J-9c_ZMP Boiler Drawing zmp-1203733-m001 Rev A.pdf

PDF 573 KB Posted

Attached to
Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN
Solicitation number
697DCK-25-R-00354
Issued by

About this file

The document is a detailed engineering drawing for boiler stack and breeching replacement at the FAA Air Route Traffic Control Center (ARTCC) in Farmington, Minnesota. The drawing, numbered ZMP-1203733-M001 Revision A, provides comprehensive technical specifications for replacing existing boiler vent stacks in the Admin Wing Basement, including precise installation instructions, material requirements, and structural details. Key technical specifications include removing the existing 30" OD stack and replacing it with a 20" ID stainless steel double-walled metal vent stack, with specific requirements for stack height, supports, bracing, insulation, flashing, and weather protection. The drawing includes a partial basement plan, elevation views, transition details, and multiple supporting technical notes that outline installation procedures, material specifications, and contractor responsibilities for the replacement work.

View the file

Other files

File Type Posted
697DCK-25-R-00354 Amendment 07.pdf PDF
PPQ for ZMP Project.pdf PDF
697DCK-25-R-00354_Amendment 06.pdf PDF
J-16_QA for ZMP Multiple Project_Final_7.31.2025.pdf PDF
Epoxy Floor in Bolier Room.pdf PDF
Exterior Stairs and Concrete Work.pdf PDF
Concrete Curb Photos.pdf PDF
Tower lights.pdf PDF
697DCK-25-R-00354 Amendment 05.pdf PDF
Exterior Doors.pdf PDF
697DCK-25-R-00354 Amendment 04.pdf PDF
J-16_QA for ZMP Multiple Project_15 July_Solo.pdf PDF
697DCK-25-R-00354_Amendment 03.pdf PDF
697DCK-25-R-00354 Amendment 02.pdf PDF
J-16_Q and A for ZMP Multiple Project.pdf PDF
J-17_Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC.pdf PDF
697DCK-25-R-00354_Amendment 01.pdf PDF
697DCK-25-R-00354_Final.pdf PDF
J-9d_ZMP Boiler Drawing zmp-msp-e-5896-a02r Bid Option.pdf PDF
J-14_DOL WD MN20250053 5 2 25.pdf PDF
J-11 FAA-STD-019G.pdf PDF
J-5_Scope of Work_380 Steam Humidifier.pdf PDF
J-13_Hazardous Energy Standard Procedure.pdf PDF
J-1b_Chilled Water Valve Replacement Drawings.pdf PDF
J-7_ZMP NASET Obstruction Lights SOW.pdf PDF
J-6c ZMP AHU 13 and 13 Humidifier Replace EOSH Impacts.pdf PDF
J-3_Scope of Work_Exterior Doors.pdf PDF
J-9a_ZMP Boiler Scope of Work.pdf PDF
J-8b_ZMP Panel Replace Drawings Binder1.pdf PDF
J-9e_ZMP Boiler EOSH Impacts.pdf PDF
J-10_Scope of Work_Exterior Concrete Work.pdf PDF
J-15 Price proposal spreadsheet r.xlsx XLSX spreadsheet
J-12 FAA-C-1217H Chg 2.pdf PDF
J-1c_EOSH Impacts Chilled Water Valve Replace.pdf PDF
J-4c_ZMP Gas Unit Heater EOSH Impacts.pdf PDF
J-4b_ZMP Gas Unit Heater Replacement Drawings (3).pdf PDF
J-1a_Chilled Water Valve Replacement Project Spec.pdf PDF
J-6a_ZMP AHU 12 and 13 Humidifier Replacement Spec.pdf PDF
J-4a_ZMP-04202024 GAS UNIT HEATER REPLACEMENT SPECS.pdf PDF
J-8c_ZMP Power Panel EOSH Impacts.pdf PDF
J-9b_ZMP Boiler Vent Stack Replacement Specifications.pdf PDF
J-8a_ZMP Panel Replace Specs.pdf PDF
J-2_Scope of Work_Epoxy Floor.pdf PDF
J-6b ZMP AHU 12 and 13 Humidifier Replacement Drawings.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8'-0" 12'-0" 20'-0" 20'-0" 16'-0"

WATER HEATERS

DOMESTIC HOT

SOFTENER

WATER

SEE DETAIL 2

BUS

ESSENTIAL

WALL STACK

NEW DOUBLE

M024

B

BOILER ROOM

ROOM

MONITORING

CHILLER ROOM

B116

VESTIBULE

MECHANICAL ROOM

B O

IL

E R

B

B

B O

IL

E R

B

A B

O

IL

E R

B

C

COVERED DRAINAGE TRENCH

PUMP

P-2C

PUMP

P-2B

PUMP

P-2A

A C

A

A C

B

(7' ABV FLOOR)

EXPANSION TANK

HOT WATER

DOMESTIC

FUEL TANK

285 GALLON

A-6A-5A-4A-3A-2A-1

C H

IL

L E

R

C H

IL

L E

R

C H

IL

L E

R

C H

IL

L E

R

B115

COMPRESSORS

CAFETERIA

P-1D

PUMP

P-1C

PUMP

P-1B

PUMP

P-1A

PUMP

B117

DOWN

RAMP

DN

UP

B118

B119

AHU-24 AH-23

AHU-21 AH-22

ABOVE

ROOF

CONC

UP

PUMPS

SUMP

N

SCALE: 1/8" = 1'-0"

PARTIAL ADMIN WING BASEMENT PARTIAL PLAN

A

1 8

TO BLR 1A

TANK

BRINE

ELEV. 86.5' BASEMENT FLOOR

ELEV. 100.5' FIRST FLOOR

ELEV. 112.0' TPO ROOF

ENCLOSURE

EXISTING

ELEV. 123.0' ADMIN ROOF

BALL VALVE

EXISTING AND NEW WORK

POINT OF CONTACT BETWEEN

WING

ADMINISTRATION

CONTROL WING

WING

AUTOMATION

NOT TO SCALE

ELEVATION VIEW - CHIMNEY STACKB

LEGEND:

BLR 1C

TO

BLR 1B

TO

1A

TO BLR

WITH LIMITED SPACE

CONE ANGLE EVEN

MAX 10 DEGREE

KEY PLAN

8' 0 8' 16'

SCALE: 1/8" = 1'-0"

2 4 5

SEE DETAIL 1 (TYP)

WALL STACK

NEW DOUBLE

WALL STACK

NEW DOUBLE

WALL STACK

NEW DOUBLE

NOT TO SCALE

STACK/BREECHING TRANSITION DETAIL

NOT TO SCALE

CLEANOUT WITH DRAIN

EXIST BRICK WALL

L4x4x1/4"

VERTICAL ANGLE)

EMBED = 3 1/8" (AT EACH

W/ A36 ROD AND A MIN

HILTI 1/2" DIAM HY270(6)

DIAGONAL STRIPES AT 4" OC

YELLOW WITH 1" WIDE BLACK

PAINT MTL FRAMING HAZARD

L6x6x5/16"

STACK,TYP

NEW FLUE

MTL HOOD

NEW FIELD FABRICATED

ROOF ASSEMBLY

ROOF DECKING

PATCH AND REPAIR

EXISTING ROOF JOIST

M

IN

SCALE: 1/2" = 1'-0"-

5/16"

5/16"

5/16"

5/16"

FLUE STACK SUPPORT DETAIL

L4x4x1/4"

HOOD BELOW

NEW METAL RAIN

WALL

EXIST BRICK

STACK, TYP

NEW BOILER

L4x4x1/4"

L6x6x5/16"

FLUE STACK

WELDED TO METAL

CONTINUOUSLY

HATCHING

AS INDICATED BY

SHEET METAL CAP

FRAME, TYP

WELD TO NEW

(VIF)

TYP

1/4"

SCALE: 1/2" = 1'-0"-

WELD BAND TO FRAME

EXIST HOT WATER VENT

FLUE STACK SUPPORT PLAN DETAIL

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN

DATE

REDLINE

APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY

H

G

F

E

D

C

B

A

8 1234567

DATE

DRAWING NO

DESIGNED

REVIEWED BY

/1

/2

:4

:3

P

M P lo tt e d b y S

R V

C -C

A E

G -E

D M

S -C

O O

R D

DATE

APPROVED

z m p -1

-m

.d w g

8 234567

H

G

F

E

D

C

A

B

GENERAL NOTES:

NEW WORK NOTES:

1) ALL WORK, MATERIAL AND INSTALLATION SHALL CONFORM TO THE

REQUIREMENTS OF THE ORDINANCE AND CODE HAVING JURISDICTION.

2) ALL WORK SHALL BE IN ACCORDANCE WITH THE PROJECT SPECIFICATION.

3) ALL WORK SHALL BE PERFORMED IN A NEAT, ACCURATE, WORKMAN-LIKE AND

PROFESSIONAL MANNER.

4) CONTRACTOR SHALL VERIFY ALL DEMOLITION WORK, EXISTING CONDITIONS,

DIMENSIONS AND NEW INSTALLATION PRIOR TO COMMENCEMENT OF WORK.

EXISTING HOT WATER HEATER VENT IS TO BE REMAIN IN PLACE AND

PROTECTED.

5) CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL DEMOLITION & NEW

CONSTRUCTION WORK WITH FAA COR TO MINIMIZE OPERATION DISRUPTIONS

WHILE WORK IS IN PROGRESS.

TRANSITIONS, ELBOWS, ETC.

FIBER INSULATOR. REPLACEMENT SHALL INCLUDE ALL REQUIRED STEEL SUPPORTS,

METAL BREECHING WITH 1" SPACING BETWEEN WALLS AND FILLED WITH HIGH TEMPERATURE

REMOVE EXISTING BREECHING AND REPLACE WITH 16" ID STAINLESS STEEL DOUBLE WALLED

TEE AND ONE 45 DEGREE TEE FOR CONNECTIONS AND ALL REQUIRED TRANSITION PIECES.

1" AIR SPACE BETWEEN WALLS. PROVIDE CLEAN OUT SECTION, BOLT FLANGE, ONE 90 DEGREE

NEW STACK SHALL TO BE 20" ID STAINLESS STEEL DOUBLE WALLED METAL VENT STACKS WITH

REMOVE EXISTING 30" OD STACK INCLUDING RAIN HOOD AND REPLACE WITH NEW STACK PIPE.

FOR VALVES.

DEGREE ELBOW PIPE, 1 1/2" DRAIN LINE WITH BALL VALVE AND PIPE CAP. PROVIDE SUPPORTS

MODIFY STACK ENCLOSURE TO INCLUDE A ACCESSIBLE 15"X15" BOLTED HAND DOOR, 90

PROVIDE BRACING FOR VERTICAL VENT STACK.

SUPPORT TO CHIMNEYS AT EACH FLOOR AND PROVIDE EXPANSION JOINT/BAND AS REQUIRED.

NEW VENT STACKS INSTALLATION. PROVIDE GUY WIRES AND RIGID BRACES TO GIVE LATERAL

MODIFY EXISTING SUPPORTS OR PROVIDE ADDITIONAL STEEL SUPPORTS AS REQUIRED TO FIT

STACK HEIGHT AND ELEVATION. NEW STACK HEIGHT SHOULD BE SIMILAR TO EXISTING.

ELEVATION AND DIMENSIONS SHOWN ARE APPROXIMATE. CONTRACTOR TO VERIFY EXISTING

STEEL.

LIGHTNING RODS AND CABLES PER EXISTING CONDITIONS. RAIN HOOD TO BE 304 STAINLESS

PROVIDE REQUIRED RAIN HOODS AND SUPPORTS. CONTRACTOR TO RECONNECT ALL EXISTING

REMOVE AND DISPOSE OF EXISTING ENCLOSURE.

PROVIDE NEW HANGERS FOR SUPPORT OF HORIZONTAL BREECHING RUNS.

THERMAL PROTECTION.

FLASHING FOR WEATHER PROTECTION. PROVIDE INSULATION BELOW NEW METAL CAP TO ENSURE

PROVIDE 22-GA ALUMINIZED STEEL ROOF FLASHING AND 20-GA ALUMINIZED STEEL COUNTER

PROVIDE COMBUSTION REPORTS FOR BOTH FUELS.

AFTER INSTALLATION OF NEW BOILER BREECHING AND STACKS PERFORM BOILER TUNING AND

IS

S

U E

D F

O R

E D

M

06/30/2022

MGR: ENGINEERING

FARMINGTON

AZMP-1203733-M001

ARTCC

ADMIN WING BASEMENT

BOILER STACK & BREECHING REPLACEMENT

PLAN, ELEV. VIEWS, DETIALS AND NOTES

z m p -1

-m

.d w g

ENROUTE/FSS

ENGINEERING SERVICES

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

C O

N S

T R

U C

T

IO

N

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

PROJECT ENGINEER

1203733

A 01/08/2024 ADDENDUM REPLACE BOILER STACK 1203733 01/08/2024 CAO

MN

10 PROVIDE FIRESTOP AND WEATHER SEAL FOR ALL PENETRATIONS.

zmp-1203733-m001

2024-01-19T13:53:32-0600
CODY A OLSON

File details come from the government source that posted it. Updated .