9Permits3
10Activity Hazard Analysis (AHA)3
11Safety Plan (SOW Ref)3
12Quality Control Plan3
13Material Listing3
14Contractor Bond after verbal NTP and/or 11553
15Operation and Maintenance Data (including closeout material submittals warranty)3
16Construction Site Maintenance3
17Noise Control3
18Accident Prevention Plan (APP)3
19Hot Work Permit3
20Shop Drawings3
21Product Data3
22Test Reports3
23SWPPP (SOW Ref)3
24DD 1354 (SOW Ref)3
25Warranty Letters (SOW Ref)3
26As-Built Drawings (SOW Ref)3
27Demolition Plan (SOW Ref)3
28Waste Manifests (SOW Ref)3
29Lead Based Paint Abatement Plan (SOW Ref)3
30Division 1 (SOW Ref)3
31Division 3 Concrete (SOW Ref)3
32Division 5 Metals (SOW Ref)3
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

&"Arial,Bold"&8AF FORM 66, OCT 89 (&"Arial,Bold Italic"EF&"Arial,Bold") &6PREVIOUS EDITION WILL BE USED&8 &"Arial,Regular" 01305-&P

File details come from the government source that posted it. Updated .