J-9a_ZMP Boiler Scope of Work.pdf

PDF 115 KB Posted

Attached to
Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN
Solicitation number
697DCK-25-R-00354
Issued by

About this file

This document is a Scope of Work (SOW) for the Boiler Stack Replacement project at the Minneapolis Air Route Traffic Control Center (ARTCC) in Farmington, Minnesota. The scope includes removing and replacing two existing 30-inch refractory-lined boiler stacks with new 20-inch double-walled stainless steel vent stacks, including new inspection doors, steel supports, rain hoods, and fire stops. The replacement will extend from the basement floor to approximately five feet above the second-floor Administration Wing roof line. Additionally, the project involves replacing breechings with 16-inch double-walled stainless steel breechings filled with high-temperature fiber insulation.

The document includes three optional bid items: Option 1 involves potential removal and reinstallation of a wall in the Dish Washing Room, Option 2 covers ceiling repair in the same room, and Option 3 addresses replacement of the hot water heater flue. The contractor is required to follow OSHA confined space requirements, coordinate with the Contracting Officer's Representative (COR) for equipment shutdowns, and ensure all work is completed in an orderly and timely manner. The project also mandates that only one boiler stack can be removed at a time, with each stack being fully replaced and operational before another can be removed.

View the file

Other files

File Type Posted
697DCK-25-R-00354 Amendment 07.pdf PDF
PPQ for ZMP Project.pdf PDF
697DCK-25-R-00354_Amendment 06.pdf PDF
J-16_QA for ZMP Multiple Project_Final_7.31.2025.pdf PDF
Tower lights.pdf PDF
Epoxy Floor in Bolier Room.pdf PDF
Concrete Curb Photos.pdf PDF
697DCK-25-R-00354 Amendment 05.pdf PDF
Exterior Stairs and Concrete Work.pdf PDF
Exterior Doors.pdf PDF
697DCK-25-R-00354 Amendment 04.pdf PDF
J-16_QA for ZMP Multiple Project_15 July_Solo.pdf PDF
697DCK-25-R-00354_Amendment 03.pdf PDF
697DCK-25-R-00354 Amendment 02.pdf PDF
J-17_Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC.pdf PDF
J-16_Q and A for ZMP Multiple Project.pdf PDF
697DCK-25-R-00354_Amendment 01.pdf PDF
J-13_Hazardous Energy Standard Procedure.pdf PDF
J-9e_ZMP Boiler EOSH Impacts.pdf PDF
J-5_Scope of Work_380 Steam Humidifier.pdf PDF
J-14_DOL WD MN20250053 5 2 25.pdf PDF
J-9d_ZMP Boiler Drawing zmp-msp-e-5896-a02r Bid Option.pdf PDF
J-9b_ZMP Boiler Vent Stack Replacement Specifications.pdf PDF
J-8c_ZMP Power Panel EOSH Impacts.pdf PDF
J-8a_ZMP Panel Replace Specs.pdf PDF
J-6b ZMP AHU 12 and 13 Humidifier Replacement Drawings.pdf PDF
J-2_Scope of Work_Epoxy Floor.pdf PDF
697DCK-25-R-00354_Final.pdf PDF
J-15 Price proposal spreadsheet r.xlsx XLSX spreadsheet
J-12 FAA-C-1217H Chg 2.pdf PDF
J-10_Scope of Work_Exterior Concrete Work.pdf PDF
J-8b_ZMP Panel Replace Drawings Binder1.pdf PDF
J-4a_ZMP-04202024 GAS UNIT HEATER REPLACEMENT SPECS.pdf PDF
J-1b_Chilled Water Valve Replacement Drawings.pdf PDF
J-11 FAA-STD-019G.pdf PDF
J-9c_ZMP Boiler Drawing zmp-1203733-m001 Rev A.pdf PDF
J-7_ZMP NASET Obstruction Lights SOW.pdf PDF
J-6c ZMP AHU 13 and 13 Humidifier Replace EOSH Impacts.pdf PDF
J-6a_ZMP AHU 12 and 13 Humidifier Replacement Spec.pdf PDF
J-4c_ZMP Gas Unit Heater EOSH Impacts.pdf PDF
J-4b_ZMP Gas Unit Heater Replacement Drawings (3).pdf PDF
J-3_Scope of Work_Exterior Doors.pdf PDF
J-1c_EOSH Impacts Chilled Water Valve Replace.pdf PDF
J-1a_Chilled Water Valve Replacement Project Spec.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ZMP BOILER STACK REPLACEMENT PAGE 1 OF 2

MINNEAPOLIS ARTCC NOVEMBER 2023

FARMINGTON, MINNESOTA

PART I - SECTION C

DESCRIPTION / SPECIFICATIONS

SCOPE: This transmittal covers the Boiler Stack Replacement work at the Minneapolis ARTCC in Farmington, Minnesota.

Work under this transmittal includes but is not limited to the following:

1. General:

a. Reference drawing shall be used as a guide to verify the height of the existing stack. Field verify all dimensions.

b. Facility personnel will operate all equipment, valves and disconnects. Coordinate with the COR prior to equipment or system shutdown.

c. Any work in Confined Spaces shall be done in accordance with OSHA Requirements

29 CFR 1910.146 and 1926.21(B)(6).

2. New Work

a. Only one Boiler Stack is to be removed at a time. That must be replaced in full and under operation for another stack to be removed. Coordinate with COR as Facility will provide approval to remove Stacks. Facility will shut down applicable Boilers and all equipment associated with each Stack. Existing Hot Water Vent is to remain and be protected.

b. Replace the two existing 30 inch OD refractory lined boiler stacks with new two new 20 inch ID double walled stainless steel vent stacks with 1 inch air space between walls. Replacement shall include new inspection doors, required steel supports, rain hood, fire stop etc. All materials shall be compatible with the stacks. Replacement shall be of the entire vent stack from basement floor up to approximately five feet above the second floor Administration Wing roof line.

c. Breechings to each boiler shall be replaced with 16 inch ID double walled stainless steel breeching with 1 inch spacing between walls and filled with high temperature fiber insulation. Replacement shall include all required steel supports, transitions, elbows, etc. All materials shall be compatible with the breechings.

d. Install the new stack and appurtenances according to manufacturer’s written instructions. Reconnect the existing grounding and lightning protection on the Stacks at the roof level.

e. Repair roof curb and flashing to ensure that there is no roof leak after stacks have been installed.

f. Remove and dispose of existing stack enclosure.

3. Scope Notes:

a. Flow of work, as presented on the Scope of Work, is suggestive of minimum work to be accomplished and may be reordered or re-prioritized based on expediency or project.

ZMP BOILER STACK REPLACEMENT PAGE 2 OF 2

MINNEAPOLIS ARTCC NOVEMBER 2023

FARMINGTON, MINNESOTA

b. All wiring and grounding requirements shall be per Order FAA-C-1217H, FAA STD-19e, and the latest National Electric Code, whichever is more stringent.

c. Contractor shall furnish all materials, equipment and labor to complete the job in an orderly and timely fashion.

d. Prior to demobilization, the work sites and staging areas shall be made clean and if damaged restored to its original state. Damage to any components or any facility property, during construction activity due to contractor’s unauthorized actions or actions not part of this project scope, shall be corrected or replaced at the expense of the contractor.

4. Bid Options:

The Work includes, but is not limited to:

1. Option 1: Removal and Reinstallation of Dish Washing Room Wall

a. Provide cost of demolition of wall in Dish Washing Room of the First Floor

Administration Wing if necessary to complete replacement of Boiler Stack.

b. Drawing ZMP-MSP-E-5896-A02R is attached for reference use.

c. Provide cost to install new wall in Dish Washing Room once Boiler Stack replacement is complete.

2. Option 2: Dishwasher Room Ceiling Repair

a. Provide cost to repair portion of ceiling in Dish Washing Room of the First Floor Administration Wing.

b. Use ZMP-MSP-E-5896-A02R as reference.

3. Option 3: Replacement of Hot Water Heater Flue

a. Provide cost to remove and replace hot water flue.

b. Provide cost to reconnect new hot water flue.

(END OF CLAUSE)